a0 Progress Energy 10 - NRC

136
a0 Progress Energy 10 CFR 50.55a Serial: RNP-RA/06-0001 JAN 1 6 2006 United States Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/LICENSE NO. DPR-23 SUBMITTAL OF 90 DAY INSERVICE INSPECTION SUMMARY REPORT Ladies and Gentlemen: In accordance with the requirements of 10 CFR 50.55a, "Codes and Standards," Carolina Power and Light Company, also known as Progress Energy Carolinas, Inc., is providing, as an attachment to this letter, the Inservice Inspection Summary Report for Class 1 and Class 2 pressure retaining components and their supports. This report has been prepared in accordance with the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI, 1995 Edition, 1996 Addenda, Article IWA-6000. This report covers inspection activities before and during Refueling Outage 23 at the H. B. Robinson Steam Electric Plant, Unit No. 2. If you have any questions concerning this matter, please contact me at (843) 857-1253. Sincerely, 6&2ly C. T. Baucom Supervisor - Licensing/Regulatory Programs CTB/cac Attachment c: Resident Inspector, HBRSEP C. P. Patel, NRC, NRR W. D. Travers, NRC, Region II Progress Energy Carolinas, Inc. Robinson Nuclear Plant 3581 West Entrance Road Hartsville, SC 29550 fV Ocl7

Transcript of a0 Progress Energy 10 - NRC

Page 1: a0 Progress Energy 10 - NRC

a0 Progress Energy 10 CFR 50.55a

Serial: RNP-RA/06-0001

JAN 1 6 2006

United States Nuclear Regulatory CommissionAttn: Document Control DeskWashington, DC 20555

H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2DOCKET NO. 50-261/LICENSE NO. DPR-23

SUBMITTAL OF 90 DAY INSERVICE INSPECTION SUMMARY REPORT

Ladies and Gentlemen:

In accordance with the requirements of 10 CFR 50.55a, "Codes and Standards," CarolinaPower and Light Company, also known as Progress Energy Carolinas, Inc., is providing,as an attachment to this letter, the Inservice Inspection Summary Report for Class 1 andClass 2 pressure retaining components and their supports. This report has been preparedin accordance with the American Society of Mechanical Engineers Boiler and PressureVessel Code, Section XI, 1995 Edition, 1996 Addenda, Article IWA-6000. This reportcovers inspection activities before and during Refueling Outage 23 at the H. B. RobinsonSteam Electric Plant, Unit No. 2.

If you have any questions concerning this matter, please contact me at (843) 857-1253.

Sincerely,

6&2lyC. T. BaucomSupervisor - Licensing/Regulatory Programs

CTB/cac

Attachment

c: Resident Inspector, HBRSEPC. P. Patel, NRC, NRRW. D. Travers, NRC, Region II

Progress Energy Carolinas, Inc.Robinson Nuclear Plant3581 West Entrance RoadHartsville, SC 29550

fV Ocl7

Page 2: a0 Progress Energy 10 - NRC

MENNNmr-

United States Nuclear Regulatory CommissionAttachment to Serial: RNP-RA/06-0001

H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2

INSERVICE INSPECTION SUMMARYREPORT FOR REFUELING OUTAGE 23

Page 3: a0 Progress Energy 10 - NRC

INSERVICE INSPECTION REPORTINTERVAL 4, PERIOD 2, OUTAGE 1

(RO #23)

ISI SUMMARY REPORT

FOR

H.B. ROBINSON NUCLEAR STATION(UNIT 2)

3581 WEST ENTRANCE ROADHARTSVILLE, SC 29550

CAROLINA POWER AND LIGHT, Dba,PROGRESS ENERGY CAROLINAS, INC.

411 FAYETTEVILLE STREETRALEIGH, NC 27602

COMMERCIAL SERVICE DATE: 3/7/71

REPORT COMPLETION DATE: 12/12/05

'I of 43

Page 4: a0 Progress Energy 10 - NRC

1995 Edition 1996 Addenda APPENDIX II - MANDATORY

FORM NIS-1 OWNER'S REPORT FOR INSERVICE INSPECTIONSAs required by the Provisions of the ASME Code Rules

FORM NIS-1

1. Owner: CP&L. Inc. Dba Progress Energy Carolinas, Inc.. 411 Fayetteville St.. Raleigh,NC 27602

(Name and Address of Owner)

2. Plant: H.B. Robinson, 3581 West Entrance Rd., Hartsville. SC 29550(Name and Address of Plant)

3. Plant Unit: 2

4. Owner Certificate of Authorization (if required) N/A

5. Commercial Service Date: 3/7/1971

6. National Board Number for Unit: 20772

7. Components Inspected

ManufacturerComponent or Manufacturer or or Installer State or NationalAppurtenance Installer Serial No. Province No. Board No.

Steam Generator B Westinghouse S/N 93733 N/A N/A

Reactor Coolant Pump B Westinghouse CPLRCPCPC2 N/A N/A

Piping Ebasco Services N/A N/A N/A

Piping Maintenance N/A N/A N/A

2 of 43

Page 5: a0 Progress Energy 10 - NRC

Form NIS-1 SECTION Xl - DIVISION 1 1995 Edition, thru 1996 Addenda

FORM NIS-1 (Back)

8. Examination Dates: 5/30/2004 to 10/27/2005

9. Inspection Period Identification: Period 2 (2/19/2005/2/19/2009)

10. Inspection Interval from: 2/19/2002 to 2/19/2012

11. Applicable Editions of Section Xl: 1995 Edition. thru 1996 Addenda

12. Date / Revision of the Inspection Plan: 4/28/2005 Revision 7

13. Abstract of Examinations and Tests. Include a list of examinations and tests and astatement concerning status of work required for the Inspection Plan.

See Attached Summaries

12. Abstract of Results of Examination and Tests.

See Attached Summaries

13. Abstract of Corrective Measures.

See attached Summaries

We certify that a) the statements made in this report are correct, b) the examinations andtests meet the Inspection Plan as required by the ASME Code, Section Xl, and c) correctivemeasures taken conform to the rules of the ASME Code, Section Xi.

Certificate of Authorization No. (if applicable): N/A Expiration Date:N/A

Date: 12/8/2005 Signed: ProEress Energy Carolinas, Inc. By: Jar, eOwner

CERTIFICATE OF INSERVICE INSPECTION

I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure VesselInspectors and the State or Province of North Carolina and employed by HSBCT haveinspected the components described in this Owner's Report during the period 5/30/2004 to 12/7/2005and state that to the best of my knowledge and belief, the Owner has performed examinations and takencorrective measures described in this Owner's Report in accordance with the requirements of the ASMECode, Section Xl.

By signing this certification neither the inspector nor his employer makes any warranty, expressed orimplied, concerning the examinations and corrective measures described in this Owner's Report.Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injuryor property da or a loss of any kind arising from or connected with this inspection.

Commissions NC 1507

Inspector's Signature National Board, State, Province, and Endorsement

Date: Dc br?005

3 of 43

Page 6: a0 Progress Energy 10 - NRC

1.0 ABSTRACT

1.1 This report presents the results of the Inservice Inspection of the Fourth Interval,

Second Period, First Outage, for refueling outage number twenty-three

(RFO#23), at the H. B. Robinson Unit 2 Nuclear Station. Examinations of steam

generator feedwater nozzles per NRC IE Bulletin No. 79-13, piping welds, piping

supports, component welds, component supports, and bolting and were

conducted in accordance with ASME Section Xl, 1995 Edition, thru 1996

Addenda. Repair and replacement efforts included modification and

maintenance of component replacements. Pressure testing of ASME Code

systems and their components was performed in accordance with the

requirements of ASME Section Xl, IWA-5000, IWB-5000, IWC-5000, and IWD-

5000. No service-induced flaws, which exceeded the acceptance criteria of

ASME Section Xl, were detected during the inservice examinations of pressure

retaining components. Indications discovered during visual examination of

component supports were evaluated and accepted, repaired or restored to the

original design configurations.

2.0 INTRODUCTION

2.1 This report contains a detailed iteem-by-item summary of examinations and

results performed by Progress Energy Carolinas, Inc. and iTi, integratedTechnologies, inc., since the start of RFO-23, on 9/17/2005. The Fourth Interval,

Second Period examination percentage requirements are contained in Tab G.

Examination reports, sketches, examination limitations, consumable testing

materials, personnel qualifications and calibration standards are retained by

Progress Energy Carolinas, Inc.. on site. Detailed information for the outage

activities are contained in the RO 23 ISI Final Outage Report and may be

obtained through the Progress Energy Carolinas, Inc. plant document control

services.

3.0 EDDY CURRENT EXAMINATION

3.1 No Eddy-Current testing was performed during refueling outage 23.

4t of 43

Page 7: a0 Progress Energy 10 - NRC

4.0 INSERVICE EXAMINATION EVALUATION

4.1 The ISI exams performed prior to and during refueling outage twenty three at H.

B. Robinson, Unit 2, Nuclear Station were conducted in accordance with the

outage plan derived from the Fourth Ten Year Inservice Inspection Program and

Plan. This plan meets the requirements of ASME Section Xl as defined in the

1995 Edition, thru the 1996 Addenda, H. B. Robinson, Unit 2, Technical

Specifications, Section 5.5, and Title 10 of the Code of Federal Regulations, Part

50.55a(g) including those applicable relief requests approved by the Nuclear

Regulatory Commission for the Fourth Ten-Year Interval.

4.2 All Inservice Examinations performed were conducted by the use of Progress

Energy procedures and documented on procedural data reports. Each data

report details the component or system examined, examination method

employed, the procedure used to perform the test and all pertinent equipment

settings or examination conditions. Recordable indications were documented

and evaluated within the individual data reports. The examination and

evaluations reports are retained in the RO 23 ISI Final Outage Report and are

retained by H. B. Robinson Nuclear Station as permanent records for retrieval

and review for the life of the plant. A summary of examinations, attached herein,

contains listings of the examinations performed, details of the component

identification, code category, code item number, examination area, work

documents and other applicable identifying information.

4.3 Ultrasonic, magnetic particle, and liquid penetrant examinations revealed no

service-induced flaws exceeding the acceptance criteria of ASME Section Xl,

1995 Edition, thru 1996 Addenda.

4.4 Visual examinations of supports, which revealed indications requiring evaluation,

have been dispositioned per TAAM-038 as functional. All reported indications on

supports were evaluated by Civil Engineering to determine if the supports were

functional and had no operability concerns. However, in some cases, Progress

Energy Carolinas, Inc. has elected to restore the supports to their original design

5 of 43

Page 8: a0 Progress Energy 10 - NRC

via the WR (Work Request) and WO (Work Order) process and will be re-

inspected (if required) to ensure those components have been returned to their

design condition.

4.5 The results of examinations performed at the H. B. Robinson Nuclear Station

during refueling outage twenty-three are classified into one of the following

categories:

Sat - No Rejectable Indications

UnSat - Rejectable Indications

4.6 The Inservice Examination Summary tables (TAB B) itemize the components

examined during refueling outage twenty-three. The percent Code required

volume (CRV) or Code required area (CRA) covered during the examination, if

less than or equal to 90%, is delineated in the comment section of the

examination. The following is a brief explanation of the type of information

included in the NDE Summary:

* Summary No. - Unique tracking number utilized within the ISI Program/Plan.

* Component ID - Identification of the component examined or tested

* Component Description - A description of the component configuration

* Categorv - The ASME code category that the examination was performed to.

* Item - The item number of the applicable code category that the examination

was performed to.

* Procedure - The procedure utilized to perform the examination.

* Method - The examination or test method

* Report # - The unique examination number assigned to an exam.

* Results - The results of the examination

* System - The system on which the component was examined

* ISO Number - The isometric drawing identifying the location of the

component being examined.

* Exam Date - The date the examination was completed.

6 of 43

Page 9: a0 Progress Energy 10 - NRC

5.0 AUGMENTED EXAMINATION PROGRAM

5.1 The Augmented Examination Program included in this report documents the

inspections performed to satisfy regulatory documents, other than ASME Section

Xl. During this period, ultrasonic; examinations were conducted in accordance

with NRC commitment ID 92R0362 for the steam generator feedwater nozzles

(79-13). These examinations and records are not subject to the interface and

review by the Authorized Nuclear Inservice Inspector (ANII), and are summarized

in the Augmented Examination Summary, TAB C, of this Report.

6.0 OWNER ELECTED EXAMINATION PROGRAM

6.1 There were no Owner Elected exams performed during RO-23 for this NIS-1

reporting period.

7.0 PRESERVICE EXAMINATION

7.1 Preservice examination of Code Class components were conducted at the H.B.

Robinson Unit 2 Plant from the close of refueling outage twenty-two (May 29,

2004) to the close of RO-23 (October 27, 2005) were performed to therequirements of ASME Section Xi 1995 Edition, thru 1996 Addenda. A summary

of these examinations and the results are listed in the Preservice Examination

Summary, TAB E, of this report.

7.2 The detailed examination data sheets recording all of the volumetric, surface and

visual results for the preservice examinations are located in the RO 23 ISI Final

Outage Report, and may be obtained through the Progress Energy Carolinas,

Inc., H.B. Robinson Plant Document Control Services.

7 of 43

Page 10: a0 Progress Energy 10 - NRC

8.0 PRESSURE TEST SUMMARY

8.1 Pressure tests and VT-2 examinations are performed in conjunction with ASME

Section Xl, Plant Technical Specifications and in accordance with procedure

TMM-020 "Inservice Inspection Pressure Testing". Also included within TMM-

020 are the approaches to testing each Code Class system and reference to the

respective Engineering Surveillance Test (EST) procedures used in the conduct

of the credited pressure test. The summary of these pressure tests is listed in

the Pressure Test Summary, TAB F, of this Report.

8.2 TAB F of this report includes the pressure tests performed after the close of the

last NIS-1 reporting period (5/29/2004) thru the end of the First Period

(2/19/2005). TAB F also includes pressure tests performed to date from the start

of the Second Period thru this reporting period (10/27/2005).

9.0 REPAIR AND REPLACEMENT PROGRAM

9.1 The H. B. Robinson Nuclear Station Repair and Replacement Program reporting

period for the Fourth Ten-Year Interval is from the close of refueling outage

twenty-two (May 29, 2004) to the close of refueling outage twenty three (October

27, 2005). Repair/replacement activities that occurred during this time frameunderwent extensive review by the station personnel involved and the Authorized

Nuclear Inservice Inspector (ANII). Work Order package information included

within this summary report are those items which have completed all the required

reviews, final engineering approval, and the required ANI/ANII NIS-2 certification

prior to the close of the reporting period as specified in ASME Section Xl, IWA-

6230(b). The repair/replacement summaries are listed in the

Repair/Replacement Summary, TAB H, of this Report.

8 of 43

Page 11: a0 Progress Energy 10 - NRC

9.2 Work Order evolutions performed during the twenty third refueling outage whose

document review, approval and certification process was not finalized by the

established closing date shall be reported either by amendment to the original

Refueling Outage Twenty Three NIS-2 Summary or shall be included in the next

refueling outage Summary Report (RO-24), within the established guidelines of

ASME Section Xl, IWA-6230(b).

9.2.1 The enclosed repair and replacement summary (TAB H) and the attached ASME

Section Xl, NIS-2 forms (Attachment I) detail the component, system, Work

Order document, component description and the description of the Work Order

activity. Complete repair and replacement documentation for the specific

component is maintained on site as a permanent record and is retrievable

through the WO (Work Order) document package, which is identified on the NIS-

2 form.

9.3 The Owners Report for Repair/Replacement Activities, Form NIS-2 is provided in

Attachment I.

9 of 43

Page 12: a0 Progress Energy 10 - NRC

INSERVICE INSPECTION REPORT

REFUELING OUTAGE 22

INDEX OF EXAMINATIONS

TAB EXAMINATION ACTIVITY

A EDDY CURRENT SUMMARY

B INSERVICE EXAMINATION SUMMARY

C AUGMENTED EXAMINATION SUMMARY

D OWNER ELECTED EXAMINATION SUMMARY

E PRESERVICE EXAMINATION SUMMARY

F PRESSURE TEST SUMMARY

G

H

EXAMINATION PERCENTAGE SUMMARY

REPAIR / REPLACEMENT SUMMARY

ATTACHMENT I

I REPAIR/REPLACEMENT NIS-2 FORMS

10 of 43

Page 13: a0 Progress Energy 10 - NRC

TAB

A

EDDY

CURRENT

SUMMARY

11 of 43

Page 14: a0 Progress Energy 10 - NRC

EDDY CURRENT SUMMARY

ABSTRACT

No Eddy-Current Testing was performed during refueling outage 23.

12 of 43

Page 15: a0 Progress Energy 10 - NRC

TAB

B

INSEERVICE

EXAMINATION

SUMMARY

13 of 43

Page 16: a0 Progress Energy 10 - NRC

The following tables are arranged by ASME Code Class and CPL component

identification. The 100 series are ASME Class 1, and the 200 series are ASME Class 2.

Code Required Volume (CRV) and Code Required Surface (CRS) have been identified

throughout the ISI Summary Tables. When an examination is limited to < 90% CRV or

CRS as defined in ASME Code Case N-460 and NRC Information Notice 98-42, a relief

request shall be submitted within 12 months of the close of the Fourth Ten-Year

Interval. Generic Code Cases that apply to all examinations are not specifically

identified for each examination.

114 of 43

Page 17: a0 Progress Energy 10 - NRC

INSERVICE EXAMINATION SUMMARYSummary

No.ExamDateComponent ID Component Description Cateqory Item Procedure Method/Report #/Results System ISO Number

Class 131400 105A101 TUBESHEET TO HEAD B-B B2.40 NDEP-0450

NDEP-0450NDEP-0450

Comment: Examination was performed to the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda.to welded insulation ring pads and a welded ID plate.

31700 105AIC SUPPORT LEG C F-A F1.40 NDEP-0613Comment: Examination was performed to the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.

UT UT-05-053 Sat 2005 HBR2-10618 SHT 007 10/4/2005UT UT-05-051 Sat 2005 HBR2-10618 SHT 007 10/4/2005UT UT-05-052 Sat 2005 HBR2-10618 SHT 007 10/4/2005

Code Case N-460 invoked for this exam for which 94.840% CRV was achieved due

VT VT-05-036 Sat 2005 HBR2-10618 SHT 007 10/4/2005

37500 107A/04DM ELBOW TO NOZZLE B-F B5.70 NDEP-0436NDEP-0201NDEP-0436

Comment: Examination was performed to the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda.in a single sided exam from the centrifugally cast stainless steel elbow side with 49.1% CRV.

37600 107AJ05DM NOZZLE TO ELBOW B-F B5.70 NDEP-0436NDEP-0201NDEP-0436

Comment: Examination was performed to the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda.in a single sided exam from the centrifugally cast stainless steel elbow side with 47.540% CRV.

37800 107A/06 ELBOW TO PIPE B-J B9.11 NDEP-0436NDEP-0436NDEP-0201NDEP-0425

Comment: Examination was performed to the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda.

37900 107A/07 PIPE TO ELBOW B-J B9.11 NDEP-0201NDEP-0436NDEP-0425NDEP-0436

Comment: Examination was performed to the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda.

38400 107A112 PIPE TO PIPE B-J B9.11 NDEP-0201NDEP-0425

Comment: Examination was performed to the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.

UT UT-05-048 Sat 2005 HBR2-10618 SHT 011 10/1/2005PT PT-05-097 Sat 2005 HBR2-10618 SHT 011 9/29/2005UT UT-05-040 Sat 2005 HBR2-10618 SHT 011 10/1/2005

Examination was limited due to steam generator nozzle configuration which resulted

UT UT-05-049 Sat 2005 HBR2-10618 SHT 011 10/1/2005PT PT-05-098 Sat 2005 HBR2-10618 SHT 011 9/30/2005UT UT-05-050 Sat 2005 HBR2-10618 SHT 011 10/1/2005

Examination was limited due to steam generator nozzle configuration which resulted

UTUTPTUT

PTUTUTUT

UT-05-041UT-05-042PT-05-099UT-05-043

PT-05-100UT-05-044UT-05-046UT-05-045

SatSatSatSat

2005200520052005

HBR2-10618 SHT 011HBR2-10618 SHT 011HBR2-10618 SHT 011HBR2-10618 SHT 011

HBR2-10618 SHT 011HBR2-10618 SHT 011HBR2-10618 SHT 011HBR2-10618 SHT 011

10/1/200510/1/20059/30/200510/1/2005

9/30/200510/1/200510/1/200510/1/2005

SatSatSatSat

2005200520052005

PT PT-05-101 SatUT UT-05-047 Sat

2005 HBR2-10618 SHT 0112005 HBR2-10618 SHT 011

10/2/200510/3/2005

15 of 43

Page 18: a0 Progress Energy 10 - NRC

INSERVICE EXAMINATION SUMMARYSummary

No. Component IDExamDateComponent Description Cateaorv Item Procedure Method/Report #/Results System ISO Number

48000

Comment:

48100

Comment:

48200

Comment:

48300

Comment:

49000Comment:

67800Comment:

67900Comment:

69200Comment:

100400Comment:

112700Comment:

112800Comment:

112900Comment:

113000Comment:

113100Comment:

111/11 ELBOW TO PIPE 6-J B9.11 NDEP-0425 UT UT-05-059 Sat

NDEP-0201 PT PT-05-102 SatExamination was performed to the requirements of ASME Section Xi, 1995 Edition, thru 1996 Addenda.

111112 PIPE TO ELBOW B-J 69.11 NDEP-0425 UT UT-05-061 Sat

NDEP-0201 PT PT-05-103 SatExamination was performed to the requirements of ASME Section Xi, 1995 Edition, thru 1996 Addenda.

111/13 ELBOW TO PIPE B-J B9.11 NDEP-0425 UT UT-05-062 Sat

NDEP-0201 PT PT-05-104 SatExamination was performed to the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.

111114 PIPE TO ELBOW B-J B9.11 NDEP-0425 UT UT-05-060 Sat

NDEP-0201 PT PT-05-105 SatExamination was performed to the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda.

111/Si-875B(B) VALVE SI-8758 BOLTING B-G-2 67.70 NDEP-0611 VT VT-05-001 SatExam performed in place under tension to the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda.

118A/RC-551B(B) VALVE RC-551B BOLTING B-G-2 B7.70 NDEP-0611 VT VT-05-039 SatExam performed in place, under tension to the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.

118AIRC-551B(FB) VALVE RC-551B FLANGE BOLTING B-G-2 B7.50 NDEP-0611 VT VT-05-040 SatExam performed in place, under tension to the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.

120/01 BRANCH CONNECTION TO CAP B-J B9.21 NDEP-0201 PT PT-05-094 SatExamination was performed to the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda.

130/03 PIPE TO VALVE SI.873E WELD B-J B9.40 NDEP-0201 PT PT-05-106 SatExamination was performed to the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda.

133/08 PIPE TO ELBOW B-J B9.40 NDEP-0201 PT PT-05-076 SatExamination was performed to the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.

133/09 ELBOW TO PIPE B-J B9.40 NDEP-0201 PT PT-05-077 SatExamination was performed to the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda.

133/10 PIPE TO ELBOW B-J B9.40 NDEP-0201 PT PT-05-078 SatExamination was performed to the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda.

133/11 ELBOW TO PIPE B-J 69.40 NDEP-0201 PT PT-05-079 SatExamination was performed to the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda.

133/12 PIPE TO ELBOW B-J 89.40 NDEP-0201 PT PT-05-080 SatExamination was performed to the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.

2080

2080

2080

2080

2080

2080

2080

2080

2005

2005

2005

2005

2080

2060

2060

2060

2060

2060

HBR2-10618 SHT 016

HBR2-10618 SHT 016

HBR2-10618 SHT 016

HBR2-10618 SHT 016

HBR2-10618 SHT 016

HBR2-10618 SHT 016

HBR2-10618 SHT 016

HBR2-10618 SHT 016

HBR2-10618 SHT 016

HBR2-10618 SHT 027

HBR2-10618 SHT 027

HBR2-10618 SHT 030

HBR2-10618 SHT 042

HBR2-10618 SHT 045

HBR2-10618 SHT 045

HBR2-10618 SHT 045

HBR2-10618 SHT 045

HBR2-10618 SHT 045

10/6/2005

10/2/2005

10/6/2005

10/2/2005

10/6/2005

10/2/2005

10/6/2005

10/2/2005

9/17/2005

10/5/2005

10/5/2005

9/29/2005

10/3/2005

9/28/2005

9/28/2005

9/28/2005

9/28/2005

9/28/2005

16 of 43

Page 19: a0 Progress Energy 10 - NRC

=

SummaryNo.

113200Comment:

113300Comment:

113400Comment:

113700Comment:

113800Comment:

113900Comment:

11i4000Comment:

116800Comment:

122700Comment:

122800Comment:

122900Comment:

138300Comment:

138400Comment:

138500Comment:

138600Comment:

138700

5

INSERVICE EXAMINATION SUMMARYComponent ID Component Description Category Item Procedure Method/Report #/Results

133/12A ELBOW TO PIPE B-J B9.40 NDEP-0201 PT PT-05-081 SatExamination was performed to the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.

133/12B PIPE TO ELBOW B-J 89.40 NDEP-0201 PT PT-05-082 SatExamination was performed to the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda.

133/13 ELBOW TO PIPE B-J B9.40 NDEP-0201 PT PT-05-083 SatExamination was performed to the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda.

133/14 PIPE TO ELBOW B-J B9.40 NDEP-0201 PT PT-05-084 SatExamination was performed to the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.

133/15 ELBOW TO PIPE B-J 89.40 NDEP-0201 PT PT-05-085 SatExamination was performed to the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda.

133/16 PIPE TO ELBOW B-J B9.40 NDEP-0201 PT PT-05-086 SatExamination was performed to the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.

133/17 ELBOW TO PIPE B-J 89.40 NDEP-0201 PT PT-05-087 S;tExamination was performed to the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.

133/FLG1(FB) FLANGE I BOLTING B-G-2 87.50 NDEP-0611 VT VT-05-044 SatExam performed in place, under tension to the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.

134/D CLEVIS ROD HANGER F-A F1.10 NDEP-0613 VT VT-05-049 SatExamination was performed to the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda.

134/E-WS WELDED ANCHOR F-A F1.10 NDEP-0613 VT VT-05-050 SatExamination was performed to the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.

134/F CLEVIS ROD HANGER F-A F1.10 NDEP-0613 VT VT-05-051 SatExamination was performed to the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.

143/18 PIPE TO ELBOW B-J 89.40 NDEP-0201 PT PT-05-095 SatExamination was performed to the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.

143/19 ELBOW TO PIPE B-J B9.40 NDEP-0201 PT PT-05-096 SatExamination was performed to the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda

143/19A PIPE TO ELBOW B-J 89.40 NDEP-0201 PT PT-05-088 SatExamination was performed to the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda.

143/19B ELBOW TO PIPE B-J B9.40 NDEP-0201 PT PT-05-089 SatExamination was performed to the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.

143/20 PIPE TO ELBOW B-J B9.40 NDEP-0201 PT PT-05-090 Sat

SystemExamDateISO Number

2060

2060

2060

2060

2060

2060

2060

2060

2060

2060

2060

2060

2060

2060

2060

2060

HBR2-10618 SHT 045

HBR2-10618 SHT 045

HBR2-10618 SHT 045

HBR2-10618 SHT 045

HBR2-10618 SHT 045

HBR2-10618 SHT 045

HBR2-10618 SHT 045

HBR2-10618 SHT 045

HBR2-10618 SHT 046

HBR2-10618 SHT 046

HBR2-10618 SHT 046

HBR2-10618 SHT 055

HBR2-10618 SHT 055

HBR2-10618 SHT 055

HBR2-10618 SHT 055

HBR2-10618 SHT 055

9/28/2005

9/28/2005

9/28/2005

9/28/2005

9/28/2005

9/28/2005

9/28/2005

10/6/2005

10/6/2005

10/6/2005

10/6/2005

9/29/2005

9/29/2005

9/28/2005

9/28/2005

9/28/2005

17 of 43

Page 20: a0 Progress Energy 10 - NRC

INSERVICE EXAMINATION SUMMARYSummary

No.ExamDateComponent ID Component Description Cateqorv Item Procedure MethodlReoort #/Results Svstem ISO Numhber

Comment: Examination was performed to the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.

138800 143/21 ELBOW TO PIPE B-J B9.40 NDEP-0201Comment: Examination was performed to the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.

138900 143/22 PIPE TO ELBOW B-J B9.40 NDEP-0201Comment: Examination was performed to the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.

139000 143/23 ELBOW TO PIPE B-J B9.40 NDEP-0201Comment: Examination was performed to the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.

142900 143/N TRAPEEZE HANGER W/U-BOLT F-A F1.10 NDEP-0613Comment: Examination was performed to the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.

143000 143/P U-BOLT RESTRAINT F-A F1.10 NDEP-0613Comment: Examination was performed to the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.

143200 143/S11WS WELDED ANCHOR F-A F1.10 NDEP-0613Comment: Examination was performed to the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda.

