a0 Progress Energy 10 CFR 50.55a
Serial: RNP-RA/06-0001
JAN 1 6 2006
United States Nuclear Regulatory CommissionAttn: Document Control DeskWashington, DC 20555
H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2DOCKET NO. 50-261/LICENSE NO. DPR-23
SUBMITTAL OF 90 DAY INSERVICE INSPECTION SUMMARY REPORT
Ladies and Gentlemen:
In accordance with the requirements of 10 CFR 50.55a, "Codes and Standards," CarolinaPower and Light Company, also known as Progress Energy Carolinas, Inc., is providing,as an attachment to this letter, the Inservice Inspection Summary Report for Class 1 andClass 2 pressure retaining components and their supports. This report has been preparedin accordance with the American Society of Mechanical Engineers Boiler and PressureVessel Code, Section XI, 1995 Edition, 1996 Addenda, Article IWA-6000. This reportcovers inspection activities before and during Refueling Outage 23 at the H. B. RobinsonSteam Electric Plant, Unit No. 2.
If you have any questions concerning this matter, please contact me at (843) 857-1253.
Sincerely,
6&2lyC. T. BaucomSupervisor - Licensing/Regulatory Programs
CTB/cac
Attachment
c: Resident Inspector, HBRSEPC. P. Patel, NRC, NRRW. D. Travers, NRC, Region II
Progress Energy Carolinas, Inc.Robinson Nuclear Plant3581 West Entrance RoadHartsville, SC 29550
fV Ocl7
MENNNmr-
United States Nuclear Regulatory CommissionAttachment to Serial: RNP-RA/06-0001
H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2
INSERVICE INSPECTION SUMMARYREPORT FOR REFUELING OUTAGE 23
INSERVICE INSPECTION REPORTINTERVAL 4, PERIOD 2, OUTAGE 1
(RO #23)
ISI SUMMARY REPORT
FOR
H.B. ROBINSON NUCLEAR STATION(UNIT 2)
3581 WEST ENTRANCE ROADHARTSVILLE, SC 29550
CAROLINA POWER AND LIGHT, Dba,PROGRESS ENERGY CAROLINAS, INC.
411 FAYETTEVILLE STREETRALEIGH, NC 27602
COMMERCIAL SERVICE DATE: 3/7/71
REPORT COMPLETION DATE: 12/12/05
'I of 43
1995 Edition 1996 Addenda APPENDIX II - MANDATORY
FORM NIS-1 OWNER'S REPORT FOR INSERVICE INSPECTIONSAs required by the Provisions of the ASME Code Rules
FORM NIS-1
1. Owner: CP&L. Inc. Dba Progress Energy Carolinas, Inc.. 411 Fayetteville St.. Raleigh,NC 27602
(Name and Address of Owner)
2. Plant: H.B. Robinson, 3581 West Entrance Rd., Hartsville. SC 29550(Name and Address of Plant)
3. Plant Unit: 2
4. Owner Certificate of Authorization (if required) N/A
5. Commercial Service Date: 3/7/1971
6. National Board Number for Unit: 20772
7. Components Inspected
ManufacturerComponent or Manufacturer or or Installer State or NationalAppurtenance Installer Serial No. Province No. Board No.
Steam Generator B Westinghouse S/N 93733 N/A N/A
Reactor Coolant Pump B Westinghouse CPLRCPCPC2 N/A N/A
Piping Ebasco Services N/A N/A N/A
Piping Maintenance N/A N/A N/A
2 of 43
Form NIS-1 SECTION Xl - DIVISION 1 1995 Edition, thru 1996 Addenda
FORM NIS-1 (Back)
8. Examination Dates: 5/30/2004 to 10/27/2005
9. Inspection Period Identification: Period 2 (2/19/2005/2/19/2009)
10. Inspection Interval from: 2/19/2002 to 2/19/2012
11. Applicable Editions of Section Xl: 1995 Edition. thru 1996 Addenda
12. Date / Revision of the Inspection Plan: 4/28/2005 Revision 7
13. Abstract of Examinations and Tests. Include a list of examinations and tests and astatement concerning status of work required for the Inspection Plan.
