About Hunter LLS - Hunter Local Land...

17
2016-17 – Aboriginal Land Management and Capacity Building Grants Program Guidelines for Applicants Program Information Funding available in 2016/17 Total funding available is $147,000 $65,897 - Catchment Action NSW $80,000 – National Landcare Program $1,103 – Hunter Catchment Contributions Individual grants are available to a maximum of $50,000 Applications open 1 August 2016 Closing date for applications 16 September 2016 Final date for completion of approved projects 31 May 2017 Eligibility Aboriginal organisations across the Hunter Local Land Services region. Partnerships between Aboriginal organisations with other organisations (government or non-government). Aboriginal organisations must be either incorporated or auspiced by an organisation that is incorporated or has an ABN. (Page 3- 4) Eligible activities See Page 4 Hunter Local Land Services 816 Tocal Rd, Paterson 2421 Tel: 02 4930 1030 | Fax: 02 49301013| www.lls.nsw.gov.au/hunter

Transcript of About Hunter LLS - Hunter Local Land...

Page 1: About Hunter LLS - Hunter Local Land Serviceshunter.lls.nsw.gov.au/__data/assets/word_doc/0011/...  · Web view80ha vertebrate pest and 8ha weed control in priority in the Lower

2016-17 – Aboriginal Land Management and Capacity Building Grants Program

Guidelines for Applicants

Program Information

Funding available in 2016/17

Total funding available is $147,000

$65,897 - Catchment Action NSW

$80,000 – National Landcare Program

$1,103 – Hunter Catchment Contributions

Individual grants are available to a maximum of $50,000

Applications open 1 August 2016

Closing date for applications

16 September 2016

Final date for completion of approved projects

31 May 2017

Eligibility

Aboriginal organisations across the Hunter Local Land Services region.

Partnerships between Aboriginal organisations with other organisations (government or non-government).

Aboriginal organisations must be either incorporated or auspiced by an organisation that is incorporated or has an ABN. (Page 3-4)

Eligible activities See Page 4

Minimum outputs to be delivered by the Program

16 Aboriginal Land management Team members employed or trained

2 management plans developed or updated with Aboriginal Land Management Team members and/ or involvement

10 ha of Terrestrial Native Vegetation enhanced/rehabilitated

80ha vertebrate pest and 8ha weed control in priority in the Lower Hunter Estuary wetlands

Priority Areas Aboriginal land across the Hunter Region identified by Aboriginal land managers.

Hunter Local Land Services816 Tocal Rd, Paterson 2421Tel: 02 4930 1030 | Fax: 02 49301013| www.lls.nsw.gov.au/hunter

Page 2: About Hunter LLS - Hunter Local Land Serviceshunter.lls.nsw.gov.au/__data/assets/word_doc/0011/...  · Web view80ha vertebrate pest and 8ha weed control in priority in the Lower

Lower Hunter Estuary wetlands including in Hunter Wetlands National Park and adjacent lands in Hexham Swamp for vertebrate pest control and weed control (Juncus acutus and other saltmarsh weeds.

Lodging applications

Electronically: [email protected]:Aboriginal Land Management and Capacity Building Grants ProgramHunter Local Land ServicesPrivate Bag 2010Paterson NSW 2421

Conditions of Funding

Standard LLS Grant funding terms and conditions apply (Page 8-9 of these guidelines)

LLS on-ground works minimum standards apply (Page 10-11)

Where to get assistance?

Website: www.hunter.lls.nsw.gov.au

Grant program contact officers:

Lower Hunter - Toby Whaleboat (Grant Program Manager)Phone: 0429 303 765Email: [email protected]

Upper Hunter – Sarah GiblinPh: 02 6540 2414Email: [email protected]

Manning-Great Lakes – Geoff FosterPh: 02 65518994 Ext 243Email: [email protected]

Note: Requests for assistance (RFA) from Hunter LLS staff must be received by 2 September 2016, in order to guarantee assistance with your project application.

