A2 media Timestable planning
-
Upload
anne-blossemberry -
Category
Social Media
-
view
170 -
download
0
Transcript of A2 media Timestable planning
![Page 1: A2 media Timestable planning](https://reader036.fdocuments.in/reader036/viewer/2022071816/55ab1f931a28abe3058b4603/html5/thumbnails/1.jpg)
Production title – Karma.
Production schedule.
Wk. 1 Mon Tues Weds Thurs Fri Sat Sun
6th
October
Planning and making a time table with the actors. Send an email to local council asking for permission to use the park. Getting permission from the house owner. Constant blog of process.
Rehearse scenes with actors. Getting permission to use the TV studio.
Production shopping.
Write down final editing techniques/transitions etc for each scene we do.
Team chat. Team chat about sound effects, editing and music and make sure to write down.
Wk. 2 Mon Tues Weds Thurs Fri Sat Sun
![Page 2: A2 media Timestable planning](https://reader036.fdocuments.in/reader036/viewer/2022071816/55ab1f931a28abe3058b4603/html5/thumbnails/2.jpg)
Production title – Karma.
Production schedule.
13th
October
Getting permission to use camera equipment’s. Constant blog of progress.
Get the actors dressed and ready to shoot in the first location which is the street. Inform the actors what to do then do constant rehearsals to get to perfection.
Meet up with actors to rehearse a different scene. Next scene will be when Diana is at the lockers.
Team chats about sound effects, music and editing. (Final decisions).
Wk. 3 Mon Tues Weds Thurs Fri Sat Sun 20th
October Replay all the scenes to check if they are performed well. Constant blog of process.
Get Asmaa dressed up to play Priscilla, the ghost. Rehearse the scene of Diana receiving
Team meeting to access progress.
Rehearse the ghost scene again to get to absolute perfection then plan the meeting at Geneva’s house for the bed scene.
Final confirmation of the dates we are available to travel to Geneva’s house.
![Page 3: A2 media Timestable planning](https://reader036.fdocuments.in/reader036/viewer/2022071816/55ab1f931a28abe3058b4603/html5/thumbnails/3.jpg)
Production title – Karma.
Production schedule.
the text then spotting Priscilla. Rehearse that particular scene of Priscilla on the bench. Get camera angles and shots right.
Wk. 4 Mon Tues Weds Thurs Fri Sat Sun
Inform Diana (main actor) to bring a night gown for Wednesday’s meet up at Geneva’s house. Constant blog of
Get the props of the camera equipment, fake blood, a bible and cranberry juice to rehearse at Geneva’s house. Rehearse
Do the next act of Diana arriving to school looking pale and tired. (Location will be outside college,
Team meeting to access performance.
![Page 4: A2 media Timestable planning](https://reader036.fdocuments.in/reader036/viewer/2022071816/55ab1f931a28abe3058b4603/html5/thumbnails/4.jpg)
Production title – Karma.
Production schedule.
process. till perfection.
near gates). Get camera shots etc right.
Wk. 5 Mon Tues Weds Thurs Fri Sat Sun
Blog process. Ask actors to get the property of the fake blood and lipstick for the toilet scene.
Shoot the toilet scene, Diana goes toilet and sees reflection of ghost. After Diana gets out of the toilet she sees the sink overflowing with blood. She blinks then there is a writing
Team meeting to access progress than rehearse scene again if need be. Arrange a date to meet at the park for the final scene and prepare
![Page 5: A2 media Timestable planning](https://reader036.fdocuments.in/reader036/viewer/2022071816/55ab1f931a28abe3058b4603/html5/thumbnails/5.jpg)
Production title – Karma.
Production schedule.
of the location of the park in red/black lipstick on the mirror.
transition to the park.
Wk. 6 Mon Tues Weds Thurs Fri Sat Sun
Blog process. Replay all scenes to access performance. Remind team to get properties of a rope, fake blood/ink, a paper, celetape, the ghost’s gown and make-up.
Check weather for park beforehand e.g. whether it is raining, foggy or snowing. Remind team about properties again.
With all equipment, go to the park to shoot the final scene. Get camera angles and shot scenes to get the angles and shots right. Rehearse over again to get right.
Team meeting to access performance & discuss sound, editing,
Discuss sound, editing etc again.
Wk. 7 Mon Tues Weds Thurs Fri Sat Sun
Blog process. Begin to ask
If need be rehearse
![Page 6: A2 media Timestable planning](https://reader036.fdocuments.in/reader036/viewer/2022071816/55ab1f931a28abe3058b4603/html5/thumbnails/6.jpg)
Production title – Karma.
Production schedule.
for feedback amongst other people.
particular scenes.
Wk. 8 Mon Tues Weds Thurs Fri Sat Sun
Wk. 9 Mon Tues Weds Thurs Fri Sat Sun
Wk. 10 Mon Tues Weds Thurs Fri Sat Sun