See Attached Summaries
12. Abstract of Results of Examination and Tests.
See Attached Summaries
13. Abstract of Corrective Measures.
See attached Summaries
We certify that a) the statements made in this report are correct, b) the examinations andtests meet the Inspection Plan as required by the ASME Code, Section Xl, and c) correctivemeasures taken conform to the rules of the ASME Code, Section Xi.
Certificate of Authorization No. (if applicable): N/A Expiration Date:N/A
Date: 12/8/2005 Signed: ProEress Energy Carolinas, Inc. By: Jar, eOwner
CERTIFICATE OF INSERVICE INSPECTION
I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure VesselInspectors and the State or Province of North Carolina and employed by HSBCT haveinspected the components described in this Owner's Report during the period 5/30/2004 to 12/7/2005and state that to the best of my knowledge and belief, the Owner has performed examinations and takencorrective measures described in this Owner's Report in accordance with the requirements of the ASMECode, Section Xl.
By signing this certification neither the inspector nor his employer makes any warranty, expressed orimplied, concerning the examinations and corrective measures described in this Owner's Report.Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injuryor property da or a loss of any kind arising from or connected with this inspection.
Commissions NC 1507
Inspector's Signature National Board, State, Province, and Endorsement
Date: Dc br?005
3 of 43
1.0 ABSTRACT
1.1 This report presents the results of the Inservice Inspection of the Fourth Interval,
Second Period, First Outage, for refueling outage number twenty-three
(RFO#23), at the H. B. Robinson Unit 2 Nuclear Station. Examinations of steam
generator feedwater nozzles per NRC IE Bulletin No. 79-13, piping welds, piping
supports, component welds, component supports, and bolting and were
conducted in accordance with ASME Section Xl, 1995 Edition, thru 1996
Addenda. Repair and replacement efforts included modification and
maintenance of component replacements. Pressure testing of ASME Code
systems and their components was performed in accordance with the
requirements of ASME Section Xl, IWA-5000, IWB-5000, IWC-5000, and IWD-
5000. No service-induced flaws, which exceeded the acceptance criteria of
ASME Section Xl, were detected during the inservice examinations of pressure
retaining components. Indications discovered during visual examination of
component supports were evaluated and accepted, repaired or restored to the
original design configurations.
2.0 INTRODUCTION
2.1 This report contains a detailed iteem-by-item summary of examinations and
results performed by Progress Energy Carolinas, Inc. and iTi, integratedTechnologies, inc., since the start of RFO-23, on 9/17/2005. The Fourth Interval,
Second Period examination percentage requirements are contained in Tab G.
Examination reports, sketches, examination limitations, consumable testing
materials, personnel qualifications and calibration standards are retained by
Progress Energy Carolinas, Inc.. on site. Detailed information for the outage
activities are contained in the RO 23 ISI Final Outage Report and may be
obtained through the Progress Energy Carolinas, Inc. plant document control
services.
3.0 EDDY CURRENT EXAMINATION
3.1 No Eddy-Current testing was performed during refueling outage 23.
4t of 43
4.0 INSERVICE EXAMINATION EVALUATION
4.1 The ISI exams performed prior to and during refueling outage twenty three at H.
B. Robinson, Unit 2, Nuclear Station were conducted in accordance with the
outage plan derived from the Fourth Ten Year Inservice Inspection Program and
Plan. This plan meets the requirements of ASME Section Xl as defined in the
1995 Edition, thru the 1996 Addenda, H. B. Robinson, Unit 2, Technical
Specifications, Section 5.5, and Title 10 of the Code of Federal Regulations, Part
50.55a(g) including those applicable relief requests approved by the Nuclear
Regulatory Commission for the Fourth Ten-Year Interval.
4.2 All Inservice Examinations performed were conducted by the use of Progress
Energy procedures and documented on procedural data reports. Each data
report details the component or system examined, examination method
employed, the procedure used to perform the test and all pertinent equipment
settings or examination conditions. Recordable indications were documented
and evaluated within the individual data reports. The examination and
evaluations reports are retained in the RO 23 ISI Final Outage Report and are
retained by H. B. Robinson Nuclear Station as permanent records for retrieval
and review for the life of the plant. A summary of examinations, attached herein,
contains listings of the examinations performed, details of the component
identification, code category, code item number, examination area, work
documents and other applicable identifying information.