About Hunter LLS The Hunter Local Land Services (LLS) region covers the following Local Government Areas: Upper Hunter, Muswellbrook, Singleton, Cessnock, Maitland, Lake Macquarie, Newcastle, Port Stephens, Dungog and MidCoast.

The Hunter LLS Local Strategic Plan 2016-2021 prioritises and directs Hunter LLS customer services, partnerships and investment across the region.

It sets the following goals:

1. Communities – Resilient, self-reliant and prepared local communities2. Industries – Biosecure, profitable, productive and sustainable3. Natural Environments – Healthy, diverse, connected natural environments

Hunter Local Land Services 2

Page 3: About Hunter LLS - Hunter Local Land Serviceshunter.lls.nsw.gov.au/__data/assets/word_doc/0011/...  · Web view80ha vertebrate pest and 8ha weed control in priority in the Lower

4. Our Organisation - Innovative, commercially focused and collaborative people delivering best practice business management and reducing red tape.

The plan identifies priorities and strategies for addressing these goals. Those relevant to this grants program are identified in the next section.

The Hunter LLS approach to delivering on this plan involves local people, delivering high quality, integrated services for healthy productive landscapes.We will work with landholders and land managers to develop measures of productivity, profitability and sustainability, to help improve primary production within healthy landscapes and assist communities in the region to be profitable and sustainable into the future.

About the Program The Aboriginal Land Management and Capacity Building Program is a component of the Hunter Regional Service Delivery Plan. The Regional Service Delivery Plan details the priorities, programs and projects to be delivered in the Lower Hunter, Upper Hunter and Manning Great Lakes Districts for the 2016/17 financial year.

Objectives

The objectives of Aboriginal Land Management and Capacity Building Grants Program are to:

Build Aboriginal community capacity to identify priority issues and participate in improved natural resource management and Indigenous fire management on their land.

Build Aboriginal community capacity to undertake on-ground works on Aboriginal and other land.

Provide targeted training in natural resource management and project management that builds business opportunities and leads to employment outcomes for Aboriginal Land Management Teams.

Build Aboriginal community capacity to exchange cultural knowledge and information across generations and communities.

This program also delivers on the following Hunter LLS Local Strategic Plan strategy and associated outcome:

Strategy 2: Deliver Integrated Services.

Outcome 2: By 2021, integrated services have helped primary producers and land managers in priority industries or landscapes implement practices for economic, social and environmental outcomes.

Strategy 7: Support and Partner Aboriginal Culture.

Outcome 7: By 2021, support for Aboriginal people to care for Country and practice traditional land management has increased.

Investors

The LLS is also delivering on the Hunter LLS National Landcare Programme (NLP) on behalf of the Australian Government. The NLP priorities that this program will deliver include:

Hunter Local Land Services 3

Page 4: About Hunter LLS - Hunter Local Land Serviceshunter.lls.nsw.gov.au/__data/assets/word_doc/0011/...  · Web view80ha vertebrate pest and 8ha weed control in priority in the Lower

1. Maintain and improve ecosystem services through sustainable management of local and regional landscapes.

2. Increase the numbers of farmers and fishers adopting practices that improve the quality of the natural resource base, and the area of land over which those practices are applied.

3. Increase engagement and participation of the community, including landcare, farmers and indigenous people in sustainable natural resource management.

4. Increase restoration and rehabilitation of the natural environment, including protecting and conserving nationally and internationally significant species, ecosystems, ecological communities, places and values.

Hunter LLS is delivering Catchment Action NSW funding on behalf of the NSW Government. The Catchment Action NSW priorities this program will deliver include:

Capacity building priorities delivered through fire management and pest animal control training workshops and activities relating to bush regeneration, revegetation, conservation and land management including weed control.

Natural resource planning and project management skills developed in Aboriginal land managers, including Local Aboriginal Land Councils and Aboriginal land management teams. Skills will include identification and recording of cultural landscapes and values.

Training workshops in fire, vegetation and pest animal management will inform the development of management plans for addressing these issues and protecting cultural and biodiversity values on Aboriginal land.

