Aaron BarwickPORTFOLIO 2015 - 2016
Data Centre WorksCDCTP Certification helped me challenge and highlight 5 areas for change within the University Data Centre’s.
Data Centre Airflow
Access
Moves, Adds, Changes
Earthing & Bonding
Cabling Infrastructure Refresh
Data Centre: Airflow
1/5
Create an efficient data centre.
Data Centre AirflowIt is estimated that 50-80% of valuable conditioned (cooled) air does not reach the intake of IT equipment due to unsealed floors and openings.
Before After• Hot/Cold Aisle Containment• Fill Air Voids• Floor Tile Alignment• Cable Management• Server Fan Direction
Data Centre Airflow40% Annual Energy Savings in AS3 Data Centre, with more savings attainable.
Ambient temperature drop from 24 °C to 16°C
Change of 8 degrees
Lowered Air Conditioning demand to raise temperature back to 24°C
Estimated 40% Annual Energy Saving
Further 2°C change estimated!
Savings paying for HPC Chiller!
Data Centre AirflowAS3 Temperature Sensor Report
Maximum Temperature Minimum Temperature Average Temperature
Aug-14 30.8 18.5 24.2
Sep-14 29.7 18.3 21.6
Oct-14 29.7 18.1 22.6
Nov-14 30.3 19.2 20.0
Dec-14 28.7 17.1 19.9
Jan-15 28.2 17.2 20.2
Feb-15 27.8 18.5 19.9
Mar-15 27.8 18.2 23.9
Apr-15 26.6 14.1 19.8
May-15 24.3 14.1 18.3
Jun-15 23.2 13.7 18.0
Jul-15 21.8 13.4 16.0
Data Centre Airflow3 Tonnes, and counting ….
Data Centre AirflowCable Management….
Before After
Data Centre AirflowAir Void Solutions
Before After
Data Centre: Access
2/5
Audit Visitor Access : Who, What, Why?
Data Centre AccessNovember 2015 - New Access Policy ImplementedFully audited trail for Data Centre Visitors
Data Centre AccessJanuary 2015 - Draft copy of Data Centre Out Of Hours Access form.
Data Centre: Moves, Adds, Changes (MAC’s)
3/5
Audit and increase visibility for changes within the data centre.
Data Centre MAC’s2015 - New Policy Created
Data Centre: Safety
4/5
Ensure a safe working environment.
Earthing & BondingA server rack with 8 servers generates 10 mA-20 mA leakage currents – 50 mA is enough to kill.
Organised the appropriate earthing and bonding of each rack in AS3 DC.
Liaised with external Electricians
Organised access
Ensured job was completed without downtime
Each network rack now has the appropriate earthing ensuring a safe environment.
Data Centre: Cabling Refresh
5/5
Rework the way data cabling is connected.
Cabling Refresh“The decision to place network data and power cabling into overheadcable trays can lower cooling fan and pump power consumption by 24%.” Schneider Electric
Under-floor cabling contributes to energy losses in three ways:
• Blockage of air due to cables
• Bypass air from rack cable cut-outs
• Bypass air from (PDU) cut-outs
Liaised with external contractors
Organised access
Ensured job was completed without downtime
Each rack now has 24 port copper and fibre patch panels back to one central location.
Data Centre: Miscellaneous
Managed PDU RolloutFully managed Power Distribution Unit (PDU) solution
Rollout of managed PDU’s.
Liaised with equipment owners
Document Ownership
Plan Suitable Downtime
Label Commando Sockets / PDU / Fuse
Each network rack now has at least two fully manageable PDU’s.
LightingEfficient lighting system installed
Organised the install of new lights and emergency lighting in AS3 DC.
Liaised with external Electricians
Organised access
Ensured job was completed without downtime
PIR System implemented
20 minute no presence timeout.
DoorProactive over Reactive
Before After
Structural IssuesFloor Tile Arrangement
Problems such as rocking panels and gaps can cause permanent damage to a floor system, personal injuries and damage to equipment.
Data Centre Information ManagementDCIM
Research DCIM Solutions
Implement/Trial openDCIM
Organised On Site Demonstrations
5
High Performance Compute (HPC)
HPCUniversity invested £2M+ in owning a High Performance Compute facility
Preparation
Rigorous room planning and preparation for new contained area to accommodated HPC equipment.
Installation
Organised work and ensure contractors adhered to our standards working within a live environment.
Implementation
Worked with all parties to sign off project and assist in the handover to the HPC Viper team.
HPCInstallation
Before
After
Disaster Recovery (DR) Room
Backup DR SiteConvert an old computer room into a data backup site to house 300k worth of hardware.
Preparation
Room required clearing of old equipment, furniture & general mess.
Air Temperature
Old Air Condition unit was running insufficiently and would not cope with increased load in room.
Power
Source, order, install & configure UPS
Backup DR SiteProactive over Reactive
Uninterruptable Power Supply (UPS)
UPS ReplacementReplace old UPS with new more efficient system
Preparation & Planning
Planning for space, power and cooling efficiency
Installation
Organised work and ensure contractors adhered to our standards working within a live environment.
Commission
Worked with all parties to sign off project and assist in the commission of the new UPS.
UPSInstallation
Before
After
Top Of Rack (ToR) Migration
ToR MigrationCreate a central repository for the 6 Top of Rack switches.
Preparation
Rack Moves, Overhead Cabling, Equipment
Planning
Major Downtime Required
Implementation
Installation & Implementation
ToR MigrationCentral Location for ToR Switches