About BMP & PMWS The Best Manufacturing Practices Program and the Program Manager’s WorkStation...
-
Upload
gerald-hicks -
Category
Documents
-
view
216 -
download
3
Transcript of About BMP & PMWS The Best Manufacturing Practices Program and the Program Manager’s WorkStation...
About BMP & PMWSThe Best Manufacturing Practices Program and the Program Manager’s WorkStation
Presented By:
Robert Hartzell & Ralph SickingerBMP Center of Excellence
October 2007
www.bmpcoe.org About BMP & PMWS 2
To provide Best Practices, To provide Best Practices,
management tools, management tools,
and technical guidelines and technical guidelines
enabling enabling
defense and commercial customers defense and commercial customers
to operate to operate
at a higher level at a higher level
of competitiveness.of competitiveness.
BMP’s Mission
www.bmpcoe.org About BMP & PMWS 3
Chief of Naval Research
BMP Center of Excellence
Operations & SupportWILLCOR/CSC (40)
Survey TeamSupport (150)
Associate Director
DOC
UMCP
Organizational Structure
Director of Transition
Manufacturing Technology Program
Satellite Centers(9)
www.bmpcoe.org About BMP & PMWS 4
BMP Center of Excellence
• Navy’s Best Manufacturing Practices Program– Identify, Validate, Document, and Distribute Best Practices
• Department of Commerce– Provide BMP to Small- and Medium-Size Companies
• University of Maryland, College Park– Introduce BMP to College of Engineering
www.bmpcoe.org About BMP & PMWS 5
New Orleans(Gulf Coast Region Maritime
Technology Center)
Ames(Iowa ProcurementOutreach Center)
Columbus(Edison Welding Institute)
Oak Ridge(Department of Energy)
York(MANTEC, Inc.)
Rockford(Rock Valley College)
Corona(Naval Surface Warfare Center)
Satellite Centers Leveraging Resources
Clemson(South Carolina Research Authority-Applied Research & Development
Institute)
• • • •
• •
• • • • • •
• •
• •
• •
Washington, DC(Department of Commerce)
www.bmpcoe.org About BMP & PMWS 6
History of the BMP Program
Many programs failing or suffering cost/schedule overruns
Defense Science Board studies the problem; publishes findings in DOD 4245.7-M (The “Willoughby Templates”)
Best Manufacturing Practices Program established to help the U.S. Defense Industrial BaseBMP conducts first Survey (Texas Instruments)
BMP publishes NAVSO P-6071 (Best Practices Book)
BMP contracts with Bell Labs to write more detail on each Template
First version of PMWS is created
BMP Center of Excellence established in College Park, MD
BMP conducts 100th Survey (Northrop Grumman)
1960-1980
1983-1984
1985
1986
1987
1991
1993
2000
www.bmpcoe.org About BMP & PMWS 7
Core Competencies
Surveys - Technology Transfer - Benchmarking - Business Process Reengineering
Systems Engineering - Expert Systems - Risk Management - Engineering Analysis - Red Team Support
Web Technologies - CWE - Oracle 10g - MRL Assist
www.bmpcoe.org About BMP & PMWS 8
Sample Products and Services
• Core
– Survey Reports
– Technical Guidelines
– Program Manager’s
WorkStation
• Work For Others
– Systems Engineering
– Acquisitions and Risk
Management
– Virtual Offices
– Production Readiness
• Special Projects
– Shipyard Benchmarking Study
– Battery Products Study
– DoD Manufacturing Readiness Levels (MRLs)
– SpecRite Tool
www.bmpcoe.org About BMP & PMWS 9
Sample Customers
• OUSD (AT&L) – System of Systems
(PEO JTRS) – JTRS Assessment
• DUSD (AS&C) – Battery Products Study
• ASN
– DASN (RDT&E) – M&S Assessment
– (DRPM EFV AAAV) – Risk Management, PRR
– (PEO C4I&S) – Radio Industry Study
– (PEO IWS) – SEWIP, HGHS
• JCS – JWID CWE
• JDMTP – MRL / MRL Assist
• DFAS – Integrated Digital Environment
• MDA – Sea Based Missile Defense
• DoN (Aegis BMD) – COSIP Radar
• NAVSEASYSCOM – STANDARD Missile
• NAVAIRSYSCOM – LINK-16
• SPAWARSYSCOM – MIDS, DMR, NMT
• MARCORSYSCOM – AAAV, UOC
• USCG – Rescue 21
• PICA – LW 155, M119A2
Broad Application of BMPCOE Expertise
www.bmpcoe.org About BMP & PMWS 10
ExperienceExperience InsightInsight
KnowledgeKnowledge
Program Manager’s WorkStation
Your Electronic Consultant!
