Transcript of Acceptance criteria, Materials, Methods and Techniques for cooling plant construction DCP WP4 status...
Acceptance criteria, Materials, Acceptance criteria, Materials, Methods and Techniques for cooling Methods and Techniques for cooling
plant constructionplant construction
DCP WP4 status3 March 2010
3 March 2010
WP4 work breakdown structureWP4 work breakdown structureWP4 Notes Who
4.1 Acceptance Criteria
4.1.1 Leak tightness
4.1.1.1 Leak requirements
4.1.1.2 Leak search procedures
4.1.1.3 Leak detection instrumentation
4.1.2 Cleanliness
4.1.2.1Collection of requirements for purchase (degreases, no poweder, caps…)
4.1.2.2 Collection of techniques for clean operation/mounting
4.1.2.3market survey and test of different filtering techniques/products
4.1.2.4 Cleanliness measurements methods
? 4.1.3 Risk Analysis
4.1.3.1 Radiation protection
4.1.3.2 ALARA approach analysis
4.1.3.3 Radiation specification (Nuclear installations)
4.1.4 Performances
4.1.4.1 Test procedure: what to test, how and when
4.1.4.2Needed equipments/ instrumentation for performance check
? 4.1.4.4 Quality Assurance
Acceptance Criteria + Material, Methods and techniques for cooling plant construction
Eng 2 +EN/CV
In common with WP1 Eng 2
Collection of existing experience (PH-BE-EN)
Eng 2 + Chem
4.2 Component database
4.2.1 Specifications for PFC installations
4.2.1.1 PFC compatible material list
valves
pumps
….
4.2.2 Specifications for CO2 installations
4.2.2.1 CO2 compatible material list
valves
pumps
….
? 4.2.3 Cryogenic specifications (?)
? 4.2.3.1 Cryogenic compatible material list (?)
4.3 Material database
4.3.1 Compatibility criteria (chemical, …)
4.3.2 Materials compatible with PFC
4.3.3 Materials compatible with CO2
? 4.3.4 Materials vs material compatibility (?)
4.4 Technologies database (synergies - duplication with other WPs)
4.4.1 Welding
4.4.2 Soldering
4.4.3 Epoxy - adhesives
4.4.4 Thermal contact material in WP2 ?
Eng 2 + CV?+MME?
Collection of results from previous test and
list/ implementation of new ones (check for
materials never tested but common in hydraulic components, supplier
database, list of installed equipments)
EN/CV?
3 March 2010
WP4 work breakdown structureWP4 work breakdown structure
Leak tightnessLeak tightness
Studies on different leak search procedures and instrumentation
• Bibliography search for standards & studies done in refrigeration and vacuum technology
• Market survey on instrumentation available and filed of application
• Test set up to calibrate liquid vs gas leaks (testing with gas for guaranteeing liquid leak tightness)
Work is on going both at CERN and at Cracow University of Technology
https://espace.cern.ch/project-DCP-WP4/default.aspx
3 March 2010
Leak tightnessLeak tightness
Methods for leak measurements @ CERN• Pressure drop with reference volume: new set-up being built (expected by
May 2010, PH-DT+CMS)• Inficon mass spectrometer: new calibration for fluorocarbon on CMS
instrument, contacts with supplier for further gas/liquid calibration http://www.inficon.com/download/en/Ecotec%20E3000%20eng%20kiba22e1-d%20(0608).pdf (CV & CMS)
• Adixen N2/H2 sniffer: plans for testing effects of H2 on joints http://www.adixen.com/adixen_avt/download/docs/prod/doc1prod77.pdf?nocache=1267586128 (CMS & PH-DT)
• He in vacuum mode (PH-DT)• Ultrasound leak detector under evaluation in CMS
3 March 2010
Leak tightnessLeak tightness
Test benches for leak measurements @ CERN• Test bench for liquid vs gas leak test: E. Anttila set up being refurbished
(https://espace.cern.ch/project-DCP-WP4/Shared%20Documents/Papers/he-pf5060.pdf)• New calibrated leak being produced: few sizes for “leak repair” set-up,
smaller sizes using gas chromatography columns
3 March 2010