AAE 451 SPRING 2007 SYSTEMS REQUIREMENTS REVIEW TEAM 4: Kevin Kwan Dan Pothala Mohammad A. Rahim...

23
AAE 451 AAE 451 SPRING 2007 SPRING 2007 SYSTEMS REQUIREMENTS REVIEW SYSTEMS REQUIREMENTS REVIEW TEAM 4: TEAM 4: Kevin Kwan Kevin Kwan Dan Pothala Mohammad A. Rahim Nicole Risley Sara Tassan John Thornton Sean Woock Alvin Yip Metro-Scout Metro-Scout UAV Team 4 UAV Team 4 SR Review SR Review 02/20/07 02/20/07 1. 1. Introduction Introduction 2. 2. Business Case Business Case 3. 3. Customer Customer Attributes Attributes 4. 4. CONOPs CONOPs 5. 5. Design Design Requirements Requirements 6. 6. Concluding Concluding Remarks Remarks
  • date post

    21-Dec-2015
  • Category

    Documents

  • view

    217
  • download

    2

Transcript of AAE 451 SPRING 2007 SYSTEMS REQUIREMENTS REVIEW TEAM 4: Kevin Kwan Dan Pothala Mohammad A. Rahim...

Page 1: AAE 451 SPRING 2007 SYSTEMS REQUIREMENTS REVIEW TEAM 4: Kevin Kwan Dan Pothala Mohammad A. Rahim Nicole Risley Sara Tassan John Thornton Sean Woock Alvin.

AAE 451 AAE 451

SPRING 2007SPRING 2007

SYSTEMS REQUIREMENTS REVIEWSYSTEMS REQUIREMENTS REVIEW

TEAM 4:TEAM 4:

Kevin KwanKevin Kwan

Dan Pothala

Mohammad A. Rahim

Nicole Risley

Sara Tassan

John Thornton

Sean Woock

Alvin Yip

Metro-ScoutMetro-Scout

UAV Team 4UAV Team 4

SR ReviewSR Review

02/20/0702/20/07

1.1. IntroductionIntroduction

2.2. Business CaseBusiness Case

3.3. Customer Customer AttributesAttributes

4.4. CONOPsCONOPs

5.5. Design Design RequirementsRequirements

6.6. Concluding Concluding RemarksRemarks

Page 2: AAE 451 SPRING 2007 SYSTEMS REQUIREMENTS REVIEW TEAM 4: Kevin Kwan Dan Pothala Mohammad A. Rahim Nicole Risley Sara Tassan John Thornton Sean Woock Alvin.

Presentation Overview

Metro-ScoutMetro-Scout

UAV Team 4UAV Team 4

SR ReviewSR Review

02/20/0702/20/07

1.1. IntroductionIntroduction

2.2. Business CaseBusiness Case

3.3. Customer Customer AttributesAttributes

4.4. CONOPsCONOPs

5.5. Design Design RequirementsRequirements

6.6. Concluding Concluding RemarksRemarks

Introduction

Business Case

Customer Attributes

Concept of Operations (CONOPs)

Current Design Requirements

Concluding Remarks

2

Page 3: AAE 451 SPRING 2007 SYSTEMS REQUIREMENTS REVIEW TEAM 4: Kevin Kwan Dan Pothala Mohammad A. Rahim Nicole Risley Sara Tassan John Thornton Sean Woock Alvin.

Business Case

Law Enforcement Traffic monitoring Event surveillance Pursuit

Metro-ScoutMetro-Scout

UAV Team 4UAV Team 4

SR ReviewSR Review

02/20/0702/20/07

1.1. IntroductionIntroduction

2.2. Business CaseBusiness Case

3.3. Customer Customer AttributesAttributes

4.4. CONOPsCONOPs

5.5. Design Design RequirementsRequirements

6.6. Concluding Concluding RemarksRemarks

UAV system for use in monitoring of traffic and breaking news events in urban areas

News Agencies Traffic monitoring Aerial event coverage Breaking news

coverage

3

Page 4: AAE 451 SPRING 2007 SYSTEMS REQUIREMENTS REVIEW TEAM 4: Kevin Kwan Dan Pothala Mohammad A. Rahim Nicole Risley Sara Tassan John Thornton Sean Woock Alvin.