4.3 Ultrasonic, magnetic particle, and liquid penetrant examinations revealed no
service-induced flaws exceeding the acceptance criteria of ASME Section Xl,
1995 Edition, thru 1996 Addenda.
4.4 Visual examinations of supports, which revealed indications requiring evaluation,
have been dispositioned per TAAM-038 as functional. All reported indications on
supports were evaluated by Civil Engineering to determine if the supports were
functional and had no operability concerns. However, in some cases, Progress
Energy Carolinas, Inc. has elected to restore the supports to their original design
5 of 43
via the WR (Work Request) and WO (Work Order) process and will be re-
inspected (if required) to ensure those components have been returned to their
design condition.
4.5 The results of examinations performed at the H. B. Robinson Nuclear Station
during refueling outage twenty-three are classified into one of the following
categories:
Sat - No Rejectable Indications
UnSat - Rejectable Indications
4.6 The Inservice Examination Summary tables (TAB B) itemize the components
examined during refueling outage twenty-three. The percent Code required
volume (CRV) or Code required area (CRA) covered during the examination, if
less than or equal to 90%, is delineated in the comment section of the
examination. The following is a brief explanation of the type of information
included in the NDE Summary:
* Summary No. - Unique tracking number utilized within the ISI Program/Plan.
* Component ID - Identification of the component examined or tested
* Component Description - A description of the component configuration
* Categorv - The ASME code category that the examination was performed to.
* Item - The item number of the applicable code category that the examination
was performed to.
* Procedure - The procedure utilized to perform the examination.
* Method - The examination or test method
* Report # - The unique examination number assigned to an exam.
* Results - The results of the examination
* System - The system on which the component was examined
* ISO Number - The isometric drawing identifying the location of the
component being examined.
* Exam Date - The date the examination was completed.
6 of 43
5.0 AUGMENTED EXAMINATION PROGRAM
5.1 The Augmented Examination Program included in this report documents the
inspections performed to satisfy regulatory documents, other than ASME Section
Xl. During this period, ultrasonic; examinations were conducted in accordance
with NRC commitment ID 92R0362 for the steam generator feedwater nozzles
(79-13). These examinations and records are not subject to the interface and
review by the Authorized Nuclear Inservice Inspector (ANII), and are summarized
in the Augmented Examination Summary, TAB C, of this Report.
6.0 OWNER ELECTED EXAMINATION PROGRAM
6.1 There were no Owner Elected exams performed during RO-23 for this NIS-1
reporting period.
7.0 PRESERVICE EXAMINATION
7.1 Preservice examination of Code Class components were conducted at the H.B.
Robinson Unit 2 Plant from the close of refueling outage twenty-two (May 29,
2004) to the close of RO-23 (October 27, 2005) were performed to therequirements of ASME Section Xi 1995 Edition, thru 1996 Addenda. A summary
of these examinations and the results are listed in the Preservice Examination
Summary, TAB E, of this report.
7.2 The detailed examination data sheets recording all of the volumetric, surface and
visual results for the preservice examinations are located in the RO 23 ISI Final
Outage Report, and may be obtained through the Progress Energy Carolinas,
Inc., H.B. Robinson Plant Document Control Services.
7 of 43
8.0 PRESSURE TEST SUMMARY
8.1 Pressure tests and VT-2 examinations are performed in conjunction with ASME
Section Xl, Plant Technical Specifications and in accordance with procedure
TMM-020 "Inservice Inspection Pressure Testing". Also included within TMM-
020 are the approaches to testing each Code Class system and reference to the
respective Engineering Surveillance Test (EST) procedures used in the conduct
of the credited pressure test. The summary of these pressure tests is listed in
the Pressure Test Summary, TAB F, of this Report.
8.2 TAB F of this report includes the pressure tests performed after the close of the
last NIS-1 reporting period (5/29/2004) thru the end of the First Period
(2/19/2005). TAB F also includes pressure tests performed to date from the start
of the Second Period thru this reporting period (10/27/2005).