These skills will be applied directly through on-ground projects to improve management of Aboriginal land in conjunction with Aboriginal land managers, and to improve management of non-Aboriginal land through Aboriginal land management teams.

Hunter LLS is also delivering Hunter Catchment Contributions funding. The Hunter Catchment Contribution priorities this program will deliver include:

By 2020, land managers participate in catchment activities that increase ground cover on highly erodible soils and decrease the impacts of pest and weeds.

By 2020, land managers are implementing priority riverine stabilisation projects that restore healthy river and estuarine ecosystems.

EligibilityGeneral

Eligibility of applications is subject to:

The project being located in an identified priority area (page 4). Applicants having completed works for any previous Hunter LLS funded projects. Proposed works must be able to be completed by 31st May 2017. LLS minimum standards for on-ground works being met (eligible activities listed below). Proposed activities must abide by NSW State and Australian Commonwealth laws e.g.

Native Vegetation Act 2003, Work Health and Safety Act 2011. All current Hunter LLS financial obligations are paid.

Hunter Local Land Services 4

Page 5: About Hunter LLS - Hunter Local Land Serviceshunter.lls.nsw.gov.au/__data/assets/word_doc/0011/...  · Web view80ha vertebrate pest and 8ha weed control in priority in the Lower

Priority AreasFor the Aboriginal community to identify priority issues and participate in improved natural resource management (NRM) and invasive weeds and pest animal management on land in the Hunter Local Land Services region:

Lower Hunter district Upper Hunter district Manning/Great Lakes district Lower Hunter Estuary wetlands including in Hunter Wetlands National Park and

adjacent lands in Hexham Swamp for vertebrate pest control and weed control activities (Juncus acutus and other saltmarsh weeds)

Types of ActivitiesThe types of activities that can be funded under this Program (but are not limited to) include:

Property management plans for aboriginal owned land (i.e. weed management plan, vegetation management plan, invasive pest management plan, indigenous (cultural) fire management plan etc).

Capacity building, training and/ or employment of Aboriginal Land Management Teams to deliver on-ground projects (listed below).

On-ground delivery of:o Conservation of native flora and faunao Bush regeneration including:

revegetation, conservation and weed control seed collection and propagation (including bush tucker)

o Pest animal controlo Indigenous fire managemento Sea or waterway management and conservation.

On-ground delivery of vertebrate pest (specifically fox) control and weed control (specifically Juncus acutus and other saltmarsh weeds) implemented in Hunter Wetlands National Park and adjacent lands in Hexham Swamp.

Each project funded under the Aboriginal Land Management Team Grants Program must also include:

A project plan for the proposed project area, which should include:o Property inspection o Outline key areas of priority o Project timeframe and delivery schedule for coordination of implementing

proposed activities for addressing key priority areaso Cooperation with other agencies, and landholders o Training, capacity building or employment for Aboriginal Land Management

Team members related to the project.o Review of project and maintenance plan for site – 5 years maintenance

required. o Final report submitted to LLS by 31st May 2017.

At least one media opportunity (flyer, media release, online article, video etc) to help promote the project to the Aboriginal and wider community.

Types of activities that will not be funded by LLS under this program include: Purely production oriented activities. Major farm water supplies including irrigation. Purely noxious weed control.

Hunter Local Land Services 5

Page 6: About Hunter LLS - Hunter Local Land Serviceshunter.lls.nsw.gov.au/__data/assets/word_doc/0011/...  · Web view80ha vertebrate pest and 8ha weed control in priority in the Lower

Purchase of machinery and computer hardware and software, where there is no demonstrated land use change.

Activities more appropriately funded by other bodies. Activities that the land managers can reasonably be expected to undertake to ensure

sustainable management of areas under their control. Work that is undertaken before the project agreement for the proposal is signed or after

the project agreement ends. Projects that mainly beautify or improve amenity. Standard boundary fencing that is the landholder’s normal responsibility. Capital works, for example construction of buildings or viewing platforms to improve

amenity. Expert advice that could alternatively be provided by the LLS or other government

agency. Research. Any works for mostly private benefit. Activities that may be required due to: legal responsibilities, compliance with

development consents and/or reasonable duty of care. Activities that do not directly deliver on the specified HLLS strategic plan outcomes.