PT PT-05-091 Sat

PT PT-05-092 Sat

PT PT-05-093 Sat

VT VT-05-037 Sat

VT VT-05-038 Sat

VT VT-05-035 Sat

2060 HBR2-10618 SHT 055

2060 HBR2-10618 SHT 055

2060 HBR2-10618 SHT 055

2060 HBR2-10618 SHT 055

2060 HBR2-10618 SHT 055

2060 HBR2-10618 SHT 055

9/28/2005

9/28/2005

9/28/2005

10/4/2005

10/4/2005

10/3/2005

150400150500150600150700150800150900151000151100151200151300151400151500151600151700151800151900152000152100152200

144/B-N01144/B-N02144/B-N03144/B-N04144/B-NOS144/B-NO6144/B-N07144/B-N08144/B-N09144/B-N10144/B-N1l144/B-N12144/B-N13144/B-N14144/B-N15144/B-N16144/B-N17144/B-N18144/B-N19

RCP B NUT IRCP B NUT 2RCP B NUT 3RCP B NUT 4RCP B NUT 5RCP B NUT 6RCP B NUT 7RCP B NUT 8RCP B NUT 9RCP B NUT 10RCP B NUT 11RCP B NUT 12RCP B NUT 13RCP B NUT 14RCP B NUT 15RCP B NUT 16RCP B NUT 17RCP B NUT 18RCP B NUT 19

B-G-1B-G-1B-G-1B-G-1B-G-1B-G-1B-G-1B-G-1B-G-1B-G-1B-G-1B-G-1B-G-1B-G-1B-G-1B-G-1B-G-1B-G-1B-G-1

B6.20086.200B6.200B6.200B6.20086.200B6.200B6.200B6.200B6.200B6.200B6.200B6.200B6.200B6.200B6.200B6.200B6.200B6.200

NDEP-0611NDEP-0611NDEP-0611NDEP-0611NDEP-0611NDEP-0611NDEP-0611NDEP-0611NDEP-0611NDEP-0611NDEP-0611NDEP-0611NDEP-0611NDEP-0611NDEP-0611NDEP-0611NDEP-0611NDEP-0611NDEP-0611

VTVTVTVTVTVTVTVTVTVTVTVTVTVTVTVTVTVTVT

VT-05-008VT-05-01 0

VT-05-011

VT-05-012

VT-05-013

VT-05-014

VT-05-015

VT-05-016

VT-05-017

VT-05-018

VT-05-019

VT-05-020

VT-05-021

VT-05-022

VT-05-023

VT-05-024

VT-05-025

VT-05-026

VT-05-027

Sat

SatSatSatSatSatSatSatSatSatSatSatSatSatSatSatSatSatSat

2005

2005

2005

2005

2005

2005

2005

2005

2005

2005

2005

2005

2005

2005

2005

2005

2005

2005

2005

HBR2-10618 SHT 056

HBR2-10618 SHT 056

HBR2-10618 SHT 056

HBR2-10618 SHT 056

HBR2-10618 SHT 056

HBR2-10618 SHT 056

HBR2-10618 SHT 056

HBR2-10618 SHT 056

HBR2-10618 SHT 056

HBR2-10618 SHT 056

HBR2-10618 SHT 056

HBR2-10618 SHT 056

HBR2-10618 SHT 056

HBR2-10618 SHT 056

HBR2-10618 SHT 056

HBR2-10618 SHT 056

HBR2-10618 SHT 056

HBR2-10618 SHT 056

HBR2-10618 SHT 056

9/23/2005

9/2312005

9/23/2005

9/23/20059/23/20059/23/20059/23/20059/23/20059/23/20059/23/20059/23/20059/23/20059/23/20059/23/20059/23/20059/23/20059/23/20059/23/20059/23/2005

18 of 43

Page 21: a0 Progress Energy 10 - NRC

INSERVICE EXAMINATION SUMMARYSummary

No.ExamDateComoonent ID Component Description Cateaorv Item Procedure Method/Renort #/Results System ISO Number

. - ------ I - � --1-'-.- ------ -1 - - -

152300

152400

152500

152600

152700Comment:

1441B-N20 RCP B NUT 20 B-G-1 B6.200

144/B-N21 RCP B NUT 21 B-G-1 B6.200

144/B-N22 RCP B NUT 22 B-G-1 B6.200

144/B.N23 RCP B NUT 23 B-G-1 B6.200

144/B-N24 RCP B NUT 24 8-G-1 86.200Exam performed in place, under tension to the requirements of ASME Section Xl, 1995

NDEP-0611 VT VT-05-028

NDEP-0611 VT VT-05-029

NDEP-0611 VT VT-05-030

NDEP-0611 VT VT-05-031

NDEP-0611 VT VT-05-032Edition, thru 1996 Addenda.

SatSatSatSatSat

2005

2005

2005

2005

2005

HBR2-10618 SHT 056

HBR2-10618 SHT 056

HBR2-10618 SHT 056

HBR2-10618 SHT 056

HBR2-10618 SHT 056

9/23/2005

9/23/2005

9/23/2005

9/23/2005

9/23/2005

152800

152900

153000

153100

153200

153300

153400

153500

153600

153700

153800

153900

154000

154100

154200

154300

154400

154500

154600

154700

154800

154900

155000

155100Comment:

144/B-S01 RCP B MAIN FLANGE STD1 B-G-1 86.180 NDEP-0439

144/B-S02 RCP B MAIN FLANGE STO 2 B-G-1 86.180 NDEP-0439

144/B-S03 RCP B MAIN FLANGE STD 3 B-G-1 B6.180 NDEP-0439

144/B-S04 RCP B MAIN FLANGE STD 4 B-G-1 B6.180 NDEP-0439

144/B-SO5 RCP B MAIN FLANGE STD 5 B-G-1 86.180 NDEP-0439

144/B-SO6 RCP B MAIN FLANGE STD 6 B-G-1 B6.180 NDEP-0439

144/B-S07 RCP B MAIN FLANGE STD 7 B-G-1 B6.180 NDEP-0439

144/B-S08 RCP B MAIN FLANGE STD 8 B-G-1 B6.180 NDEP-0439

144/B-S09 RCP B MAIN FLANGE STD 9 B-G-1 B6.180 NDEP-0439

144/B-SIO RCP B MAIN FLANGE STD 10 B-G-1 86.180 NDEP-0439

144/B-S11 RCP B MAIN FLANGE STD 11 B-G-1 86.180 NDEP-0439

144/B-512 RCP B MAIN FLANGE STD 12 B-G-1 B6.180 NDEP-0439

144/B-S13 RCP B MAIN FLANGE STD 13 B-G-1 B6.180 NDEP-0439

144/B-S14 RCP B MAIN FLANGE STD 14 B-G-1 B6.180 NDEP-0439

144/B-S15 RCP B MAIN FLANGE STD 15 B-G-1 86.180 NDEP-0439

144/5-S16 RCP B MAIN FLANGE STD 16 B-G-1 86.180 NDEP-0439

144/B-S17 RCP B MAIN FLANGE STD 17 B-G-1 B6.180 NDEP-0439

144/B-S18 RCP B MAIN FLANGE STD 18 8-G-1 86.180 NDEP-0439

144/B-S19 RCP B MAIN FLANGE STD 19 B-G-1 86.180 NDEP-0439

144/B-S20 RCP B MAIN FLANGE STD 20 B-G-1 B6.180 NDEP-0439

144/B-S21 RCP B MAIN FLANGE STD 21 B-G-1 86.180 NDEP-0439

144/B-S22 RCP B MAIN FLANGE STD 22 B-G-1 B6.180 NDEP-0439

144/B-S23 RCP B MAIN FLANGE STD 23 B-G-1 B6.180 NDEP-0439

144/B-S24 RCP B MAIN FLANGE STD 24 8-G-1 86.180 NDEP-0439Examination was performed to the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.

UT

UT

UT

UT

UT

UT

UTI T

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT

UT-05-001

UT-05-002

UT-05-003

UT-05-004

UT-05-005

UT-05-006

UT-05-007

UT 05-008

UT-05-009

UT-05-010

UT-05-011

UT-OS-012

UT-OS-013

UT-05-014

UT-05-015

UT-OS-016

UT-OS-017

UT-OS-018

UT-OS 019

UT-05-020

UT-05-021

UT-05-022

UT-05-023

UT-05-024

SatSatSatSatSatSatSatSatSatSatSatSatSatSatSatSatSatSatSatSatSatSatSatSat

2005

2005

2005

2005

2005

2005

2005

2005

2005

2005

2005

2005

2005

2005

2005

2005

2005

2005

2005

2005

2005

2005

2005

2005

HBR2-10618 SHT 056

HBR2-10618 SHT 056

HBR2-10618 SHT 056

HBR2-10618 SHT 056

HBR2-10618 SHT 056

HBR2-10618 SHT 056

HBR2-10618 SHT 056

HRR2-10618 SHT 056

HBR2-10618 SHT 056

HBR2-10618 SHT 056

HBR2-10618 SHT 056

HBR2-10618 SHT 056

HBR2-10618 SHT 056

HBR2-10618 SHT 056

HBR2-10618 SHT 056

HBR2-10618 SHT 056

HBR2-10618 SHT 056

HBR2-10618 SHT 056

HBR2-10618 SHT 056

HBR2-10618 SHT 056

HBR2-10618 SHT 056

HBR2-10618 SHT 056

HBR2-10618 SHT 056

HBR2-10618 SHT 056

9/23/2005

9/23/2005

9/23/2005

9/23/2005

9/23/2005

9/23/2005

9/23/2005

9/23/2005

9/23/2005

9/23/2005

9/23/2005

9/23/2005

9/23/2005

9/23/2005

9/23/2005

9/23/2005

9/23/2005

9/23/2005

9/23/2005

9/23/2005

9/23/2005

9/23/2005

9/23/2005

9/23/2005

9/23/2005155200 144/B-SH-BLT RCP B SEAL HOUSE BOLTING B-G-2 87.60 NDEP-0611 VT VT-05-009 SatComment: Exam performed in place, under tension to the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.

2005 HBR2-10618 SHT 056

19 of 43

Page 22: a0 Progress Energy 10 - NRC

INSERVICE EXAMINATION SUMMARYSummary

No.Examnst=Component ID ComDonent Descrintion Catenorv ItPm PmrPriurp MPthnr1l/RPnnrt fi/PPQidk, Rvqfiom IMr Nujmhar-11 ...... --------- 1-1- " 1. -,- -1.1

Class 2168800 205A102 TUBESHEET TO STUB BARREL WELD C-A C1.30 NDEP-0450

NDEP-0450NDEP-0450

Comment: Examination was performed to the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda.hand holes and instrumentation taps.

168900 205A/03 STUB BARREL TO LOWER SHELL WELD C-A C1.10 NDEP-0450NDEP-0450NDEP-0450

Comment: Examination was performed to the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda.

UT UT-05-036 Sat 3005 HBR2-10618 SHT 062 9/29/2005UT UT-05-035 Sat 3005 HBR2-10618 SHT 062 9/29/2005UT UT-05-034 Sat 3005 HBR2-10618 SHT 062 9/29/2005

Code Case N-460 invoked for this exam for which 92.37% CRV was achieved due to

UTUTUT

UT-05-037UT-05-038UT-05-039

SatSatSat

3005 HBR2-10618 SHT 0623005 HBR2-10618 SHT 0623005 HBR2-10618 SHT 062

9/28/20059/28/20059/28/2005

169000 205A/04 UPPER SHELL TO LOWER TRANSITIONWELD

C-A C1i10 NDEP-0450NDEP-0450NDEP-0450NDEP-0450NDEP-0450NDEP-0450

UT UT-05-031 Sat 3005 HBR2-10618 SHT 062 9/28/2005UT UT-05-030 Sat 3005 HBR2-10618 SHT 062 9127/2005UT UT-05-033 Sat 3005 HBR2-10618 SHT 062 9/28/2005UT UT-05-028 Sat 3005 HBR2-10618 SHT 062 9/27/2005UT UT-05-029 Sat 3005 HBR2-10618 SHT 062 9/27/2005UT UT-05-032 Sat 3005 HBR2-10618 SHT 062 9/28/2005

Code Case N-460 invoked for this exam for which 98.50% CRV was achieved dueComment: Examination was performed to the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda. .to welded insulation ring pads.

169500 205A/07 UPPER HEAD TO STEAM NOZZLE WELD C-B C2.21 NDEP-0301NDEP-0450NDEP-0450NDEP-0450

Comment: Examination was performed to the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda.

MTUTUTUT

MT-05-002UT-05-063UT-05-064UT-05-065

SatSatSatSat

3005300530053005

HBR2-10618 SHT 062HBR2-10618 SHT 062HBR2-10618 SHT 062HBR2.10618 SHT 062

10/14/200510/15/200510/15/200510115/2005

10/5/2005178500 2121R-WS WELDED BOX RESTRAINT F-A F1.20 NDEP-0613 VT VT-05-043 Eval 3020 HBR2-10618 SHT 071Evaluation Disposition Acceptable: Support has been evaluated as functional, work request (WR 212019) has been generated to remove loose coatings and reapply.

Comment: Examination was performed to the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda. Examination revealed coating degradation - flaking and peeling paint. Support hasbeen evaluated as functional, work request (WR 212019) has been generated to remove loose coatings and reapply.

179500 213/01 SG B NOZZLE TO REDUCING ELBOW C-F-2 C5.51 NDEP-0437NDEP-0437NDEP-0301

Comment: Examination was performed to the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda.

UT UT-05-066 SatUT UT-05-067 SatMT MT-05-001 Sat

3020 HBR2-10618 SHT 0723020 HBR2-10618 SHT 0723020 HBR2-10618 SHT 072

10/15/200510/15/200510/14/2005

20 of 43

Page 23: a0 Progress Energy 10 - NRC

INSERVICE EXAMINATION SUMMARYSummary Exam

No. Component ID Component Description Category Item Procedure Method/Report #/Results System ISO Number Date

180800 213/12 PIPE TO ELBOW C-F-2 C5.51 NDEP-0437 UT UT-05-054 Sat 3020 HBR2-10618 SHT 072 10/5/2005NDEP-0437 UT UT-05-055 Sat 3020 HBR2-10618 SHT 072 10/5/2005NDEP-0201 PT PT-05-111 Sat 3020 HBR2-10618 SHT072 10/4/2005

Comment: Examination was performed to the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda. PT performed in lieu of MT due to limited access of whip restraint.

180900 213/13 ELBOW TO PIPE C-F-2 C5.51 NDEP-0437 UT UT-05-058 Sat 3020 HBR2-10618 SHT 072 10/5/2005NDEP-0437 UT UT-05-057 Sat 3020 HBR2-10618 SHT 072 10/5/2005NDEP-0437 UT UT-05-056 Sat 3020 HBR2-10618 SHT 072 10/5/2005NDEP-0201 PT PT-05-112 Sat 3020 HBR2-10618 SHT 072 10/4/2005

Comment: Examination was performed to the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda, PT performed in lieu of MT due to limited access of whip restraint.

182500 213/C SPRING HANGER F-A F1.20 NDEP-0613 VT VT-05-041 Eval 3020 HBR2-10618 SHT 072 10/5/2005Evaluation Disposition Acceptable: Support has been evaluated as acceptable as is, no further action required.

Comment: Examination was performed to the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda. Examination identified there was no scale on spring can. Measured slot length 3.7"Indicator was 2.1" from top of slot. Civil Engineering evaluated the support as acceptable as is, no further action required.

182800 213/F-WS WELDED BOX RESTRAINT F-A F1.20 NDEP-0613 VT VT-05-042 Eva1 3020 HBR2-10618 SHT 072 10/5/2005

Evaluation Disposition Acceptable: Support was evaluated as acceptable as is, however, support will be restored to original design configuration under WR 211601.Comment: Examination was performed to the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda. Examination identified weld (5") is not adhered to the plate/web intersection. Civil

Engineering evaluated the support as acceptable as is: however, support will be restored to original design configuration under WR 211601.

319700 246/03 PIPE TO ELBOW C-F-1 C5.30 NDEP-0201 PT PT-05-107 Sat 2080 HBR2-10618 SHT 112 10/3/2005Comment: Examination was performed to the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda.

319800 246/04 ELBOW TO PIPE C-F-1 C5.30 NDEP-0201 PT PT-05-108 Sat 2080 HBR2-10618 SHT 112 10/3/2005Comment: Examination was performed to the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda.

319900 246/05 PIPE TO ELBOW C-F-1 C5.30 NDEP-0201 PT PT-05-109 Sat 2080 HBR2-10618 SHT 112 1013/2005Comment: Examination was performed to the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda.

320000 246/06 ELBOW TO PIPE C-F-1 C5.30 NDEP-0201 PT PT-05-110 Sat 2080 HBR2-10618 SHT 112 10/3/2005Comment: Examination was performed to the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda.

325300 246/1 U-BOLT TRAPEEZE ROD HANGER F-A F1.20 NDEP-0613 VT VT-05-045 Eval 2080 HBR2-10618 SHT 112 10/6/2005Evaluation Disposition Acceptable: Support has been evaluated as acceptable as is, no further action required.

Comment: Examination was performed to the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda, Examination identified 3/4 thread engagement on clamp to pipe bolting. CivilEngineering has evaluated the support as acceptable as is, no further action required.

325500 246/K-WS WELDED U-BOLT RESTRAINT F-A F1.20 NDEP-0613 VT VT-05-046 Sat 2080 HBR2-10618 SHT 112 10/6/2005Comment: Examination was performed to the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda.

21 of 43

Page 24: a0 Progress Energy 10 - NRC

INSERVICE EXAMINATION SUMMARYSummary

No.ExamDateComponent ID Component Description Cateaorv Item Procedure Method/Report #/Results System ISO Numher

332600 247/D SPRING HANGER F-A F1.20 NDEP-0613 VT VT-05-048 Eval 2080 HBR2-10618 SHT 113 10/6/2005Evaluation Disposition Acceptable: Support has been evaluated as acceptable as is, no further actions required.

Comment: Examination was performed to the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda, Examination identified a loose nut on U support to clevis. No Scale On Spring Can,slot is 1.9", pointer is at 1.13". Civil Engineering evaluated the missing load scale as acceptable as is. The clevis pin nut was tightened to enhance margin of threads and tightness.

333600 247/N ANGLE IRON SUPPORT F-A F1.20 NDEP-0613Comment: Examination was performed to the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda.

VT VT-05-047 Sat 2080 HBR2-10618SHT 113 10/6/2005

22 of 43

Page 25: a0 Progress Energy 10 - NRC

TAB

C

AUGMENTED

EXAMINATION

SUMMARY

23 of 43

Page 26: a0 Progress Energy 10 - NRC

AUGMENTED EXAMINATION SUMMARYSummary Exam

No. Component ID Component Description Category Item Procedure Method/Report #/Results System ISO Number Date

192300 215/79-13-A SIG A NOZZLE TO ELBOW AUGMENT E-1 NDEP-0437 UT UT-05-025 Sat 3050 HBR2-10618 SHT 074 9/26/2005Comment: Augmented examination completed to the requirements of NRC Bulletin No. 79-13, "Cracking in Feedwater System Piping". No recordable indications were noted. Maintained a 5% to

20% ID roll during examination. Scanned 360° of base metal/weld from nozzle taper to 18" on upstream side of elbow.

197200 216/79-13-B S/G B NOZZLE TO ELBOW AUGMENT E-1 NDEP-0437 UT UT-05-026 Sat 3050 HBR2-10618 SHT 075 9/26/2005Comment: Augmented examination completed to the requirements of NRC Bulletin No. 79-13, "Cracking in Feedwater System Piping". No recordable indications were noted. Maintained a 5% to

20% Id roll during examination. Scanned 3600 of base metal/weld from nozzle taper to 18" on upstream side of elbow.

201000 217/79-13-C S/G C NOZZLE TO ELBOW AUGMENT E-1 NDEP-0437 UT UT-05-027 Sat 3050 HBR2-10618 SHT 076 9/26/2005Comment: Augmented examination completed to the requirements of NRC Bulletin No. 79-13, "Cracking in Feedwater System Piping". No recordable indications were noted. Maintained a 5% to

20% Id roll during examination. Scanned 360° of base metal/weld from nozzle taper to 18" on upstream side of elbow.

24 of 43

Page 27: a0 Progress Energy 10 - NRC

TAB

D

OWNER' ELECTED

EXAM I NATION

SUMMARY

25 of 43

Page 28: a0 Progress Energy 10 - NRC

OWNER ELECTED EXAMINATION SUMMARY

Component NDE Method Exam ISO Exam

Summary No Identification Component Description Category Item Procedure Report # Results System Number Date

There were no Owner Elected exams performed during RO-23 for this NIS-1 reporting period.

26 of 43

Page 29: a0 Progress Energy 10 - NRC

TAB

E

PRESERVICE

EXAM INATION

SUMMARY

27 of 43

Page 30: a0 Progress Energy 10 - NRC

Pre-Service Examination SummarySummary

No.Exam

System ISO Number DateComponent ID Component Description Category Item Procedure Method/Report #/Results

25950Comment:

25975Comment:

26025Comment:

26050Comment:

26575Comment:

26625Comment:

26650Comment:

26675Comment:

26725Comment:

26750Comment:

26775Comment:

26825Comment:

26850Comment:

26875Comment:

26925Comment:

101C126(a) TOP ROD TRAVEL HOUSING WELD B-0 B14.10 NDEP-0201 PT PT-05-003 SatPreservice examination performed to meet the requirements of ASME Section Xi, 1995 Edition, thru 1996 Addenda.

101C/26(f) BOTTOM CRDM HEAD ADAPTER WELD B-a B14.10 NDEP-0201 PT PT-05-004 SatPreservice examination performed to meet the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda.

II0C/27(a) TOP ROD TRAVEL HOUSING WELD B-a B14.10 NDEP-0201 PT PT-05-005 SatPreservice examination performed to meet the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.

101C127(f) BOTTOM CRDM HEAD ADAPTER WELD B-a B14.10 NDEP-0201 PT PT-05-006 SatPreservice examination performed to meet the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.

101C/28(a) TOP ROD TRAVEL HOUSING WELD B-a B14.10 NDEP-0201 PT PT-05-007 SatPreservice examination performed to meet the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.

IOIC/28(fl BOTTOM CRDM HEAD ADAPTER WELD B-a B14.10 NDEP-0201 PT PT-05-008 SatPreservice examination performed to meet the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.

101C/29(a) TOP ROD TRAVEL HOUSING WELD B-O B14.10 NDEP-0201 PT PT-05-009 SatPreservice examination performed to meet the requirements of ASME Section XI, 1995 Edition. thru 1996 Addenda.

101CI29(fl BOTTOM CRDM HEAD ADAPTER WELD B-a B14.10 NDEP-0201 PT PT-05-010 SatPreservice examination performed to meet the requirements of ASME Section Xi, 1995 Edition, thru 1996 Addenda.

101C/30(a) TOP ROD TRAVEL HOUSING WELD B-a B14.10 NDEP-0201 PT PT-05-011 SatPreservice examination performed to meet the requirements of ASME Section Xi, 1995 Edition, thru 1996 Addenda.

101C/30(f) BOTTOM CRDM HEAD ADAPTER WELD B-a B14.10 NDEP-0201 PT PT-05-012 SatPreservice examination performed to meet the requirements of ASME Section Xi, 1995 Edition, thru 1996 Addenda.

101C/31(a) TOP ROD TRAVEL HOUSING WELD B-a B14.10 NDEP-0201 PT PT-05-013 SatPreservice examination performed to meet the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.

101C131(fl BOTTOM CRDM HEAD ADAPTER WELD B-a B14.10 NDEP-0201 PT PT-05-014 SatPreservice examination performed to meet the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.

101C/32(a) TOP ROD TRAVEL HOUSING WELD B-a B14.10 NDEP-0201 PT PT-05-015 SatPreservice examination performed to meet the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.

101C/32(t BOTTOM CRDM HEAD ADAPTER WELD B-a B14.10 NDEP-0201 PT PT-05-016 SatPreservice examination performed to meet the requirements of ASME Section Xi, 1995 Edition, thru 1996 Addenda.

101C/33(a) TOP ROD TRAVEL HOUSING WELD B-a B14.10 NDEP-0201 PT PT-05-017 SatPreservice examination performed to meet the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.

1005

1005

1005

HBR2-10618 SHT 004

HBR2-10618 SHT 004

HBR2-10618 SHT 004

1005 HBR2-10618 SHT 004

1005 HBR2-10618 SHT 004

1005 HBR2-10618 SHT 004

1005 HBR2-10618 SH i 004

1005 HBR2-10618 SHT 004

1005 HBR2-10618 SHT 004

1005 HBR2-10618 SHT 004

1005 HBR2-10618 SHT 004

1005 HBR2-10618 SHT 004

1005 HBR2-10618 SHT 004

1005 HBR2-10618 SHT 004

1005 HBR2-10618 SHT 004

4/8/2005

4/8/2005

4/8/2005

4/8/2005

4/8/2005

4/8/2005

4i82G05

4/8/2005

4/8/2005

4/8/2005

4/8/2005

4/8/2005

4/8/2005

4/8/2005

4/8/2005

28 of 43

Page 31: a0 Progress Energy 10 - NRC

Pre-Service Examination SummaryComponent Description Category Item Procedure Method/Report #/Results

SummaryNo.

Exam- System ISO Number DateComoonent ID

26950Comment:

26975Comment:

27025Comment:

27050Comment:

27075Comment:

27125Comment:

27150Comment:

27175Comment:

27225Comment:

27250Comment:

27275Comment:

27325Comment:

27350Comment:

27375Comment:

27425Comment:

101C/33(f) BOTTOM CRDM HEAD ADAPTER WELD B-0 B14.10 NDEP-0201 PT PT-05-018 SatPreservice examination performed to meet the requirements of ASME Section Xi, 1995 Edition, thru 1996 Addenda.

101C/34(a) TOP ROD TRAVEL HOUSING WELD B-0 B14.10 NDEP-0201 PT PT-05-019 SatPreservice examination performed to meet the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.

101C,/34(f) BOTTOM CRDM HEAD ADAPTER WELD B-0 B14.10 NDEP-0201 PT PT-05-020 SatPreservice examination performed to meet the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.

101C/35(a) TOP ROD TRAVEL HOUSING WELD B-O B14.10 NDEP-0201 PT PT-05-021 SatPreservice examination performed to meet the requirements of ASME Section Xi, 1995 Edition, thru 1996 Addenda.

101C135(f) BOTTOM CRDM HEAD ADAPTER WELD B-0 B14.10 NDEP-0201 PT PT-05-022 SatPreservice examination performed to meet the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.

101C136(a) TOP ROD TRAVEL HOUSING WELD B-0 B14.10 NDEP-0201 PT PT-05-023 SatPreservice examination performed to meet the requirements of ASME Section Xi, 1995 Edition, thru 1996 Addenda.

101C/36(f) BOTTOM CRDM HEAD ADAPTER WELD B-0 B14.10 NDEP-0201 PT PT-05-024 SatPreservice examination performed to meet the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda.

101C/37(a) TOP ROD TRAVEL HOUSING WELD B-0 614.10 NDEP-0201 PT PT-05-025 SatPreservice examination performed to meet the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.

101C/37(f) BOTTOM CRDM HEAD ADAPTER WELD B-O B14.10 NDEP-0201 PT PT-05-026 SatPreservice examination performed to meet the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.

101C/38(a) TOP ROD TRAVEL HOUSING WELD B-O B14.10 NDEP-0201 PT PT-05-027 SatPreservice examination performed to meet the requirements of ASME Section Xi, 1995 Edition, thru 1996 Addenda.

101C/38(fl BOTTOM CRDM HEAD ADAPTER WELD B-0 614.10 NDEP-0201 PT PT-05-028 SatPreservice examination performed to meet the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.

101C/39(a) TOP ROD TRAVEL HOUSING WELD B-0 B14.10 NDEP-0201 PT PT-05-029 SatPreservice examination performed to meet the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.

101C/39(fl BOTTOM CRDM HEAD ADAPTER WELD B-0 B14.10 NDEP-0201 PT PT-05-030 SatPreservice examination performed to meet the requirements of ASME Section Xi, 1995 Edition, thru 1996 Addenda.

101C/40(a) TOP ROD TRAVEL HOUSING WELD B-0 B14.10 NDEP-0201 PT PT-05-031 SatPreservice examination performed to meet the requirements of ASME Section Xi, 1995 Edition, thru 1996 Addenda.

101C/40(f) BOTTOM CRDM HEAD ADAPTER WELD B-0 B14.10 NDEP-0201 PT PT-05-032 SatPreservice examination performed to meet the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.

29 of 43

1005

1005

1005

1005

1005

1005

1005

1005

1005

1005

1005

1005

1005

1005

1005

HBR2-10618 SHT 004

HBR2-10618 SHT 004

HBR2-10618 SHT 004

HBR2-10618 SHT 004

HBR2-10618 SHT 004

HBR2-10618 SHT 004

HBR2-10618 SHT 004

HBR2-10618 SHT 004

HBR2-10618 SHT 004

HBR2-10618 SHT 004

HBR2-10618 SHT 004

HBR2-10618 SHT 004

HBR2-10618 SHT 004

HBR2-10618 SHT 004

HBR2-10618 SHT 004

4/8/2005

4/8/2005

4/8/2005

4/8/2005

4/8/2005

4/8/2005

4/8/2005

4/8/2005

4/8/2005

4/8/2005

4/8/2005

4/8/2005

4/8/2005

4/8/2005

4/8/2005

Page 32: a0 Progress Energy 10 - NRC

Pre-Service Examination SummarySummary

No. Component IDExam

ISO Number DateComoonent Description Cateaorv Item Procedure Method/Report #/Results Svstem

27450Comment:

27475Comment:

27525Comment:

27550Comment:

27575Comment:

101 C/41 (a) TOP ROD TRAVEL HOUSING WELD B-0 B14.10 NDEP-0201 PT PT-05-033 SatPreservice examination performed to meet the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.

10 11C/41 (f) BOTTOM CRDM HEAD ADAPTER WELD B-O B14.10 NDEP-0201 PT PT-05-034 SatPreservice examination performed to meet the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.

101C142(a) TOP ROD TRAVEL HOUSING WELD B-O B814.10 NDEP-0201 PT PT-05-035 SatPreservice examination performed to meet the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda,

1 01 C142(f) BOTTOM CRDM HEAD ADAPTER WELD B-0 B14.10 NDEP-0201 PT PT-05-036 SatPreservice examination performed to meet the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.

101C/43(a) TOP ROD TRAVEL HOUSING WELD B-0 B14.10 NDEP-0201 PT PT-05-037 SatPreservice examination performed to meet the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.

1005

1005

HBR2-10618 SHT 004

HBR2-10618 SHT 004

1005 HBR2-10618 SHT 004

1005 HBR2-10618 SHT 004

27625 410C,'43(01 BOTTOM CRDM HEAD ADAPTER WELD B-O B14.10 NDEP-0201 PT PT-05-038 SatComment: Preservice examination performed to meet the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda.