PMWS is...
www.bmpcoe.org About BMP & PMWS 12
Purpose:Provide a Cost-Effective Alternative to Government Military Standards
for Design and Manufacturing
Technical Guidelines Documents
www.bmpcoe.org About BMP & PMWS 13
Technical Guidelines Documents
DoD 4245.7-M
“Willoughby Templates”
www.bmpcoe.org About BMP & PMWS 14
Technical Guidelines Documents
NAVSO P-6071
“Best Practices Book”
www.bmpcoe.org About BMP & PMWS 15
Technical Guidelines Documents
Template Reference Guides
Produced by Bell Labs, to cover Templates in even more detail.
www.bmpcoe.org About BMP & PMWS 16
Technical Guidelines Documents
NAVSO P-3641
Power Supply Reliability
Switching-mode conversionSingle output {5 VDC < Output Voltage < 28 VDC}Hold-up period: 1 millisecondConduction cooledMTBF: See Table 3-4EMI: MIL-STD-461 except with RE-01 and CE-01 modifiedPrime Power: 270 VDC or 3-phase per MIL-STD-704 and/or MIL-STD-1399
TABLE 3-2. LOW-VOLTAGE BASELINE POWERSUPPLY CHARACTERISTICS
www.bmpcoe.org About BMP & PMWS 17
Technical Guidelines Documents
NAVSO P-3687
How to design producible products in a “sustained acquisition excellence environment.”
www.bmpcoe.org About BMP & PMWS 18
Technical Guidelines Documents
NAVSO P-3680
Environmental Best Practices
www.bmpcoe.org About BMP & PMWS 21
KnowHow [Book] Builder
Create your own books andadd them to the library!
Create your own books andadd them to the library!
www.bmpcoe.org About BMP & PMWS 23
Survey ofAccel LANs, Inc.
Best Manufacturing Practices
WebSite
Accel LANs, Inc.
BMP — An Honest Broker For Technology Transfer
Unique Survey Process – Learning From The Best
• Company Makes Request and Controls Content
• Emerging Technology and Best Practices Documented
• All Data Is Validated by a Team of Experts
• Results Distributed Nationwide
www.bmpcoe.org About BMP & PMWS 24
The BMP Program Defines a The BMP Program Defines a Best PracticeBest Practice as: as:“an established documented process, technique, or
innovative use of equipment or resources that has a proven record of success in providing significant improvement in cost, schedule, quality, performance, safety, environment, or other
measurable factors which impact the health of a company. ”
The BMP Program Defines an The BMP Program Defines an Information ItemInformation Item as: as:“a practice that does not have a proven track record or is not significantly different from what others are doing. An Information Item could have the potential to be a Best Practice.”
BMP Validated Best Practices
www.bmpcoe.org About BMP & PMWS 25
BMP Is A Win-Win Opportunity
What’s In It For Government And Industry
• Reduces Reinvention, Duplication, and Risk
• Provides Higher Quality, More Reliable Products and Services
• Technology Transfer
• Benchmarking
• Promotes What the Organization Does Well
• No Cost Beyond the Organization’s Time to Participate
www.bmpcoe.org About BMP & PMWS 26
More Than 4,000 Practices Documented...
Management33%
Facilities12%
Logistics4%
Production29%
Test6%
Design16%
Best Practices Breakout
www.bmpcoe.org About BMP & PMWS 27
…Collected From More Than 150 Surveys Since 1985
Government28%
Academia3%
Small18%
Medium12%
Large 39%
BMP Survey Distribution
www.bmpcoe.org About BMP & PMWS 29
Surveyed Organizations – For Example...