The following activities will not be funded under the National Landcare Programme component of this program:

Activities or investments undertaken, or liabilities incurred, before the Commonwealth enters into a written funding agreement with the successful Applicant

Activities that will be receiving, or completed activities that have previously received, funding through other Australian Government (including Caring for our Country or the Biodiversity Fund), state or territory or local government funding initiatives or programmes, or from other third parties, where those activities are substantially the same and in the same location

Activities that are the responsibility, or the business, of state, territory or local governments or of private land managers, including activities that are a legislative and regulatory responsibility, such as managing or controlling certain weeds or compliance activities, and activities that would be considered a landholder’s responsibility, such as standard boundary fencing. These activities may be undertaken in conjunction with Programme funded activities provided that Programme funding is not used for them

Activities that are required to be undertaken by any person or are part of an approval under Commonwealth, state or territory legislation, for example, the provision of an environmental offset under the EPBC Act

Activities that are likely to have a significant adverse impact on any species or ecological community listed under the EPBC Act, an ecosystem of national or international significance (e.g. a Ramsar listed site, World Heritage area or part of the National Reserve System) or activities with the potential to exacerbate a threatening process listed under the EPBC Act

Activities that may have a significant adverse impact on Indigenous cultural heritage and which have not received approval through relevant state or territory legislative requirements

Activities that involve planting of species (including native species) that are known to be, or could become, environmental or agricultural weeds in or near the project location

Activities or elements of activities that are primarily for the purpose of beautifying or improving amenity, for example, landscaping, picnic tables, shelters and paving

Hunter Local Land Services 6

Page 7: About Hunter LLS - Hunter Local Land Serviceshunter.lls.nsw.gov.au/__data/assets/word_doc/0011/...  · Web view80ha vertebrate pest and 8ha weed control in priority in the Lower

Activities that predominantly support applied research, tool building and/or development of modelling approaches except where an activity of this nature is demonstrably required to achieve outcomes in line with Programme objectives and outcomes

Where to get assistance?LLS staff are available to assist you with developing your application, including providing advice on best practice management, design, costing, and developing a detailed project works map. All applications must be accompanied by a project works map showing the location and type of proposed management activities on your property.

Landholders are invited to submit a Request for Assistance (RFA) for this program to Hunter LLS by 2 September 2016. RFAs can be made by contacting LLS staff (see below) or completing an online RFA available at http://hunter.lls.nsw.gov.au/our-region/grants-funding-scholarships

Applications for Aboriginal Land Management and Capacity Building Grants Program will need to complete a Land Management Grant Application Form.

Contact details for your local office and Grant program contact officers:

Lower Hunter - Toby Whaleboat (Grant Program Manager)Phone: 0429 303 765Email: [email protected]

Upper Hunter – Sarah GiblinPh: 02 6540 2414 Email: [email protected]

Manning-Great Lakes – Geoff FosterPh: 02 65518994 Ext 243Email: [email protected]

Hunter Local Land Services 7

Page 8: About Hunter LLS - Hunter Local Land Serviceshunter.lls.nsw.gov.au/__data/assets/word_doc/0011/...  · Web view80ha vertebrate pest and 8ha weed control in priority in the Lower

Lodging Applications Applications can be lodged in two ways.

1. Submit the original signed application to the LLS by 16 September 2016. Applications post marked this date will be accepted.

Aboriginal Land Management Team Grants ProgramHunter Local Land ServicesPrivate Bag 2010Paterson NSW 2421

2. Submit your application electronically by 16 September 2016 to

[email protected] Electronically lodged applications must come from the applicant’s e-mail account and must include a copy of the LLS produced map. The subject line should include the following information:

HR_xxx-“Applicant surname”(the HR_xxx project identifier will be provided by your LLS Officer)

Applications that are sent directly to LLS staff will not be accepted.