27650 101C/44(a) TOP ROD TRAVEL HOUSING WELD B-O B14.10 NDEP-0201 PT PT-05-039 SatComment: Preservice examination performed to meet the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.

27675 101C/44(fl BOTTOM CRDM HEAD ADAPTER WELD B-0 B14.10 NDEP-0201 PT PT-05-040 SatComment: Preservice examination performed to meet the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda.

27725 101C/45(a) TOP ROD TRAVEL HOUSING WELD B-0 B14.10 NDEP-0201 PT PT-05-041 SatComment: Preservice examination performed to meet the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.

27750 101C/45(fl BOTTOM CRDM HEAD ADAPTER WELD B-O B14.10 NDEP-0201 PT PT-05-042 SatComment: Preservice examination performed to meet the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda.

27775 101C/62(a) TOP ROD TRAVEL HOUSING WELD B-0 B14.10 NDEP-0201 PT PT-05-043 SatComment: Preservice examination performed to meet the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.

27825 101C/62(f) BOTTOM CRDM HEAD ADAPTER WELD B-0 814.10 NDEP-0201 PT PT-05-044 SatComment: Preservice examination performed to meet the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.

1005 HBR2-10618 SHT 004

1005 HBR2-10618 SHT 004

1005 HBR2-10618 SHT 004

1005 HBR2-10618 SHT 004

1005 HBR2-10618 SHT 004

1005 HBR2-10618 SHT 004

1005 HBR2-10618 SHT 004

1005 HBR2-10618 SHT 004

1005 HBR2-10618 SHT 004

1005 HBR2-10618 SHT 004

4/8/2005

4/8/2005

4/8/2005

4/8/2005

4/8/2005

4/8/2005

4/8/2005

4/8/2005

4/8/2005

4/8/2005

4/8/2005

4/8/2005

4/8/2005

4/8/2005

27850Comment:

27875Comment:

101C/63(a) TOP ROD TRAVEL HOUSING WELD B-0 814.10 NDEP-0201 PT PT-05-045 SatPreservice examination performed to meet the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.

101C/63(f) BOTTOM CRDM HEAD ADAPTER WELD B-0 B14.10 NDEP-0201 PT PT-05-046 SatPreservice examination performed to meet the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.

30 of 43

Page 33: a0 Progress Energy 10 - NRC

Pre-Service Examination SummarySummary

No. Component ID Component DescriptionExam

System ISO Number DateCategory Item Procedure Method/Report #/Results

27925 101C/64(a) TOP ROD TRAVEL HOUSING WELD B-0 B14,10 NDEP-0201 PT PT-05-047 SatComment: Preservice examination performed to meet the requirements of ASME Section Xi, 1995 Edition, thru 1996 Addenda.

27950 101C164(f) BOTTOM CRDM HEAD ADAPTER WELD B-0 B14.10 NDEP-0201 PT PT-05-048 SatComment: Preservice examination performed to meet the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda.

27975 101C/65(a) TOP ROD TRAVEL HOUSING WELD B-O B14.10 NDEP-0201 PT PT-05-049 SatComment: Preservice examination performed to meet the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.

28025 101C/65(f) BOTTOM CRDM HEAD ADAPTER WELD B-0 B14.10 NDEP-0201 PT PT-05-050 SatComment: Preservice examination performed to meet the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.

28050 101C/66(a) TOP ROD TRAVEL HOUSING WELD B-0 B14.10 NDEP-0201 PT PT-05-051 SatComment: Preservice examination performed to meet the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.

28075 101C/66(f) BOTTOM CRDM HEAD ADAPTER WELD B-0 B14.10 NDEP-0201 PT PT-05-052 SatComment: Preservice examination performed to meet the requirements of ASME Section XI, 1995 Edition. thru 1996 Addenda.

28125 101C/67(a) TOP ROD TRAVEL HOUSING WELD B-0 B14.10 NDEP-0201 PT PT-05-053 SatComment: Preservice examination performed to meet the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.

28150 101C167(f) BOTTOM CRDM HEAD ADAPTER WELD B-0 B14.10 NDEP-0201 PT PT-05-054 SatComment: Preservice examination performed to meet the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.

28175 101C/68(a) TOP ROD TRAVEL HOUSING WELD B-O B14.10 NDEP-0201 PT PT-05-055 SatComment: Preservice examination performed to meet the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.

28225 10IC/68(f) BOTTOM CRDM HEAD ADAPTER WELD B-0 B14.10 NDEP-0201 PT PT-05-056 SatComment: Preservice examination performed to meet the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda.

28250 101C/69(a) TOP ROD TRAVEL HOUSING WELD B-0 B14.10 NDEP-0201 PT PT-05-057 SatComment: Preservice examination performed to meet the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda.

28275 101C/69(f) BOTTOM CRDM HEAD ADAPTER WELD B-0 B14.10 NDEP-0201 PT PT-05-058 SatComment: Preservice examination performed to meet the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda.

1005

1005

HBR2-10618 SHT 004

HBR2-10618 SHT 004

1005 HBR2-10618 SHT 004

1005 HBR2-10618 SHT 004

1005 HBR2-10618 SHT 004

1005 HBR2-10618 SHT 004

1005 HBR2-10618 SHT 004

1005 HBR2-10618 SHT 004

1005 HBR2-10618 SHT 004

1005 HBR2-10618 SHT 004

1005 HBR2-10618 SHT 004

1005 HBR2-10618 SHT 004

4/8/2005

4/8/2005

4/8/2005

4/8/2005

4/8/2005

4/8/2005

4/8/2005

4/8/2005

4/8/2005

4/8/2005

4/8/2005

4/8/2005

9/25/2005

9/29/2005

10/3/2005

322800 246/26 PIPE TO VALVE SI-873B WELD C-F-1 C5.30 NDEP-0201 PT PT-05-070 Sat 2080 HBR2-10618 SHT 112Comment: Examination was performed to the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda. Preservice examination due to valve SI-873B replacement.

322900 246/27 VALVE SI-873B TO PIPE C-F-1 C5.30 NDEP-0201 PT PT-05-071 Sat 2080 HBR2-10618 SHT 112Comment: Examination was performed to the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda. Preservice examination due to valve SI-873B replacement

322725 246/42 PIPE TO COUPLING C-F-1 C5.30 NDEP-0201 PT PT-05-061 Sat 2080 HBR2-10618 SHT 112Comment: Examination was performed to the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda. Preservice examination due to valve Sl-873B replacement.

31 of 43

Page 34: a0 Progress Energy 10 - NRC

Pre-Service Examination SummarySummary Exam

No. Component ID Component Description Category Item Procedure Method/Report #/Results System ISO Number Date

322775 246/43 COUPLING TO PIPE C-F-1 C5.30 NDEP-0201 PT PT-05-062 Sat 2080 HBR2-10618 SHT 112 9/29/2005Comment: Examination was performed to the requirements of ASME Section Xi, 1995 Edition, thru 1996 Addenda. Preservice examination due to valve SI-8738 replacement.

322925 246/44 PIPE TO COUPLING C-F-1 C5.30 NDEP-0201 PT PT-05-063 Sat 2080 HBR2-10618 SHT 112 9/29/2005Comment: Examination was performed to the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda. Preservice examination due to valve Sl-873B replacement.

322975 246/45 COUPLING TO PIPE C-F-1 C5.30 NDEP-0201 PT PT-05-064 Sat 2080 HBR2-10618 SHT 112 10/3/2005Comment: Examination was performed to the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda. Preservice examination due to valve SI-873B replacement.

330400 247/32 PIPE TO VALVE SI.873A WELD C-F-1 C5.30 NDEP-0201 PT PT-05-072 Sat 2080 HBR2-10618 SHT 113 9/25/2005Comment: Examination was performed to the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda. Preservice examination due to valve Sl-873A replacement.

330500 247/33 VALVE SIl873ATO PIPE C-F-1 C5.30 NDEP-0201 PT PT-05-073 Sat 2080 HBR2-10618 SHT 113 9/29/2005Comment: Examination was performed to the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda. Preservice examination due to valve Sl-873A replacement.

330600 247/34 PIPE TO COUPLING C-F-1 C5.30 NDEP-0201 PT PT-05-074 Sat 2080 HBR2-10618 SHT 113 9/29/2005Comment: Examination was performed to the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda. Preservice examination due to valve Sl-873A replacement.

330325 247/49 PIPE TO COUPLING C-F-1 C5.30 NDEP-0201 PT PT-05-065 Sat 2080 HBR2-10618 SHT 113 10/7/2005Comment: Examination was performed to the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda. Preservice examination due to valve Sl-873A replacement.

330375 247/50 COUPLING TO PIPE C-F-1 C5.30 NDEP-0201 PT PT-05-066 Sat 2080 HBR2-10618 SHT 113 9/29/2005Comment: Examination was performed to the requirements of ASME Section Xl, 1995 Edition, thwu 1996 Addenda. Preservice examination due to valve Sl-873A replacement.

32 of 43

Page 35: a0 Progress Energy 10 - NRC

TAB

F

PRESSU RE

TEST

SUMMARY

33 of 43

Page 36: a0 Progress Energy 10 - NRC

The table below lists the pressure tests performed from the close date of the previous NIS-1 (May 27, 2004) and the close of the First Period of the

Fourth Ten Year Interval.

SYSTEM DESCRIPTION COMPLETION PROCEDURE RESULTS

DATE

SFPC ISI Pressure Testing of Spent Fuel Cooling System 12/10/2004 *EST-084 SAT

CVCS ISI Pressure Testing of Chemical and Volume Control System Outside Containment 1/14/2005 *EST-131 SAT

SI Inservice Inspection Pressure Testing of SI Pump Discharge Piping 11/30/2004 *EST-078 SAT

SW Inservice Inspection Pressure Testing of Service Water System 1/18/2005 EST-094 SAT

AFW Inservice Inspection Pressure Testing of The Auxiliary Feedwater System 1/19/2005 EST-082 SAT

CVCS inservice Inspection Pressure Testing of Chemical and Volume Control System 1/13/2005 *EST-093 SAT

SI Inservice Inspection Pressure Testing of Spray additive Tank and Associated Piping 2/8/2005 *EST-092 SAT

CCW ISI Pressure Testing of Component Cooling Water System Inside the Auxiliary Building 12/17/2004 EST-088 SAT

FW ISI Pressure Testing of Feedwater System Outside Containment 12/2/2004 EST-077 SAT

MS ISI Pressure Testing of Steam Supply to the SDAFW Pump 9/9/2004 EST-097 SAT

EDGFO ISI Pressure Testing of Diesel Fuel Oil System 11/22/2004 EST-098 SAT

*Includes Bolting Inspection on Borated Systems (invoked Code Case N-533-1)

No deficiencies were noted for the above Engineering Surveillance Tests and all exceptions were addressed by the normal work

request process and retained as permanent records, which may be obtained through the Progress Energy Carolinas, Inc., Document

Control Services.

34 of 43

Page 37: a0 Progress Energy 10 - NRC

The table below lists the pressure tests performed to date for the Second Period of the Fourth Ten Year Interval since the last NIS-1 submittal.

SYSTEM DESCRIPTION COMPLETION PROCEDURE RESULTS

DATE

CCW ISI Pressure Testing Of Component Cooling Water To CRD Cooler, RCP-A, B, 9/17/2005 EST-076 SAT

And C, And Excess Letdown Heat Exchanger

SW Inservice Inspection Pressure Testing Of Service Water Inside Containment To 9/17/2005 EST-081 SAT

And From HVH Units 1 Through 4

Si Inservice Inspection Pressure Testing Of SI System and Containment Spray 9/14/2005 *EST-091 SAT

Pump Suction Piping

SG Inservice Inspection Pressure Testing Of The Steam Generator Secondary Side 9/17/2005 EST-128 SAT

And Associated Class 2 Piping

Si Inservice Inspection Pressure Testing Of The SIS Accumulators And Associated 9/17/2005 *EST-129 SAT

Class 2 Piping Inside Containment

RCS Inservice Inspection Pressure Retaining VT-2 Bolting Examination Of Reactor 9/21/2005 **EST-083-1 SAT

Coolant System

RCS Inservice Inspection Pressure Testing Of Reactor Coolant System 10/24/2005 **EST-083-2 SAT

*Includes Bolting Inspection on Borated Systems (invoked Code Case N-533-1)

** EST-083-1 is for bolted connections, EST-083-2 is for pressure testing at the end of the refueling outage.

No deficiencies were noted for the above Engineering Surveillance Tests and all exceptions were addressed by the normal work

request process and retained as permanent records, which may be obtained through the Progress Energy Carolinas, Inc., Document

Control Services.

35 of 43

Page 38: a0 Progress Energy 10 - NRC

TAB

G

EXAM I NATION

PERCENTAGE

SUMMARY

36 of 43

Page 39: a0 Progress Energy 10 - NRC

CLASS 1 SUMMARY TABLETOTAL INTERVAL INTERVAL INTERVAL NUMBER SCHEDULED/COMPLETED

CATEGORY NUMBER OF NUMBER NUMBER PERCENT 1ST 2 ND 3RD

COMPONENTS REQUIRED COMPLETE COMPLETE PERIOD PERIOD PERIOD

B-A* 2 20 20 0 0% 0/0 0/0 20/0

B-B1 13 5 1 20% 1/1 2/0 2/0

B-D* 36 23 3 13% 3/3 4/0 16/0

B-F 18 18 6 33% 4/4 4/2 10/0

B.G-1* 347 344 96 28% 48/48 48/48 248/0

B-G-2 45 45 21 46% 17/17 13/4 15/0

B-J 721 181 93 51% 64164 73/29 81/0

B-K 53 6 2 33% 2/2 2/0 2/0

B-L-1 9 3 0 0%0 0/0 0(0 3(0

B-L-2 3 0 0 0% 0/0 0/0 0/0

B-M-2 11 3 0 0% 0/0 0/0 0/0

B-N-I 1 1 0 0% 0/0 0/0 1/0

B-N-2 1 1 0 0% 0/0 0/0 1/0

B-N-3 1 1 0 0% 0/0 0/0 1/0

B-O2 56 5 1 20% 1/1 2/0 2/0

B-P 1 7 3 of 7 42% 2/2 3/1 2/0

B-Q 3 TECH SPEC N/A N/A N/A N/A N/A* Deferral Permissible' Code Case N-598 invoked for this Category2 Reactor Head Replaced in RO-23

37 of 43

Page 40: a0 Progress Energy 10 - NRC

CLASS 2 SUMMARY TABLE

TOTAL INTERVAL INTERVAL INTERVAL # SCHEDULED/COMPLETED

CATEGORY NUMBER OF NUMBER NUMBER PERCENT 1ST 2 ND 3RD

COMPONENTS REQUIRED COMPLETE COMPLETE PERIOD PERIOD PERIOD

C-A 21 9 6 66% 3/3 3/3 3/0

C-B 26 10 5 50% 4/4 2/1 4/0

C-C 148 9 5 55% 3/3 4/2 2/0

C-D 1 1 0 0% 0/0 1/0 0/0

C-F-I 898 68 28 41% 24/241 26/4 35/0

C-F-2 141 28 15 53% 12/121 11/3 11/0

C-G 4 2 0 : 0 j / 0/0 210

C-H 11 011 (per period) j 14 of 33 42% 11/11 11/3 | 11/0

I Code Case N-598 invoked for this Category

38 of 43

Page 41: a0 Progress Energy 10 - NRC

CLASS 1, 2, & 3 SUPPORT SUMMARY TABLE

TOTAL INTERVAL INTERVAL INTERVAL # SCHEDULED/COMPLETED

CATEGORY NUMBER OF NUMBER NUMBER PERCENT 1ST 2ND 3RD

COMPONENTS REQUIRED COMPLETE COMPLETE PERIOD PERIOD PERIOD

F-A F1.101 207 52 27 51% 21/21 22/6 22/0

F-A, F1.201 385 58 30 51% 23/23 27/7 26/0

F-A, F1.301 556 56 29 51% 29/29 25/0 26/0

F-A, F1.401 92 Supports 66 23 34% 22/22 18/1 2610

on44

components

l 1(23 Groups)

' Code Case N-598 invoked for this Category

39 of 43

Page 42: a0 Progress Energy 10 - NRC

TAB

H

REPAIR

AND

REPLACEMENT

40 of 43

Page 43: a0 Progress Energy 10 - NRC

RO-23 REPAIR/REPLACEMENT SUMMARY REPORT

NIS-2 # Work Order Component ID System Descri tion04-034 338905 CVC-293C 2060 Replacing valve, piping and fitting04-035 525362 CVC-277A 2060 Replacing valve and piping.04-036 510800 CVC-277C 2060 Replacing valve, piping and fitting04-037 586766 CHG-PMP-C 2060 Replaced valve stop.04-038 483464 SW-374 4060 Replaced SW-374 with new valve05-001 168081 01 Capscrew 2060 Replaced bolting on Boric Acid Filter due to boric acid accumulation/corrosion05-002 618922 DG-B-LO-HTX 4060 Replaced Lube Oil HTX End Cover05-003 597678 DG-A-LO-HTX 4060 Replaced Lube Oil Htx End Cover with spare05-004 681666 8-AC-151R-61 7110 Repaired piping line 8-AC-151R-61 by welding05-005 671221 FE-150 2060 Replaced bolting (studs and nuts) due to leakage05-006 628658 EDG-A 4060 Alternate Cooling Water Supply & Discharge Modification05-007 622493 EDG-I 4060 Alternate Cooling Water Supply & Discharge Modification05-008 661742 BA-XFER-PMP-A 2060 Replaced 2 studs and nuts due to leakage.05-009 697587 HVH-8B 4060 Replaced threaded nipples05-010 670842 HVH-8B 4060 Replaced cooling coil, piping, and fittings05-011 768917 SI-870B 2080 Repalced valve disc05-012 615770 SW-8 4060 Replaced valve05-013 624261 SW-7 4060 Replaced valve05-014 651737 SW-375 4060 Replaced Check Valve with rotating spare05-015 189336 SW-377 4060 Replaced check valve with rotating spare05-016 665455 AC-7-34/2 4080 Modified CCW system supports per EC 5573105-017 648715 S6-1B 4060 Replaced inlet and outlet Strainer Flange bolting05-018 759301 RC-525 2005 Replaced valve and piping05-019 664068 SI-873A 2080 Replaced valve and pipe pieces05-020 581883 LTDN-ORIFICE-A 2060 Replaced "A" Letdown restricting orifice05-021 534701 CC-738 4060 Replacing valve05-022 619151 Rx Head 2005 Replaced RVLIS and head vent piping and fittings05-022 619146 1-RC-2501R-99 2005 Replaced RVLIS and Head Vent piping and fittings05-023 558600 RPV Head 1005 Replaced RPV Head05-024 564296 FI-660 4080 Modifying piping section and relocating FI-66005-025 767472 213/F-WS 3020 Weld repair of restraint structure stiffener plate05-026 662477 Snubber #20 2045 Replaced snubber05-027 544849 FCV-478 3050 Replaced one stud and one nut damaged during maintenance

41 of 43

Page 44: a0 Progress Energy 10 - NRC

RO-23 REPAIR/REPLACEMENT SUMMARY REPORT

NIS-2 # Work Order Component ID System Description05-028 544818 MS-263A 3020 Replaced valve piston05-029 664066 SI-873B 2080 Replaced valve and pipe pieces05-030 633486 A & B CS Pump 2080 Modified A & B containment spray pump discharge piping05-031 662682 Snubber #23 2060 Replaced snubber05-032 703718 01 S/G A Manway 3005 Replaced bolts with studs/nuts to support temporary repair of mechanical connection05-033 703718 05 S/G A Manway 3005 Replaced Manway cover, threaded inserts and machined Manway pad05-034 703490 S/G A Manway 3005 Replacing studs and nuts installed with bolts05-035 559034 FE-496 3050 Removed and re-welded tack welds for inspection05-036 554808 FE-476 3050 Removed and re-welded tack welds for inspection05-037 664191 Snubber#35 2060 Replaced snubber

42 of 43

Page 45: a0 Progress Energy 10 - NRC

ATTACHMENT

I

OWVNERS REPAIR I

REPLACEMENT ACTIVITIES

FORM NIS-2

43 of 43

Page 46: a0 Progress Energy 10 - NRC

1995 Edition 1996 Addenda APPENDIX II MANDATORY

FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY

As Required by the Provisions of the ASME Code Section Xi

Form NIS 2I

----- ---

1. Owner PROGRESS ENERGY CAROLINAS, INCName

411 FAYETTEVILLE ST.. RALEIGH. NC 27602Address

2. Plant H.B.ROBINSON

Date: 9/1012004

Sheet: I Of 2

Unit: 2Name

3581 WEST Entrance RD: HARTSVILLE, SC 29550Address

3. Work Performed by PROGRESS ENERGY CAROLINAS. INCName

3581 WEST ENTRANCE RD: HARTSVILLE. SC 29550

ESR#:N/A EE:N/AWR/WO:338905 CR:N/A

Repair Organization PO No;Job No;etc.

Type Code Symbol Stamp: N/AAuthorization No.: N/AExpiration Date: N/A

Address

4.

5.

Iticntiffu'Atinn nf 5Rvstpm- rlAInq,' r;4FMI~C.Al Ahnfln Vt IimF rC)ONTPOI qvq.Ti= 2060wwh W w va 1-. F -1-1 - 11 - I - - -- - -- - - -- -

(a) Applicable Construction Code: B 31.1 Edition: 1986 Addenda:N/A Code Case:N/ADesign Specification: CPL-HBR2-M-019

(b) Applicable Edition of Section Xl Used for Repair/Replacement Activity: 1995 Edition 1996 AddendaCode Case: N-416-2

Identification of ComoonentS Ranaired or Renlaced and Redlacement Comoonents6.

Name of Name of Manufacturer National Other Year Corected, ASMEComponent Manufacturer Serial No. Board No. Identification Built Removed, or Code

Installed Stamp(Yes orNo)

CVC-293C Edwards 8K447 NIA Valve 1971 Removed N

CVC-293C Edwards N/A IN/A Valve (HT FOAC) 2004 Installed N

Pipe Ebasco N/A IN/A Pipe 1971 Removed N

Pipe Dubose N/A IN/A Pipe (HT 32789) 2004 Installed N

Fitting Ebasco N/A N/A Elbow 1971 Removed N

Fitting Energy & N/A N/A Elbow (HT KJ) 2004 Installed NProcess Corp. .__ _ _ _ __ _ _ _ _ _ _ _ _ _ _

7. Description of Work: Replacino valve, pipina and fittina

8. Test Conducted: Hydrostatic I:] Pneumatic L-i Nominal Operating Pressure [J Exempt [-l

Other IVT-21 Pressure LNOPI psig Test Temp. INOT1 OF04-034

Page 47: a0 Progress Energy 10 - NRC

I V vp

Form NIS2 1995 Edition 1996 AddendaSECTION Xi DIVISION 1

FORM NIS-2 (Back)Sheet 2 of 2.

Remarks: See WO 338905 turnover packageApplicable Manufacturer's Data Reports to be attached

CERTIFICATE OF COMPLIANCE

I certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code, Section Xi.

Type Code Symbol Stamp N/A

Certificate uthonzato _ N/A

Signed ISI ENGINEER Date 9/1312004Owner or Owner's Designee, Title

CERTIFICATE OF INSERVICE INSPECTION

1, the undersigned, holding a valid commission issued try the National Board of Boiler and Pressure Vessel Inspectors and the

State or Province of North Carolina and employed by HSBCT of HARTFORD, CONNECTICUT have

inspected the components described in this Owner's Report during the period 31112004 to 9/13/2004 and state that to the best

of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners

Report in accordance with the requirements of the ASMIE Code, Section Xi.

By signing this certificate neither the Inspector or his employer makes any warranty, expressed or implied, concerning the

examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer

shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with

this inspection.

_______Commissions NC 1507Insector Signature National Board, State, Province, and Endorsements

Date:9/1 3/2004

04 034

.

Page 48: a0 Progress Energy 10 - NRC

1995 Edition 1996 Addenda APPENDIX It MANDATORY

FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY

As Required by the Provisions of the ASME Code Section XI

Form NIS 2

1. Owner PROGRESS ENERGY CAROLINAS, INCName

411 FAYETTEVILLE ST., RALEIGH, NC 27602

Datae 9/24/2004

Sheet: 1 of 2Address

LA D 93f'tE3KIetrK12. P lAnt# Unit: 2.. . _Name

3581 WEST Entrance RD: HARTSVILLE. SC 29550Address

3. Work Performed by PROGRESS ENERGY CAROLINAS. INCName

3581 WEST ENTRANCE RD: HARTSVILLE, SC 29550

ESR#:N/A EE:N/AWRtWO:525362 CR;N/A

Repair Organization PO No;Job No;etc.

Type Code Symbol Stamp: Nt/AAuthorization No.: N/AExpiration Date: NWA

4.

5.

Address

Identification of System: Class:2 CHEMICAL AND VOLUME CONTROL SYSTEM 2060

(a) Applicable Construction Code: B 31.1 Edition: 1986 Addenda:N/A Code Case:N/ADesign Specification: CPL-HBR2-M-019

(b) Applicable Edition of Section Xl Used for Repair/Replacement Activity: 1995 Edition 1996 AddendaCode Case: N-416-2

6. Identification of Components Hepaired or Replaced and He lacement Components

Name of Name of Manufacturer National Other Year Corrected, ASMEComponent Manufacturer Serial No. Board No. Identification Built Removed, or Code

Installed Stamp(Yes orNO)

CVC-277A Edwards 17ANE N/A Valve 2001 Removed N

CVC-277A Edwards 22AVU N/A Valve (HT FOCA) 2004 Installed N

Piping Maintenance N/A N/A Piping 2001 Removed N

Piping Dubose N/A NIA Piping (HT 32789 2004 Installed N

7. Description of Work: Replacing valve and Dioir g.

8. Test Conducted: Hydrostatic E] Pneumatic ] Nominal Operating Pressure fX] Exempt [-3

Other [VT 21 Pressure INOP1 psig Test Temp. INOT1 °F04-035

Page 49: a0 Progress Energy 10 - NRC

Form NIS2 1995 E[dition 1996 AddendaSECTION Xi DIVISION 1

FORM NIS-2 (Back)Sheet 2 of 2.

9. Remarks: See WO 525362 turnover Dpckac eApplicable Manufacturer's Data Reports to be attached

CERTIFICATE OF COMPLIANCE

I certify that the statements made In the report are correct and this conforms to the requirements of the ASME Code, Section Xi.

Type Code Symbol Stamp W/A

Certificato. _ N/A

Signed 4 ISI ENGINEER Date 9/24/2004Owner or Owner's Designee, Title

CERTIFICATE OF INSERVICE INSPECTION

1, the undersigned, holding a valid commission Issued by the National Board of Boiler and Pressure Vessel Inspectors and the

State or Province of North Carolina and employed by HSBCT of HARTFORD. CONNECTICUT have

inspected the components described in this Owner's Report during the period 3/412004 to 9/2412004 and state that to the best

of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's

Report in accordance with the requirements of the ASME Code, Section Xi.

By signing this certificate neither the Inspector or his employer makes any warranty, expressed or implied, concerning the

examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer

shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with

this inspection.

__ ______Commissions NC 1507nspectsPrgnature National Board, State, Province, and Endorsements

Date:9124/2004

04-035

Page 50: a0 Progress Energy 10 - NRC

I 0

1995 Edition 1996 Addenda APPENDIX II MANDATORY

FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY

As Required by the Provisions of the ASME Code Section Xi

Form NIS 2

1. Owner PROGRESS ENERGY CAROLINAS, INCName

411 FAYETTEVILLE ST.. RALEIGH, NC 27602Address

2. Plant. H.B.ROBINSONName

3581 WEST Entrance RD: HARTSVILLE, SC 29550Address

3. Work Performed by PROGRESS ENERGY CAROLINAS, INCName

3581 WEST ENTRANCE RD: HARTSVILLE, SC 29550

Date: 9/2412004

Sheet: 1 of 2

Unit: 2

ESR#:NIA EE:NIAWRIWO:510800 CR:N/A

Repair Organization PO NoJob No;etc.

Type Code Symbol Stamp: N/AAuthorization No.: NIAExpiration Date: N/A

Address

Identification of System: Class:24.

5.

CHEMICAL AND VOLUME CONTROL SYSTEM 2060----_ . _. ,, _, ._, .................. _ . _ _ _, ............... _ _ .... _ _ _ . _ . ................ _ _ _ _ _

(a) Applicable Construction Code: B 31.1 Edition: 1986 Addenda:N/A Code CaseDesign Specification: CPL-HBR2-M-419

(b) Applicable Edition of Section Xi Used for Flepair/Replacement Activity: 1995 Edition 1996 AddendaCode Case: N-416-2

:N/A

6. Identification of Cnmnonnnts R~nairod or RenIlir-Ad and Ranlanamant CnmnnnAnt.a

0Name of Name of Manufacturer National Other Year Corrected, ASMEComponent Manufacturer Serial No. Board No. Identification Built Removed, or Code

Installed Stamp(Yes orNo)

CVC-277C Edwards 08AFH N/A Valve 1998 Removed N

CVC-277C Edward 48AYV N/A Valve (HT 2004 Installed N_ ___ SONO)

Piping Maintenance N/A N/A Piping 1998 Removed N

Piping Dubose N/A N/A Piping (HT 2004 Installed N__________________________32789) _ _ _ _ _ _

Fitting Maintenance N/A N/A Elbow 1998 Removed N

Fitting E&P Corp. N/A N/A Elbow (HT KJ) 2004 Installed N

7. Description of Work: Replacing valve. Pioina and fittina

8. Test Conducted: Hydrostatic -1 Pneumatic Uj Nominal Operating Pressure LXJ Exempt [-3

Other [VT-21 Pressure [NOP1 psig Test Temp. [NOTl IF04-036

S

Page 51: a0 Progress Energy 10 - NRC

W I

Form NIS2 1995 Edition 1996 AddendaSECTION Xi DIVISION 1

FORM NIS-2 (Back)Sheet dof 2e

I9. Remarks: See WO 510800 turnover packaneApplicable Manufacturer's Data Reports to be attached

CERTIFICATE OF COMPLIANCE

I certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code, Section Xl.