• Large– Lockheed Martin, Northrop Grumman, Raytheon, Electric Boat, Rockwell Collins,
Weirton Steel, JLG, Cincinnati Milacron, Texas Instruments
• Government– NAVSEA PMS-422, USCG LANT/PAC-Maintenance Facilities, NASA Marshall,
DOE-Oak Ridge, Sandia & Livermore National Labs, NAWC-Lakehurst, NUWC-Keyport, NADEP-North Island, 8 Army Depots
• Medium– Bender Shipbuilding & Repair, Stryker Howmedica Osteonics, Applied Research
Lab-Penn State University, Kurt Manufacturing, General Dynamics Armament Systems
• Small– In Tolerance, ABC Virtual Communications, Frontier Electronic Systems, General
Tool, Sharretts Plating, Thermacore, Dayton Parts, Hamilton Standard, Nascote, United Electric Controls, Wainwright Industries, and Orenda Turbines and Strite Industries (Canada)
• Focused– Polariod Corp., City of Chattanooga, USS Carl Vinson, Elizabethtown College,
Northrop Grumman
www.bmpcoe.org About BMP & PMWS 31
• TRIMS (Technical Risk Identification & Mitigation System): A Methodology for Doing Knowledge-Based, Process-Oriented Risk Management
• Includes Set of Software Tools to Help Implement the Methodology (Navy-Owned, Fixed Revision Cycle)
• Outgrowth of DoD 4245.7-M and NAVSO P-6071 Templates
• Fully Compatible with BMPCOE-Combined Government/Industry Systems Engineering Model
• Fully Supported: Training Classes, Computer-Based Training, On-line Help, 24-hour Help Desk
What Is TRIMS?
Process Based and Predictive
www.bmpcoe.org About BMP & PMWS 32
TRIMS Proactive Methodology
TRIMS
Probability Effect
• Risk Management
• Snapshot Assessments
• Multiple Program Rollups
• Automatic Updates
Milestone Dates
PersonnelAssignments
QuestionWeighting
Due Dates
References
ComplianceStatus
Risks
Next Actions
Responsibilities
Action ItemTracking
Mission ProfileScheduleQualityCost
Guidance Documents
EngineeringProcess Model
Statistics
PastExperience
Planning &Tracking
SystemArchitecture
Risk Management
Understanding The Future Effects Of Today's Decisions
Risk Assessment
www.bmpcoe.org About BMP & PMWS 33
Technical Issues
Process Risks
Reactive
Proactive
Proactive vs. Reactive
Schedule Slippage
Cost Overruns
TRIMS Identifies the Root Causes of Cost & Schedule Problems
www.bmpcoe.org About BMP & PMWS 34
Process Risks
Product Risks
Time
Problems
“A ‘Problem’ Is A Risk Whose Time Has Come”
Risk Management & Problem Tracking Continuum
www.bmpcoe.org About BMP & PMWS 35
The Accuracy in Predicting Consequence Varies Over Time
Process Risks Problems
Product Risks
T1 T2 T3 T4 T5 T6
Evaluating Process Risk Permits More Timely & Efficient Mitigation
www.bmpcoe.org About BMP & PMWS 36
Time
Cos
t to
Miti
gate
Design Test Production
$1
$100
$10
Cost To Mitigate Increases Exponentially
www.bmpcoe.org About BMP & PMWS 37
Process Risks
Product Risks
Problems
Risk Management or Damage Control?