As map files can be large in size, please email your application and map separately to ensure the emails are transmitted by the due date but ensure to include the HRXXXX on all correspondence.

Incomplete applications will not be accepted.

Assessment ProcessApplications will be initially screened to confirm that all eligibility criteria are met and there is sufficient information in the form for an assessment to be made.

Applications will then be assessed by a panel against the following criteria:

1. The degree to which the project delivers on the objectives of the funding program 2. The degree to which the project delivers on investor priorities3. The scale of outcomes 4. The degree to which project actions are likely to deliver the intended outcomes5. The capacity to complete planned works on time6. The relative proportion of applicants in-kind and/or cash contributions 7. The approach to monitoring evaluation and reporting8. The approach to Aboriginal Cultural Heritage9. The degree to which the applicant has engaged in previous grant programs10. The likelihood of the project delivering productivity benefits

The LLS may contact applicants during the assessment process to confirm or clarify any information in the application form.

All applicants will be notified of the outcome of the assessment process.

Further rounds may be opened in 2016-17 if all funds are not allocated.

Hunter Local Land Services 8

Page 9: About Hunter LLS - Hunter Local Land Serviceshunter.lls.nsw.gov.au/__data/assets/word_doc/0011/...  · Web view80ha vertebrate pest and 8ha weed control in priority in the Lower

Conditions of funding

ContractsAll Hunter LLS Land Management Grants will be delivered through a Land Management Agreement.

A copy of the standard contract with all the terms and conditions is available to all applicants to review prior to submitting the application. Please contact the LLS office to access a copy of the standard agreement template.

The contract will need to be signed by the applicant and the land owner (If different). The landholder on the application should match the landholder that will sign the contract and this should also match landholder that will receive the Grant funds.

How will you be paid?A payment schedule will be determined as part of funding agreement negotiations. Funds will generally be paid 40% on completion of the first milestone which will generally be the submission of a WHS management plan and baseline photo-point monitoring. The remainder of funds will paid on completion of agreed milestones with 10% being withheld for the submission and approval of the final report.

All Grant payments from the LLS will be made during the 2016-17 financial year provided milestones are achieved.

Milestone payments may require a site inspection by the LLS to verify completion of the milestone. A final report on the project outcomes will be required to receive the final payment.

Payment will be made on receipt of a signed ATO compliant tax invoice on completion of agreement milestones.

GST registered Grantees will be paid 10% GST on top of the approved Grant amount.

Applicants should discuss the implications of receiving funding from the LLS with a financial adviser prior to applying.

Monitoring and ReportingAll on-ground projects funded by the LLS will be required to undertake photo point monitoring or take before and after photos of activities. The LLS has a guideline for photo monitoring on the website.

The LLS may also require monitoring of groundcover using the step point monitoring method or native vegetation condition monitoring depending on the type of

activities proposed.

Given that funding aims to deliver economic, social and environmental outcomes, LLS will develop with successful grant funding applicants a set of relevant production, profitability and sustainability measures for monitoring and reporting on project outcomes.

All projects funded by the LLS may be included in more detailed vegetation and/or soil condition monitoring undertaken by the LLS.

A final report on the project outcomes will be required to receive a final payment. All agreements will require further brief annual monitoring reports for the agreement duration on the outcomes achieved and the management actions and monitoring undertaken.

Further details of monitoring requirements and templates for reports are available from an LLS contact officer and will be made available to successful applicants.

MaintenanceAll funded activities will require maintenance to ensure the outcomes are maintained. All activities must be regularly maintained for at least 5 years.

Public Liability InsuranceAll funded projects must be prepared to maintain current Public Liability Insurance ($20 million) for the duration of the agreement. A copy of your certificate of currency should be provided with your project application. If you are unable to provide the $20m of coverage you may apply to the LLS for a reduced amount, but this would be subject to an assessment of the Public Liability risk of the project.