Type Code Symbol Stamp NWA

Certificate O<tflyza o0 N/A

Signed A -- ISI ENGINEER Date 9/24/2004Owrer or Owners Designee, Title

CERTIFICATE OF INSERVICE INSPECTION

1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the

State or Province of North Carolina and employed by HSBCT of HARTFORD, CONNECTICUT have

inspected the components described in this Owner's Report during the period 2/24/2004 to 9/24/2004 and state that to the

best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this

Owners Report in accordance with the requirements of the ASME Code, Section Xl.

By signing this certificate neither the Inspector or his employer makes any warranty, expressed or implied, concerning the

examinations and corrective measures described In this Owners Report. Furthermore, neither the Inspector nor his employer

shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with

this inspection.

Date:9/24/2004

01OA--, Commissions NC 1507

National Board, State, Province, and Endorsements

04-036

Page 52: a0 Progress Energy 10 - NRC

1995 Edition 1996 Addenda APPENDIX II MANDATORY

FORM NIS-2 OWNER'S REPORT FOR REPAIRIREPLACEMENT ACTIVITY

As Required by the Provisions of the ASME Code Section Xi

Form NIS 2

1. Owner PROGRESS ENERGY CAROLINAS. INCName

411 FAYETTEVILLE ST.. RALEIGH. NC 27602

Date: Q92412004

Sheet: 1 of 2Address

U D Qf%0)Kl.rfK2. F9I-nt101~ Pk .J.f.,,I.J..U

Name

3581 WEST Entrance RD: HARTSVILLE. SC 29550Address

3. Work Performed by PROGRESS ENERGY CAROLINAS. INCName

3581 WEST ENTRANCE RD: HARTSVILLE. SC 29550

Unit: 2

ESR#:N/A EE:N/AWRWJO:586766 CR:N/A

Repair Organization PO No;Job No;etc.

Type Code Symbol Stamp: NWAAuthorization No.: NWAExpiration Date: NMA

Address

4.

5.

Identification of System: Class:2 CHEMICAL AND VOLUME CONTROL SYSTEM 2060

(a) Applicable ConstructionCode,: B 31.1 Edition: 1986 Addenda:N/A Code Case:N/ADesign Specification: 717319

(b) Applicable Edition of Section Xl Used for Repair/Replacement Activity: 1995 Edition 1996 AddendaCode Case: N/A

6. Identification of Compoens Repaired or Replaced and Replacement Components

Name of Name of Manufacturer National Other Year Corrected, ASMEComponent Manufacturer Serial No. Board No. Identification Built Removed, or Code

Installed Stamp(Yes orNo)

CHG-PMP-C Union N/A N/A Valve Stop 1996 Removed N

CHG-PMP-C Union NA N/A Valve Stop 2004 Installed N

7. Description of Work: Redaced valve stop.

8. Test Conducted: Hydrostatic El Pneumatic I U Nominal Operating Pressure Ug Exempt l-l

Other 1I Pressure [NOP] psig Test Temp. INOTI 0F04.037

9

----

Page 53: a0 Progress Energy 10 - NRC

Form NIS2 1995 Edition 1996 AddendaSECTION Xl DIVISION 1

FORM NIS-2 (Back)Sheet 2 of 2.

9. Remarks: See 586766 turnover oackaae.Applicable Manufacturer's Data Reports to be attached

CERTIFICATE OF COMPUANCE

I certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code, Section Xi.

Type Code Symbol Stamp N/A

Certificate oI `o N/A

Signed A 044.. ISI ENGINEER Date 924/2004Owner or Owner's Designee, Title

CERTIFICATE OF INSERVICE INSPECTION

1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the

State or Province of NorLth Carolina and employed by HSBCT of HARTFORD. CONNECTICUT have

inspected the components described in this Owner's Report during the period 7/15/2004 to 9/24/2004 and state that to the

best of my knowledge and belief, the Owner has pertormed examinations and taken corrective measures described in this

Owner's Report in accordance with the requirements od the ASME Code, Section Xl.

By signing this certificate neomer the Inspector or his employer makes any warranty, expressed or implied, concerning the

examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer

shall be liable in any manner for any personal injury or property damage or a loss of any kind arising Irom or connected with

this inspection.

0"10. (iX7L Comiss-ions NC' S157'- Ihspt~3s Sinaturo

Date:"1412004

National Board, State, Province, and Endorsements

04-037

Page 54: a0 Progress Energy 10 - NRC

1995 Edition 1996 Addenda APPENDIX If MANDATORY

FORM NIS-2 OWNER'S REPORT FOR REPAIRIREPLACEMENT ACTIVITY

As Required by the Provisions of the ASME Code Section Xi

Form NIS 2

1. Owner PROGRESS ENERGY CAROLINAS INCName

411 FAYETTEVILLE ST., RALEIGH. NC 27602

Date: 12/712004_._. . . .____

Sheet: 1 Of 2Address

2. Plant H.B.ROBINSONName

3581 WEST Entrance RD: HARTSVILLE, SC 29550Address

3. Work Performed by PROGRESS ENERGY CAROLINAS. INCName

3581 WEST ENTRANCE RD: HARTSVILLE. SC 29550

Unit: 2

ESR#:NIA EE:N/AWRfWO:4483464 CR:N/A

Repair Organization PO No;Job No;etc.

Type Code Symbol Stamp: NIAAuthorization No.: N/AExpiration Date: NIA

Address

Identification of System: Class:34.

5.

CICOX/If- W^AYTF OV4TrIA Araf%,- -- -- , I - . ---

(a) Applicable Construction Code: B31.1 Edition: 1967 Addenda:N/A Code CasEDesign Specification: HBR-12053

(b) Applicable Edition of Section Xl Used for Repair/Replacement Activity: 1995 Edition 1996 AddendaCode Case: W1A

~:N/A

6. Identification f Components Repaired or Replaced and Replacement Components

Name of Name of Manufacturer Nalional Other Year Corrected, ASMEComponent Manufacturer Serial No. Board No. Identification Built Removed, or Code

Installed Stamp(Yes orNo)

SW-374 Crane N/A N/A Check Valve 1971 Removed N

SW-374 Crane D2693 N/A Check Valve 2004 Installed N

7. Description of Work: Reolaced SW-374 with new valve

8. Test Conducted Hydrostatic j] Pneumatic L U Nominal Operating Pressure A)I Exempt l-l

Other M-2] Pressure INOPP psig Test Temp. 1NOTQ OF04-038

Page 55: a0 Progress Energy 10 - NRC

t

Form NIS2 1995 Edition 1996 AddendaSECTION Xi DIVISION 1

FORM NIS-2 (Back)Sheet 2 of L

9. Remarks: See WO 483464 turnover packageApplicable Manufacturer's Data Reports to be attached

CERTIFICATE OF COMPLIANCE

I certify that the statements made In the report are correct and this conforms to the requirements of the ASME Code, Section Xi.

Type Code Symbol Stamp NIA

Certificatf at o N/A

Signed 4 ISI ENGINEER Date 12/7/2004Owner or Owner's Designee, Title

CERTIFICATE OF INSERVICE INSPECTION

1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the

State or Province of North Carolina and employed by HSBCT of HARTFORD. CONNECTICUT have

inspected the components described in this Owners Report during the period 9/2712004 to 1217/2004 and state that to the

best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this

Owners Report in accordance with the requirements of the ASME Code, Section Xi.

By signing this certificate neither the Inspector or his employer makes any warranty, expressed or implied, concerning the

examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer

shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with

this inspection.

F P522 .i___ _ Commissions NC 1507I Int ror's Stlature National Board, State, Province, and Endorsements

Date:1217/2004

04-038

Page 56: a0 Progress Energy 10 - NRC

1995 Edition 1996 Addenda APPENDIX II MANDATORY

FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY

As Required by the Provisions of the ASME Cede Section Xl

Form NIS 2

1. Owner PROGRESS ENERGY CAROLINAS INCName

411 FAYETTEVILLE ST.. RALEIGH. NC 27602Address

2. Plant H.B.ROBINSON

Date:- 21412005

Sheet: t of 2

Unit: 2Name

3581 WEST Entrance RD; HARTSVILLE, SC 295550Address

3. Work Performed by PROGRESS ENERGY CAROLINAS. INCName

3581 WEST ENTRANCE RD: HARTSVILLE, SC 29550

ESR#:NIA EE:N/AWRNWO:168081 01 CR:NIA

Repair Organization PO No;Job No:etc.

Type Code Symbol Stamp: N/AAuthorization No.: NWAExpiration Date: N/A

Address

Identification of System: Class:2 I4.

5.

C:HEMICAL AND VOLUME CONTROL SYSTEM 2060----_, _ _ ._ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

(a) Applicable Construction Code: B 31.1 Edition: 1967 Addenda:NlA Code CaseDesign Specification: CPL-XXXX-M-001

(b) Applicable Edition o Section Xl Used for Repair/Replacement Activity: 1995 Edition l9 AddendaCode Case: NWA

;:N/A

R Idrpntiffiratinn nf Crnmrwnn~nt- Ranairerl nr R~nlnpzrn sandi Ranlainamant (romnnnant-q

Name of Name of Manufacturer National Other Year Corrected, ASMEComponent Manufacturer Serial No. Board No. Identification Built Removed, or Code

Installed Stamp(Yes orNo)

Capscrew Maintenance N/A N/A Boric-Acid-FLT 1998 Removed N__ Bolting

Capscrew HC Warner NA N/A Boric-Acid-FLT 2004 Installed NBolting

Nut Maintenance N/A NIA Boric-Acid-FLT 1998 Removed N__ _ ,Bolting

Nut Nova N/A N/A Boric-Acid-FLT 2004 Installed NBolting

7. Description of Work: Replaced bolting on Boric Acid Filter due to boric acid accumulation/corrosion

8. Test Conducted: Hydrostatic U Pneumatic LI Nominal Operating Pressure fj Exempt pXq

Other U Pressure [WAI psig Test Temp. INWA1 0F05.001

S

Page 57: a0 Progress Energy 10 - NRC

Form NIS2 1995 Edition 1996 AddendaSECTION Xl DIVISION 1

FORM NIS-2 (Back)Sheet 2 of 2.

9. Remarks: See 168081 01 turnover package.Applicable Manufacturer's Data Reports to be attached

CERTIFICATE OF COMPLIANCE

I certify that the statements made In the report are correct and this conforms to the requirements of the ASME Code, Section Xi.

Type Code Symbol Stamp N/A

Certificate N/A

Signed T4L 1 A : . (- ISI ENGINEER Date 2y4e200Owner or Owner's Designee, Title

CERTIFICATE! OF INSERVICE INSPECTION

1. the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the

State or Province of North Carolina and employed by HSBCT of HARTFORD. CONNECTICUT have

inspected the components described in this Owner's Report during the period 916/2003 to 24/2005 and state that to the best

of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's

Report in accordance with the requirements of the ASME Code, Section Xl

By signing this certificate neither the Inspector or his employer makes any warranty, expressed or Implied, concerning the

examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer

shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with

this inspection.

________Commissions NC 1507rp s Signature National Board, State, Province, and Endorsements

Date:214/2005

0-001

Page 58: a0 Progress Energy 10 - NRC

1995 Edition 1996 Addenda APPENDIX II MANDATORY

FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY

As Required by the Provisions of the ASME Code Section Xl

Form NIS 2

1. Owner PROGRESS ENERGY CAROLINAS, INCName

411 FAYETTEVILLE ST., RALEIGH. NC 27602Address

2. Plant H.B.ROBINSONName

3581 WEST Entrance RD: HARTSVILLE. SC 29550Address

3. Work Performed by PROGRESS ENERGY CAROLINAS. INCName

3581 WEST ENTRANCE RD: HARTSVILLE. SO 29550

Date: 612212005

Sheet: 1 of 2

Unit: 2

EC#:N/A EE:NIAWR/WO:61 8922 CR:N/A

Repair Organization PO No:Job No;etc.

Type Code Symbol Stamp: NIAAuthorization No.: NIAExpiration Date: NIA

4.

5.

Address

Identification of System: Class:3 SERVICE WATER SYSTEM 4060

(a) Applicable Construction Code: 831.1 Edition 1967 Addenda:N/A Code Case:N/ADesign Specification: 729-063-16

(b) Applicable Edition of Section XI Used for Repair/Replacement Activity: 1995 Edition 1996 AddendaCode Case: N/A

Identification of Comoonents Reoaired or Reolaced and Reolacement Comoonents6.

Name of Name of Manufacturer National Other Year Corrected, ASMEComponent Manufacturer Serial No. Board No. Identification Built removed, or Code

Installed Stamp(Yes orNo)

DG-B-LO-HTX Fairbanks Morse N/A N/A HTX End Cover 1971 Removed N

DG-B-LO-HTX Fairbanks Morse N/A N/A HTX End Cover 2005 Installed N

7.

8.

Description of Work: Replaced Lube Oil HTX End Cover

Test Conducted: Hydrostatic U1 Pneumatic L] Nominal Operating Pressure UX Exempt [-l

Other jVT-1 Pressure [NOPj psig Test Temp. [NOT]° F05-002

9

Page 59: a0 Progress Energy 10 - NRC

Form NIS2 1995 Edition 1996 AddendaSECrION Xl DIVISION 1

FORM NIS-2 (Back)Mk Sheet 2 of 2.

9. Remarks: See WO 618922 turnover packaoeApplicable Manufacturer's Data Reports to be attached

CERTIFICATE OF COMPLIANCE

I certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code, Section Xi.

Type Code Symbol Stamp N/A

Certificate ojctf o. N/A

Signed 4 . ISI ENGINEER Date 61212005Owner or Owner's Designee, Title

CERTIFICATE OF INSERVICE INSPECTION

1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the

State or Province of North Carolina and employed by HSBCT of HARTFORD. CONNECTICUT have

inspected the components described in this Owner's Report during the period 2/712005 to 6/22/2005 and state that to the best

of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's

Report in accordance with the requirements of the ASIVIE Code, Section Xl.

By signing this certificate neither the Inspector or his employer makes any warranty, expressed or implied, concerning the

examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer

shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with

this inspection.

Kd|n sQ,____ Commissions NC 1507Inspecs Siaure National Board, State, Province, and Endorsements

Date:6/2212005

05-002

Page 60: a0 Progress Energy 10 - NRC

S1995 Edition 1996 Addenda APPENDIX II MANDATORY

FORM NIS-2 OWNER'S REPORT FOR REPAIRtREPLACEMENT ACTIVITY

As Required by the Provisions of the ASME Code Section Xi

Form NIS2

1. Owner PROGRESS ENERGY CAROUNAS INCName

411 FAYETTEVILLE ST.. RALEIGH. NC 27602

nnt.-. &rsn"fVsvx

Sheet: 1 of 2Address

14 R DfVI0et'nK2. PZlfin# Unit: 2lw.� I

Name

3581 WEST Entrance RD: HARTSVILLE, SC 29550Address

3. Work Performed by PROGRESS ENERGY CAROLINAS. INCName

3581 WEST ENTRANCE RD: HARTSVILLE, SC 29550

EC#:N/A EE:N/AWRIWO:597678 CR:N/A

Repair Organization PO No;Job No;etc.

Type Code Symbol Stamp::N/AAuthorization No.: N/AExpiration Date: N/A

Address

Identification of System: Class:34.

5.

RlFIX/r'C:. WAT170 RYRTFMK Afn-1

(a) Applicable Construction Code: B 31.1 Edition: 1967 Addenda:N/A Code CastDesign Specification: 729-063-16

(b) Applicable Edition of Section Xi Used for Repair/Replacement Activity: 1995 Edition 1996 AddendaCode Case: N/A

):N/A

6 fidantifir~tinn ^f (~nmra~nuntk Ra~nsiraud mr Rcrnisked jnn.1 Ranlw~anpnt Cr~jnnnnc~ntr,

Name of Name of Manufacturer National Other Year Corrected, ASMEComponent Manufacturer Serial No. Board No. Identification Built lRemoved, or Code

Installed Stamp(Yes orNo)

DG-A-LO-HTX Fairbanks Morse N/A N/A HTX End Cover 1971 Removed N

DG-A-LO-HTX Fairbanks Morse N/A N/A HTX End Cover 2005 Installed N

7. Description of Work: Rerdaced Lube Oil Htx Erd Cover with snare

8. Test Conducted Hydrostatic LUj Pneumatic U ] Nominal Operating Pressure 2g Exempt f-]

Other [T-21 Pressure INOPI psig Test Temp. lNOTi °F05-003

Page 61: a0 Progress Energy 10 - NRC

Form NIS2 1995 Edition 1996 Addenda

SECTION Xl DIVISION 1

FORM NIS-2 (Back)

Sheet 2 of 2.

9. Remarks: See 597678 turnover packageApplicable Manufacturer's Data Reports to be attached

CERTIFICATE OF COMPUANCE

I certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code, Section XI.

Type Code Symbol Stamp N/A

Cenificti0Me io. NIA

Signed 16 ISI ENGINEER Date 6120/2005Owner or Owner's Designee, Title

CERTIFICATE OF INSERVICE INSPECTION

I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the

State or Province of North Carolina and employed by HSBCT of HARTFORD. CONNECTICUT have

inspected the components described In this Owneres Report during the period 2/4/2005 to 6/2012005 and state that to the best

of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's

Report in accordance with the requirements of the ASME Code, Section Xl.

By signing this certificate neither the Inspector or his employer makes any warranty, expressed or implied, concerning the

examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer

shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with

this inspection.

7______Commissions NC 1507Inspe s Sig e National Board, State, Province, and Endorsements

Date:6/20/2005

.5.03

e

Page 62: a0 Progress Energy 10 - NRC

1995 Edition 1996 Addenda APPENDIX II MANDATORY

FORM NIS-2 OWNER'S REPORT FOR REPAIRIREPLACEMENT ACTIVITY

As Required by the Provisions of the ASME Code Section Xi

Form NIS 2

1. Owner PROGRESS ENERGY CAROLINAS. INCName

411 FAYETTEVILLE ST.. RALEIGH. NC 27602Address

2. Plant H.B.ROBINSONName

3581 WEST Entrance RD: HARTSVILLE, SC 29550Address

3. Work Performed by PROGRESS ENERGY CAROLINAS. INCName

3SS1 WEST ENTRANCE RD: HARTSVILLE SC 29550

Date: 6/20/2005

Sheet: 1 of 2

Unit 2,. L

EC#:60405 EE:N/AWR/WO:681666 CR:t52423

Repair Organization PO No;Job No;etc.

Type Code Symbol Stamp: N/AAuthorization No.: N/AExpiration Date: N/A___- - ._ .___.___ __ -_-

4.

5.

Address

Identification of System: Class:3 SPENT FUEL PIT COOLING SYSTEM 7110

(a) Applicable Construction Code: B31.1 Edition: 1967 Addenda:N/A Code Case:N/ADesign Specification: CPL-HBR2-M-048

(b) Applicable Edition of Section Xl Used for Repair/Replacement Activity: 1995 Edition 1996 AddendaCode Case: N-416-2

Identification of Comoonents Renaired or Renlaced and Rnelacement Comnonents6.

Name of Name of Manufacturer National Other Year Corrected, ASMEComponent Manufacturer Serial No. I3oard No. Identification Built Removed, or Code

Installed Stamp(Yes orNo)

8-AC-15IR-61 Ebasco N/A N/A Pipe 1971 Corrected N

7.

8.

Description of Work: Repaired Diping line 8-AC-151R-61 by weldina

Test Conducted: Hydrostatic UL Pneumatic 1.] Nominal Operating Pressure PQ Exempt [-I

Other IVT-2 Pressure [NOPM psig Test Temp. INOT] IF05-004

Page 63: a0 Progress Energy 10 - NRC

Form NIS2 1995 Edition 1996 AddendaSECTION Xl DIVISION 1

FORM NIS-2 (Back)Sheet 2 of 2.

9. Remarks: See WO 681666 turnover PackageApplicable Mantuacturer's Data Reports to be attached

CERTIFICATE OF COMPLIANCE

I certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code, Section Xi.

Type Code Symbol Stamp N/A

Certfia!N o N/A

Signed 4 G o L.C Q ISI ENGINEER Date 6/20/2005Owner or Owners Designee, Title

CERTIFICATE OF INSERVICE INSPECTION

1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the

State or Province of North Carolina and employed by HSBCT of HARTFORD, CONNECTICUT have

inspected the components described in this Owner's Report during the period 3/3/2005 to 6120/2005 and state that to the best

of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's

Report in accordance with the requirements of the ASMIE Code, Section Xi.

By signing this certificate neither the Inspector or his employer makes any warranty, expressed or implied, concerning the

examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer

shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with

this inspection.

________Commissions NC 1507ns National Board, State, Province, and Endorsements

Date:6/2012005

05004

Page 64: a0 Progress Energy 10 - NRC

1995 Edition 1996 Addenda APPENDIX II MANDATORY

FORM NIS-2 OWNER'S REPORT FOR REPAIRIREPLACEMENT ACTIVITY

As Required by the Provisions of the ASME Code Section Xi

Form NIS 2

1111111=1

1. Owner PROGRESS ENERGY CAROLINAS. INC -Q.v.

Name

411 FAYETTEVILLE ST.. RALEIGH- NC 27602 Sheet: 1 of 2....... ............ _ _ ___ Y .......... a__. _ ......... _ _ . ____

Address

2. Plant H.B.ROBINSONName

3581 WEST Entrance RD: HARTSVILLE, SC 29550Address

3. Work Performed by PROGRESS ENERGY CAROLINAS. INCName

3581 WEST ENTRANCE RD: HARTSVILLE. SC 29550

Unit: 2

EC#:N/A EE:NIAWRIWO:671221 CR:NIA

Repair Organization PO No;Job No;etc.

Type Code Symbol Stanp. N/AAuthorization No.: N/AExpiration Date: N/A

Address

Identification of System: Class:24.

5.

rfLWrChAt'A1 Akin Ini[ I IMFA 1r.%iT~nl QVQTFkA OrnA2:V - --.- -1 - . - . -11,

(a) Applicable Construction Code: B 31.1 Edition: 1967 Addenda:N/A Code CaseDesign Specification: CPL-XXXX-M-001

(b) Applicable Edition of Section Xi Used for Repair/Replacement Activity+. 1995 Edition 1996 AddendaCode Case: N/A

):N/A

6. Identiication of Components Repaired or Replaced and Replacement Components

Name of Name of Manufacturer National Other Year Corrected, ASMEComponent Manufacturer Serial No. Board No. Identirication Built Removed, or Code

Installed Stamp(Yes orNo)

FE-150 Maintenance N/A N/A Studs 1998 Removed N

FE-150 Mackson NIA N/A Studs 2005 Installed N

FE-150 Maintenance N/A N/A Nuts 1998 Removed N

FE-150 Mackson N/A N/A Nuts 2005 Installed N

7. Description of Work: Replaced BoIting (Studs and Nuts) due to leakage

8. Test Conducted: Hydrostatic El Pneumatic L U Nominal Operating Pressure I U Exempt [XI

Other [ Pressure [A psig Test Temp. [N/Al OF05-005

Page 65: a0 Progress Energy 10 - NRC

Form NIS2 1995 Edition 1996 AddendaSECTION XI DIVISION 1

FORM NIS-2 (Back)Sheet 2 of 2.

9. Remarks: See WO 671221 turnover packageApplicable Manufacturer's Data Reports to be attached

CERTIFICATE OF COMPUANCE

I certify that the statements made In the report are correct and this conforms to the requirements of the ASME Code. Section Xl.

Type Code Symbol Stamp N/A

Certificate ofv No. N/A

Signed 4 ISI ENGINEER Date 6/2212005Owner or Owner's Designee, Title

CERTIFICATE OF INSERVICE INSPECTION

I. the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the

State or Province of North Carolina and employed by HSBCT of HARTFORD, CONNECTICUT have

inspected the components described in this Owner's Report during the period 3/28/2005 to 6/22/2005 and state that to the

best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this

Owner's Report in accordance with the requirements of the ASME Code, Section Xl.

By signing this certificate neither the Inspector or his employer makes any warranty, expressed or Implied, concerning the

examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer

shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with

this inspection.

- _v __'_ _ Commissions NC 1507ins " gnature National Board, State, Province, and Endorsements

Date:6/2212005

05-005

I

Page 66: a0 Progress Energy 10 - NRC

-;-wX7

1995 Edition 1996 Addenda APPENDIX II MANDATORY

FORM NIS-2 OWNER'S REPORT FOR REPAIRIREPLACEMENT ACTIVITY

As Required by the Provisions of the ASME Code Section Xi

Form NIS 2

1. Owner PROGRESS ENERGY CAROLINAS. INCName

411 FAYETTEVILLE ST.. RALEIGH, NC 27602Address

2. Plant H.B.ROBINSONName

3581 WEST Entrance RD; HARTSVILLE. SC 29550Address

3. Work Performed by PROGRESS ENERGY CAROLINAS. INCName

3581 WEST ENTRANCE RD: HARTSVILLE. SC 29550

Date: 824/2005

Sheet: 1 of 2

Unit, 2

EC#:59019 EE:NIAWR/WO:628658 CR:167663

Repair Organization PO No;Job No;etc.

Type Code Symbol Stamp: NIAAuthorization No.: N/AExpiration Date: NIA

Address

Identification of System: Class:34.

5.

iFR'IN WATR CVCT=IR Anon-- .. I � I - - - -11.

(a) Applicable Construction Code: B 31.1 Edition: 1967 Addenda:N/A Code CaseDesign Specification: See EC 59019

(b) Applicable Edition of Section XI Used for Repair/Replacement Activity: 1995 Edition 1996 AddendaCode Case: N-416-2

e:N/A

6. Identification of Components Repaired or Replaced and Replacement Components

Name of Name of Manufacturer National Other Year Corrected. ASMEComponent Manufacturer Serial No. Board No. Identification Built Removed, or Code

Installed Stamp(Yes orNo)

EDG-A Fairbanks Morse N/A N/A Jacket Water 1971 Removed NHTX Covers

4-CW-488 Maintenance N/A N/A Alt. Cooling 2005 Installed NPiping

EDG-A Fairbanks Morse N/A N/A After Coolant 1971 Removed NHTX Covers

6-CW-487 Maintenance NIA NIA Alt. Cooling 2005 Installed NPiping

7. Description of Work: Alternate Cooling Water SuOplV & Discharge Modification

8. Test Conducted: Hydrostatic 1.U Pneumatic L:] Nominal Operating Pressure f:J Exempt l-l

Other IVT2/@3 Pressure [NOPI psig Test Temp. INOT] 0F05-006

Page 67: a0 Progress Energy 10 - NRC

Form NIS2 1995 Edition 1996 AddendaSECTION XI DIVISION 1

FORM NIS-2 (Back)Sheet 2 of 2.

9. Remarks: See WO 628658 turnover DackageApplicable Manutacturer's Data Reports to be attached

CERTIFICATE OF COMPUANCE

I certify that the statements made In the report are correct and this conforms to the requirements of the ASME Code, Section XI.

Type Code Symbol Stamp N/A

Certifiat No. N/A

Signed ISI ENGINEER Date 8/2412005Owner or Owners Designee, Tite

CERTIFICATE OF INSERVICE INSPECTION

I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the

State or Province of North Carolina end employed by HSBCT of HARTFORD. CONNECTICUT have

inspected the components described in this Owner's Report during the period 12/612004 to 8/24/2005 and state that to the

best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this

Owners Report in accordance with the requirements of the ASME Code, Section Xl.

By signing this certificate neither the Inspector or his employer makes any warranty, expressed or implied, concerning the

examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer

shall be liable in any manner for any personal Injury or property damage or a loss of any kind arising from or connected with

this inspection.

____ LCommissions NC 1507Ines sigriture National Board, State, Province, and Endorsements

Date:8/2412005

05-006

k

Page 68: a0 Progress Energy 10 - NRC

1995 Edition 1996 Addenda APPENDIX II MANDATORY

FORM NIS-2 OWNER'S REPORT FOR REPAIRIREPLACEMENT ACTIVITY

As Required by the Provisions of the ASME Code Section Xi

Form NIS 2

1. Owner PROGRESS ENERGY CAROLINAS. INCName

411 FAYETTEVILLE ST., RALEIGH, NC 2760'2

Date: 8/24/2005

Sheet: 1 of 2Address

2. Plant H.B.ROBINSONName

3581 WEST Entrance RD: HARTSVILLE, SC 29550Address

3. Work Performed by PROGRESS ENERGY CAROLINAS. INCName

3581 WEST ENTRANCE RD: HARTSVILLE. 'SC 29550

Unit: 2

EC#:59017 EE:NIAWR/WO:622493 CR:167663

Repair Organization PO No;Job No;etc.

Type Code Symbol Stamp: N/AAuthorization No.: NIAExpiration Date: N/A

TFM 406r0

Address

Identification of System: Class:34.

5.

SFRVICF WATFR RYS

(a) Applicable Construction Code. B 31.1 Edition: 1967 Addenda:N/A Code CaseDesign Specification: See EC 59017

(b) Applicable Edition of Section Xi Used for Repair/Replacement Activity: 1995 Edition 1996 AddendaCode Case: N-416-2

i:N/A

6. Identification of Cornponents Repaired or Re -aced and Re lacement Components

Name of Name of Manufacturer National Other Year Corrected, ASMEComponent Manufacturer Serial No. Board No. Identification Built Removed, or Code

Installed Stamp(Yes orNo)

EDG-B Fairbanks Morse N/A N/A Jacket Water 1971 Removed N._ HTX Covers

4-CW-486 Maintenance N/A N/A Alt. Cooling 2005 Installed NPiping

EDG-B Fairbanks Morse N/A N/A After Coolant 1971 Removed NHTX Covers

6-CW-460 Maintenance N/A N/A Alt. Cooling 2005 Installed N___ __ __ __ _ _ __ __ __ _ , P iping __ _ _ _ _ __ _ _ _

7. Description of Work: Alternate Cooling Water Supply & Discharge Modification

8. Test Conducted: Hydrostatic L-] Pneumatic U Nominal Operating Pressure 1 Exempt l-l

Other EVT-?J3 Pressure INOPJ psig Test Temp. INO1 'F05-007

Page 69: a0 Progress Energy 10 - NRC

Form NIS2 1995 Edition 1996 AddendaSECTION Xl DIVISION 1

FORM NIS-2 (Back)Sheet 2 of .2.