Cost To Mitigate Increases Exponentially
Time
Cos
t to
Miti
gate
Design Test Production
www.bmpcoe.org About BMP & PMWS 38
PRODUCT TQM
FUNDING MoneyPhasing
DESIGN TEST PRODUCTION FACILITIES LOGISTICS MANAGEMENT
TRANSITION PLAN
• Design Refer. Mission Profile
• Design Requirements
• Trade Studies
• Design Policy
• Design Process
• Design Analysis
• Parts & Mater. Selection
• Software Design
• Computer-Aided Design (CAD)
• Design for Testing
• Built-In Test (BIT)
• Configuration Control
• Design Reviews
• Design Release
• Integrated Test
• Failure Reporting System
• Uniform Test Report
• Software Test
• Design Limit
• Life
• Test, Analyze & Fix (TAAF)
• Field Feedback
• Manufacturing Plan
• Qualify Manufacturing Process
• Piece Part Control
• Subcontractor Control
• Defect Control
• Tool Planning
• Special Test Equipment (STE)
• CAM
• Manufacturing Screening
• Modernization
• Factory Improvements
• Productivity Center
• Logistics Support Analysis
• Manpower & Personnel
• Support & Test Equipment
• Training Materials & Equipment
• Spares
• Technical Manuals
• Manufacturing Strategy
• Personnel Requirements
• Data Requirements
• Technical Risk Assessment
• Production Breaks
TRIMS Baseline Templates
www.bmpcoe.org About BMP & PMWS 39
PRODUCT TQM
FUNDING MoneyPhasing
DESIGN TEST PRODUCTION FACILITIES LOGISTICS MANAGEMENT
TRANSITION PLAN
• Design Refer. Mission Profile
• Design Requirements
• Trade Studies
• Design Policy
• Design Process
• Design Analysis
• Parts & Mater. Selection
• Software Design
• Computer-Aided Design (CAD)
• Design for Testing
• Built-In Test (BIT)
• Configuration Control
• Design Reviews
• Design Release
• Integrated Test
• Failure Reporting System
• Uniform Test Report
• Software Test
• Design Limit
• Life
• Test, Analyze & Fix (TAAF)
• Field Feedback
• Manufacturing Plan
• Qualify Manufacturing Process
• Piece Part Control
• Subcontractor Control
• Defect Control
• Tool Planning
• Special Test Equipment (STE)
• CAM
• Manufacturing Screening
• Modernization
• Factory Improvements
• Productivity Center
• Logistics Support Analysis
• Manpower & Personnel
• Support & Test Equipment
• Training Materials & Equipment
• Spares
• Technical Manuals
• Manufacturing Strategy
• Personnel Requirements
• Data Requirements
• Technical Risk Assessment
• Production Breaks
TRIMS Baseline Templates
CAM•Manufacturing Screening
www.bmpcoe.org About BMP & PMWS 40
PRODUCT TQM
FUNDING MoneyPhasing
CostAssessment
DESIGN TEST PRODUCTION FACILITIES LOGISTICS MANAGEMENT
TRANSITION PLAN
New PMWSTemplatesNew PMWSTemplates
• Design Refer. Mission Profile
• Design Requirements
• Trade Studies
• Design Policy
• Design Process
• Design Analysis
• Parts & Mater. Selection
• Software Design
• Computer-Aided Design (CAD)
• Design for Testing
• Built-In Test (BIT)
• Configuration Control
• Design Reviews
• Design Release
• Concept Studies & Analysis
• Bread Board Development
• Brass Board Development
• Specification Dev/Allocation/ Validation
• Design for Assembly
• Prototype Development & Review
• Integrated Test
• Failure Reporting System
• Uniform Test Report
• Software Test
• Design Limit
• Life
• Test, Analyze & Fix (TAAF)
• Field Feedback
• TEMP Development/ Execution
• Software Simulator
• Manufacturing Plan
• Qualify Manufacturing Process
• Piece Part Control
• Subcontractor Control
• Defect Control
• Tool Planning
• Special Test Equipment (STE)
• CAM
• Manufacturing Screening
• Production Fabrication
• Environmental Issues
• Modernization
• Factory Improvements
• Productivity Center
• Field Visits/Site Surveys
• Logistics Support Analysis
• Manpower & Personnel
• Support & Test Equipment
• Training Materials & Equipment
• Spares
• Technical Manuals
• Logistics Analysis Documentation
• Manufacturing Strategy
• Personnel Requirements
• Data Requirements
• Technical Risk Assessment
• Production Breaks
• Determining Defining Need for System
• Prepare Requirement Documents
• Quality Assurance
• Design/Milestone Review Planning
• Make or Buy Decisions
• Technology Base Analysis
• Schedule & Planning
• Dim. Manuf. Sources & Mat. Shortage (DMSMS)