Metro-ScoutMetro-Scout

UAV Team 4UAV Team 4

SR ReviewSR Review

02/20/0702/20/07

1.1. IntroductionIntroduction

2.2. Business CaseBusiness Case

3.3. Customer Customer AttributesAttributes

4.4. CONOPsCONOPs

5.5. Design Design RequirementsRequirements

6.6. Concluding Concluding RemarksRemarks

Competition

Helicopter Fleets Well established industry, many potential

customers would already use helicopters

Trusted by public, our product would be a revolutionary idea

Other UAVs Existing UAVs are smaller scale for less vital roles

and are not being seriously deployed

Our UAV would supplement and relieve workload and cost for law enforcement air divisions

Would have the capability to perform any task a new helicopter would

4

Page 5: AAE 451 SPRING 2007 SYSTEMS REQUIREMENTS REVIEW TEAM 4: Kevin Kwan Dan Pothala Mohammad A. Rahim Nicole Risley Sara Tassan John Thornton Sean Woock Alvin.

Metro-ScoutMetro-Scout

UAV Team 4UAV Team 4

SR ReviewSR Review

02/20/0702/20/07

1.1. IntroductionIntroduction

2.2. Business CaseBusiness Case

3.3. Customer Customer AttributesAttributes

4.4. CONOPsCONOPs

5.5. Design Design RequirementsRequirements

6.6. Concluding Concluding RemarksRemarks

Market Size

Sell to news and law enforcement agencies nationwide

Our goal is to reduce costs Purchase cost

Operating cost

Maintenance cost

Reduce police helicopter flight hours

5

Page 6: AAE 451 SPRING 2007 SYSTEMS REQUIREMENTS REVIEW TEAM 4: Kevin Kwan Dan Pothala Mohammad A. Rahim Nicole Risley Sara Tassan John Thornton Sean Woock Alvin.

Customer Relationship Management

Metro-ScoutMetro-Scout

UAV TeamUAV Team

SR ReviewSR Review

02/20/0702/20/07

1.1. IntroductionIntroduction

2.2. Business CaseBusiness Case

3.3. Customer Customer AttributesAttributes

4.4. CONOPsCONOPs

5.5. Design Design RequirementsRequirements

6.6. Concluding Concluding RemarksRemarks

Manufacturing,

Marketing

General Public

FAA

News Agencies,

Law Enforcement Agencies

Internal Customers

External Customers

Design Requirements

Ext. Regulating Influences

6

Page 7: AAE 451 SPRING 2007 SYSTEMS REQUIREMENTS REVIEW TEAM 4: Kevin Kwan Dan Pothala Mohammad A. Rahim Nicole Risley Sara Tassan John Thornton Sean Woock Alvin.

Customer-Centered Design Philosophy

Metro-ScoutMetro-Scout

UAV TeamUAV Team

SR ReviewSR Review

02/20/0702/20/07

1.1. IntroductionIntroduction

2.2. Business CaseBusiness Case

3.3. Customer Customer AttributesAttributes

4.4. CONOPsCONOPs

5.5. Design Design RequirementsRequirements

6.6. Concluding Concluding RemarksRemarks

PLANNINGSUSTAINING

DESIGN

MANUFACTURING

CUSTOMER

7

Page 8: AAE 451 SPRING 2007 SYSTEMS REQUIREMENTS REVIEW TEAM 4: Kevin Kwan Dan Pothala Mohammad A. Rahim Nicole Risley Sara Tassan John Thornton Sean Woock Alvin.

Metro-ScoutMetro-Scout

UAV Team 4UAV Team 4

SR ReviewSR Review

02/20/0702/20/07

1.1. IntroductionIntroduction

2.2. Business CaseBusiness Case

3.3. Customer Customer AttributesAttributes

4.4. CONOPsCONOPs

5.5. Design Design RequirementsRequirements

6.6. Concluding Concluding RemarksRemarks

8

Page 9: AAE 451 SPRING 2007 SYSTEMS REQUIREMENTS REVIEW TEAM 4: Kevin Kwan Dan Pothala Mohammad A. Rahim Nicole Risley Sara Tassan John Thornton Sean Woock Alvin.