9. Remarks: See WO 622493 turnover packaaeApplicable Manufacturer's Data Reports to be attached

CERTIFICATE OF COMPLIANCE

I certify that the statements made In the report are correct and this conforms to the requirements of the ASME Code, Section Xl.

Type Code Symbol Stamp N/A

CertificateLAuatezbion No. N/A

Signed A = ISI ENGINEER Date 8/24/2005Owner or Owner's Designee, Title

CERTIFICATE OF INSERVICE INSPECTION

1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the

State or Province of North Carolina and employed by HSBCT of HARTFORD. CONNECTICUT have

inspected the components described In this Owner's Report during the period 1218/2004 to 824/2005 and state that to the

best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this

Owner's Report In accordance with the requirements of the ASME Code, Section Xl.

By signing this certificate neither the Inspector or his employer makes any warranty, expressed or implied, concerning the

examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer

shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with

this inspection.

A_______ Commissions NC 1507Ins Signature National Board, State, Province, and Endorsements

Date:8/2412005

05-007

LS-

Page 70: a0 Progress Energy 10 - NRC

1995 Edition 1996 Addenda APPENDIX II MANDATORY

FORM NIS-2 OWNER'S REPORT FOR REPAIRPREPLACEMENT ACTIVITY

As Required by the Provisions of the ASME Code Section Xl

Form NIS 2

1. Owner PROGRESS ENERGY CAROLINAS INCName

411 FAYETTEVILLE ST.. RALEIGH. NC 27602Address

2. Plant H.B.ROBINSONName

3581 WEST Entrance RD: HARTSVILLE. SC 29550Address

3. Work Performed by PROGRESS ENERGY CAROLINAS. INCName

3581 WEST ENTRANCE RD: HARTSVILLE, SC 29550

Date: 6/30/2005

Sheet: 1 of 2

Unit: 2

EC#:N/A EE:NIAWR/WO:661742 CR:147748

Repair Organization PO No;Job No;etc.

Type Code Symbol Stamp: N/AAuthorization No.: N/AExpiration Date: N/A

Address

Identification of System: Class:24.

5.

CHEMICAL AND VOLUME CONTROL SYSTEM 2060----_ . _ _ _ _ _ _ _ _ _ _ _ _

(a) Applicable Construction Code: B 31.1 Edition: 1967 Addenda:N/A Code CaseDesign Specification: CPL-XXXX-M-001

(b) Applicable Edition of Section Xl Used for lepair/Replacement Activity: 1995 Edition 1996 AddendaCode Case: N/A

e:N/A

6. Identification of Components Repaired or Replaced and Replacement Components

Name of Name of Manufacturer National Other Year Corrected, ASMEComponent Manufacturer Serial No. Board No. Identification Built Removed, or Code

Installed Stamp(Yes orNo)

BA-XFER- Maintenance UA N/A Discharge Flange 1998 Removed NPMP-A BoltingBA-XFER- Mackson N/A N/A Discharge Flange 2005 Installed NPMP-A StudsBA-XFER- Anchor Darling N/A NA Discharge Flange 2005 Installed NPMP-A Nuts

- . = __________________

7. Description of Work: Replaced 2 studs and nuts due to leakage.

B. Test Conducted: Hydrostatic 1-1 Pneumatic 1j Nominal Operating Pressure LJ Exempt [-I

Other [M-1 I Pressure IN/Al psig Test Temp. IN/l I F05-008

Page 71: a0 Progress Energy 10 - NRC

.I

Form NIS2 1995 Edition 1996 AddendaSECTION Xl DIVISION I

FORM NIS-2 (Back)Sheet 2 of 2.

9. Remarks: See WO 661742 turnover packaaeApplicable Manufacturer's Data Reports to be attached

CERTIFICATE OF COMPUANCE

I certify that the statements made In the report are correct and this conforms to the requirements of the ASME Code, Section XI.

Type Code Symbol Stamp N/A

Certificate oftoil No. M/A

Signed_ ISI ENGINEER Date 6130/2005Owner or Owner's Designee, Title

CERTIFICATE OF INSERVICE INSPECTION

1. the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the

State or Province of North Carolina and employed by HSBCT of HARTFORD. CONNECTICUT have

inspected the components described In this Owner's Report during the period 3/28/2005 to 6130/2005 and state that to the

best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this

Owner's Report in accordance with the requirements od the ASME Code, Section Xl.

_ By signing this certificate neither the Inspector or his employer makes any warranty, expressed or implied, concerning the

examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer

shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with

this inspection.

ths ip ( Commissions NC 1507)Insrs7 nature National Board, State, Province, and Endorsements

Date:6/30/2005

05-008

Page 72: a0 Progress Energy 10 - NRC

e1995 Edition 1996 Addenda APPENDIX II MANDATORY

FORM NIS-2 OWNER'S REPORT FOR REPAIRIREPLACEMENT ACTIVITY

As Required by the Provisions of the ASME Code Section Xi

Form NIS 2

1. Owner PROGRESS ENERGY CAROLINAS, INCName

411 FAYETTEVILLE ST.. RALEIGH. NC 27602Address

2. Plant H.B.ROBINSON

Date: 1014/2005

Sheet: 1 of 2

Unit: 2Name

3581 WEST Entrance RD: HARTSVILLE, SC 29550Address

3. Work Performed by PROGRESS ENERGY CAROLINAS. INCName

3581 WEST ENTRANCE RD: HARTSVILLE, SC 29550

EC#:N/A EEMAWRIWO:697587 CR:N/A

Repair Organization PO No;Job No;etc.

Type Code Symbol Stamp: N/AAuthorization No.: N/AExpiration Date: N/A

Address

Identification of System: Class:3 i4.

5.

SERVICE WATER SYSTEM 4060

(a) Applicable Construction Code: B 31.1 Edition: 1967 Addenda:N/A Code CaseDesign Specification: N/A

(b) Applicable Edition of Section Xl Used for Repair/Replacement Activity: 1995 Edition 1996 AddendaCode Case: NIA

rN/A

6. Identification of ComponentS Repaired or Repaced and Re lacement Components

Name of Name of Manufacturer National Other Year Corrected, ASMEComponent Manufacturer Serial No. l3oard No. Identification Built Removed, or Code

Installed Stamp(Yes orNo)

HVH-8B Maintenance N/A N/A Inlet flange nipple 1997 Removed N

HVH-8B Maintenance N/A NIA Inlet flange nipple 2005 Installed N

7. Description of Work: Redlaced threaded niopl s

8. Test Conducted. Hydrostatic IU Pneumatic Uj Nominal Operating Pressure mJ Exempt [-H

Other IT-21 Pressure INOPi psig Test Temp. fNOr, 'F05-009

Page 73: a0 Progress Energy 10 - NRC

Form NIS2 1995 Edition 1996 AddendaSECTION Xl DIVISION 1

FORM NIS-2 (Back)Sheet 2 of 2.

9. Remarks: See WO 697587 turnover packace.Applicable Manufacturer's Data Reports to be attached

CERTIFICATE OF COMPUANCE

I certify that the statements made In the report are correct and this conforms to the requirements of the ASME Code, Section Xl.

Type Code Symbol Stamp N/A

Certificate t No. N/A

Signed ISI ENGINEER Date 10/4/2005Owner or Owner's Designee, Title

CERTIFICATE OF INSERVICE INSPECTION

1. the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the

State or Province of North Carolina and employed by HSBCT of HARTFORD. CONNECTICUT have

inspected the components described in this Owner's Report during the period 4/1/2005 to 10/4/2005 and state that to the

best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this

Owner's Report in accordance with the requirements of the ASME Code, Section Xl.

By signing this certificate neither the Inspector or his employer makes any warranty, expressed or implied, concerning the

examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer

shall be liable in arny manner for any personal injury or property damage or a loss of any kind arising from or connected with

this inspection.

_______Commissions NC 1507nrsC sp ib e National Board, State, Province, and Endorsements

Date:1 0/4/2005

05-009

Page 74: a0 Progress Energy 10 - NRC

1995 Edition 1996 Addenda APPENDIX II MANDATORY

FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY

As Required by the? Provisions of the ASME Code Section Xi

Form NIS 2

01. Owner PROGRESS ENERGY CAROLINAS. INC

Name

411 FAYETTEVILLE ST.. RALEIGH. NC 2760:Address

2. Plant H.B.ROBINSONName

3581 WEST Entrance RD: HARTSVILLE, SC 29550Address

3. Work Performed by PROGRESS ENERGY CAROLINAS. INCName

3581 WEST ENTRANCE RD: HARTSVILLE. SC 29550

Date: 10/4/2005

Sheet: 1 of 2

Unit:

EC#:60189 EE:N/AWR/WO:670642 CR:N/A

Repair Organization PO No;Job No;etc.

Type Code Symbol Stamp: N/AAuthorization No.: N/AExpiration Date: N/A

Address

Identification of System: Class:34.

5.

SERVICE WATER SYSTEM 4060

(a) Applicable Construction Code: B31.1 Edition: 1967 Addenda:N/A Code Case.Design Specification:

(b) Applicable Edition of Section Xi Used for Repair/Replacement Activity: 1995 Edition 1996 AddendaCode Case: N-416-2

Identification of Comronents Reoaired or Renlaced and Realacement Comoonents

:N/A

6.

Name of Name of Manufacturer National Other Year Corrected, ASMEComponent Manufacturer Serial No. Board No. Identification Built Removed, or Code

Installed Stamp(Yes orNo)

HVH-BB H. K. Porter Co N/A N/A Cooling Coil 1997 Removed N

HVH-8B Mario 038006 NIA Cooling Coil 2005 Installed N

1 1/2-CW-399 Maintenance N/A N Piping 1971 Removed N

1 1/2-CW-399 Maintenance N/A N Piping 2005 Installed N

1 1/2-CW-400 Maintenance N/A N Piping 1971 Removed N

1 1/2-CW-400 Maintenance N/A N Piping 2005 Installed N

.J , , _ I _ _ _ =====

7. Description of Work: Replaced cooling coil. piiina., and fittinos

8. Test Conducted: Hydrostatic E Pneumatic U. Nominal Operating Pressure LM Exempt I-)

Other IVTI21 Pressure rNOPI psig Test Temp. [NOT) OF05-010

Page 75: a0 Progress Energy 10 - NRC

Form NIS2 1995 Edition 1996 AddendaSECTION XI DIVISION 1

FORM NIS-2 (Back)

0

Sheet 2 of 2.

9. Remarks: See WO 670842 turnover packace.Applicable Manufacturer's Data Reports to be attached

CERTIFICATE OF COMPLIANCE

I certify that the statements made In the report are correcd and this conforms to the requirements of the ASME Code. Section XI.

Type Code Symbol Stamp N/A

Certificate cuuenzao F A N/A

Signed -4 %A - IRI ENG.INEER Date two5jOwner or Owner's Designee, Title

CERTIFICATE OF INSERVICE INSPECTION

1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the

State or Province of North Carolina and employed by HSBCT of HARTFORD. CONNECTICUT have

inspected the components described in this Owner's Report during the period 7/13/2005 to 10/4/2005 and state that to the

best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this

Owners Report in accordance with the requirements of the ASME Code, Section XI.

By signing this certificate neither the Inspector or his employer makes any warranty, expressed or Implied, concerning the

examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer

shall be liable in any manner for any personal injury cr property damage or a loss of any kind arising from or connected with

this inspection.

'Inspet i% wre-Commissions NC 1507National Board, State, Province, and Endorsements

Date:10/4/2005

05"010

Page 76: a0 Progress Energy 10 - NRC

1995 Edition 1996 Addenda APPENDIX II MANDATORY

FORM NIS-2 OWNER'S REPORT FOR REPAIRIREPLACEMENT ACTIVITY

As Required by the Provisions of the ASME Code Section XI

form NIS 2

1. Owner PROGRESS ENERGY CAROLINAS, INCName

AlI FAYFTTFVIII F ST. RAI FIGH.M NC 276029

Dnate: 1 01/200fl5cow.1- --YE--Y

Sheet: 1 Of 2....... - -... ... .--

Address

SI = nMIblf.NKI2. Ffot-U29 IL

Name

3581 WEST Entrance RD.: HARTSVILLE. SC 29550Address

3. Work Performed by PROGRESS ENERGY CAROLINAS. INCName

3581 WEST ENTRANCE RD: HARTSVILLE, SC 29550Address

Unit: 2

EC#:N/A EE:N/AWRMO.:768917 CR:N/A

Repair Organizatlon PO No;Job No;etc.

Type Code Symbol Stamp: N/AAuthorization No.: N/AExpiration Date: N/A

4.

5.

Identification of System: Class:2 'SAFFTY IN.JFC1TION SYSTFM 2080

(a) Applicable Construction Code: B 31.1 Edition: 1967 Addenda:N/A Code CasEDesign Specification: N/A

(b) Applicable Edition of Section XI Used for Repair/Replacement Activity: 1995 Edition 1996 AddendaCode Case: N/A

i:N/A

6. Identification of Comoonents Reoaired or Replaced and Reolacement Comoonents

Name of Name of Manufacturer National Other Year Corrected, ASMEComponent Manufacturer Serial No. Board No. Identification Buii Removed, or Code

Installed Stamp(Yes orNo)

SI-870B Anchor Darling N/A N/A Valve Disc 1971 Removed N

SI-870B Anchor Darling N/A N/A Valve Disc 2005 Installed N

7. Description of Work: Replaced valve disc

8. Test Conducted: Hydrostatic I I Pneumatic L U Nominal Operating Pressure U-) Exempt [XJ

Other U. Pressure f[/4 psig Test Temp. IN/Al OF05-011

Page 77: a0 Progress Energy 10 - NRC

1Form NIS2 1995 Edition 1996 AddendaSECTION Xi DIVISION 1 9

FORM NIS-2 (Back)

. Sheet 2 of 2.

9. Remarks: See WO 768917 turnover DackaoeApplicable Manufacturer's Data Reports to be attached

CERTIFICATE OF COMPUANCE

I certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code, Section Xi.

Type Code Symbol Stamp N/A

Certificate 0LA"flhrztr+c4o NtA

Signed J ISI ENGINEER Date 10/17/2005Owner or Owner's Designee, Title

CERTIFICATE OF INSERVICE INSPECTION

1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the

State or Province of North Carolina and employed by HSBCT of HARTFORD. CONNECTICUT have

inspected the components described in this Owner's Report during the period 10/82005 to 10/17/2005 and state that to the

best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this

Owner's Report in accordance with the requirements of the ASME Code, Section Xi.

By signing this certificate neither the Inspector or his employer makes any warranty, expressed or Implied, concerning the

examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer

shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with

this inspection. _

) - | b sCommissions NC 1507National Board, State, Province, and Endorsements'1nspe�gn�u�re

Date: 1 0/1 7/2005

05411

Page 78: a0 Progress Energy 10 - NRC

1995 Edition 1996 Addenda APPENDIX II MANDATORY

FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY

As Required by the! Provisions of the ASME Code Section Xi

OForm NIS 2

1. Owner PROGRESS ENERGY CAROLINAS. INCName

411 FAYETTEVILLE ST.. RALEIGH. NC 27602Address

2. Plant H.B.ROBINSONName

3581 WEST Entrance RD: HARTSVILLE. SC 29550Address

3. Work Performed by PROGRESS ENERGY CAROLINAS. INCName

3581 WEST ENTRANCE RD: HARTSVILLE. SC 29550

Date: 10/18/2005

Sheet: 1 of 2

Unit: 2

EC#:N/A EE:N/AWR/WO:61 5770 CR:NIA

Repair Organization PO No;Job No;etc.

Type Code Symbol Stamp: N/AAuthorization No.: N/AExpiration Date: NWA_ . . , .. , . . _ .

-

0

Address

4. Identification of System: Class:3 SERVICE WATER SYSTEM 4060

5. (a) Applicable Construction Code: B 31.1 Edition: 1967 Addenda:N/A Code Case:NfADesign Specification:

(b) Applicable Edition of Section Xi Used for Repair/Replacement Activity: 1995 Edition 1996 AddendaCode Case: N/A

6. Identification of Components Repaired or Replaced and Replacement Components

Name of Name of Manufacturer National Other Year Corrected, ASMEComponent Manufacturer Serial No. Board No. Identification Built Removed, or Code

Installed Stamp(Yes orNO)

SW-8 Allis Chalmers N/A N/A Butterfly Valve 1971 Removed N

SW-8 Allis Chalmers 01 N/A Butterfly Valve 2005 Installed N

7.

8.

Description of Work: Replaced valve

Test Conducted: Hydrostatic E Pneumatic L-] Nominal Operating Pressure fJ Exempt [1-

Other IVT-21 Pressure INOPI psig Test Temp. INOT! OF05-012

Page 79: a0 Progress Energy 10 - NRC

I

Form NIS2 1995 Edition 1996 AddendaSECTION Xi DIVISION 1

FORM NIS-2 (Back)Sheet 2 of 2.

9. Remarks: See WO 615770 turnover packaoe.Applicable Manufacturer's Data Reports to be attached

CERTIFICATE OF COMPLIANCE

I certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code. Section XI.

Type Code Symbol Stamp N/A

Certfficate pfAvVlz_ No. N/A

Signed A 4 ISI ENGINEER Date 10/18/2005Owner or Owner's Designee, Title

CERTIFICATE OF INSERVICE INSPECTION

I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the

State or Province of North Carolina and employed by HSBCT of HARTFORD. CONNECTICUT have

inspected the components described in this Owner's Report during the period 9/12/2005 to 10118/2005 and state that to the

best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this

Owner's Report In accordance with the requirements cf the ASME Code, Section Xi.

By signing this certificate neither the Inspector or his employer makes any warranty, expressed or Implied, concerning the

examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer

shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with

this inspection.

________Commissions NC 1507Inspect National Board, State, Province, and Endorsements

Date:10/18/2005

05-012

Page 80: a0 Progress Energy 10 - NRC

1995 Edition 1996 Addenda APPENDIX II MANDATORY

FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY

As Required by the Provisions of the ASME Code Section Xi

Form NIS 2

1. Owner PROGRESS ENERGY CAROLINAS, !NCName

411 FAYETTEVILLE ST.. RALEIGH. NC 27602Address

2. Plant H.B.ROBINSONName

3581 WEST Entrance RD: HARTSVILLE, SC 29550Address

3. Work Performed by PROGRESS ENERGY CAROLINAS. INCName

3581 WEST ENTRANCE RD: HARTSVILLE, SC 29550

Date: 10/18/2005

Sheet: 1 of 2

Unit:_

FC#:NJA

2

FF4JJAAn . vrr _ _ _

wawn-;oso;:r fnI&IIAVWVW .'.:4i1 Ml.rm

Repair Organization PO No;Job No;etc.

Type Code Symbol Stamp: N/AAuthorization No.: N/AExpiration Date: NWA

Address

4. Identification of System: Class:3 SERVICE WATER SYSTEM 4060

5. (a) Applicable Construction Code: B 31.1 Edition: 1967 Addenda:N/A Code Case:NIADesign Specification:

(b) Applicable Edition of Section XI Used for Repair/Replacement Activity: 1995 Edition 1996 AddendaCode Case: N/A

6. IdentIfication of Components Repaired or Replaced and Replacement Components

Name of Name of Manufacturer National Other Year Corrected, ASMEComponent Manufacturer Serial No. Board No. Identification Built Removed, or Code

Installed Stamp(Yes orNo)

SW-7 Allis Chalmers N/A N/A Butterfly Valve 1971 Removed N

SW-7 Allis Chalmers 01 N/A Butterfly Valve 2005 Installed N

7.

8.

Description of Work: Replaced valve

Test Conducted: Hydrostatic U 1 Pneumatic U 1 Nominal Operating Pressure [g Exempt [-l

Other IVT-21 Pressure [NOPi psig Test Temp. INOTI *F05-013

Page 81: a0 Progress Energy 10 - NRC

Form NIS2 1995 Edition 1996 AddendaSECTION Xi DIVISION I

FC)RM NIS-2 (Back)Sheet 2 of 2.

9. Remarks: See WO 624261 turnover packaceApplicable Manufacturers Data Reports to be attached

CERTIFICATE OF COMPLIANCE

I certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code, Section Xi.

Type Code Symbol Stamp N/A

Certificatfato No. NIA

Signed I iSI ENGINEER Date 10/18/2005Owner or Owner's Designee, Title

CERTIFICATE OF INSERVICE INSPECTION

1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the

State or Province of North Carolina and employed by HSBCT of HARTFORD. CONNECTICUT have

inspected the components described in this Owner's Report during the period 9/13/2005 to 1011812005 and state that to the

best of my knowledge and belief. the Owner has performed examinations and taken corrective measures described in this

Owner's Report in accordance with the requirements of the ASME Code, Section XI.

By signing this certificate neither the Inspector or his employer makes any warranty, expressed or implied, conceming the

examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer

shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with

this inspection.

(_2.__ Commissions NC 1507Inspect3S ature National Board, State, Province, and Endorsements

Date:10/1812005

05-013

Page 82: a0 Progress Energy 10 - NRC

1995 Edition 1996 Addenda APPENDIX II MANDATORY

FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY

As Required by the Provisions of the ASME Code Section Xi

* Form NIS 2

1. Owner PROGRESS ENERGY CAROLINAS. INCName

411 FAYETTEVILLE ST.. RALEIGH. NC 27602

no -* 4^114 0stnnncLU'al. I U? I UofUU.J

Sheet: 1 of 2Address

2. Plant H.B.ROBINSONName

3581 WEST Entrance RD: HARTSVILLE, SC .9550Address

3. Work Performed by PROGRESS ENERGY CAROLINAS. INCName

3581 WEST ENTRANCE RD: HARTSVILLE. SC 29550

Unit: 2

EC#:N/A EE:N/AWRMWO:651 737 CR:N/A

Repair Organization PO No;Job No;etc.

Type Code Symbol Stamp: NIAAuthorization No.: NIAExpiration Date: NIA

Address

4. Identification of System: Class:3 SERVICE WATER SYSTEM 4060

5. (a) ApplicableConstructionCode: B 31.1 Edition. 1967 Addenda:N/A Code Case N/ADesign Specification:

(b) Applicable Edition of Section Xi Used for Repair/Replacement Activity: 1995 Edition 1996 AddendaCode Case: N/A

6. Identification of Components Repaired or Reolaced and Replacement Components

Name of Name of Manufacturer National Other Year Corrected, ASMEComponent Manufacturer Serial No. Board No. Identifcation Built Removed, or Code

installed Stamp(Yes orNO)

SW-375 Crane N/A N/A Check Valve 1971 Removed N

SW-375 Crane N/A N/A Check Valve 1971 Installed N

7.

8.

Description of Work: Replaced Check Valve with rotating spare

Test Conducted: Hydrostatic U Pneumatic U. Nominal Operating Pressure LXJ Exempt [-]

Other [IVT-21 Pressure INOP! psig Test Temp. INOTI 'F05-014

Page 83: a0 Progress Energy 10 - NRC

Form NIS2 1995 Edition 1996 AddendaSECTION Xl DIVISION 1

FORM NIS-2 (Back)* Sheet 2 of 2.

9. Remarks: See W0651737 turnover packaae. Replacement valve previously at SW-374 location (ref WO 483464)Applicable Manufacturer's Data Reports to be attached

CERTIFICATE OF COMPLIANCE

I certify that the statements made In the report are correcit and this conforms to the requirements of the ASME Code, Section XI.

Type Code Symbol Stamp N/A

Certificate9LAueiftie o.a N/A

Signed ISI ENGINEER Date 10/1812005Owner or Owners Designee, Title

CERTIFICATE OF INSERVICE INSPECTION

I. the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the

State or Province of North Carolina and employed by HSBCT of HARTFORD. CONNECTICUT have

inspected the components descnbed in this Owners Report during the period 10/10/2005 to 10/18/2005 and state that to the

best of my knowledge and belief, the Owner has peiformed examinations and taken corrective measures described in this

Owner's Report in accordance with the requirements cf the ASME Code. Section Xl.

By signing this certificate neither the Inspector or his employer makes any warranty, expressed or implied, concerning the

examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer

shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with

this inspection.

__________Commissions NC 1507nspec sr re National Board, State. Province, and Endorsements

Date:10/18/2005

05-014

Page 84: a0 Progress Energy 10 - NRC

1995 Edition 1996 Addenda

i

APPENDIX II MANDATORY

FORM NIS-2 OWNER S REPORT FOR REPAIR/REPLACEMENT ACTIVITY

As Required by the Provisions of the ASME Code Section XI

Form NIS 2

I

1. Owner PROGRESS ENERGY CAROLINAS. INCName

411 FAYETTEVILLE ST.. RALEIGH. NC 2760:2Address

2. Plant H.B.ROBINSONName

3581 WEST Entrance RD: HARTSVILLE. SC 29550Address

3. Work Performed by PROGRESS ENERGY CAROLINAS. INCName

3581 WEST ENTRANCE RD: HARTSVILLE, SC 29550

Date: 10/18/2005----------

Sheet: 1 Of 2

Unit: 2

EC#:N/A EE:NJAWRNVO:189336 CR:N/A

Repair Organization PO No;Job No;etc.

Type Code Symbol Stamp: N/AAuthorization No.: N/AExpiration Date: N/A

Address

Identification of System: Class:34.

5.

9;ERVICE WATER SYSTEM 4060

(a) Applicable Construction Code: B 31.1 Edition: 1967 Addenda:N/A Code CaseDesign Specification: HBR2-12053

(b) Applicable Erition ot Section Xl Used for Repair/Replacement Activity: 1995 Edition 1996 AddendaCode Case: NIA

:NIA

It6. Identicaton o Coponents Repaired or Replaced and He l a 2cement Components

Name of Name of Manufacturer National Other Year Corrected, ASMEComponent Manufacturer Serial No. Board No. Identiication Buil Removed, or Code

Installed Stamp(Yes orNo)

SW-377 Crane N/A NWA Check Valve 1971 Removed N

SW-377 Crane N/A N/A Check Valve 1971 Installed N

7. Description of Work: Reolaced check valve with rotating spare

8. Test Conducted: Hydrostatic 1j Pneumatic IzJ Nominal Operating Pressure [XJ Exempt 1-]

Other rVT-21 Pressure fNOP1 psig Test Temp. [NOT] °F05-015

Page 85: a0 Progress Energy 10 - NRC

Form NIS2 1995 Edition 1996 AddendaSECTION Xl DIVISION 1 .

FORM NIS-2 (Back)Sheet 2 of 2.

9. Remarks: See WO 189336 turnover cackape. Reeplacement valve oreviouslv at SW-375 location (ref WO 651737)Applicable Manufacturer's Data Reports to be attached

CERTIFICATE OF COMPLIANCE

I certify that the statements made In the report are correct and this conforms to the requirements of the ASME Code, Section Xl.

Type Code Symbol Stamp NIA

Certificate &As= 0o. N/A

Signed ISI ENGINEER Date 10/1812005

Owner or Owners Designee, Title

CERTIFICATE OF INSERVICE INSPECTION

1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the

State or Province of North Carolina and employed by HSBCT of HARTFORD. CONNECTICUT have

inspected the components described in this Owner's Report during the period 9/14/2005 to 10/18/2005 and state that to the

best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this

Owner's Report in accordance with the requirements of the ASME Code, Section Xl.

By signing this certificate neither the Inspector or his employer makes any warranty, expressed or Implied, concerning the

examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer

shall be flable In any manner for any personal Injury or property damage or a loss of any kind arising from or connected with

this inspection.

__ __ Commissions NC 1507lnspect P*atur, National Board, State. Province, and Endorsemnets

Date:10/18/2005

05-015

Page 86: a0 Progress Energy 10 - NRC

V

1995 Edition 1996 Addenda

0APPENDIX II MANDATORY

FORM NIS-2 OWNER'S R:EPORT FOR REPAIR/REPLACEMENT ACTIVITY

As Required by the Provisions of the ASME Code Section Xi

Form NIS 2

1. Owner PROGRESS ENERGY CAROLINAS. INCName

411 FAYETTEVILLE ST.. RALEIGH, NC 27602

Date: 10/22/2005

Sheet: 1 of 4Address

Li R 3lRoIMOIkPd2. P1-4,n-lal f ,tn~ ~ _

Name

3581 WEST Entrance RD: HARTSVILLE, SC 29550Address

3. Work Performed by PROGRESS ENERGY CAROLINAS. INCName

3581 WEST ENTRANCE RD: HARTSVILLE, 'C 29550

Unit: 2

EC#:55731 EE:NIAWRIWO:665455 CR:11 1506

Repair Organization PO No;Job No;etc.

