INTERIOR GLAZING TYPES:
FIRE (REFER TO SPECIFICATIONS FOR ASSEMBLIES)
GLI-1 1/4" CLEAR FLOAT GLASS TO MATCH APPEARANCE OF EXTERIORGLI-1T 1/4" CLEAR FLOAT GLASS TO MATCH APPEARANCE OF EXTERIOR,TEMPEREDGLI-2 1/4" CLEAR FLOAT GLASSGLI-2T 1/4" CLEAR FLOAT GLASS, TEMPEREDGLI-3 1/4" TRANSLUCENT FLOAT GLASS,GLI-3T 1/4" TRANSLUCENT FLOAT GLASS, TEMPEREDGLI-4T 1/2" CLEAR MONOLITHIC GLASS, TEMPEREDGLI-5 1/2" TRANSLUCENT MONOLITHIC GLASSGLI-5T 1/2" TRANSLUCENT MONOLITHIC GLASS, TEMPEREDGLI-6 1/2" TEXTURED, TRANSLUCENT GLASS
1. FIELD VERIFY OPENINGS PRIOR TO MAKING GLASS ANDFABRICATING FRAMES.
2. ALL INTERIOR GLASS DOOR LITES, GLASS SIDE LITES, AND GLAZINGGREATER THAN 9 SF, WITH THE TOP EDGE GREATER THAN 36"ABOVE FINISHED FLOOR AND THE BOTTOM EDGE LESS THAN 18"BELOW FINISHED FLOOR, ETC. SHALL BE TEMPERED GLASS PER2009 IBC SECTION 2406.4 HAZARDOUS LOCATIONS.
3. WINDOW AND DOOR DIMENSIONS SHOWN ARE NOMINAL. ACTUALDIMENSIONS SHALL BE BASED ON REQUIREMENTS OF THE HEAD,JAMB, AND SILL DETAILS AND FIELD VERIFICATION OF BUILT ROUGHOPENINGS.
4. REFERENCE DOOR SCHEDULE FOR ADDITIONAL FRAMEREFERENCES AT DOOR OPENINGS.
5. REFERENCE WALL SECTIONS AND RELATED DETAILS FORADDITIONAL FRAME DETAILS.
NOTES:
Storefront Sill MullionCaulkCarpet Re: Room Finish Schedule
Floor Finish Re: RoomFinish Schedule
8" Metal Studs5/8" Gypsum Wall Board
Treated Wood BlockingStorefront Jamb Mullion
Caulk
5/8" Gypsum Wall Board
Thermal Batt Insulation8" Metal Studs @ 16" O.C.
Fluid Applied Air/Weather BarrierOver 5/8" Exterior Gypsum Sheathing
1" Rigid InsulationTreated Wood Blocking Seal Overw/ Liquid Flashing
Storefront Jamb Mullion
Extruded Aluminum
Brick Veneer w/ Masonry Ties@ 16" O.C. both ways
Backerrod and Sealant
Re: R
CP fo
r Ceil
ing H
eights
and T
ypes
Steel Lintel Re: Structural
Mortar Net
Weep Cell Vent @ 24" O.C.
Continuous CoatedCopper Flashing
Stainless Steel Sub Flashing
Temination Bar SealOver w/ Liquid Flashing
Treated Wood BlockingSeal over w/ Liquid Flashing
Storefront Head Mullion
Metal Stud Box Beam
5/8" Gypsum Wall BoardAcoustical Batt Insulation
Caulk
Backerrod and Sealant
Storefront Corner MullionBy Manufacturer
Brick Veneer w/ Masonry Ties@ 16" O.C. each way
CaulkStorefront Sill Mullion
Backerrod and Sealant
Stainless Steel Sub Flashing
Treated Wood BlockingSeal Over w/ Liquid Flashing
Continous CoatedCopper Flashing
Stainless Steel Sub Flashing
Weep Cell Vant @ 24" O.C.
SLOPE AWAY FROM BUILDING
1/2" Expansion Joint w/Backerrod and Sealant
Storefront Sill Mullion
5/8" Gypsum Wall BoardJ-Mould
Caulk
2 Layers of 5/8"Gypsum Wall Board
1/2" Resilient Channels@ 24" O.C. Vertically
Storefront Head Mullion
3 5/8" Metal Stud Header
2 Layers of 5/8"Gypsum Wall Board
1/2" Resilient Channels@ 24" O.C. Vertically
J-Mould
3 5/8" Metal Stud5/8" Gypsum Wall BoardJ-MouldCaulk
Jamb MullionTreated Wood Blocking
5/8" Gypsum Wall BoardJ-Mould
Caulk
2 Layers of 5/8"Gypsum Wall Board
1/2" Resilient Channels@ 24" O.C. Vertically
3 5/8" Metal Stud Header
Storefront Sill Mullion
Storefront Head Mullion
Metal Stud BoxBeam Header
Treated Wood Blocking Re: R
CP fo
r Ceil
ing H
eight
and T
ype
Caulk
5/8" Gypsum Wall Board
5/8" Gypsum Wall Board
Storefront Sill Mullion
CaulkTreated Wood Blocking
Metal Stud Box Beam5/8" Gypsum Wall Board
Treated Wood Blocking
L.W. Stud Framing
5/8" Gypsum Wall Board
Finish Grade Wood Trim toMatch Window
Treated Wood BlockingSeal Over w/ Liquid Flashing
Backerrod and Sealant
Aluminum Wood Clad Window Re: Window Types
Weep Cell Vent @ 24" O.C.