9.0 REPAIR AND REPLACEMENT PROGRAM
9.1 The H. B. Robinson Nuclear Station Repair and Replacement Program reporting
period for the Fourth Ten-Year Interval is from the close of refueling outage
twenty-two (May 29, 2004) to the close of refueling outage twenty three (October
27, 2005). Repair/replacement activities that occurred during this time frameunderwent extensive review by the station personnel involved and the Authorized
Nuclear Inservice Inspector (ANII). Work Order package information included
within this summary report are those items which have completed all the required
reviews, final engineering approval, and the required ANI/ANII NIS-2 certification
prior to the close of the reporting period as specified in ASME Section Xl, IWA-
6230(b). The repair/replacement summaries are listed in the
Repair/Replacement Summary, TAB H, of this Report.
8 of 43
9.2 Work Order evolutions performed during the twenty third refueling outage whose
document review, approval and certification process was not finalized by the
established closing date shall be reported either by amendment to the original
Refueling Outage Twenty Three NIS-2 Summary or shall be included in the next
refueling outage Summary Report (RO-24), within the established guidelines of
ASME Section Xl, IWA-6230(b).
9.2.1 The enclosed repair and replacement summary (TAB H) and the attached ASME
Section Xl, NIS-2 forms (Attachment I) detail the component, system, Work
Order document, component description and the description of the Work Order
activity. Complete repair and replacement documentation for the specific
component is maintained on site as a permanent record and is retrievable
through the WO (Work Order) document package, which is identified on the NIS-
2 form.
9.3 The Owners Report for Repair/Replacement Activities, Form NIS-2 is provided in
Attachment I.
9 of 43
INSERVICE INSPECTION REPORT
REFUELING OUTAGE 22
INDEX OF EXAMINATIONS
TAB EXAMINATION ACTIVITY
A EDDY CURRENT SUMMARY
B INSERVICE EXAMINATION SUMMARY
C AUGMENTED EXAMINATION SUMMARY
D OWNER ELECTED EXAMINATION SUMMARY
E PRESERVICE EXAMINATION SUMMARY
F PRESSURE TEST SUMMARY
G
H
EXAMINATION PERCENTAGE SUMMARY
REPAIR / REPLACEMENT SUMMARY
ATTACHMENT I
I REPAIR/REPLACEMENT NIS-2 FORMS
10 of 43
TAB
A
EDDY
CURRENT
SUMMARY
11 of 43
EDDY CURRENT SUMMARY
ABSTRACT
No Eddy-Current Testing was performed during refueling outage 23.
12 of 43
TAB
B
INSEERVICE
EXAMINATION
SUMMARY
13 of 43
The following tables are arranged by ASME Code Class and CPL component
identification. The 100 series are ASME Class 1, and the 200 series are ASME Class 2.
Code Required Volume (CRV) and Code Required Surface (CRS) have been identified
throughout the ISI Summary Tables. When an examination is limited to < 90% CRV or
CRS as defined in ASME Code Case N-460 and NRC Information Notice 98-42, a relief
request shall be submitted within 12 months of the close of the Fourth Ten-Year
Interval. Generic Code Cases that apply to all examinations are not specifically
identified for each examination.
114 of 43
INSERVICE EXAMINATION SUMMARYSummary
No.ExamDateComponent ID Component Description Cateqory Item Procedure Method/Report #/Results System ISO Number
Class 131400 105A101 TUBESHEET TO HEAD B-B B2.40 NDEP-0450
NDEP-0450NDEP-0450
Comment: Examination was performed to the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda.to welded insulation ring pads and a welded ID plate.
31700 105AIC SUPPORT LEG C F-A F1.40 NDEP-0613Comment: Examination was performed to the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.
UT UT-05-053 Sat 2005 HBR2-10618 SHT 007 10/4/2005UT UT-05-051 Sat 2005 HBR2-10618 SHT 007 10/4/2005UT UT-05-052 Sat 2005 HBR2-10618 SHT 007 10/4/2005
Code Case N-460 invoked for this exam for which 94.840% CRV was achieved due
VT VT-05-036 Sat 2005 HBR2-10618 SHT 007 10/4/2005
37500 107A/04DM ELBOW TO NOZZLE B-F B5.70 NDEP-0436NDEP-0201NDEP-0436
Comment: Examination was performed to the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda.in a single sided exam from the centrifugally cast stainless steel elbow side with 49.1% CRV.
