Abandonment and Reclamation
Presented by:
Court Smith,
Vice President
Nuna Logistics
![Page 2: Abandonment and Reclamation Presented by: Court Smith, Vice President Nuna Logistics](https://reader030.fdocuments.in/reader030/viewer/2022032313/56812c2b550346895d90a647/html5/thumbnails/2.jpg)
Nuna Logistics’ Ownership
Federal Registered Company 1993
25.5% Kitikmeot Corporation
25.5% Nunasi Corporation
49% Management Group
Specializing in Northern Canadian Operations
![Page 3: Abandonment and Reclamation Presented by: Court Smith, Vice President Nuna Logistics](https://reader030.fdocuments.in/reader030/viewer/2022032313/56812c2b550346895d90a647/html5/thumbnails/3.jpg)
Nuna Logistics’ Business
Mining Industry Nunavut & NWT Contract Mining Earthworks Construction Dam and Dike Construction Winter and All-weather Roads Site Services Crushing Logistics Support
![Page 4: Abandonment and Reclamation Presented by: Court Smith, Vice President Nuna Logistics](https://reader030.fdocuments.in/reader030/viewer/2022032313/56812c2b550346895d90a647/html5/thumbnails/4.jpg)
Nuna Logistics’ Experience
EKATI Diavik Winter Road Lupin Snap Lake
![Page 5: Abandonment and Reclamation Presented by: Court Smith, Vice President Nuna Logistics](https://reader030.fdocuments.in/reader030/viewer/2022032313/56812c2b550346895d90a647/html5/thumbnails/5.jpg)
Nuna Logistics’ Work with Tahera
Assisted in the field from early phases of exploration
Provided site development and open pit mining cost estimates for various stages of study work
Reclamation cost estimate
![Page 6: Abandonment and Reclamation Presented by: Court Smith, Vice President Nuna Logistics](https://reader030.fdocuments.in/reader030/viewer/2022032313/56812c2b550346895d90a647/html5/thumbnails/6.jpg)
Nuna Logistics - Misery Site (Ekati)
Misery Site is of Similar Size to the Projected Jericho Site
Misery is part of BHPBilliton’s Ekati Mine and is Located 30km from the Ekati Plant Site
Nuna Developed & Operates Misery
![Page 7: Abandonment and Reclamation Presented by: Court Smith, Vice President Nuna Logistics](https://reader030.fdocuments.in/reader030/viewer/2022032313/56812c2b550346895d90a647/html5/thumbnails/7.jpg)
![Page 8: Abandonment and Reclamation Presented by: Court Smith, Vice President Nuna Logistics](https://reader030.fdocuments.in/reader030/viewer/2022032313/56812c2b550346895d90a647/html5/thumbnails/8.jpg)
![Page 9: Abandonment and Reclamation Presented by: Court Smith, Vice President Nuna Logistics](https://reader030.fdocuments.in/reader030/viewer/2022032313/56812c2b550346895d90a647/html5/thumbnails/9.jpg)
![Page 10: Abandonment and Reclamation Presented by: Court Smith, Vice President Nuna Logistics](https://reader030.fdocuments.in/reader030/viewer/2022032313/56812c2b550346895d90a647/html5/thumbnails/10.jpg)
![Page 11: Abandonment and Reclamation Presented by: Court Smith, Vice President Nuna Logistics](https://reader030.fdocuments.in/reader030/viewer/2022032313/56812c2b550346895d90a647/html5/thumbnails/11.jpg)
![Page 12: Abandonment and Reclamation Presented by: Court Smith, Vice President Nuna Logistics](https://reader030.fdocuments.in/reader030/viewer/2022032313/56812c2b550346895d90a647/html5/thumbnails/12.jpg)
Jericho
Abandonment & Reclamation
![Page 13: Abandonment and Reclamation Presented by: Court Smith, Vice President Nuna Logistics](https://reader030.fdocuments.in/reader030/viewer/2022032313/56812c2b550346895d90a647/html5/thumbnails/13.jpg)
Jericho Reclamation Estimate
Prepared by Nuna Logistics Limited and
based on Contractor-performed work
Based on Tahera Quantities & Scope
Quantities Checked for Reasonableness
Scope Checked for Completeness
![Page 14: Abandonment and Reclamation Presented by: Court Smith, Vice President Nuna Logistics](https://reader030.fdocuments.in/reader030/viewer/2022032313/56812c2b550346895d90a647/html5/thumbnails/14.jpg)
Site Assumptions
Surface facilities such as the camp, office complex, dry, and shop are Nuna owned and operated
Waste dumps would be reclaimed pre-closure however costs are included in the estimate
Some progressive reclamation has been assumed
![Page 15: Abandonment and Reclamation Presented by: Court Smith, Vice President Nuna Logistics](https://reader030.fdocuments.in/reader030/viewer/2022032313/56812c2b550346895d90a647/html5/thumbnails/15.jpg)
Reclamation Assumptions
Waste Dump 1 and 2 Reclaimed in Year 5 Edges sloped, overburden layer on upper bench
PKC Area Liner contingency included East Cell reclaimed pre-closure West Cell reclaimed end of processing Coarse PK cover overlain with overburden
Pads Edges dozed, surface scarified
![Page 16: Abandonment and Reclamation Presented by: Court Smith, Vice President Nuna Logistics](https://reader030.fdocuments.in/reader030/viewer/2022032313/56812c2b550346895d90a647/html5/thumbnails/16.jpg)
Reclamation Assumptions
Roads Edges dozed, surface scarified
Coarse Kimberlite Rejects Dump Slopes dozed and covered with overburden Upper bench covered with overburden
Low Grade Stockpile Edges dozed, upper bench covered
Facilities Almost all facilities disassembled and removed
![Page 17: Abandonment and Reclamation Presented by: Court Smith, Vice President Nuna Logistics](https://reader030.fdocuments.in/reader030/viewer/2022032313/56812c2b550346895d90a647/html5/thumbnails/17.jpg)
Major Reclamation Requirements
Mobile Equipment Caterpillar 992 Loader Caterpillar 777 Trucks (100 ton) Caterpillar D10 Dozer Crane (70 ton) Caterpillar 16H Grader
Facilities Camp Shop Fuel Tankage Generators
![Page 18: Abandonment and Reclamation Presented by: Court Smith, Vice President Nuna Logistics](https://reader030.fdocuments.in/reader030/viewer/2022032313/56812c2b550346895d90a647/html5/thumbnails/18.jpg)
Jericho Reclamation Estimate
Estimate
Crown Lands $5,945,174
Inuit Owned Lands $1,250,433
$7,195,607
![Page 19: Abandonment and Reclamation Presented by: Court Smith, Vice President Nuna Logistics](https://reader030.fdocuments.in/reader030/viewer/2022032313/56812c2b550346895d90a647/html5/thumbnails/19.jpg)
Jericho Reclamation Cost Breakdown
Mobilization/Demobilization $ 285,000 Disassembly of Facilities 2,269,698 Waste Dump 657,280 PKC and Remaining Areas 1,013,419 Nuna Overheads 697,264 Support Facilities & Equipment 690,000 Southbound Transport 928,800 Contingency 654,146
7,195,607