Continuous CoatedCopper Flashing
Stainless Steel Sub Flashing
Thermal Batt Insulation
Treated Wood Blocking
Backerrod and SealantExtruded Alum.
Liquid Flashing
Finish Grade Wood to Match Window8" Metal Studs
Treated Wood BlockingSeal Over w/ Liquid Flashing
Metal Stud Box Beam Header
5/8' Gypsum Wall Board
Finish Grade Woodto Match Window Trim
Sidelight Re: Door Schedule
Trim Piece By Manfacturer
Treated Wood BlockingSeal Over w/ Liquid Flashing
Metal Stud Box Beam Header
5/8' Gypsum Wall Board
Finish Grade Woodto Match Window Trim
Door Re: Door Schedule
Trim Piece By Manfacturer
Finish Grade Woodto Match Window
5/8" Gypsum Wall Board
8" Metal Studs
Treated Wood BlockingSeal Over w/ Liquid Flashing
Fluid Applied Air/Weather Barrier Over5/8" Exterior Gypsum Sheathing
Thermal Batt Insulation
Trim Piece By Manufacturer
5 5/8"
Treated Wood BlockingSeal Over w/ Liquid Flashing
Backerrod and Sealant
Finish Grade Wood Stoolto Match WindowMetal Stud Box Beam5/8" Gypsum Wall Board
Cast Stone Sill
1" Rigid Insulation2" Air Space
Fluid Applied Air/Weather BarrierOver 5/8" Exterior Gypsum Sheathing
Aluminum Wood Clad Window
Finish Grade Woodto Match Window
5/8" Gypsum Wall Board
8" Metal Studs
Treated Wood BlockingSeal Over w/ Liquid Flashing
Fluid Applied Air/Weather Barrier Over5/8" Exterior Gypsum Sheathing
Thermal Batt Insulation
Trim Piece By Manufacturer
REGISTERED R
ETIHCA
CT
ST A T E O F ISS SSI
II
M
PP
Michael W.
4822
Taylor
PROJECT NO.
CHECKED BY:DRAWN BY:
PryorMorrow PCC 2016Copyright
SCALE:
PryorMorrow
9/1/
2017
3:3
5:34
PM
As indicated
Col
umbu
s, M
issi
ssip
pi
2016111LAS
MWT
GLAZING/WINDOWDETAILS, LEGEND, +ELEVATIONS
A8.2
Demo
nstra
tion S
choo
l Ren
ovati
onG.
S.#1
04-18
7
Bure
au o
f Bui
ldin
g, G
roun
ds a
nd R
eal P
rope
rty M
anag
emen
t
3" = 1'-0"15 DETAIL
3" = 1'-0"8 DETAIL
3" = 1'-0"13 DETAIL
3" = 1'-0"1 DETAIL
3" = 1'-0"7 DETAIL
3" = 1'-0"3 DETAIL
3" = 1'-0"9 DETAIL 3" = 1'-0"6 DETAIL
3" = 1'-0"12 DETAIL
3" = 1'-0"18 DETAIL
3" = 1'-0"2 DETAIL
3" = 1'-0"14 DETAIL
3" = 1'-0"4 DETAIL
3" = 1'-0"10 DETAIL
3" = 1'-0"16 DETAIL
3" = 1'-0"5 DETAIL
3" = 1'-0"11 DETAIL
3" = 1'-0"17 DETAIL
REFER TO FLOOR PLANS FOR WALL TYPES
3" = 1'-0"19 DETAIL
MAR
KDA
TEDE
SCRI
PTIO
NSD
June
17,
201
6SC
HEM
ATIC
DES
IGN
DD
Nov
embe
r 30,
201
6D
ESIG
N D
EVEL
OPM
ENT
CD
May
31,
201
7C
ON
STR
UC
TIO
N D
OC
UM
ENTS
(75%
)C
DJu
ly 1
4, 2
017
CO
NST
RU
CTI
ON
DO
CU
MEN
TS (1
00%
)C
DSe
ptem
ber 5
, 201
7O
FFIC
IAL
BID
DO
CU
MEN
TS
2017