Type Code Symbol Stamp: N/AAuthnz7atinn No.: MIAExpiration Date: N/A

Address

1rla-CM-r-in -f C0-4m ^I- c4. f'VNILACL"NKMM1, (VfI IKIIt WAY=TFD OVC TFI Au"ilvi~vr Ul--sen.bascv~~~ I .. II~ VV W I cn I I -- CM v

5. (a) Applicable Construction Code: B 31.1 Edition: 1967 Addenda:N/A Code Case:N/ADesign Specification: GID/R87038/0003

(b) Applicable Edition of Section XI Used for Repair/Replacement Activity: 1995 Edition 1996 AddendaCode Case: N/A

6. tdentification of Components Repaired or ReF acet and Replacement Com ents -

Name of Name of Manufacturer National Other Year Corrected, ASMEComponent Manufacturer Serial No. Board No. Identificatbon Buit Removed, or Code

Installed Stamp(Yes orNo)

AC-7-34/2 Ebasco N/A N/A Support 1971 Corrected N

AC-7-38/16B Ebasco N/A N/A Restraint 1971 Corrected N

AC-8-35/7 Ebasco NWA NIA Restraint 1971 Corrected N

AC-8-35/23 Ebasco N/A N/A Restraint 1971 Corrected N

AC-8-35/24 Ebasco NA N/A Restraint 1971 Corrected N

AC-7-38B Ebasco N/A N/A Restraint 1971 Corrected N

. I _ . S - - -- - , -

7. Description of Work: Modified CCW system suicorts per EC 55731

8. Test Conducted: Hydrostatic LU Pneumatic L-U Nominal Operating Pressure 'LI Exempt fXJ

Other JVT-31 Pressure IN/Al psig Test Temp. [N/Al °F05-016

Page 87: a0 Progress Energy 10 - NRC

1995 Edition 1996 Addenda

0~APPENDIX II MANDATORY

FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY

As Required by tho Provisions of the ASME Code Section Xi

Form NIS 2

1. Owner PROGRESS ENERGY CAROLINAS, INCName

411 FAYETTEVILLE ST.. RALEIGH. NC 27602Address

2. Plant H.B.ROBINSONName

3581 WEST Entrance RD: HARTSVILLE. SC 29550Address

3. Work Performed by PROGRESS ENERGY CAROLINAS. INCName

3581 WEST ENTRANCE RD: HARTSVILLE. SC 29550

Date: I 10010mr5. w vs--^avvz

Sheet: 2 of 4

Unit: 2

EC#:55731 EE:N/AWR/WO:665455 CR:1115 06

Repair OrganIzation PO No;Job No;etc.

Type Code Symbol Stamp: NIAAuthorization No.: NJAExpiration Date: N/A

4.

5.

Address

Identification of System: Class:2 C OMPONENT COOLING WATER SYSTEM 4080

(a) Applicable Construction Code: B 31.1 Edition: 1967 Addenda:N/A Code Case:N/ADesign Specification: GID/R87038/0003

(b) Applicable Edition of Section Xi Used for Repair/Replacement Activity: 1995 Edition 1996 AddendaCode Case: NIA

06. Identification of Comrnents Repaired or Replaced and Re lacement Components

Name of Name of Manufacturer National Other Year Corrected, ASMEComponent Manufacturer Seral No. Board No. Identification Built Renmoed, or Code

Installed Stamp(Yes orNo)

AC-8-H4 Ebasco N/A NIA Support 1971 Corrected N

AC-8-35122 Ebasco N/A N/A Restraint 1971 Corrected N

AC-7-3714 Ebasco N/A N/A Restraint 1971 Corrected N

AC-7-3 Ebasco N/A N/A Restraint 1971 Corrected N

AC-7-38J5J Ebasco NIA N/A Restraint 1971 Corrected N

AC-9-H15 Ebasco N/A NIA Support 1971 Corrected N

AC-9-H18 Ebasco N/A NIA Restraint 1971 Corrected N

AC-8-35110 Ebasco N/A N/A Restraint 1971 Removed N

AC-8-35/4 Ebasco N/A NIA Restraint 1971 Removed N

AC4-35/3 Ebasco N/A N/A Restraint 1971 Removed N

7. Description of Work: Modified CCW system supports oer EC 55731

8. Test Conducted: Hydrostatic U Pneumatic 1U. Nominal Operating Pressure Uj Exempt [XI

Other Dg.3] Pressure IN/A1 psig Test Temp. INIA) °F05-016

Page 88: a0 Progress Energy 10 - NRC

91995 Edition 1996 Addenda

.APPENDIX li MANDATORY

FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY

As Required by tho Provisions of the ASME Code Section XI

Form NiS 2

1. Owner PROGRESS ENERGY CAROLINAS. INCName

411 FAYETTEVILLE ST.. RALEIGH. NC 27602Address

2. Plant H.B.ROBINSON

n%.#.- inio)9ftw;VQrasu. w -

Sheet: 3 of 4

Unit: 2Name

3581 WEST Entrance RD: HARTSVILLE. SC 29550Address

3. Work Performed by PROGRESS ENERGY CAROLINAS. INCName

3581 WEST ENTRANCE RD: HARTSVILLE, SC 29550

EC#:55731 EE:NIAWRIWO:665455 CR:1111506

Repair Organization PO No;Job No;etc.

Type Code Symbol Stamp. N/AAuthorizatinn Nno. NIA

_: _ .- :-Expiration Date: N/A

Address

Identification of System: Class:24.

5.

(,OMPONENT COOLING WATER SYSTEM 4080_ . _ .... _ . _ . . _ _ _ _ ... _ ... .. _ .. _ . _ . = ... . _ _

(a) Applicable Construction Code: B_31.1 Edition: 1967 Addenda:N/A Code Cas4Design Specification: GID1R87038/0003

(b) Applicable Edition of Section XI Used for Repair/Replacement Activity: 1995 Edition 1996 AddendaCode Case: N/A

;:N/A

6. Identification or conponents Hepaired or R aced and R acement Components

Name of Name of Manufacturer National Other Year Corrected, ASMEComponent Manufacturer Serial No. Board No. Identification Built Removed, or Code

Installed Stamp(Yes orNo)

AC-9-36/7 Ebasco N/A N/A Support 1971 Removed N

AC-7-37/1 1J Ebasco N/A N/A Restraint 1971 Removed N

AC-8-35/25 Ebasco N/A N/A Support 1971 Removed N

AC-8-343 Ebasco N/A N/A Restraint 1971 Removed N

AC-8-H10 Ebasco NIA N/A Support 1971 Removed N

AC-9-38Ff7 Ebasco N/A N/A Restraint 1971 Removed N

AC-9-38F/H4 Ebasco N/A N/A Restraint 1971 Removed N

AC-7-H15 Ebasco NIA N/A Restraint 1971 Removed N

AC-7-H2 Ebasco N/A N/A Restraint 1971 Removed N

AC-8-H11 Ebasco NIA N/A Support 1971 Removed N

7. Description of Work: Modified CCW system s ineorts per EC 55731

8. Test Conducted: Hydrostatic LI. Pneumatic fjj Nominal Operating Pressure U Exempt [XI

Other IT-31 Pressure [ /Al psig Test Temp. IN[Al °F05-016

Page 89: a0 Progress Energy 10 - NRC

Form NIS2 1995 Edition 1996 AddendaSECTION XI DIVISION 1

t

FORM NIS-2 (Back)Sheet 4 of 4.

9. Remarks: See WO 665455 and EC55731 turnover oackaaesApplicable Manufacturer's Data Reports to be attached

CERTIFICATE OF COMPUANCE

I certify that the statements made in the report are correc: and this conforms to he requirements of fee ASME Code, Section XI.

Type Code Symbol Stamp N/A

Certific ata No. N N/A

Signed 4 ISI ENGINEER Date 10/22/2005Owner or Owner's Designee, Title

CERTIFICATE OF INSERVICE INSPECTION

I. the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the

State or Province of North Carolina end employed by HSBCT of HARTFORD. CONNECTICUT have

inspected the components described in this Owners Report during the period 5/13/2005 to 10/22/2005 and state that to the

best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this

Owner's Report in accordance with the requirements of the ASME Code, Section XI.

By signing this certificate neither the Inspector or his employer makes any warranty, expressed or implied, concerning the

examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer

shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with

this inspection.

this inseCommissions NC 1507

Inspect s Spature National Board, State, Province, and Endorsements

Date:10/2212005

05.016

Page 90: a0 Progress Energy 10 - NRC

Form NIS 21995 Edition 1996 Addenda APPENDIX II MANDATORY

FORM NIS-2 OWNER'S REPORT FOR REPAIRIREPLACEMENT ACTIVITY

As Required by the Provisions of the ASME Code Section Xl

1. Owner PROGRESS ENERGY CAROLINAS. INCName

411 FAYETTEVILLE ST.. RALEIGH. NC 27602Address

2. Plant HKB.ROBINSONName

3581 WEST Entrance RD: HARTSVILLE. SC 29550Address

3. Work Performed by PROGRESS ENERGY CAROLINAS. INCName

35R1 WFST ENTRANCE RD, HARTSVILLF SC 29S50

n~i.-. I r0snrsBaby. w Woof two

Sheet: 1 Of 2

Unit: 2

EC#:62401 EE:NIAWR/WO:648715 CR:N/A

Repair Organization PO No;Job No;etc.

Type Code Symbol Stamp: N/AAuthorization No.: N/AExpiration Date: N/A

-- -----Address

4. Identification of System: Class:3 SERVICE WATER SYSTEM 4060

5. (a) Applicable Construction Code: B 31.1 Edition: 1967 Addenda:N/A Code Case:N/ADesign Specification: CPL-XXXX-M-001

(b) Applicable Edition of Section XI Used for Repair/Replacement Activity: 1995 Edition 1996 AddendaCode Case: NIA

6. Identification of Components Repaired or Replaced and Replacement Components

Name of Name of Manufacturer National Other Year Corrected, ASMEComponent Manufacturer Serial No. Board No. Identification Built Removed, or Code

Installed Stamp(Yes orNO)

S641B Maintenance N/A N/A Strainer bolting 1971 Removed N

S6-1B Mackson N/A N/A Strainer bolting 2005 Installed N

__

a _______________ a ________________ ________ a _____________

7.

8.

Description of Work: Replaced inlet and outlet Strainer Flange bolting

Test Conducted: Hydrostatic L I Pneumatic I) Nominal Operating Pressure L-] Exempt l-l

Other [1 Pressure f.W1 psig Test Temp. IN/Al OF

05-017

Page 91: a0 Progress Energy 10 - NRC

Form NIS2 1995 Edition 1996 AddendaSECTION Xl DIVISION 1

FORM NIS-2 (Back)Sheet 2 of L

9. Remarks: See WO 648715 turnover packaaeApplicable Manufacturer's Data Reports to be attached

CERTIFICATE OF COMPUANCE

I certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code, Section Xi.

Type Code Symbol Stamp N/A

Certificate f No. N/A

Signed S181 ENGINEER Date 10123/2005Owner or Owner's Designee, Title

CERTIFICATE OF INSERVICE INSPECTION

1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the

State or Province of North Carolina and employed by HSBCT of HARTFORD. CONNECTICUT have

inspected the components described In this Owner's Report during the period 1011/2005 to 10/23/2005 and state that to the

best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this

Owner's Report In accordance with the requirements of the ASME Code, Section XI.

By signing this certificate neither the Inspector or his employer makes any warranty, expressed or Implied, concerning the

examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer

shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with

this inspection.

(217_____ _ Commissions NC 1507lsp6g nature National Board, State, Province, and Endorsements

Date:10/23/2005

05-017

Page 92: a0 Progress Energy 10 - NRC

FormNIS 21995 Edition 1996 Addenda APPENDIX II MANDATORY

FORM MS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY

As ReqWired by tht? Provisions of the ASME Code Section XII - --

1. Owner PROGRESS ENERGY CAROLINAS. INCName

411 FAYElTEVILLE ST.. RALEIGH. NC 27602Address

2. Plant H.B.ROBINSONName

3581 WEST Entrance RD: HARTSVILLE, SC 29550Address

3. Work Performed by PROGRESS ENERGY CAROLINAS. INCName

3581 WEST ENTRANCE RD: HARTSVILLE. 'C 29550

Dat ta Ini"laonfWW. * vl - cvw

Sheet: 1 of 2

Unit: 2

EC#:N/A EE:N/AWR!WO:759301 CR:N/A

Repair Organization PO No;Job No;etc.

Type Code Symbol Stamp: N/AAuthorization No.: N/AExpiration Date: N/A

Address

Identification of System: Class:1 I4.

5.

FIEACTOR COOLANT SYSTEM 2005

(a) Applicable Construction Code: B 31.1 Edition: 1967 Addenda:N/A Code CaseDesign Specification: CPL-HBR2-M-048

(b) Appicable Edition of Section Xl Used for Repair/Replacement Activity 1995 EditIon 1996 AddendaCode Case: N-416-2

eN/A

6. Identification of Comoonents Renaired or Reolaced and Renlacement Comnonents

Name of Name of Manufacturer National Other Year Corrected, ASMEComponent Manufacturer Serial No. Board No. Idertification Buift Removed, or Code

Installed Stamp(Yes orNo)

RC-525 Edwards N/A N/A Globe valve 2004 Removed N

RC-525 Edwards N/A N/A Globe valve 2005 Installed N

Piping Dubose N/A N/A 3/4'-RC-28A 2004 Removed N

Piping Dubose N/A NIA 3/4--RC-28A 2005 Installed N

I I 4 I.

7. Description of Work: Replaced valve and piping

8. Test Conducted: Hydrostatic [1d Pneumatic U Nominal Operating Pressure IX] Exempt (-J

Other IVT-21 Pressure [NOPl psig Test Temp. [NOT! F05-018

Page 93: a0 Progress Energy 10 - NRC

Form NIS2 1995 Edition 1996 AddendaSECTION Xi DIVISION 1

FORM NIS-2 (Back)Sheet 2 of 2.

9. Remarks: See WO 697587 turnover packaoeApplicable Manufacturer's Data Reports to be attached

CERTIFICATE OF COMPUANCE

I certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code, Section Xi.

Type Code Symbol Stamp N/A

Certifilal No. NIA

Sigred A ISI ENGINEER Date 0 0Owner or Owners Designee, Title

CERTIFICATE OF INSERVICE INSPECTION

1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the

State or Province of North Carolina and employed by HSBCT of HARTFORD. CONNECTICUT have

inspected the components described in this Owner's Report during the period 9/23/2005 to 10/24/2005 and state that to the

best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this

Owner's Report in accordance with the requirements of the ASME Code, Section XI.

By signing this certificate neither the Inspector or his employer makes any warranty, expressed or implied, concerning the

examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer

shall be liable In any manner for any personal injury or property damage or a loss of any kind arising from or connected with

this inspection.

________Commissions NC 1507S?6alu e National Board, State, Province, and Endorsements

Date:10/2412005

0-01 8

Page 94: a0 Progress Energy 10 - NRC

1995 Edition 1996 Addenda APPENDIX II MANDATORY

FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY

As Required by the Provisions of the ASME Code Section Xi

Form NIS 2

1. Owner PROGRESS ENERGY CAROLINAS. INCName

411 FAYETTEVILLE ST.. RALEIGH. NC 27602Address

2. Plant H.B.ROBINSONName

3581 WEST Entrance RD: HARTSVILLE, SC .9550Address

3. Work Performed by PROGRESS ENERGY CAROLINAS. INCName

3581 WEST ENTRANCE RD: HARTSVILLE. SC 29550

na4- 4 flrI'flA3.'-L,.. EwaLk.

Sheet: 1 Of 2

Unit: 2

EC#:N/A EE:N/AWRIWO:664068 CR:NtA

Repair Organization PO No;Job No;etc.

Type Code Symbol Stamp: N/AAuthorizaton No.: N/AExpiration Date: NtA

Address

Identification of System: Class:24.

S.

CACL-rV IKI Or'TlKI 0V0TFrU oN'tar0-1 .. llvv�� I IWI. %�- I %11. -...

(a) Applicable Construction Code: B 31.1 Edition: 1967 AddendaN/A Code CaseDesign Specification: CPL-HBR2-M-048

(b) Applicable Edition of Section Xl Used for Repair/Replacement Activity. 1995 Edition 1996 AddendaCode Case: N-416-2

e:NlA

6. Identification of Components Repaired or Repiaced and Replacement Components

Narmeof Name of Manufacturer National Other Year Corrected. ASMEComponent Manufacturer Serial No. Board No. Identification Built Removed, or Code

Installed Stamp(Yes orNo)

Si-873A Edwards N/A N/A Check valve 1971 Removed N

Sl-873A Edwards 40BCG N/A Check valve 2005 Installed N

Piping Ebasco NIA N/A 2-SI-65 1971 Removed N

Piping Dubose N/A NWA 2-SI-65 2005 Installed N

7. Description of Work: Replaced valve and pine pieces

8. Test Conducted: Hydrostatic LIj Pneumatic 1 1 Nominal Operating Pressure QXJ Exempt (-]

Other [EPT Pressure lN~'PJ psig Test Temp. [WOTI °F05-019

Page 95: a0 Progress Energy 10 - NRC

- s1Form NIS2 1995 Edition 1996 Addenda

SECTION Xi DIVISION 1

FORM NIS-2 (Back)Sheet 2 of 2.

9. Remarks: See WO 664068 turnover packace.Applicable Marufacturer's Data Reports to be attached

CERTIFICATE OF COMPUANCE

I certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code, Section Xl.

Type Code Symbol Stamp N/A

Certificate pLAthem No. N/A

Signed ISI ENGINEER Date 10/23/2005Owner or Owner's Designee, Title

CERTIFICATE OF INSERVICE INSPECTION

1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the

State or Province of North Carolina and employed by HSBCT of HARTFORD. CONNECTICUT have

inspected the components described in this Owner's Report during the period 9/13/2005 to 10/2312005 and state that to the

best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this

Owner's Report in accordance with the requirements cif the ASME Code, Section Xl.

By signing this certificate neither the Inspector or his employer makes any warranty, expressed or implied, concerning the

examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer

shall be liable in any manner for any personal Injury or property damage or a loss of any kind arising from or connected with

this inspection.

________Commissions NC 1507nsp 's tgnature National Board, State, Province, and Endorsements

Date:10/23/2005

05-019

Page 96: a0 Progress Energy 10 - NRC

Form NIS 2

.1995 Edition 1996 Addenda APPENDIX II MANDATORY

FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY

As Required by the Provisions of the ASME Code Section XiI

1. Owner PROGRESS ENERGY CAROLINASJ INGName

411 FAYETTEVILLE ST.. RALEIGH. NC 27602Address

2. Plant H.B.ROBINSONName

3581 WEST Entrance RD: HARTSVILLE, SC' 29550Address

3. Work Performed by PROGRESS ENERGY CAROLINAS. INCName

3581 WEST ENTRANCE RD: HARTSVILLE. SC 29550

Date: 10/25/2005

Sheet:

Unit:-

1 of 2

2

EC#:N/A EE:NfAWRMWO:581883 CR:N/A

Repair Organization PO NoWJob No:etc.

Type Code Symbol Stamp: NIAAuthorization No.: N/AExpiration Date: N/A

Address

Identification of System: Class:24.

5.

r-LJ~Alf'Ad AKfl Vnl~i I IP&A= fYrdT~elI QVQT=&R Orn1. - . -- '. - - - . - - - -

(a) Applicable Construction Code: B31.1 Edition: 1967 Addenda:N.A Code CaseDesign Specification: 883D391

(b) Applicable Edition o Section Xl Used for Repair/Replacement Activity: 1995 Edition 1996 AddendaCode Case: N-416-2

:N/A

06. Identition d Components Hepaired or Heplaced and Heplacement uompnents

Name of Name of Manufacturer National Other Year Corrected, ASMEComponent Manufacturer Serial No. Board No. Identification Built Removed, or Code

Installed Stamp(Yes orNo)

LTDN- Westinghouse N/A N/A Restricting orifice 1971 Removed NORIFICE-ALTDN- Energy Steel & N/A N/A Restricting orifice 2005 Installed NORIFICE-A Supply

7. Description of Work: Replaced 'A' Letdown restricting orifice

8. Test Conducted: Hydrostatic I Pneumatic U ] Nominal Operating Pressure %J Exempt (-I

Other IVT-21 Pressure [NOPI psig Test Temp. INOTI 0F05-020

0

Page 97: a0 Progress Energy 10 - NRC

Form NIS2 1995 Edition 1996 AddendaSECTION Xi DIVISION 1

FORM NIS-2 (Back)0 Sheet 2 of 2.

9. Remarks: See WO 581883 turnover packageApplicable Manufacturer's Data Reports to be attached

CERTHIrCATE OF COMPLIANCE

I certify that the statements made In the report are correct and this conforms to the requirements of the ASME Code, Section Xl.

Type Code Symbol Stamp N/A

Certificate o0 e Yo. N/A

Signed 4 ISI ENGINEER Date 1012512005Owner or Owner's Designee, rifle

CERTIFICATE OF INSERVICE INSPECTION

1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the

State or Province of North Carolina and employed by HSBCT of HARTFORD. CONNECTICUT have

inspected the components described In this Owner's Report during the period 11/16/2004 to 10125/2005 and state that to the

best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this

Owner's Report In accordance with the requirements of the ASME Code, Section Xl.

By signing this certificate neither the Inspector or his employer makes any warranty, expressed or implied, concerning the

examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer

shall be liable in any manner for any personal Injury or property damage or a loss of any kind arising from or connected with

this inspection.

/ pAAg; c_ ___GCommissions NC 1507Inspect ture National Board, State, Province, and Endorsements

Date:10125/2005

05020

Page 98: a0 Progress Energy 10 - NRC

1995 Edition 1996 Addenda APPENDIX II MANDATORY

FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY

As Required by the Provisions of the ASME Code Section XI

FForm NIS 2

1. Owner PROGRESS ENERGY CAROLINAS. INCName

411 FAYETTEVILLE ST.. RALEIGH. NC 27602Address

2. Plant H.B.ROBINSONName

3581 WEST Entrance RD; HARTSVILLE. SC 29550Address

3. Work Performed by PROGRESS ENERGY CAROLINAS. INC

n11.1 1 fliY;)N%Uutu. wcwcwv

Sheet: 1 of 2

Unit: 2

EC#:51 861 EE:NAWR/WO:534701 CR:N/A

Repair Organization PO No-Job No;etc.

Type Code Symbol Stamp: NAAuthorization No.: N/AExdration Data: NIA

NameS5R1 WFST ENTRANCE RD: HARTSVILLE SC 2'5wO- ----- _Y.. _.._. . _._. _ . _ . .

_ . _

4.

5.

Address

Identification of System: Class:3 C OMPONENT COOLING WATER SYSTEM 4060

(a) Applicable Construction Code: B 31.1 Edition: 1967 Addenda:NlA Code Case:NlADesign Specification: CPL-HBR2-M-26

(b) Applicable Edition of Section XI Used for Repair/Replacement Activity: 1995 Edition 1996 AddendaCode Case: N-416-2

Identification of flnmnnnants Rpnaired or Rpnlaacd and Ronlanpmant Comnonents6

Name of Name of Manufacturer National Other Year Corrected. ASMEComponent Manufacturer Serial No. Board No. Wdentificatlon BuIlt Removed, or Code

Installed Stamp(Yes orNo)

CC-738 Ebasco N/A N/A Check Valve 1971 Removed N

CC-738 Velan 50S N/A Check Valve 2004 Installed N

7.

8.

Description of Work: Replacing valve

Test Conducted: Hydrostatic U Pneumatic U-) Nominal Operating Pressure EXJ Exempt [-J

Other [VT-21 Pressure MNOPM psig Test Temp. I[NOT OF05-021

Page 99: a0 Progress Energy 10 - NRC

Form NIS2 1995 Edition 1996 AddendaSECTION Xl DIVISION 1

FORM NIS-2 (Back)Sheet 2 of 2.

9. Remarks: See WO 534701 turnover packageApplicable Manufacturer's Data Reports to be attached

CERTIFICATE OF COMPLIANCE

I certify that the statements made In the report are correct and this conforms to the requirements of the ASME Code, Section Xi.

Type Code Symbol Stamp N/A

Certificate k n No. N/A

Signed - ISI ENGINEER Date 10/25/2004Owner or Owner's Designee, Tile

CERTIFICATE OF INSERVICE INSPECTION

1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the

State or Province of North Carolina and employed by I-SBCT of HARTFORD. CONNECTICUT have

inspected the components described In this Owner's Report during the period 4/15/2004 to 10/25/2004 and state that to the

best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this

Owner's Report in accordance with the requirements of the ASME Code, Section Xi.

By signing this certificate neither the Inspector or his employer makes any warranty, expressed or implied, concerning the

examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer

shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with

this inspection.

G ______ Commissions NC 1507In" Sgnature National Board, State, Province, and Eniorsements

Date:10/25/2004

05-021

Page 100: a0 Progress Energy 10 - NRC

>r- %

I1995 Edition 1996 Addenda APPENDIX II MANDATORY

FORM NIS-2 OWNER'S RElPORT FOR REPAIRIREPLACEMENT ACTIVITY

As Required by thep Provisions of the ASME Code Section Xi

FormNIS2

1. Owner PROGRESS ENERGY CAROLINAS. INCName

411 FAYETTEVILLE ST.. RALEIGH. NC 2760:2Address

2. Plant H.B.ROBINSONName

3581 WEST Entrance RD: HARTSVILLE, SC 29550Address

3. Work Performed by PROGRESS ENERGY CAROLINAS. INCName

3581 WEST ENTRANCE RD: HARTSVILLE. ;C 29550

Date: 1217/2005

Sheet: 1 of 2

Unit:_ 2

EC#:56266 EE:NIAWRWO:6191461619161 CR:NtA

Repair Organization PO No;Job No;etc.

Type Code Symbol Stamp:. NtAAuthorization No.: NWAExpiration Date: N/A

4.

S.

Address

Identification of System: Class:1 REACTOR COOLANT SYSTEM 2005

(a) Applicable Construction Code: ASME III Edition: 1965 Addenda:NlA Code Case:N/ADesign Specification: 418A12

(b) Applicable Edition of Section Xl Used for Repair/Replacement Activity: 1995 Edition 1996 AddendaCode Case: N/A

.W

6. Identirt or caGponens Repaired or aeplaced and Heacement Components

Name of Name of Manufacturer National Other Year Corrected. ASMEComponent Manufacturer Serial No. Board No. Identification Built Removed, or Code

Installed Stamp(Yes orNO)

1-RC-2501R- Westinghouse NIA N/A RVUS Piping 1971 Removed N991-RC-2501R- Westinghouse N/A N/A RVUS Piping 2005 Installed N99

3t4-RC- Westing house N/A N/A RPV Head Vent 1971 Removed N2501 R-27 piping_3/4-RC- Westinghouse N/A N/A RPV Head Vent 2005 Installed N2501R-27 PipingRC-578 Ebasco N/A N/A Valve 1971 Removed N

7. Description of Work: Replaced RVUS and Head Vent piping and fittinas as part of RPV Head Replacement

8. Test Conducted: Hydrostatic L-] Pneumatic frI Nominal Operating Pressure ri Exempt pq

Other L Pressure [WLAJ psig Test Temp. INtA] 0F05.022

Page 101: a0 Progress Energy 10 - NRC

Form NIS2 1995 Edition 1996 AddendaSECTION XI DIVISION 1

S

FORM NIS-2 (Back)Sheet 2 of 2

9. Remarks: See WO 619146/619151 and EC 56266 turnover PackaaesApplicable Manufacturer's Data Reports to be attached

CERTIFICATE OF COMPLIANCE

I certify that the statements made in the report are correci: and this conforms to the requirements of the ASME Code, Section Xl.

Type Code Symbol Stamp N/A

Certificate d As zibeiiaeo. N/A

Sitned % IMrI FNGINFFR Date 19fli7/2S;

Owner or Owner's Designee, Title

CERTIFICATE OF INSERVICE INSPECTION

I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the

State or Province of North Carolina and employed by HSBCT of HARTFORD. CONNECTICUT have

inspected the components described in this Owner's Report during the period 9/21/2005 to 12/7/2005 and state that to the

best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this

Owner's Report in accordance with the requirements of the ASME Code, Section Xl.

By signing this certificate neither the Inspector or his; employer makes any warranty, expressed or Implied, concerning the

examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer

shall be liable In any manner for any personal injury C; property damage or a loss of any kind arising from or connected with

this inspection.

/72 u ( Commissions NC 1507

0

- nspect 5s S~l6nature National Board, State, Province, and Endorsements

Date:12/712005

05-022

Page 102: a0 Progress Energy 10 - NRC

eForm NIS 21995 Edition 1996 Addenda APPENDIX II MANDATORY

FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY

As Required by the Provisions of the ASME Code Section Xl1�111

1. Owner PROGRESS ENERGY CAROLINAS, INCName

411 FAYETTEVILLE ST.. RALEIGH. NC 27602Address

2. Plant H.B.ROBINSON

Date: I fIOPnnfl'. | W - W - VVO

Sheet: 1 Of 2

Unit: 2Name

3581 WEST Entrance RD: HARTSVILLE, SC 29550Address

3. Work Performed by PROGRESS ENERGY CA!ROLINAS. INCName

3581 WEST ENTRANCE RD: HARTSVILLE. ;C 29550

EC#:56266 EE:N/AWRIWO:558600 CR:N/A

Repair Organization PO No:Job No;etc.

Type Code Symbol Stamp: N/AAuthorization No.: N/AExpiration Date: N/A

4.

5.

Address

Identification of System: Class:1 REACTOR VESSEL 1005

(a) Applicable Construction Code: ASME ll Edition: 1998 Addenda:2000 Code CaseDesign Specification: 418A12

(b) Applicable Edition of Section XI Used for Repair/Replacement Activity: 1995 Edition 1996 AddendaCode Case: N/A

e:N-525

6. Identifieation of Comnonnnntq Rpnairert nr Ranlacrpti and Renlanamont rnmonnentaq

Name of Name of Manufacturer National Other Year Corrected, ASMEComponent Manufacturer Seriat No. Board No. Identfication Built Removed, or Code

Installed Stamp(Yes orNo)

RPV Head Westinghouse 66109 2928 N/A 1971 Removed Y

RPV Head Westinghouse B-VH-N12 5853 N/A 2005 Installed Y

. .

7. Description of Work: Redlaced RPV Head

8. Test Conducted: Hydrostatic L-1 Pneumatic U.. Nominal Operating Pressure LXJ Exempt H-

Other IVT-21 Pressure iNOPI psig Test Temp. MNOT °F05-023

Page 103: a0 Progress Energy 10 - NRC

I -If II '�51

Form NIS2 1995 Edition 1996 AddendaSECTION Xl DIVISION 1

FORM NIS-2 (Back)Sheet 2 of 2.