Customer Attributes

Metro-ScoutMetro-Scout

UAV Team 4UAV Team 4

SR ReviewSR Review

02/20/0702/20/07

1.1. IntroductionIntroduction

2.2. Business CaseBusiness Case

3.3. Customer Customer AttributesAttributes

4.4. CONOPsCONOPs

5.5. Design Design RequirementsRequirements

6.6. Concluding Concluding RemarksRemarks

Law Enforcement

Low cost

Quick response time

Easily maintained

Effective target identification

Safety

News Agencies Low cost

Quick response time

Easily maintained and operated

High quality images

High endurance

9

Page 10: AAE 451 SPRING 2007 SYSTEMS REQUIREMENTS REVIEW TEAM 4: Kevin Kwan Dan Pothala Mohammad A. Rahim Nicole Risley Sara Tassan John Thornton Sean Woock Alvin.

Customer Attributes

Manufacturing Pre-existing

methods

Simple to assemble

FAA Safe operation

Airworthiness

Complies with regulations

Metro-ScoutMetro-Scout

UAV Team 4UAV Team 4

SR ReviewSR Review

02/20/0702/20/07

1.1. IntroductionIntroduction

2.2. Business CaseBusiness Case

3.3. Customer Customer AttributesAttributes

4.4. CONOPsCONOPs

5.5. Design Design RequirementsRequirements

6.6. Concluding Concluding RemarksRemarks

10

Page 11: AAE 451 SPRING 2007 SYSTEMS REQUIREMENTS REVIEW TEAM 4: Kevin Kwan Dan Pothala Mohammad A. Rahim Nicole Risley Sara Tassan John Thornton Sean Woock Alvin.

Current FAA Regulations

Metro-ScoutMetro-Scout

UAV Team 4UAV Team 4

SR ReviewSR Review

02/20/0702/20/07

1.1. IntroductionIntroduction

2.2. Business CaseBusiness Case

3.3. Customer Customer AttributesAttributes

4.4. CONOPsCONOPs

5.5. Design Design RequirementsRequirements

6.6. Concluding Concluding RemarksRemarks

Highly improbable collision

Apply with appropriate cloud and terrain clearances

Must have a pilot in command

Can apply for a waiver

11

Page 12: AAE 451 SPRING 2007 SYSTEMS REQUIREMENTS REVIEW TEAM 4: Kevin Kwan Dan Pothala Mohammad A. Rahim Nicole Risley Sara Tassan John Thornton Sean Woock Alvin.

CONCEPT OF OPERATIONS (CONOPs)

Law Enforcement Patrolling highways

for speeding vehicles

Assist in search and rescue

Criminal pursuit

Crowd monitoring

UAV design mission

News Agencies Traffic reporting

Event coverage

Other breaking news stories (stationary and pursuit)

Metro-ScoutMetro-Scout

UAV Team 4UAV Team 4

SR ReviewSR Review

02/20/0702/20/07

1.1. IntroductionIntroduction

2.2. Business CaseBusiness Case

3.3. Customer Customer AttributesAttributes

4.4. CONOPsCONOPs

5.5. Design Design RequirementsRequirements

6.6. Concluding Concluding RemarksRemarks

12

Page 13: AAE 451 SPRING 2007 SYSTEMS REQUIREMENTS REVIEW TEAM 4: Kevin Kwan Dan Pothala Mohammad A. Rahim Nicole Risley Sara Tassan John Thornton Sean Woock Alvin.