TRIMS Baseline Templates
CAM•Manufacturing Screening
•Production Fabrication•Environmental Issues
www.bmpcoe.org About BMP & PMWS 41
UserAdded
Templates
UserAdded
TemplatesUser
AddedQuestions
UserAdded
Questions
3 Tiers: Category
Template
Knowledge
Base
Question
4.0 Design
4.6 Design Analysis
4.6.1 Do the contractor's corporate standards identify design analysis as an integral part of the design process?
TRIMS Tailoring
TRIMS Hierarchy
Design Test Production Facilities LogisticsManagementFunding TransitionPlan
User Added
Categories
User Added
Categories
www.bmpcoe.org About BMP & PMWS 43
Tailoring TRIMS To Your Needs
• Identify Risks Before they Become Problems
• Build YOUR Knowledge into TRIMS– Use the Systems Engineering Knowledge Base as a Starting Point
for A Good Engineering Process
• Create a Concrete, Repeatable Process for Evaluating & Comparing Programs & Contractors
• Ease the Learning Curve for New Employees
• Retain Knowledge of Lost Employees
• Share Knowledge
• To Maximize Benefits of Using TRIMS– Apply as Early as Possible in Program Life– Apply to All Subcontractors, Divisions & Vendors Involved– Use Tool Regularly to Prioritize Resources & Make Decisions
www.bmpcoe.org About BMP & PMWS 44
TRIMS Knowledge Models
TRIMS Has Many Applications
• Existing (Released) Models– Systems Engineering
– Software Risk Engineering (Carnegie Mellon)
– Circuit Card Testability
– Interoperability and Integration
• Existing (Beta) Models– Human Factors Engineering
• Development (Prototype) Models– Management
– Port Security/Force Protection
www.bmpcoe.org About BMP & PMWS 46
TRIMS - Total Risk Management
PP33RMRM Technical Risk
Identification Mitigation
Problem, Product & Problem, Product & ProcessProcess Risk Management, Risk Management,
in a Single Tool!in a Single Tool!
www.bmpcoe.org About BMP & PMWS 47
• Reduce Risk Throughout Acquisition Process• KnowHow: What To Do • Database: Where To Get Help• TRIMS: Keep On Track
• Tested and Used by Government and Industry
• Taught at Defense Acquisition University and Industrial College of the Armed Forces
• Accepted Tool/Methodology Within the DoD Acquisition Knowledge Sharing System
• Acquisition Community Connection:• Program Management: http://acc.dau.mil/pm• Risk Management: http://acc.dau.mil/rm
An Integrated Problem Solver
Program Manager’s WorkStation
www.bmpcoe.org About BMP & PMWS 50
Since 1985 BMP Has . . .
• Conducted More Than 150 On-site Surveys
• Documented More Than 4,000 Practices
• Developed the Program Manager’s WorkStation
• Created the BMP Center of Excellence
• Opened Nine Regional BMP Satellite Centers
www.bmpcoe.org About BMP & PMWS 51
BMP Benefits
• Technology Transfer Between Organizations . . . Saves Time & Money by Reducing Repetitive Problem Solving
• Finds Best Practices, Facilitates their Diffusion and Promotes Excellence
• Government, Industry, & Academic Partnerships
• Provide Resources and Tools for Solving Technical Problems
• Free Benchmarking
• Expert Assistance
www.bmpcoe.org About BMP & PMWS 52
How To Get Help Using PMWS
• Go to Help Menus in Each Tool
• Use the Computer-Based Training (CBT) Videos • Available on PMWS CD and on BMP’s Website• These are Animated & Narrated Tours Showing Each Step of
Using PMWS
• Call our 24 Hour Helpdesk 301-405-9963
• E-Mail the BMP Center at [email protected]
• Arrange a Training Session• With Local BMP Satellite Center• Via VTC with College Park, MD• Other Options Available
Help Is Available