37600 107AJ05DM NOZZLE TO ELBOW B-F B5.70 NDEP-0436NDEP-0201NDEP-0436
Comment: Examination was performed to the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda.in a single sided exam from the centrifugally cast stainless steel elbow side with 47.540% CRV.
37800 107A/06 ELBOW TO PIPE B-J B9.11 NDEP-0436NDEP-0436NDEP-0201NDEP-0425
Comment: Examination was performed to the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda.
37900 107A/07 PIPE TO ELBOW B-J B9.11 NDEP-0201NDEP-0436NDEP-0425NDEP-0436
Comment: Examination was performed to the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda.
38400 107A112 PIPE TO PIPE B-J B9.11 NDEP-0201NDEP-0425
Comment: Examination was performed to the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.
UT UT-05-048 Sat 2005 HBR2-10618 SHT 011 10/1/2005PT PT-05-097 Sat 2005 HBR2-10618 SHT 011 9/29/2005UT UT-05-040 Sat 2005 HBR2-10618 SHT 011 10/1/2005
Examination was limited due to steam generator nozzle configuration which resulted
UT UT-05-049 Sat 2005 HBR2-10618 SHT 011 10/1/2005PT PT-05-098 Sat 2005 HBR2-10618 SHT 011 9/30/2005UT UT-05-050 Sat 2005 HBR2-10618 SHT 011 10/1/2005
Examination was limited due to steam generator nozzle configuration which resulted
UTUTPTUT
PTUTUTUT
UT-05-041UT-05-042PT-05-099UT-05-043
PT-05-100UT-05-044UT-05-046UT-05-045
SatSatSatSat
2005200520052005
HBR2-10618 SHT 011HBR2-10618 SHT 011HBR2-10618 SHT 011HBR2-10618 SHT 011
HBR2-10618 SHT 011HBR2-10618 SHT 011HBR2-10618 SHT 011HBR2-10618 SHT 011
10/1/200510/1/20059/30/200510/1/2005
9/30/200510/1/200510/1/200510/1/2005
SatSatSatSat
2005200520052005
PT PT-05-101 SatUT UT-05-047 Sat
2005 HBR2-10618 SHT 0112005 HBR2-10618 SHT 011
10/2/200510/3/2005
15 of 43
INSERVICE EXAMINATION SUMMARYSummary
No. Component IDExamDateComponent Description Cateaorv Item Procedure Method/Report #/Results System ISO Number
48000
Comment:
48100
Comment:
48200
Comment:
48300
Comment:
49000Comment:
67800Comment:
67900Comment:
69200Comment:
100400Comment:
112700Comment:
112800Comment:
112900Comment:
113000Comment:
113100Comment:
111/11 ELBOW TO PIPE 6-J B9.11 NDEP-0425 UT UT-05-059 Sat
NDEP-0201 PT PT-05-102 SatExamination was performed to the requirements of ASME Section Xi, 1995 Edition, thru 1996 Addenda.
111112 PIPE TO ELBOW B-J 69.11 NDEP-0425 UT UT-05-061 Sat
NDEP-0201 PT PT-05-103 SatExamination was performed to the requirements of ASME Section Xi, 1995 Edition, thru 1996 Addenda.
111/13 ELBOW TO PIPE B-J B9.11 NDEP-0425 UT UT-05-062 Sat
NDEP-0201 PT PT-05-104 SatExamination was performed to the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.
111114 PIPE TO ELBOW B-J B9.11 NDEP-0425 UT UT-05-060 Sat
NDEP-0201 PT PT-05-105 SatExamination was performed to the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda.
111/Si-875B(B) VALVE SI-8758 BOLTING B-G-2 67.70 NDEP-0611 VT VT-05-001 SatExam performed in place under tension to the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda.
118A/RC-551B(B) VALVE RC-551B BOLTING B-G-2 B7.70 NDEP-0611 VT VT-05-039 SatExam performed in place, under tension to the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.
118AIRC-551B(FB) VALVE RC-551B FLANGE BOLTING B-G-2 B7.50 NDEP-0611 VT VT-05-040 SatExam performed in place, under tension to the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.
120/01 BRANCH CONNECTION TO CAP B-J B9.21 NDEP-0201 PT PT-05-094 SatExamination was performed to the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda.
130/03 PIPE TO VALVE SI.873E WELD B-J B9.40 NDEP-0201 PT PT-05-106 SatExamination was performed to the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda.