Disclosure of InformationThe LLS has requirements with the Australian and NSW Government to provide spatial information and details of funded works. The LLS will be required report spatially and on activities to these funding bodies, which may in turn be published on public websites. The LLS aims to provide information to the public spatially on achievements associated with public funds. Your project may be represented spatially e.g. point or polygon on catchment scale map in publicly released documents but no detailed information will be released.

Aboriginal Cultural HeritageThe LLS recommends that Aboriginal consultation be undertaken during the planning stage of all projects.

The LLS has Aboriginal staff that can assist you in

Hunter Local Land Services816 Tocal Rd, Paterson 2421Tel: 02 4930 1030 | Fax: 02 49301013| www.lls.nsw.gov.au/hunter

Page 10: About Hunter LLS - Hunter Local Land Serviceshunter.lls.nsw.gov.au/__data/assets/word_doc/0011/...  · Web view80ha vertebrate pest and 8ha weed control in priority in the Lower

contacting the appropriate person(s) or organisation.

Workplace Health and SafetyThe first milestone payment will be linked to completion of a Work Health and Safety Management Plan and submission of baseline photo-point monitoring. The WHS Management Plan should document a Work Health and Safety risk assessment in accordance with Work Health and Safety Act 2011 requirements. LLS staff can assist in preparing a risk assessment and Work Health and Safety Management Plan for projects.

Conflicts of InterestThe Local Land Services has a Conflict of Interest Policy. Applicants should declare any perceived, actual or potential conflict of interest on their application. This could include being a current or past LLS staff member or being related to a staff member. Noting a Conflict of Interest will not automatically exclude applications for funding, but it does mean the LLS will need to follow certain procedures to ensure the conflict of interest is dealt with appropriately.

Hunter Local Land Services 10

Page 11: About Hunter LLS - Hunter Local Land Serviceshunter.lls.nsw.gov.au/__data/assets/word_doc/0011/...  · Web view80ha vertebrate pest and 8ha weed control in priority in the Lower

Minimum standards for on-ground works

GeneralIt is a requirement that proponents maintain the condition of the project site to at least pre-project level in addition to any management activities proposed. For example, weed and pest animal control should be maintained to at least the pre-project level and/or that required by relevant legislation regardless of whether it is a proposed management action or not.

FencingAll fencing (electric or standard) must be managed in a stock-proof condition for the term of the agreement. In addition the following standards apply:

Stock proof fencing to stabilise natural waterways:

Fence to be permanent and located a minimum distance back from the top of the high bank of 5m + the full height of the high bank from the streambed + an allowance for the rate of erosion versus stabilisation.

Stock proof fencing to manage nutrient runoff or to restore in-stream habitat:

Fence to be permanent and located a minimum distance back from the top of the high bank of 5m.

Stock proof fencing to protect or regenerate native riparian vegetation:

Fence to be permanent and should be located a minimum distance back from the top of the high bank of 20m for riparian vegetation.

Stock proof fencing to protect or regenerate remnant native vegetation:

Fence is to be permanent. Fencing around single trees will generally not be funded.

Revegetation All revegetation activities funded by the LLS must achieve and maintain at least an 80% survival and establishment rate and stock exclusion fencing must be installed where stock could potentially access the site. Local provenance seed/planting stock must be used on revegetation sites. Importantly, all areas

revegetated through funding will be defined as ‘protected regrowth’ under the Native Vegetation Act 2003 and therefore cannot be cleared in the future. In addition, the following standards apply to specific revegetation activities:

Revegetation of gullies, rivers and creeks: Any plantings along riparian lands must use local native species. Riparian revegetation projects should aim, if possible, to cover both sides of the flow line.

Revegetation for biodiversity and conservation purposes: A mix of local native species suitable for the site must be used. Wildlife corridors must link (be within 20m) of existing areas of remnant vegetation or established revegetation sites and must be at least 25 m wide or have an average width of at least 30m.

Structural worksThis may include earthworks or construction activities for:

gully filling/shaping, construction of diversion banks, construction of gully control structures/ dams, construction of concrete or rock flumes, rock revetment, groynes and bed control

structures, in-stream works for enhancing aquatic habitat

and/or controlling bed or bank erosion.