Mission 1: Long-endurance Surveillance

Examples:

Sporting event coverage/crowd control, fire coverage, traffic surveillance

Metro-ScoutMetro-Scout

UAV Team 4UAV Team 4

SR ReviewSR Review

02/20/0702/20/07

1.1. IntroductionIntroduction

2.2. Business CaseBusiness Case

3.3. Customer Customer AttributesAttributes

4.4. CONOPsCONOPs

5.5. Design Design RequirementsRequirements

6.6. Concluding Concluding RemarksRemarks

13

Page 14: AAE 451 SPRING 2007 SYSTEMS REQUIREMENTS REVIEW TEAM 4: Kevin Kwan Dan Pothala Mohammad A. Rahim Nicole Risley Sara Tassan John Thornton Sean Woock Alvin.

Examples:

High-speed pursuits, coverage of events in locations far from TV station

Mission 2: Long-range Pursuit

Metro-ScoutMetro-Scout

UAV Team 4UAV Team 4

SR ReviewSR Review

02/20/0702/20/07

1.1. IntroductionIntroduction

2.2. Business CaseBusiness Case

3.3. Customer Customer AttributesAttributes

4.4. CONOPsCONOPs

5.5. Design Design RequirementsRequirements

6.6. Concluding Concluding RemarksRemarks

14

Page 15: AAE 451 SPRING 2007 SYSTEMS REQUIREMENTS REVIEW TEAM 4: Kevin Kwan Dan Pothala Mohammad A. Rahim Nicole Risley Sara Tassan John Thornton Sean Woock Alvin.

Mission Design Requirements

Identify license plate numbers from 1500 ft AGL

Four hour minimum endurance for Highway patrol and search and rescue missions

Minimum top speed of 120 mph

High resolution HD coverage

Metro-ScoutMetro-Scout

UAV Team 4UAV Team 4

SR ReviewSR Review

02/20/0702/20/07

1.1. IntroductionIntroduction

2.2. Business CaseBusiness Case

3.3. Customer Customer AttributesAttributes

4.4. CONOPsCONOPs

5.5. Design Design RequirementsRequirements

6.6. Concluding Concluding RemarksRemarks

15

Page 16: AAE 451 SPRING 2007 SYSTEMS REQUIREMENTS REVIEW TEAM 4: Kevin Kwan Dan Pothala Mohammad A. Rahim Nicole Risley Sara Tassan John Thornton Sean Woock Alvin.

Law Enforcement

Video camera

Infrared camera

Still camera

Camera gimbals

Radar gun

Auto pilot

Total weight 63.19 lbs

Payload Packages

News Agencies High resolution

filming camera for (HDTV)

Camera gimbals

Auto pilot

Total weight 67.19 lbs

Metro-ScoutMetro-Scout

UAV Team 4UAV Team 4

SR ReviewSR Review

02/20/0702/20/07

1.1. IntroductionIntroduction

2.2. Business CaseBusiness Case

3.3. Customer Customer AttributesAttributes

4.4. CONOPsCONOPs

5.5. Design Design RequirementsRequirements

6.6. Concluding Concluding RemarksRemarks

16

Page 17: AAE 451 SPRING 2007 SYSTEMS REQUIREMENTS REVIEW TEAM 4: Kevin Kwan Dan Pothala Mohammad A. Rahim Nicole Risley Sara Tassan John Thornton Sean Woock Alvin.

Trade Study

Metro-ScoutMetro-Scout

UAV Team 4UAV Team 4

SR ReviewSR Review

02/20/0702/20/07

1.1. IntroductionIntroduction

2.2. Business CaseBusiness Case

3.3. Customer Customer AttributesAttributes

4.4. CONOPsCONOPs

5.5. Design Design RequirementsRequirements

6.6. Concluding Concluding RemarksRemarks

17

Page 18: AAE 451 SPRING 2007 SYSTEMS REQUIREMENTS REVIEW TEAM 4: Kevin Kwan Dan Pothala Mohammad A. Rahim Nicole Risley Sara Tassan John Thornton Sean Woock Alvin.

Trade Study

Metro-ScoutMetro-Scout

UAV Team 4UAV Team 4

SR ReviewSR Review

02/20/0702/20/07

1.1. IntroductionIntroduction

2.2. Business CaseBusiness Case

3.3. Customer Customer AttributesAttributes

4.4. CONOPsCONOPs

5.5. Design Design RequirementsRequirements

6.6. Concluding Concluding RemarksRemarks

18

Page 19: AAE 451 SPRING 2007 SYSTEMS REQUIREMENTS REVIEW TEAM 4: Kevin Kwan Dan Pothala Mohammad A. Rahim Nicole Risley Sara Tassan John Thornton Sean Woock Alvin.

