Westbrook Mills, Borough Road, Godalming, GU7 2AZ, UK
T+ 44 (0) 1483 528 400, F+ 44 (0) 1483 528 989
APPROVED:
PROJECT No:
SCALE @ A0:
TITLE:
PROJECT:
DRAWING No:
DESIGNED:
CHECKED:
DATE:
REV:
CLIENT:
DRAWING STATUS:
File nam
e \\U
K.W
SP
GR
OU
P.C
OM
\C
EN
TR
AL D
AT
A\P
RO
JE
CT
S\700370X
X\70037047 - D
RA
X R
E-P
OW
ER
IN
G D
CO
-Y
OR
KS
HIR
E\C
AD
\70037047-2.6A
-E
L-01.D
WG
, printed on 11 M
ay 2018 16:38:41, by S
pinks, S
am
DRAWN:
WSP UK Ltd
c
70037047
70037047-2.6A-EL 01
AS SHOWN R.MAKIN B.SIBTHORP
B.SIBTHORP S.SPINKS 06/04/2018
SUBMISSION FOR REFERENCE
The Drax Power
(Generating Stations) Order
Application Document Reference 2.6A
- Indicative Plant Elevations
Infrastructure Planning (Applications: Prescribed Forms and
Procedure) Regulations 2009 - Regulation 5(2) (o)
AutoCAD SHX Text
PLAN VIEW - SCALE 1:10000
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
C
AutoCAD SHX Text
C
AutoCAD SHX Text
D
AutoCAD SHX Text
D
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
TOP OF EXHAUST STACK LEVEL +125.06m AOD
AutoCAD SHX Text
ELECTRICITY GENERATING STATION GROUND LEVEL +5.06m AOD
AutoCAD SHX Text
ELECTRICITY GENERATING STATION GROUND LEVEL +5.06m AOD
AutoCAD SHX Text
ELECTRICITY GENERATING STATION GROUND LEVEL +5.06m AOD
AutoCAD SHX Text
ELECTRICITY GENERATING STATION GROUND LEVEL +5.06m AOD
AutoCAD SHX Text
SECTION A-A SOUTH ELEVATION
AutoCAD SHX Text
SECTION B-B EASTERN ELEVATION
AutoCAD SHX Text
SECTION C-C NORTHERN ELEVATION
AutoCAD SHX Text
SECTION D-D WESTERN ELEVATION
AutoCAD SHX Text
ORIGINAL SCALE 1:750
AutoCAD SHX Text
60m
AutoCAD SHX Text
40
AutoCAD SHX Text
20
AutoCAD SHX Text
0
AutoCAD SHX Text
20
AutoCAD SHX Text
TOP OF GAS TURBINE AIR INLET +41.06m AOD
AutoCAD SHX Text
TOP OF HRSG BUILDING +43.06m AOD
AutoCAD SHX Text
TOP OF PIPERACK +24.06m AOD
AutoCAD SHX Text
TOP OF BATTERY STORAGE FACILITY +15.04m AOD
AutoCAD SHX Text
NOTE: 1. PLANT TO BE CONSTRUCTED AS PART OF ELECTRICITY GENERATING STATION UNIT X SHOWN IN A DARKER SHADE OF GREY. PLANT TO BE CONSTRUCTED AS PART OF ELECTRICITY GENERATING STATION UNIT Y SHOWN IN A LIGHTER SHADE OF GREY. 2. - ELECTRICITY GENERATING STATION GROUND LEVEL +5.06m AOD - BATTERY STORAGE FACILITY GROUND LEVEL +5.04m AOD - SLUDGE LAGOON AREA GROUND LEVEL +5.12m AOD