133/08 PIPE TO ELBOW B-J B9.40 NDEP-0201 PT PT-05-076 SatExamination was performed to the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.
133/09 ELBOW TO PIPE B-J B9.40 NDEP-0201 PT PT-05-077 SatExamination was performed to the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda.
133/10 PIPE TO ELBOW B-J B9.40 NDEP-0201 PT PT-05-078 SatExamination was performed to the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda.
133/11 ELBOW TO PIPE B-J 69.40 NDEP-0201 PT PT-05-079 SatExamination was performed to the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda.
133/12 PIPE TO ELBOW B-J 89.40 NDEP-0201 PT PT-05-080 SatExamination was performed to the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.
2080
2080
2080
2080
2080
2080
2080
2080
2005
2005
2005
2005
2080
2060
2060
2060
2060
2060
HBR2-10618 SHT 016
HBR2-10618 SHT 016
HBR2-10618 SHT 016
HBR2-10618 SHT 016
HBR2-10618 SHT 016
HBR2-10618 SHT 016
HBR2-10618 SHT 016
HBR2-10618 SHT 016
HBR2-10618 SHT 016
HBR2-10618 SHT 027
HBR2-10618 SHT 027
HBR2-10618 SHT 030
HBR2-10618 SHT 042
HBR2-10618 SHT 045
HBR2-10618 SHT 045
HBR2-10618 SHT 045
HBR2-10618 SHT 045
HBR2-10618 SHT 045
10/6/2005
10/2/2005
10/6/2005
10/2/2005
10/6/2005
10/2/2005
10/6/2005
10/2/2005
9/17/2005
10/5/2005
10/5/2005
9/29/2005
10/3/2005
9/28/2005
9/28/2005
9/28/2005
9/28/2005
9/28/2005
16 of 43
=
SummaryNo.
113200Comment:
113300Comment:
113400Comment:
113700Comment:
113800Comment:
113900Comment:
11i4000Comment:
116800Comment:
122700Comment:
122800Comment:
122900Comment:
138300Comment:
138400Comment:
138500Comment:
138600Comment:
138700
5
INSERVICE EXAMINATION SUMMARYComponent ID Component Description Category Item Procedure Method/Report #/Results
133/12A ELBOW TO PIPE B-J B9.40 NDEP-0201 PT PT-05-081 SatExamination was performed to the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.
133/12B PIPE TO ELBOW B-J 89.40 NDEP-0201 PT PT-05-082 SatExamination was performed to the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda.
133/13 ELBOW TO PIPE B-J B9.40 NDEP-0201 PT PT-05-083 SatExamination was performed to the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda.
133/14 PIPE TO ELBOW B-J B9.40 NDEP-0201 PT PT-05-084 SatExamination was performed to the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.
133/15 ELBOW TO PIPE B-J 89.40 NDEP-0201 PT PT-05-085 SatExamination was performed to the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda.
133/16 PIPE TO ELBOW B-J B9.40 NDEP-0201 PT PT-05-086 SatExamination was performed to the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.
133/17 ELBOW TO PIPE B-J 89.40 NDEP-0201 PT PT-05-087 S;tExamination was performed to the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.
133/FLG1(FB) FLANGE I BOLTING B-G-2 87.50 NDEP-0611 VT VT-05-044 SatExam performed in place, under tension to the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.
134/D CLEVIS ROD HANGER F-A F1.10 NDEP-0613 VT VT-05-049 SatExamination was performed to the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda.
134/E-WS WELDED ANCHOR F-A F1.10 NDEP-0613 VT VT-05-050 SatExamination was performed to the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.
134/F CLEVIS ROD HANGER F-A F1.10 NDEP-0613 VT VT-05-051 SatExamination was performed to the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.
143/18 PIPE TO ELBOW B-J 89.40 NDEP-0201 PT PT-05-095 SatExamination was performed to the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.
143/19 ELBOW TO PIPE B-J B9.40 NDEP-0201 PT PT-05-096 SatExamination was performed to the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda
143/19A PIPE TO ELBOW B-J 89.40 NDEP-0201 PT PT-05-088 SatExamination was performed to the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda.
