AASHTO TCCE UPDATE. 2008 TEA Conference Saratoga Springs, NY. Region 1 Scott Bickford-Maine Norie Calvert-MD Dave Kent- NY Mike Fowler - VT. Region 2 Greg Davis – FL Darrell Richardson – GA Ryan Griffith – KY Jim Frick – SC. Members. Region 3 Roger Bierbaum – IA Tim Quinn – Minn - PowerPoint PPT Presentation

Transcript of AASHTO TCCE UPDATE

Page 1: AASHTO TCCE UPDATE

AASHTO TCCE UPDATE

2008 TEA Conference

Saratoga Springs, NY

Page 2: AASHTO TCCE UPDATE

Members

Region 1– Scott Bickford-Maine– Norie Calvert-MD– Dave Kent- NY– Mike Fowler - VT

Region 2– Greg Davis – FL– Darrell Richardson – GA– Ryan Griffith – KY– Jim Frick – SC

Page 3: AASHTO TCCE UPDATE

Members

Region 3– Roger Bierbaum – IA– Tim Quinn – Minn– Travis Koestner – MO– Jeff Hisem - OH

Region 4– John Riedl – OR– Marie Burke – TX– Jay Drye – WA– Ken Spear - WY

Page 4: AASHTO TCCE UPDATE

Members

Chair – Lesly Tribelhorn – MT

FHWA – Jim Sinnette – DC AASHTO – Jim McDonnell - DC

Page 5: AASHTO TCCE UPDATE

Members Top Issues 2007

Market consolidation/competition Consistent long range estimates Cost/schedule increases from outside forces Inflation forecasting Scope management

Page 6: AASHTO TCCE UPDATE

Members Top Issues 2008

Inflation Forecasting/Market/Material Cost Cost risk analysis Growing funding gap Market consolidation/competition Consistent long range estimates

Page 7: AASHTO TCCE UPDATE

Cost Estimation Workshops

St. Louis 2007 – Construction Materials Minnesota 2008 – Managing Estimates

– Report 574 update– Risk analysis and contingencies

Page 8: AASHTO TCCE UPDATE

Discussion Topics

Asphalt Binder Issues– Scheduling/Program impacts– Index payouts

Fuel price issues– Index payments

Competition– General increase

Page 9: AASHTO TCCE UPDATE

Submitted Research Topics

Impacts of Indexes on Highway Const.

Contractor Competition – Tools to enhance

Page 10: AASHTO TCCE UPDATE

Update on Manual

Page 11: AASHTO TCCE UPDATE

Chapters

Parametric – Draft Risk Based – Draft Historical – Final Draft Cost Based – Final Draft Inflation Forecasting – Under Construction Evaluation Of Bids – Final Draft

Page 12: AASHTO TCCE UPDATE

Future Chapters

Innovative Tools for Cost Control Performance Measures for Estimates

Page 13: AASHTO TCCE UPDATE

Research Reviews/Updates

NCHRP 8-49 TRB 8-36-72 TRB 25-25 NCHRP 8-60 MnDOT Project MDT Project

See http://design.transportation.org for links

Page 14: AASHTO TCCE UPDATE

SCOD Strategic Plan

Developed and Aligned Tech. Committee On Cost Estimation Goals and Action Plan with the SCOD Plan

Page 15: AASHTO TCCE UPDATE

Work Plan

Reviewed 2008 plan and progress Set milestone dates for 2009 work

Page 16: AASHTO TCCE UPDATE

QUESTIONS?