9. Remarks: See Form N-2 for NB Number 5853 (Attached)Applicable Manufacturer's Data Reports to be attached

CERTIFICATE OF COMPLIANCE

I certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code, Section Xi.

Type Code Symbol Stamp N/A

Certificate 0 No. N/A

Signed 4 4m- IS ISI ENGINEER Date 10/26/2005Owner or Owner's Designee, Title

CERTIFICATE OF INSERVICE INSPECTION

1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the

State or Province of North Carolina and employed by HSBCT of HARTFORD. CONNECTICUT have

inspected the components described in this Owner's Report during the period 9/21/2005 to 10/26/2005 and state that to the

best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this

Owner's Report in accordance with the requirements of the ASME Code, Section Xi.

By signing this certificate neither the Inspector or his employer makes any warranty, expressed or Implied, concerning the

examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer

shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with

this inspection.

>___a__ _Commissions NC 1507Ins ore Signature National Board, State, Province, and Endorsements

Date:10/2612005

05-023

Page 104: a0 Progress Energy 10 - NRC

|Record No.I -ioH-- -0-FORM N-2 CERTIFICATE HOLDERS' DATA REPORT FOR IDENTICAL

NUCLEAR PARTS AND APPURTENANCESAs Required by the Provisions of the ASME Code, Section L

Not to Exceed One Day's ProductionPg.1 Iof

1. Manulacture andoerfed by MITSUBISHI HEAW IIWSTRIES, LTD. KOBE SHIPYARD & MACHINERY WORKS1t-, WADASAIt1CHO 1l.CHOME, HYOGO-KU, KOBE 652-8585 JAPANmsnead ma ms dNPTcMIs Holda4

2. Manufacred for PROGRESS NEtRGYCAROUNAS. UJC./POWGRESS ENERGYSERVICE C0JPANY LC 411 Flvie ~ MauL 9aP, Nno2760- ui addrss of pu4hant

3. Location ot Insallation H.B. Robinson Nudear Power leneration Faclity Urnt 2 3851 West Entrance Rord Hattviile, SC USA 29550(- -ii ad-m

4. Type L5IDS001 Rsv.2 SA508 Gr.3 CLI 80 to 105 ksl -L5-01 DS =0 Rev.2 2005__ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Wavf no.) (eana. Spo.) Dona* ,trPm (11 (tt4

6. ASME Code, Section II. Division1: 1998 AOO 1 N525(4 dda dd a Ic.C m)

6. Fabricated In accordance with ConsL Spec. (Dv.2 only) - evislon - Datetno

7. Remarks: 45 control rod drive mechanism (CRDMl oenetratons. 45 CRDM assembles.2 vaent ninnw (one for RVHVS. ona fne RVIS). 45 nIlda funnALq. Intemart Cdaddna 2 dosura h PartA kavwavs- 2 einsura head Mifinn hij s8 ioud SuPport structu O throuch-holes for i

5._ __ . .. _ . _. _ yy_. y . �w,-

8. Non. thickness (n) 7.95 Mn. desIgn thickness In.) 7.76 Dia.lD(ft&In.) 12'4.8" Laengthoverall(ftIn.) 28'7.19'

9. Whonpplicabe. Cercate Holders' Data Repons re attached for each Item of this report

Part orApputtenancePart or Appurtenance

Serial Number

13"'H_12

NationalBoard No.

In Numerical Order

853 _(1)12)(3)(4)(5)(6)O')(8)(1)

(11)12)

(13)(14)(16)

(16)(17)(18)

(19)(2)(21)(22)

(23)(24)

M

I_-

below blankI

I 1 I-A CRDMassembly cons of the toowing.

- Pressure housing essembly- Latch housIng- Rod travel housing

4 fiux ings- Latch assembly

NationalPaIt or Appurtenance Board No.

Serial Number In Numerical Order

826)

(2 7) , _ _ __._._ _ _ __. _

#29)t30)

t32)(331 _ _ _ _ _ _

4) _ _ _ _ _ _ _ _

(35) _ _ _ _ _ _

(37) -. _.

(381

40) _ _41)i __ _ __ _ __ _ __ _

42) .r._ _ _ _ _ _ _ _ _ _ _ _

(43) . _ _ _ _ _ _

(44) __ _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _

(45)__ _ _ _ _ _ _ _

(46) - _ _ _ _ _ _ _

(47) _ _ _ _ _ _ _ _ _

49) __ _ _ __ _ _ _ __ _ _ _

(5 )_ _ _ _ _ _ _ _ _ ___________________________________________I_____________________.

10. Design pressure 2500 psal Temp. 650 *F. Hydro. Test pressure 3205 pa. at imp. 68 'F.C 2485 PuWl C P3le.)

Suepnltmel Intrxrrna intheoinn olfits, skches, orsdrawinsmay beused proided (I) sze Is 3 'auxt, (2) normatonintes 2and 3ontis Da Report

Is Inctuded on each rea. (3) each sheet Is nubetred and ihe mumabr of sheet Is recorded at the top of thls form.

(7198) This form (EOOD40) may be obtained frorm the Order Dept., ASME. 22 Law DrIve. Box 2300. Fairfeld. NJ 07007-2300

RRVCIr PECI RB.Robinsotr2 t P.O.3382 0039I MMI Section 2 - Page I

Page 105: a0 Progress Energy 10 - NRC

FORM N-2 (Back - Pg 2 of _;j

Certificate Holder's SWral Nos. _ -VH-N12 through

CERT11:CATION OF DESIGN

Design specifications cerfied by Harshad C. Jambusarla P.E. State SC Reg. no. 20824

Design report, certified by DulaOC. Bhominck PE State SC Reg. no. 21082

CERTIFICATE OF COMPUANCE

Reactor Vessel Closure Head with 45 Control RodWe certify that the statements made In this report are correct and that this (these) Drive Mechanismconforms to the rules of construction of the ASME Code, Serxn M, Division t.

NPT Certificate ofAuthorization No. N-2327 Evpires December a,2007

MtTSUBISHI HEAWI INDUSTRIES, LTD.Date k (rO oS Name KOBESHIPYARD&MACHINERYWORKS Signed _ _ _ _ __ _ _ _

INPT CWIF.Mte Hol

CERTIFICATE OF INSPECTION

1. the undersigned, holding a valid corwmlsion Issued by tie National Board of Boiler and Pressure Vassel Inspectors and the State orProvince Of PA and employed by HARTFORD STEAM BOILER OF CONNECTICUT

of HiTFORD. CT have inspected these Items described in tis Data Report on MAY 10.2005 , andstate that to the best of my knowledge and belief, the Certificade Holder has fabricated these parts or appurtenances In accordance with theASME Code, Section M, Division 1. Each part listed has been authorized for stamping on the date shown above.By signing this certificates, neither the Inspector nor his employer makes any wanenty, expressed or implied, concerning the equipment

described in thts Data ReporL Furthermore, neither the hispector nor his employer shall be liable In any manner for any personal biury orproperty damage or loss of any kind arising from or connected with this pectiorn.

Date / y /O4oO S' Signed Commissions Rt,&A3) o ,Z 39-:t4c I. Pd, endorh) wid or powd no.

RRVCtr PEC I IBRobinson-2 t P.0.3382-0039 1 MIS 2Section 2 - Page 2

Page 106: a0 Progress Energy 10 - NRC

r

FORM N-2 (3 of

C Certificate Holder's Serial Nos. B-VHWNI2 Uttough -

Manufactured for PROGRESS ENERGY CAROUNAS. INC. IPROGRESS ENERGY SEX COMIPANY. tiC 411 Fawlee S. Mli.t Raln. Cic 27D2Van* ld ress d g prchaint

Location of instafation H.B. Robinson Nuclear Power Generation Facility Urit 2 3851 West Entrance Road Harvt-le, SC USA 29560#Wmi. aid addmess

RHVCHW PEC I HiRRobinson-2 I P.0.3382-00391 MHI Section 2 - Page 3

jm,'� , ,

Page 107: a0 Progress Energy 10 - NRC

e1995 Edition 1996 Addenda APPENDIX It MANDATORY

FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY

As Required by the Provisions of the ASME Code Section Xl

Form NIS 2

1. Owner PROGRESS ENERGY CAROLINAS. INCName

411 FAYETTEVILLE ST., RALEIGH. NC 2760

Date: 1 1/ S/2005nrw. . ,. ,<

Sheet: 1 of 3Address

Li D Dt^0lhI.I1^K12. PPi -0�K I

Name

3581 WEST Entrance RD: HARTSVILLE, SC 29550Address

3. Work Performed by PROGRESS ENERGY CAROLINAS. INCName

3581 WEST ENTRANCE RD: HARTSVILLE, SC 29550Address

Unit: 2

EC#:58305 EE:N/AWR/WO:564296 CR:N/A

Repair Organization PO No;Job No~etc.

Type Code Symbol Stamp: N/AAuthorization No.: NWAExpiration Date: NWA

4.

5.

Identification of System: Class:3 I1'.A13DI% i&jrT (ttV IKf- VATFr 0V0TSrU ANrbn�W-v W-11- .. - �rl � I � I ""I 1�v

(a) Applicable Construction Code: B 31.1 Edition: 1967 Addenda:N/A Code CaseDesign Specification: N/A

(b) Applicable Edition of Section Xl Used for lepair/Replacement Activity: 1995 Edition 1996 AddendaCode Case: N-416-2

:N/A

6. Identifi ation of Componen Repaired or acedand Replacement Components

Name of Name of Manufacturer National Other Year Corrected, ASMEComponent Manufacturer Serial No. Board No. Identification Bunt Removed, or Code

Installed Stamp(Yes orNo)

FI-660 Ebasco N/A NWA Flow Indicator 1971 Removed N

Fl-660 Brooks N/A N/A Flow Indicator 2005 Installed N

FE-660 Ebasco N/A N/A Flow Element 1971 Removed N

CC-934 Velan 05-003-1 N/A Globe Valve 2005 Installed N

CC-734A Ebasco NVA N/A Globe Valve 1971 Removed N

CC-734A Velan MMOO84 N/A Globe Valve 2005 Installed N

7. Description of Work: Modifvina piving section and relocatinq FI-660

8. Test Conducted: Hydrostatic L ] Pneumatic [ 1 Nominal Operating Pressure W Exempt 'X]

Other VT21 Pressure INOPI psig Test Temp. [NOT] °F05024

Page 108: a0 Progress Energy 10 - NRC

e1995 Edition 1996 Addenda APPENDIX II MANDATORY

FORM NIS-2 OWNER'S REPORT FOR REPAIRIREPLACEMENT ACTIVITY

As Required by the Provisions of the ASME Code Section Xi

Form NIS 2

1. Owner PROGRESS ENERGY CAROLINAS. INCName

411 FAYETTEVILLE ST.. RALEIGH. NC 27602Address

2. Plant H.B.ROBINSON

n.#-. 41 1 .1MrnrI #I 1-�

Sheet: 2 of 3

Unit:_ 2Name

3581 WEST Entrance RD: HARTSVILLE. SC 29550Address

3. Work Performed by PROGRESS ENERGY CAROLINAS. INCName

3581 WEST ENTRANCE RD: HARTSVILLE, SC 29550

EC4:58305 EE:N/AWRIWO:564296 CR:N1A

Repair Organization PO NoJob No;etc.

Type Code Symbol Stamp: N/AAuthorization No.: N/AExpiration Date: NWA

Address

Identification of System: Class:34.

5.

COMPONENT COOLING WATER SYSTEM 408Q

(a) ApplicableConstructionCode: B3.1 Edition: 1967 Addenda:N/A Code CaseDesign Specification: N/A

(b) Applicable Edition of Section Xl Used for Repair/Replacement Activity: 1995 Edition 1996 AddendaCode Case: N-416-2

:NtA

6. Identification of Components Repaired or Hep-- and Repacement Componts-

Name of Name of Manufacturer National Other Year Corrected, ASMEComponent Manufacturer Serial No. Board No. Identificaton Built Removed, or Code

Installed Stamp(Yes orNo)

CC-734B Ebasco NIA N/A Globe Valve 1971 Removed N

CC-734B Velan MMOOB4 NIA Globe Valve 2005 Installed N

3-AC-152N- Ebasco N/A N/A 3 Piping 1971 Removed N

3-AC-152N- Maintenance N/A NIA 3" Piping 2005 Installed N

2-AC-152N Ebasco N/A N/A 2" Piping 1971 Removed N

2-AC-152N Maintenance N/A N/A 2 Piping 2005 Installed N

7. Description of Work: Modifying vivino section and relocating FI-660

8. Test Conducted: Hydrostatic H Pneumatic U1 Nominal Operating Pressure [X Exempt [XJ

Other IVT-21 Pressure 1N0P] psig Test Temp. (NOT] OF05-024

Page 109: a0 Progress Energy 10 - NRC

Form NIS2 1995 Edition 1996 AddendaSECTION XI DIVISION 1

FC)RM NIS-2 (Back)Am Sheet 3 of 3.

9. Remarks: See WO 564296/EC58305 turnover packaaesApplicable Manufacturer's Data Reports to be attached

CERTIFICATE OF COMPUANCE

I cerfify that the statements made In the report are correct and this conforms to the requirements of the ASME Code, Section XI.

Type Code Symbol Stamp N/A

Certificate = zao. N/A

Signed A ISI ENGINEER Date 11/16/2 5Owner or Owner's Designee, Title

CERTIFICATE OF INSERVICE INSPECTION

1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the

State or Province of North Carolina and employed by HSBCT of HARTFORD. CONNECTICUT have

inspected the components described in this Owners Report during the period 9/19/2005 to 11/1612005 and state that to the

best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this

Owner's Report in accordance with the requirements c the ASME Code, Section XI.

By signing this certificate neither the Inspector or his employer makes any warranty, expressed or implied, concerning the

examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer

shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with

this inspection.

° 0 6. Commissions NC 1507InsW ofSinature National Board, State. Province, and Endorsements

Date:1 1116/2005

05-024

Page 110: a0 Progress Energy 10 - NRC

1995 Edition 1996 Addenda

.APPENDIX II MANDATORY

FORM NIS-2 OWNER'S REPORT FOR REPAIRIREPLACEMENT ACTIVITY

As Required by the Provisions of the ASME Code Section XI

Form NiS 2

I - --

1. Owner PROGRESS ENERGY CAROLIN!S. INCName

411 FAYETTEVILLE ST.. RALEIGH, NC 27602Address

2. Plant H.B.ROBINSONName

3581 WEST Entrance RD: HARTSVILLE, SC 29550Address

3. Work Performed by PROGRESS ENERGY CAROLINAS, INCName

3581 WES(T FNTRANCE RD: HARTSVI I F 2 RC 95509;A

na#- I1 It PonlonnizJOl*. I IM-

Sheet: I of 2

Unit: 2

EC#:N/A EE:NIAWR/WO:767472 CR:N/A

Repair Organization PO No;Job No;etc.

Type Code Symbol Stamrp; NIAAi thriMatinn No NIA

I....r.a..i Da...Expiration Date:, N/A--- , ---- -- -- -----

4.

5.

Address

Identification of System: Class:2 MAIN STEAM SYSTEM 3020

(a) Applicable Construction Code: AISC Edition: NIA Addenda:NJA Code Case:N/ADesign Specification:

(b) Applicable Edition of Section XI Used for Repair/Replacement Activity: 1995 Editon 1996 AddendaCode Case: N/A

Identifiticaifn of Comoonents Renairnd or Reoilacrd and Rdanpement onmoonents6.

Name of Name of Manufacturer National Other Year Corrected. ASMEComponent Manufacturer Serial No. Board No. Identification Built Removed, or Code

Installed Stamp(Yes orNo)

213iF-WS Ebasco N/A N/A Piping restraint 1971 Corrected N_ _ _ _ _ _ _ _ _ _M S-11B-b _ _ _

7.

8.

Description of Work: Weld repair of restraint structure stiffener plate

Test Conducted: Hydrostatic LI] Pneumatic L-] Nominal Operating Pressure f] Exempt H

Other IVT-31 Pressure [N/A] psig Test Temp. fN/Al °F05-025

Page 111: a0 Progress Energy 10 - NRC

Form NIS2 1995 Edition 1996 AddendaSECTION Xi DIVISION 1

FORM NIS-2 (Back)At Sheet 2 of 2.

9. Remarks: See WO 767472 turnover eackace.Applicable Manufacturer's Data Reports to be attached

CERTIFICATE OF COMPLIANCE

I certify that the statements made In the report are corred and this conforms to the requirements of the ASME Code, Section Xi.

Type Code Symbol Stamp N/A

Certficat at No. N/A

Signed CISI ENGINEER Date 1218/2005Owner or Owner's Designee, Title

CERTIFICATE! OF INSERVICE INSPECTION

1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the

State or Province of North Carolina and employed by HSBCT of HARTFORD. CONNECTICUT have

inspected the components described in this Owner's Report during the period 10/6/2005 to 12/8/2005 and state that to the

best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this

Owner's Report in accordance with the requirements of the ASME Code, Section XI.

By signing this certificate neither the Inspector or his employer makes any warranty, expressed or implied, concerning the

examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer

shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with

this inspection.

(_ ______ Commissions NC 1507Inspe aesgnature National Board, State, Province, and Endorsements

Date:1 2/8/2005

05-025

Page 112: a0 Progress Energy 10 - NRC

1995 Edition 1996 Addenda APPENDIX II MANDATORY

FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY

As Required by the Provisions of the ASME Code Section Xi

Form NIS 2

1. Owner PROGRESS ENERGY CAROLINAS INCName

411 FAYETTEVILLE ST.. RALEIGH. NC 27602Address

2. Plant H.B.ROBINSONName

3581 WEST Entrance RD: HARTSVILLE. SC 29550Address

3. Work Performed by PROGRESS ENERGY CAROLINAS. INCName

3581 WEST ENTRANCE RD: HARTSVILLE. SC 29550

Date: 1212/2005

Sheet: 1 Of 2

Unit: 2

EC#:NIA EE:NIAWR/WO 662477 CR:N/A

Repair Organization PO No;Job No;etc.

Type Code Symbol Stamp: NIAAuthorization No.: N/AExpiration Date: NWA

4.

5.

Address

Identification of System: Class:2 RESIDUAL HEAT REMOVAL SYSTEM 2045

(a) Applicable Construction Code: B 31.1 Edition: 1967 Addenda:N/A Code Case:N/ADesign Specification: N/A

(b) Applicable Edition of Section Xi Used for RepairlReplacement Activity: 1995 Edition 1996 AddendaCode Case: N/A

6. Identification of Components Repaired or Replaced and Re lacement Components

Name of Name of Manufacturer National Other Year Corrected, ASMEComponent Manufacturer Serial No. Board No. Identification Built Removed, or Code

Installed Stamp(Yes orNo)

Snubber #20 Grinnell 3221 N/A Hydraulic 1998 Removed NSnubber

Snubber #20 Grinnell 34439 N/A Hydraulic 2005 Installed NSnubber ____

7.

B.

Description of Work: Replaced snubber

Test Conducted: Hydrostatic El Pneumatic I U Nominal Operating Pressure U Exempt [-]

Other [IT-31 Pressure KN/AI psig Test Temp. [WA] 'F05-026

Page 113: a0 Progress Energy 10 - NRC

Form NIS2 1995 Edition 1996 AddendaSECTION Xi DIVISION 1

FORM NIS-2 (Back)Sheet 2 of 2.

9. Remarks: See WO 662477 turnover package and EST-033Applicable Manufacturer's Data Reports to be attached

CERTIFICATE OF COMPUANCE

I certify that the statements made hI the report are correct and this conforms to the requirements of the ASME Code, Section Xl.

Type Code Symbol Stamp N/A

CertificatNO N/A

Signed 4 C ISI ENGINEER Date 12/9/2005Owner or Owner's Designee, Title

CERTIFICATE OF INSERVICE INSPECTION

1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the

State or Province of North Carolina and employed by HSBCT of HARTFORD. CONNECTICUT have

inspected the components described in this Owner's Report during the period 10/8/2005 to 12/9(2005 and state that to the

best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this

Owners Report in accordance with the requirements of the ASME Code, Section Xi.

By signing this certificate neither the Inspector or his employer makes any warranty, expressed or implied, concerning the

examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer

shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with

this inspection.

____ ___Commissions NC 1507I-ns--,ris Sl ature National Board, State, Province, and Endorsements

Date:12/9/2005

05-026

e

Page 114: a0 Progress Energy 10 - NRC

1995 Edition 1996 Addenda

0ftAPPENDIX II MANDATORY

FORM NIS-2 OWNER'S REPORT FOR REPAIRIREPLACEMENT ACTIVITY

As Required by the Provisions of the ASME Code Section Xl

10 Form NIS 2

�111

1. Owner PROGRESS ENERGY CAROLINASU INCName

411 FAYETTEVILLE ST.. RALEIGH. NC 27602_

Date: i122/n00wow. . cows

Sheet: 1 of 2Address

Li e 0r%01rt1Nj%2. PI.--.1I4% .I.tJ II.% U

Name

3581 WEST Entrance RD: HARTSVILLE. SC 29550Address

3. Work Performed by PROGRESS ENERGY CAROLINAS. INCName

3581 WEST ENTRANCE RD: HARTSVILLE- SC 29550

Unit: 2

EC#:N/A EE:N/AWRIWO,544849 CR:NJA

Repair Organizatin PO No;Job No~etc.

Type Code Symbol Stamp: N/AAuthorization No.: N/AExpiration Date: N/A

A 3050

Address

Identification of System: Class:34.

5.

FFF WATFR qYqTFP... ----

_ . _

(a) Applicable Construction Code: B 31.1 Edition: 1967 Adenda:N/A CodeCaseDesign Specification: 5379-01397 SH1

(b) Applicable Edition of Section Xl Used for Repair/Replacement Activity: 1995 Edition 1996 AddendaCode Case: NWA

e:N/A

6. Identification of Components Repaired or Replaced and Replacement Components= - - � - U = a

Name of Name of Manufacturer Nahonal Other Year Corrected. ASME

NameotComponent

Name SnManufacturer

ManufacturerSerial No.

Natioa'Board No.

OtherIdentification

YearBuilt

Corrected SRemoved, orInlstalled

ASMECodeStamp(Yes orNo)

FCV-478 Copes-Vulcan N/A NA Bonnet Stud 1971 Removed N

FCV-478 Copes Vulcan NIA N/A Bonnet Stud 1986 Installed N

FCV-478 Copes Vulcan N/A NA Bonnet Nut 1971 Removed N

FCV-478 Mackson NA NIA Bonnet Nut 2001 Installed N

7. Description of Work: Replaced one stud and one nut damaged during maintenance.

8. Test Conducted: Hydrostatic U1 Pneumatic U Nominal Operating Pressure Il Exempt N

Other [] Pressure IN/AI psig Test Temp. IN/Al 'F05-O027

Page 115: a0 Progress Energy 10 - NRC

Form NIS2 199S Edition 1996 AddendaSECTION XI DIVISION 1

FORM NIS-2 (Back)Sheet 2 of 2.

9. Remarks: See WO 544849 turnover packaceApplicable Manufacturer's Data Reports to be attached

CERTIFICATE OF COMPUANCE

I certify that the statements made in the report are correcs and this conforms to the requirements of the ASME Code, Section XI.

Type Code Symbol Stamp N/A

Certlficati of Autotion No. N/A

Signed- A IS ENGINEER Date 12/5/2005Owner or Owners Designee, Title

CERTIFICATE OF INSERVICE INSPECTION

1, the undersigned, holding a valid commission issued by the National Board of Boler and Pressure Vessel Inspectors and the

State or Province of North Carolina and employed by HSBCT of HARTFORD. CONNECTICUT have

inspected the components described in this Owner's Report during the period 9/2 005 to 12/5/2005 and state that to the

best of my knowledge and belief, the Owner has peilormed examinations and taken corrective measures described in this

Owner's Report In accordance with the requirements of the ASME Code, Section XI.

By signing this certificate neither the Inspector or his employer makes any warranty, expressed or implied, concerning the

examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer

shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with

this inspection.-

ths in n Commissions NC 1507Inspect Snature National Board, State, Province, and Endorsements

Date:1 2/5/2005

05-027

- 1'.

Page 116: a0 Progress Energy 10 - NRC

I

0ND1995 Edition 1996 Addenda APPENDIX II MANDATORY

FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY

As Required by the Provisions of the ASME Code Section Xl

Form NIS 2

1. Owner PROGRESS ENERGY CAROLINAS. INCName

411 FAYETTEVILLE ST.. RALEIGH, NC 27602Address

2. Plant H.B.ROBINSONName

3581 WEST Entrance RD: HARTSVILLE. SC 29550Address

3. Work Performed by PROGRESS ENERGY CAROLINAS. INCName

3581 WEST ENTRANCE RD: HARTSVILLE, S;C 29550

Date: 12/2/2005

Sheet: 1 of 2

Unit: 2

EC#:N/A EE:N/AWR/WO:544818 CR:N/A

Repair Organization PO NoJob No;etc.

Type Code Symbol Stamp: N/AAuthorization No.: NWAExpiration Date: N/A

A '13020

Address

irtantifi1p-tienn ei qviqtnm. I KRAIN ATFAM qVRTFIJ4.

5. (a) Applicable Construction Code: B31.1 Edition: 1967 Addenda:N/A Code Case;N/ADesign Specification:

(b) Applicable Edition of Section XI Used for Repair/Replacement Activity: 1995 Edition 1996 AddendaCode Case: N/A

Identification of Comoonents Renaired or Renlaced and Renlacement Cornnonants6.=- *_:-- ----_______ _ _ =-

Name of Name of Manufacturer National Other Year Corrected, ASMEComponent Manufacturer Serial No. Board No. Identification Built Removed, or Code

Installed Stamp(Yes orNo)

MS-263A Vogt N/A N/A Piston 1971 Removed N

MS-263A Vogt N/A N/A Piston 1991 Installed N

__ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ____ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

7.

8.

Description of Work: replaced valve piston

Test Conducted: Hydrostatic fj Pneumatic [U] Nominal Operating Pressure [1U Exempt I-)

Other [N/Al Pressure "Ad psig Test Temp. IN/Al 0F05.028

Page 117: a0 Progress Energy 10 - NRC

Form NIS2 1995 Edition 1996 AddendaSECTION Xi DIVISION .

FORM NIS-2 (Back)A1 Sheet 2 of 2

9. Remarks: See WO 544818 turnover MackageApplicable Manufacturer's Data Reports to be attached

CERTIFICATE OF COMPLIANCE

I certify that the statements made In the report are correct and this conforms to the requirements of the ASME Code, Section XI.

Type Cede Symbol Stamp N/A

Certificatepl ateo. . N/A

Signed ISI ENGINEER Date 12/5/2005Owner or Owner's Designee, Title

CERTIFICATE: OF INSERVICE INSPECTION

1. the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the

State or Province of North Carolina and employed by HSBCT of HARTFORD, CONNECTICUT have

inspected the components described in this Owners Report during the period 9/2512005 to 12/5/2005 and state that to the

best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this

Owner's Report in accordance with the requirements of the ASME Code, Section Xi.

*P By signing this certificate neither the Inspector or his employer makes any warranty, expressed or implied, concerning the

examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer

shall be liable in any manner for any personal injury Co property damage or a loss of any kind arising from or connected with

this inspection.

9___ ____ Commissions NC 1507Ins atSignature National Board, State, Province, and Endorsements

Date:1215/2005

05-028

Page 118: a0 Progress Energy 10 - NRC

1995 Edition 1996 Addenda APPENDIX II MANDATORY

FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY

As Required by the Provisions of the ASME Code Section Xl

Form NIS 2

1. Owner PROGRESS ENERGY CAROLINAS. INCName

411 FAYETTEVILLE ST.. RALEIGH, NC 2760:2

r%-- 41n(YU;ffwattr

Sheet: I of 2Address

WI R 0f%0M1frNI2. PlantName

3581 WEST Entrance RD: HARTSVILLE, SC 29550Address

3. Work Performed by PROGRESS ENERGY CAROLINAS. INCName

3581 WEST ENTRANCE RD: HARTSVILLE. SC 29550

Unit: 2

EC#:N/A EE:NIAWRNVO:664066 CR:N/A

Repair Organization P0 No-Job No;etc.

Type Code Symbol Stamp: NMAAuthorization No.: NIAExpiration Date: N/A

4.

5.

Address

Identification of System: Class:2 SAFETY INJECTION SYSTEM 2080

(a) Applicable Construction Code: B 31.1 Edition: 1967 Addenda:N/A Code Case: NIADesign Specification: CPL-HBR2-M-048

(b) Applicable Edition of Section Xl Used for Repair/Replacement Activity 1995 Edition 1996 AddendaCode Case: N-416-2

6. Identification of Components Repaired or Replaced and Replacement Components

Name of Name of Manufacturer National Other year Corrected. ASMEComponent Manufacturer Serial No. Board No. Identification Buit Removed, or Code

Installed Stamp(Yes orNo)

SI-873B Edwards N/A N/A Check valve 1971 Removed N

SI-873B Edwards SONC24 N/A Check valve 2005 Installed N

Piping Ebasco N/A N/A 2-SI-64 1971 Removed N

Piping Dubose N/A N/A 2-SI-64 2005 Installed N

7. Description of Work: Replaced valve and opie rieces

8. Test Conducted. Hydrostatic f U Pneumatic LI Nominal Operating Pressure [X) Exempt [-l

Other [FP Pressure MP] psig Test Temp. [NOfl 0F05-029

Page 119: a0 Progress Energy 10 - NRC

Form NIS2 1995 Edition 1996 AddendaSECTION Xl DIVISION 1

FORM NIS-2 (Back)Sheet 2 of 2.

9. Remarks: See WO 664066 turnover packageApplicable Manufacturer's Data Reports to be attached

CERTIFICATE OF COMPLIANCE

I certify that the statements made In the report are correct: and this conforms to the requirements of the ASME Code, Section XI.