All structural works must be constructed to LLS standards and meet all regulatory requirements.

Soil TestingWhere soil testing is required, it must be carried out by a NATA accredited laboratory.

Provision of alternate stock water suppliesAlternate stock watering for protecting or regenerating native riparian vegetation or managing nutrient runoff may be required where stream bank vegetation is fenced. This may be achieved by installing additional stock water troughs, pipelines, tanks and pumps for a reticulated supply. The installation of additional stock water supply should be limited to providing water to areas that were previously supplied by the riparian area that has been fenced. All stock water works including provision of alternate stock water supply for sustainable grazing and implementing property plans must be technically sound and comply with the Native Vegetation Act, 2003.

Hunter Local Land Services816 Tocal Rd, Paterson 2421Tel: 02 4930 1030 | Fax: 02 49301013| www.lls.nsw.gov.au/hunter

Page 12: About Hunter LLS - Hunter Local Land Serviceshunter.lls.nsw.gov.au/__data/assets/word_doc/0011/...  · Web view80ha vertebrate pest and 8ha weed control in priority in the Lower

Weed ControlWeed control for treating weeds or regenerating or protecting native vegetation will need to demonstrate that weed control is integral to achieving good biodiversity outcomes and/or addressing broader environmental issues. While noxious weed control may be required on a given site by legislation, funding for the control of noxious weeds is permitted where weed control is not the primary activity.

Weed control activities must achieve at least an 80% reduction in cover of the targeted weed species and this should be maintained for the term of the agreement. Directions on appropriate herbicide use must be adhered to and relevant permits must be acquired if undertaking weed control near waterways or water bodies. Permits may also be required from the NSW National Parks and Wildlife Service to control weeds in Endangered Ecological Communities (EECs).

Grazing ManagementGrazing must be excluded unless it is compatible with the proposed NRM actions and intended outcomes. Technical advice should be sought from LLS staff or other suitably qualified persons.

Project activities and outcomes determine if projects involve sustainable grazing or strategic grazing.

Sustainable grazing: Grazing management practices that increase pasture and stock productivity without high inputs, improve farm profitability, increase rainfall capture and enhance both on and off-farm resources. This requires a good understanding of pasture growth processes, managing stock feed demand against herbage mass availability, managing for land capability, maintaining high levels of groundcover and pasture litter and increasing pasture perenniality and species diversity.

All activities for sustainable grazing incentives must be carried out and monitored with a sustainable grazing plan.

Strategic Grazing: Grazing management practices used as a land management tool for outcomes such as bushfire fuel load reduction, weed control or increasing native plant diversity. It involves short grazes at limited strategic times and to an extent compatible with achieving NRM rather than production outcomes. It predominantly entails stock exclusion.

Grazing must be excluded for projects that deliver native vegetation, riverine or biodiversity outcomes,

unless it is compatible with a given vegetation community that is present (e.g. grassy woodland), its current condition, proposed future condition and proposed management actions. Where strategic grazing is appropriate, it should follow a minimum period of stock exclusion of 3 years to initiate and promote natural regeneration and to ensure any necessary revegetation plantings (groundcover, shrubs and or trees) are established. Strategic grazing thereafter should be limited to a maximum of 8 weeks in any one year, a maximum of 2 weeks grazing within any one grazing period and with grazing periods a minimum of 8 weeks apart.

A minimum of 70% groundcover must be maintained, with stock excluded during declared droughts and immediately following heavy rainfall. Step point and photo point monitoring of groundcover at 6 monthly intervals must be undertaken.

Fire Management

The landholder must not carry out any burning for

Native Vegetation or Riparian Protection or

Regeneration, and for Revegetation of Highly Erodible

Soils unless required to do so under the Rural Fires Act 1997, or in accordance with a LLS approved Fire

Plan. Burning must involve an ecologically appropriate

fire management regime that promotes biodiversity

outcomes. Technical advice should be sought from

LLS staff or other suitably qualified persons.

Hunter Local Land Services 12