© ABB GroupJune 17, 2012 | Slide 3
2011 2013 2015 2020
23
100
18%
Subsea opportunityMarket growing at 18% CAGR reaching ~$100Bn by 2020
• Eliminate costly topside solutions• Deeper, longer distance, marginal fields• Increased recovery at falling pressure
Subsea drivers
Taking subsea power and automationLonger, deeper, colder
Enabling subsea production and processing
Long distance power transmission
High number of subsea loads
Subsea power distribution
Availability
Improved Oil Recovery
HSE
Cost and technology
© ABB Group June 17, 2012 | Slide 4
© ABB GroupJune 17, 2012 | Slide 5© ABB Group June 17, 2012 | Slide 5
Evolvement of subsea power distributionTowards longer step-out
Long step-out drive systemCable transfer ~50km
Statoil – ÅsgardWorld’s first subsea compression
Customers needs
A system that can transmit enough power a distance of 43 km between a drive on the floating production facility and a compressor on the seabed, with the highest voltage and frequency ever delivered
ABB’s solution
A variable speed drive system designed to avoid harmonic disturbances and voltage drops. System consists of a drive and transformer on the platform, and a cable to the transformer and the motor on the seabed.
Customer value
Cost and energy efficient, reliable power for the compressor.
© ABB Group June 17, 2012 | Slide 6
© ABB GroupJune 17, 2012 | Slide 7
ABB’s Subsea initiativeDrawing upon our global capabilities
Norway Sweden Finland
Poland
SwitzerlandUK
US
© ABB GroupJune 17, 2012 | Slide 8
ABB a reliable subsea providerDrawing upon ABB’s global capabilities
Domain knowledge
ABB’s global competencies geared towards subsea power and automation
Project execution Products
R&D
© ABB GroupJune 17, 2012 | Slide 11© ABB Group June 17, 2012 | Slide 11
Offshore electrification, more than subsea
HVDC
HVDC
HVDCAC
AC