Trade Study

Metro-ScoutMetro-Scout

UAV Team 4UAV Team 4

SR ReviewSR Review

02/20/0702/20/07

1.1. IntroductionIntroduction

2.2. Business CaseBusiness Case

3.3. Customer Customer AttributesAttributes

4.4. CONOPsCONOPs

5.5. Design Design RequirementsRequirements

6.6. Concluding Concluding RemarksRemarks

19

Page 20: AAE 451 SPRING 2007 SYSTEMS REQUIREMENTS REVIEW TEAM 4: Kevin Kwan Dan Pothala Mohammad A. Rahim Nicole Risley Sara Tassan John Thornton Sean Woock Alvin.

Initial Sizing

Aircraft Take-off Weight 377.71 lbs

Fuel Weight 83 lbs

Payload Weight 63.2 lbs

Engine Power 57.6 hp

Metro-ScoutMetro-Scout

UAV Team 4UAV Team 4

SR ReviewSR Review

02/20/0702/20/07

1.1. IntroductionIntroduction

2.2. Business CaseBusiness Case

3.3. Customer Customer AttributesAttributes

4.4. CONOPsCONOPs

5.5. Design Design RequirementsRequirements

6.6. Concluding Concluding RemarksRemarks

20

Page 21: AAE 451 SPRING 2007 SYSTEMS REQUIREMENTS REVIEW TEAM 4: Kevin Kwan Dan Pothala Mohammad A. Rahim Nicole Risley Sara Tassan John Thornton Sean Woock Alvin.

Design Requirements

Metro-ScoutMetro-Scout

UAV Team 4UAV Team 4

SR ReviewSR Review

02/20/0702/20/07

1.1. IntroductionIntroduction

2.2. Business CaseBusiness Case

3.3. Customer Customer AttributesAttributes

4.4. CONOPsCONOPs

5.5. Design Design RequirementsRequirements

6.6. Concluding Concluding RemarksRemarks

Aircraft Take-off Weight 450 lbs

Endurance 5 hrs

Range 600 nm

Payload 63.2 lbs

Cruise Speed 100 knots

Ceiling 15,000 ft

G-Loading Capacity 3.5 sustained

21

Page 22: AAE 451 SPRING 2007 SYSTEMS REQUIREMENTS REVIEW TEAM 4: Kevin Kwan Dan Pothala Mohammad A. Rahim Nicole Risley Sara Tassan John Thornton Sean Woock Alvin.

Metro-ScoutMetro-Scout

UAV Team 4UAV Team 4

SR ReviewSR Review

02/20/0702/20/07

1.1. IntroductionIntroduction

2.2. Business CaseBusiness Case

3.3. Customer Customer AttributesAttributes

4.4. CONOPsCONOPs

5.5. Design Design RequirementsRequirements

6.6. Concluding Concluding RemarksRemarks

PROJECTED TIMELINE

22

Page 23: AAE 451 SPRING 2007 SYSTEMS REQUIREMENTS REVIEW TEAM 4: Kevin Kwan Dan Pothala Mohammad A. Rahim Nicole Risley Sara Tassan John Thornton Sean Woock Alvin.

Conclusion

Metro-ScoutMetro-Scout

UAV Team 4UAV Team 4

SR ReviewSR Review

02/20/0702/20/07

1.1. IntroductionIntroduction

2.2. Business CaseBusiness Case

3.3. Customer Customer AttributesAttributes

4.4. CONOPsCONOPs

5.5. Design Design RequirementsRequirements

6.6. Concluding Concluding RemarksRemarks

Requirements Summary

• Flies safely at 1000-1500 ft. (AGL)

• Perform required missions

• Cheaper to acquire and operate

Outstanding Issues

• FAA regulations

• Sizing

• Airfoil and engine selection

23