Type Code Symbol Stamp N/A

Cerfific N/A

Signed A4 t ISI ENGINEER Date 12/7/2005Owner or Owner's Designee, Tie

CERTIFICATE- OF INSERVICE INSPECTION

I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the

State or Province of North Carolina and employed by HSBCT of HARTFORD. CONNECTICUT have

inspected the components described in this Owner's Report during the period 9/1312005 to 12/7/2005 and state that to the

best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this

Owner's Report in accordance with the requirements of the ASME Code. Section Xl.

By signing this certificate neither the Inspector or his employer makes any warranty, expressed or implied, concerning the

examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer

shall be liable in any manner for any personal Injury or property damage or a loss of any kind arising from or connected with

this inspection.

___ _ _Commissions NC 1507pecJ SIgature National Board, State, Province, and Endorsements

Date: 12(7/2005

05-029

Page 120: a0 Progress Energy 10 - NRC

'I

1995 Edition 1996 Addenda APPENDIX II MANDATORY

FORM NIS-2 OWNER'S RElPORT FOR REPAIRIREPLACEMENT ACTIVITY

As Required by the Provisions of the ASME Code Section Xl

Form NIS 2

1. Owner PROGRESS ENERGY CAROLINAS INCName

411 FAYETTEVILLE ST.. RALEIGH. NC 27602

Data: 121612F0lonw.w. s.v__

Sheet: 1 of 3Address

14 n MrIMKI0r2. F0l...lM t I*LJftlI*Kl

Name

3581 WEST Entrance RD: HARTSVILLE, SC :9550Address

3. Work Performed by PROGRESS ENERGY CAROLINAS. INCName

3581 WEST ENTRANCE RD; HARTSVILLE, SC 29550

Unit: 2

EC#:58640 EE:N/AWR/WO:633486 CR;N/A

Repair Organization PO No;Job No;etc.

Type Code Symbol Stamp: N/AAuthorization No.: N/AExpiration Date: N/A

4.

5.

Address

Identification of System: Class:2 SAFETY INJECTION SYSTEM 2080

(a) Applicable Construction Code: 831.1 Edition: 1967 Addenda:N/A Code Case:Nl/ADesign Specification: CPL-HBR2-M-048

(b) Applicable Edition of Section Xl Used for Repair/Replacement Activity: 1995 Edition 1996 AddendaCode Case: NI1A

Identification of ComDonents Repaired or Renlaced and Reolacement Comoonents6.

Name of Name of Manufacturer National Otler Year Correed, ASMEComponent Manufacturer Serial No. Board No. Identification Buift Removed, or Code

Installed Stamp(Yes orNO)

6-SI-30 Maintenance N/A NIA Piping 2004 Removed N

6-SI-30 Maintenance N/A N/A Piping 2005 Installed N

6-SI-31 Maintenance N/A N/A Piping 2004 Removed N

6-SI-31 Maintenance N1A N/A Piping 2005 Installed N

4-SI-244 Maintenance N/A N/A Piping 2004 Removed N

4-SI-244 Maintenance N/A NIA Piping 2005 Installed N

7. Description of Work: Modified 'A and *B- Conlainment Spray Pump discharae pipin

8. Test Conducted: Hydrostatic jM Pneumatic Lj Nominal Operating Pressure U Exempt [-

Other IVT-21 Pressure 13751 psig Test Temp. [NOT] °F05-030

Page 121: a0 Progress Energy 10 - NRC

4-

1995 Edition 1996 Addenda APPENDIX II MANDATORY

FORM NIS-2 OWNER'S REPORT FOR REPAIRIREPLACEMENT ACTIVITY

As Required by the Provisions of the ASME Code Section Xi

Form NIS 2

I-

1. Owner PROGRESS ENERGY CAROLINAS. INGName

411 FAYETTEVILLE ST.. RALEIGH. NC 27602

Dnte: 12/6F/200w9.

Sheet: 2 of 3Address

i- R l=f.1CNN:K82. F11-4fmilt

Name

3581 WEST Entrance RD: HARTSVILLE, SC 29550Address

3. Work Performed by PROGRESS ENERGY CAROLINAS. INCName

3581 WEST ENTRANCE RD: HARTSVILLE. SC 29550

Unit: 2

EC#:58640 EE:NIAWR/WO:633486 CR:NtA

Repair Organization PO No;Job No;etc.

Type Code Symbol Stamp. N1AAuthorization No.: NIAExpiration Date: NtA

Address

4.

5.

Identification of System: Class:2 SAFETY INJFCTION SYSTFM 2080

(a) Applicable Construction Code: B 31.1 Edition: 1fl7 Addenda:N/A Code CaseDesign Specification: CPL-HBR2-M-048

(b) Applicable Edition of Section Xl Used for Repair/Replacement Activity: 1995 Edition 1996 AddendaCode Case: NWA

e:NlA

6. Identification of Comoonents Reoaired or Replaced and Replacement Components

Name of Name of Manufacturer National Other Year Corrected. ASMEComponent Manufacturer Serial No. Board No. Identification Built Removed, or Code

Installed Stamp(Yes orNo)

4-SI-245 Maintenance N/A N/A Piping 2004 Removed N

4-SI-245 Maintenance N/A N/A Piping 2005 Installed N

2-SI-151 Maintenance NtA N/A Piping 2004 Removed N

2-SI-151 Maintenance NtA N/A Piping 2005 Installed N

2SI-152 Maintenance N/A N/A Piping 2004 Removed N

2-SI-152 Maintenance N/A N/A Piping 2005 Installed N

7. Description of Work: Modified A' and 813 Containment Spray Pumo discharge Piing

8. Test Conducted: Hydrostatic LXJ Pneumatic U Nominal Operating Pressure EJ Exempt [-]

Other [VT-21 Pressure f3751 psig Test Temp. [NOT1 IF05-030

Page 122: a0 Progress Energy 10 - NRC

-I

Form NIS2 1995 Edition 1996 AddendaSECTION Xi DIVISION 1

FORM NIS-2 (Back)* Sheet 3 of 3

9. Remarks: See WO 633486 and EC 58640 turnover packagesApplicable Manufacturer's Data Reports to be attached

CERTIFICATE OF COMPUANCE

I certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code, Section Xi.

Type Code Symbol Stamp N/A

Certificat c t No. N/A

Signed 4 ISI ENGINEER Date 12/6/2005Owner or Owner's Designee, Title

CERTIFICATE OF INSERVICE INSPECTION

I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the

State or Province of North Carolina and employed by HSBCT of HARTFORD. CONNECTICUT have

inspected the components described in this Owners Report during the period 4/21/2005 to 1216/2005 and state that to the

best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this

Owner's Report in accordance with the requirements of the ASME Code. Section Xi.

By signing this certificate neither the Inspector or his employer makes any warranty, expressed or implied, concerning the

examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer

shall be liable In any manner for any personal injury or property damage or a loss of any kind arising from or connected with

this inspection.

is *____ Commissions NC 1507Insdoer gegnature National Board, State, Province, and Endorsements

Date:121612005

05-030

Page 123: a0 Progress Energy 10 - NRC

1995 Edition 1996 Addenda

0Af

APPENDIX 1i MANDATORY

FORM NIS-2 OWNER'S REPORT FOR REPAIRJREOLACEMENT ACTIVITY

As Required by the Provisions of the ASME Code Section Xi

* Form NIS 2

1. Owner PROGRESS ENERGY CAROLINAS, INCName

411 FAYETTEVILLE ST.. RALEIGH. NC 27602

Oa~t: 191/219MM* - -- --

Sheet: 1 of 2Address

Li D nMfClK12. PI-*.pu.. F I.

Name

3581 WEST Entrance RD: HARTSVILLE, SC 29550Address

3. Work Performed by PROGRESS ENERGY CAROLINAS. INCName

3581 WEST ENTRANCE RD: HARTSVILLE, SC 29550

Unit: 2

EC#:N/A EE:N/AWR/WO:662682 CR:NIA

Repair Organization PO No-Job No;etc.

Type Code Symbol Stamp: N/AAuthorization No.: NWAExpiration Date: N/A

4.

5.

Address

Identification of System: Class:2 C:HEMICAL AND VOLUME CONTROL SYSTEM 2060

(a) Applicable Construction Code: B31.1 Edition: 1967 Addenda:N/A Code Case:NIADesign Specification: N/A

(b) Applicable Edition of Section Xl Used for Repair/Replacement Activity: 1995 EdItion 1996 AddendaCode Case: N/A

6. Identification of Components Repaired or Re laced and Replacement Components

Name of Name of Manufacturer National Other Year Corrected, ASMEComponent Manufacturer Serial No. Board No. Identification Built Removed, or Code

Installed Stamp(Yes orNo)

Snubber #23 Grinnell 34033 N/A Hydraulic 1998 Removed NSnubber

Snubber #23 Grinnell 35487 NIA Hydraulic 2005 Installed NSnubber

,_v

7. Description of Work: Replaced snubber

8. Test Conducted: Hydrostatic U1 Pneumatic U 1 Nominal Operating Pressure U] Exempt [-J

Other IVT-3/Functionafl Pressure IN/Al psig Test Temp. INA] OF05-031

Page 124: a0 Progress Energy 10 - NRC

Form NIS2 1995 Edition 1996 AddendaSECTION Xi DIVISION 1

FORM NIS-2 (Back)Sheet 2 of L

9. Remarks: See WO 662682 turnover packageApplicable Manufacturer's Data Reports to be attached

CERTIFICATE OF COMPUANCE

I certify that the statements made In the report are correci and this conforms to the requirements of the ASME Code, Section Xl.

Type Code Symbol Stamp N/A

Certificate { NIA

Signed 4 8- ISI ENGINEER Date 12/5/2005Owner or Owners Designee, Title

CERTIFICATE: OF INSERVICE INSPECTION

I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the

State or Province of North Carolina and employed by HSBCT of HARTFORD. CONNECTICUT have

inspected the components described in this Owner's Report during the period 101812005 to 12/512005 and state that to the

best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this

Owner's Report in accordance with the requirements of the ASME Code, Section Xl.

By signing this certificate neither the Inspector or his employer makes any warranty, expressed or implied, concerning the

examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer

shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with

this inspection.

°a4 ________Commissions NC 1507Ins Itef Signature National Board, State, Province, and Endorsements

Date:1 2/5/2005

05i031

Page 125: a0 Progress Energy 10 - NRC

1995 Edition 1996 Addenda

0APPENDIX 11 MANDATORY

FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY

As Required by thei Provisions of the ASME Code Section Xi

Form NIS 2

1. Owner PROGRESS ENERGY CAROLINAS. INCName

411 FAYETTEVILLE ST.. RALEIGH. NC 27602Address

2. Plant H.8.ROBINSON

Date: 1215/2005-------

Sheet: 1 Of 2

Unit:_ 2Name

3581 WEST Entrance RD: HARTSVILLE. SC O9550I Address

3. Work Performed by PROGRESS ENERGY CAROLINAS. INCName

3581 WEST ENTRANCE RD: HARTSVILLE, SC 29550

EC#:60960 EE:NtAWR/WO:703718 01 CR:NIA

Repair Organization PO No;Job No;etc.

Type Code Symbol Stamp: N/AAuthorization No.: NIAExpiration Date:- N/A

4.

5.

Address

Identification of System: Class:2 STEAM GENERATOR SYSTEM 3005

(a) Applicable Construction Code: ASME III Edition: 1965 AddendaJNIA Code Case-N/ADesign Specification: N/A

(b) Applicable Edition of Section Xl Used for Repair/Replacement Activity: 1995 Edition 1996 AddendaCode Case: N/A

b. Identification of Components Hepaired or Heplsced and He xacement Cornponents

Name of Name of Manufacturer National Other Year Corrected. ASMEComponent Manufacturer Serial No. Board No. Identification Built Removed, or Code

Installed Stamp(Yes orNo)

S/G A Westinghouse N/A N/A Bolts 1984 Removed NManwayS/G A Mackson N/A N/A Studs 2005 Installed NManway . -

SIG A Nova N/A N/A Nuts 2005 Installed NManway

7. Description of Work: Replaced bolts with studsfnuts to support temporary repair of mechanical connection.

8. Test Conducted: Hydrostatic 1U Pneumatic U. Nominal Operating Pressure LI Exempt [XI

Other INIA] Pressure fWAI psig Test Temp. fN/A1 °F05-032

Page 126: a0 Progress Energy 10 - NRC

Form NIS2 1995 Edition 1996 AddendaSECTION Xi DIVISION 1

FORM NIS-2 (Back)Sheet 2 of 2.

9. Remarks: See WO 703718 01 and EC 60960 turnover oackaoesApplicable Manufacturer's Data Reports to be attached

CERTIFICATE OF COMPUANCE

I certify that the statements made In the report are correct and this conforms to the requirements of the ASME Code, Section XI.

Type Code Symbol Stamp N/A

Certif 4Axrtz No. N/A

SignedA G W I 151 ENGINEER Date 12/5/2005Owner or Owner's Designee, Title

CERTIFICATE OF INSERVICE INSPECTION

1, the undersigned, holding a valid commission Issued by the National Board of Boiler and Pressure Vessel Inspectors and the

State or Province of North Carolina and employed by HSBCT of HARTFORD. CONNECTICUT have

inspected the components described in this Owner's Report during the period 5/4/2005 to 12/5/2005 and state that to the best

of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's

Report in accordance with the requirements of the ASMIE Code, Section Xi.

By signing this certificate neither the Inspector or his employer makes any warranty, expressed or implied, concerning the

examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer

shall be liable in any manner for any personal injury om property damage or a loss of any kind arising from or connected with

this inspection.

0______Commissions NC 1507Inspe s Agnature National Board, State, Province, and Endorsements

Date:12/512005

05032

Page 127: a0 Progress Energy 10 - NRC

0

0

1995 Edition 1996 Addenda APPENDIX II MANDATORY

FORM NIS-2 OWNER'S REPORT FOR REPAIRIREPLACEMENT ACTIVITY

As Required by the Provisions of the ASME Code Section Xl

Form NIS 2

1. Owner PROGRESS ENERGY CAROLINAS. INCName

411 FAYETTEVILLE ST.. RALEIGH. NC 27602Address

2. Plant H.B.ROBINSONName

3581 WEST Entrance RD: HARTSVILLE. SC 29550Address

3. Work Performed by PROGRESS ENERGY CAROLINAS. INCName

3581 WEST ENTRANCE RD: HARTSVILLE, SC 29550

Date: 12/5/2005

Sheet: 1 of 2

Unit: 2

EC#:N/A EE:N/AWRIWO:703718 05 CR:N/A

Repair Organization PO No;Job No;etc.

Type Code Symbol Stamp: N/AAuthorization No.: N/AExpiration Date: N/A

4.

5.

Address

Identification of System: Class:2 STEAM GENERATOR SYSTEM 3005

(a) Applicable Construction Code: ASME III Edition: 1965 Addenda:N/A Code Case:N/ADesign Specification: N/A

(b) Applicable Edition of Section Xl Used for Repair/Replacement Activity: 1995 Edition 1996 AddendaCode Case: N/A

Identification of Comnonents Repaired or Renalced and Renlacement Comronants6.

Name of Name of Manufacturer National Other Year Corrected. ASMEComponent Manufacturer Serial No. Board No. Identification Built Removed, or Code

Installed Stamp(Yes orNo)

S/G A Westinghouse N/A N/A Manway Cover 1984 Removed NManwaySIG A Westinghouse A-0011 N/A Manway Cover 1993 Installed NManwayS/G A Nova N/A N/A Threaded Inserts 2005 Installed NManway .. _

7.

8.

Description of Work: Reolaced Manwav cover, threaded inserts and machined Manwav Dad and cover sealing surfaces

Test Conducted: Hydrostatic LI Pneumatic L-] Nominal Operating Pressure Q9 Exempt [-]

Other [VT-21 Pressure [NOPI psig Test Temp. INOQ1 OF05-033

Page 128: a0 Progress Energy 10 - NRC

a

A

Form NIS2 1995 Edition 1996 AddendaSECTION Xi DIVISION 1

FORM NIS-2 (Back)

e

Sheet 2 of 2.

9. Remarks: See WO 703718 turnoerepackageApplicable Manufacturer's Data Reports to be attached

CERTIFICATE OF COMPLIANCE

I certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code. Section Xi.

Type Code Symbol Stamp NWA

Cerificat t No. NIA

Signed -A A U- IS! ENGINEER Date 12/512005Owner or Owner's Designee, Title

AftW

CERTIFICATE OF INSERVICE INSPECTION

1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the

State or Province of North Carolina and employed by HSBCT of HARTFORD. CONNECTICUT have

inspected the components described in this Owner's Report during the period 8/23/2005 to 12/5/20Q5 and state that to the

best of my knowledge and belief, the Owner has pelrormed examinations and taken corrective measures described in this

Owner's Report in accordance with the requirements of the ASME Code, Section Xi.

By signing this certificate neither the Inspector or his employer makes any warranty, expressed or Implied, concerning the

examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer

shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with

this inspection.

7'(~zU4 (Commissions NC 1507f-nspecto(dyture National Board, State, Provnce, and Endorsements

Date: 1 215/2005

05-033

Page 129: a0 Progress Energy 10 - NRC

- fi -

1995 Edition 1996 Addenda APPENDIX II MANDATORY

FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY

As Required by the Provisions of the ASME Code Section Xl

* Form NIS 2

1. Owner PROGRESS ENERGY CAROLINAS, INCName

411 FAYETTEVILLE ST., RALEIGH. NC 27602Address

2. Plant H.B.ROBINSONName

3581 WEST Entrance RD: HARTSVILLE. SC' 29550Address

3. Work Performed by PROGRESS ENERGY CAPROLINAS. INCName

35A1 WEST FNTRANCEF Rnl: HARTAVII I F Prl 29550

Date: 12/5/2005

Sheet: 1 of 2

Unit: 2

EC#:NIA EE-NIAWR/WO:703490 CR:N/A

Repair Organization PO No;Job No;etc.

Type Code Symbol Stamp: N/AAuthorization No.: NIAExpiration Date: NIA

Address-. r,

4. Identification of System: Class:2 STEAM GENERATOR SYSTEM 3005

5. (a) Applicable Construction Code: ASME Ill Edition: 1965 Addenda:N/A Code Case:N/ADesign Specification:

(b) Applicable Edition of Section Xi Used for Repair/Replacement Activity: 1995 Edition 1996 AddendaCode Case: N/A

6. Identification of Comoonents Repaired or Replaced and Reolacement Comnonents

Name of Name of Manufacturer National Other Year Corrected, ASMEComponent Manufacturer Serial No. Board No. Identification Built Removed, or Code

Installed Stamp(Yes orNo)

S/G A Mackson N/A N/A Studs 2005 Removed NManway_S/G A Nova NWA A Nuts 2005 Removed NManway

S/G A Westinghouse N/A N/A Bolts 1992 Installed NManway . =

7.

8.

Description of Work, Reolacing studs and nuts installed Per EC 60963 and WO 70371 8 01 with bolts

Test Conducted: Hydrostatic lU, Pneumatic Ij Nominal Operating Pressure Ij Exempt [X]

Other IN/A1 Pressure [lNA psig Test Temp. IN/Al 0F05-034

Page 130: a0 Progress Energy 10 - NRC

0.

Form NIS2 1995 Edition 1996 AddendaSECTION XI DIVISION 1

FORM NIS-2 (Back)Sheet 2 of 2.

9. Remarks: See WO 703490 turnover oackageApplicable Manufacturer's Data Reports to be attached

CERTIFICATE OF COMPUANCE

I certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code, Section XI.

Type Code Symbol Stamp N/A

IOL-f- lrlk t WLI IWA

iSigned 'A a C ' - ISI ENGINEER Date 12/5J2005Owner or Owners Designee, Title

CERTIFICATE: OF INSERVICE INSPECTION

1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the

State or Province of North Carolina and employed by HSBCT of HARTFORD. CONNECTICUT have

inspected the components described in this Owners Report during the period 9/1912005 to 1215/2005 and state that to the

best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this

Owner's Report in accordance with the requirements of the ASME Code, Section XI.

By signing this certificate neither the Inspector or his employer makes any warranty, expressed or Implied, concerning the

examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer

shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with

this inspection.

SI X ________Comnmissions NC 1507nsper ignature National Board, State, Province, and Endorsements

Date:12/512005

05-034

Page 131: a0 Progress Energy 10 - NRC

Form NIS 2

S1995 Edition 1996 Addenda APPENDIX II MANDATORY

FORM NIS-2 OWNER'S REPORT FOR REPAIRIREPLACEMENT ACTIVITY

As Required by thi Provisions of the ASME Code Section XI

1. Owner PROGRESS ENERGY CAROLINAS, INCName

411 FAYETTEVILLE ST., RALEIGH. NC 27602Address

2. Plant H.B.ROBINSONName

3581 WEST Entrance RD: HARTSVILLE, SC 29550Address

3. Work Performed by PROGRESS ENERGY CAROLINAS. INCName

3581 WEST ENTRANCE RD: HARTSVILLE. SC 29550

Date: 12/6/2005

Sheet: I Of 2

Unit: 2

EC#:NJA EE:N/AWR/WO:554808 CR:N/A

Repair Organization PO No;Job No;etc.

Type Code Symbol Stamp: N/AAuthorization No.: N/AExpiration Date: N/A

-

Address

4. Identification of System: Class:3 FEED WATER SYSTEM 3050

5. (a) Applicable Construction Code: B 31.1 Edition: 1967 Addenda:N/A Code Case:N/ADesign Specification:

(b) Applicable Edition of Section XI Used for RepairlReplacement Activity: 1995 Edition 1996 AddendaCode Case: N/A

6. Identification of Comoonents Reoaired or Reolaced and Reolacement Comoonents

Name of Name of Manufacturer National Other Year Corrected, ASMEComponent Manufacturer Serial No. Board No. Identification Built Removed, or Code

Installed Stamp(Yes orNo)

FE-496 Maintenance N/A N/A Venturi tack 1971 Removed Nwelds

FE-496 Maintenance NA N/A Venturi tack 2005 Installed Nwelds

7.

8.

Description of Work: Removed and re-welded Venuri tack welds for inspection

Test Conducted: Hydrostatic Uj Pneumatic U1 Nominal Operating Pressure 1.1 Exempt [X]

Other IN/Al Pressure 04/Al psig Test Temp. [INA1 IF05M035

Page 132: a0 Progress Energy 10 - NRC

Form NIS2 1995 Edition 1996 AddendaSECTION Xi DIVISION 1

FORM NIS-2 (Back)Sheet 2 of 2.

9. Remarks: See WO 554808 turnover DackacteApplicable Manufacturer's Data Reports to be attached

CERTIFICATE OF COMPLIANCE

I certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code, Section XI.

Type Code Symbol Stamp N/A

Certificate - i-on . N/A

Signed 'A a Q L- ISI ENGINEER Date 12/612005Owner or Owner's Designee, Title

.

CERTIFICATE: OF INSERVICE INSPECTION

I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the

State or Province of North Carolina and employed by HSBCT of HARTFORD. CONNECTICUT have

inspected the components described in this Owner's Report during the period 10/9/2005 to 12/6/2005 and state that to the

best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this

Owner's Report in accordance with the requirements of the ASME Code, Section Xi.

By signing this certificate neither the Inspector or his employer makes any warranty, expressed or implied, concerning the

examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer

shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with

this inspection.

NC 1507National Board, State, Province, and Endorsements

Date: 1 26/2005

05-035

Page 133: a0 Progress Energy 10 - NRC

Form NIS 21995 Edition 1996 Addenda APPENDIX If MANDATORY

FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY

As Required by the Provisions of the ASME Code Section Xl

1. Owner PROGRESS ENERGY CAROLINAS. INCName

411 FAYETTEVILLE ST.. RALEIGH. NC 27602Address

2. Plant H.B.ROBINSONName

3581 WEST Entrance RD: HARTSVILLE, SC 29550Address

3. Work Performed by PROGRESS ENERGY CAROLINAS. INCName

3581 WEST ENTRANCE RD: HARTSVILLE. SC 29550

Date: i 5pinrintz

Sheet: 1 of 2

Unit: 2

EC#:N/A EE:N/AWRIWO:559034 CR:NIA

Repair Organization PO No;Job No;etc.

Type Code Symbol Stamp: N/AAuthorization No.: N/AExpiration Date: NIA

-

Address

4. Identification of System: Class:3 FEED WATER SYSTEM 3050

5. (a) Applicable Construction Code: B 31.1 Edition: 1967 Addenda:N/A Code Case: N/ADesign Specification:

(b) Applicable Edition of Section Xi Used for Repair/Replacement Activity: 1995 Edition 1996 AddendaCode Case: N/A

6. Identification of Comoonents Reoaired or Replaced and Replacement Comoonents= ~ ~~ =, ___a _ ____. =, _ ,=----,-,:,

Name of Name of Manufacturer National Other Year Corrected. ASMEComponent Manufacturer Serial No. Board No. Identification Built Removed, or Code

Installed Stamp(Yes orNo)

FE-476 Maintenance N/A NA Venturi tack 1971 Removed N.welds

FE-476 Maintenance N/A N/A Venturi tack 2005 Installed Nwelds l

7.

a.

Description of Work: Removed and re-welded tack welds for inspection

Test Conducted: Hydrostatic 1:1 Pneumatic EJ Nominal Operating Pressure U 1 Exempt [X]

Other [N/A] Pressure L" psig Test Temp. INIA1 OF05-036

Page 134: a0 Progress Energy 10 - NRC

Form NIS2 1995 Edition 1996 AddendaSECTION Xi DIVISION 1

FORM NIS-2 (Back)Sheet 2 of 2.

9. Remarks: See WO 559034 turnover oackaoeApplicable Manufacturer's Data Reports to be attached

CERTIFICATE OF COMPUANCE

I certify that the statements made In the report are correct and this conforms to the requirements of the ASME Code, Section Xl.

Type Code Symbol Stamp N/A

Certifica N/A

Signed 4 ISI ENGINEER Date 1216/2005Owner or Owner's Designee, Title

CERTIFICATE OF INSERVICE INSPECTION

1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the

State or Province of North Carolina and employed by HSBCT of HARTFORD, CONNECTICUT have

inspected the components described in this Owners Report during the period 10/9/2005 to 12/6/2005 and state that to the

best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this

Owner's Report in accordance with the requirements of the ASME Code, Section XI.

By signing this certificate neither the Inspector or hi; employer makes any warranty, expressed or implied, concerning the

examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer

shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with

this inspection..

this insp n Commissions NC 1507Irlspecto, k nature National Board, State, Province, and Endorsements

Date: 12/6/2005

054036

Page 135: a0 Progress Energy 10 - NRC

80<4 :

1995 Edition 1996 Addenda APPENDIX II MANDATORY

FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY

As Required by tho Provisions of the ASME Code Section Xl

Form NIS 2

1. Owner PROGRESS ENERGY CAROLINAS. INCName

411 FAYETTEVILLE ST., RALEIGH. NC 27602Address

2. Plant H.B.ROBINSONName

3581 WEST Entrance RD: HARTSVILLE, SC 29550Address

3. Work Performed by PROGRESS ENERGY CAROLINAS, INCName

3581 WEST ENTRANCE RO: HAPTSVILLE. SC 29550

nrl-- t -5F7^flnfrIu.1- - ,,w

Sheet: 1 of 2

Unit: 2

EC#:N/A EE:N/AWR/WO:664191 CR:N/A

Repair Organization PO No.Job No;etc.

Type Code Symbol Stamp: N/AAuthorization No.: N/AExpiration Date. NMA

Address

4. Identification of System. Class:2 CHEMICAL AND VOLUME CONTROL SYSTEM 2060

5. (a) Applicable Construction Code: B 31.1 Edition: 1967 Addenda:N/A Code Case:N/ADesign Specification:

(b) Applicable Edition of Section Xl Used for Flepair/Replacement Activity: 1995 Edition 1996 AddendaCode Case: N/A

6. Identification of Components Repaired or Replaced and Reolacement CGononents

Name of Name of Manufacturer National Other Year Corrected, ASMEComponent Manufacturer Serial No. Board No. Identification Built Removed, or Code

Installed Stamp(Yes orNo)

Snubber #35 Grinnell 32212 NWA Hydraulic 1998 Removed N__ __ _ Snubber _

Snubber #35 Grinnell 34607, NA Hydraulic 2005 Installed N__ Snubber

4 4 5- .4 4 5

4 4 I- 4 + 1 4

___________________________ .5. _______________________________ .4 ___________________________ L = - . a- ___________________________ . = = . -± __________________ I ____________________________

7.

8.

Description of Work: Replaced snubber

Test Conducted: Hydrostatic U 1 Pneumatic 1U Nominal Operating Pressure U Exempt 1-)

Other [VTJ81 Pressure [l/Aj psig Test Temp. tIN/Al OF05-037

Page 136: a0 Progress Energy 10 - NRC

I

Form NIS2 1995 Edition 1996 AddendaSECTION XI DIVISION 1

FORM NIS-2 (Back)Sheet 2 of 2.

9. Remarks: See WO 664191 turnover packaaeApplicable Manufacturer's Data Reports to be attached

CERTIFICATE OF COMPLIANCE

I certify that the statements made In the report are correct and this conforms to the requirements of the ASME Code, Section XI.

Type Code Symbol Stamp N/A

CiW N/A

Signed ISI ENGINEER Date 1217/2005Owner or Owner's Designee, Title

CERTIFICATE OF INSERVICE INSPECTION

1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the

State or Province of North Carolina and employed by HSBCT of HARTFORD. CONNECTICUT have

inspected the components described in this Owners Report during the period 10/8/2005 to 12/7I2005 and state that to the

best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this

Owner's Report in accordance with the requirements of the ASME Code, Section XI.

By signing this certificate neither the Inspector or his employer makes any warranty, expressed or Implied, concerning the

examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer

shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with

this inspection.

Commissions NC 1507Inspe tre National Board, State, Province, and Endorsements

Date:121712005

05-037