143/19B ELBOW TO PIPE B-J B9.40 NDEP-0201 PT PT-05-089 SatExamination was performed to the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.
143/20 PIPE TO ELBOW B-J B9.40 NDEP-0201 PT PT-05-090 Sat
SystemExamDateISO Number
2060
2060
2060
2060
2060
2060
2060
2060
2060
2060
2060
2060
2060
2060
2060
2060
HBR2-10618 SHT 045
HBR2-10618 SHT 045
HBR2-10618 SHT 045
HBR2-10618 SHT 045
HBR2-10618 SHT 045
HBR2-10618 SHT 045
HBR2-10618 SHT 045
HBR2-10618 SHT 045
HBR2-10618 SHT 046
HBR2-10618 SHT 046
HBR2-10618 SHT 046
HBR2-10618 SHT 055
HBR2-10618 SHT 055
HBR2-10618 SHT 055
HBR2-10618 SHT 055
HBR2-10618 SHT 055
9/28/2005
9/28/2005
9/28/2005
9/28/2005
9/28/2005
9/28/2005
9/28/2005
10/6/2005
10/6/2005
10/6/2005
10/6/2005
9/29/2005
9/29/2005
9/28/2005
9/28/2005
9/28/2005
17 of 43
INSERVICE EXAMINATION SUMMARYSummary
No.ExamDateComponent ID Component Description Cateqorv Item Procedure MethodlReoort #/Results Svstem ISO Numhber
Comment: Examination was performed to the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.
138800 143/21 ELBOW TO PIPE B-J B9.40 NDEP-0201Comment: Examination was performed to the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.
138900 143/22 PIPE TO ELBOW B-J B9.40 NDEP-0201Comment: Examination was performed to the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.
139000 143/23 ELBOW TO PIPE B-J B9.40 NDEP-0201Comment: Examination was performed to the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.
142900 143/N TRAPEEZE HANGER W/U-BOLT F-A F1.10 NDEP-0613Comment: Examination was performed to the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.
143000 143/P U-BOLT RESTRAINT F-A F1.10 NDEP-0613Comment: Examination was performed to the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.
143200 143/S11WS WELDED ANCHOR F-A F1.10 NDEP-0613Comment: Examination was performed to the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda.
PT PT-05-091 Sat
PT PT-05-092 Sat
PT PT-05-093 Sat
VT VT-05-037 Sat
VT VT-05-038 Sat
VT VT-05-035 Sat
2060 HBR2-10618 SHT 055
2060 HBR2-10618 SHT 055
2060 HBR2-10618 SHT 055
2060 HBR2-10618 SHT 055
2060 HBR2-10618 SHT 055
2060 HBR2-10618 SHT 055
9/28/2005
9/28/2005
9/28/2005
10/4/2005
10/4/2005
10/3/2005
150400150500150600150700150800150900151000151100151200151300151400151500151600151700151800151900152000152100152200
144/B-N01144/B-N02144/B-N03144/B-N04144/B-NOS144/B-NO6144/B-N07144/B-N08144/B-N09144/B-N10144/B-N1l144/B-N12144/B-N13144/B-N14144/B-N15144/B-N16144/B-N17144/B-N18144/B-N19
RCP B NUT IRCP B NUT 2RCP B NUT 3RCP B NUT 4RCP B NUT 5RCP B NUT 6RCP B NUT 7RCP B NUT 8RCP B NUT 9RCP B NUT 10RCP B NUT 11RCP B NUT 12RCP B NUT 13RCP B NUT 14RCP B NUT 15RCP B NUT 16RCP B NUT 17RCP B NUT 18RCP B NUT 19
B-G-1B-G-1B-G-1B-G-1B-G-1B-G-1B-G-1B-G-1B-G-1B-G-1B-G-1B-G-1B-G-1B-G-1B-G-1B-G-1B-G-1B-G-1B-G-1
B6.20086.200B6.200B6.200B6.20086.200B6.200B6.200B6.200B6.200B6.200B6.200B6.200B6.200B6.200B6.200B6.200B6.200B6.200
NDEP-0611NDEP-0611NDEP-0611NDEP-0611NDEP-0611NDEP-0611NDEP-0611NDEP-0611NDEP-0611NDEP-0611NDEP-0611NDEP-0611NDEP-0611NDEP-0611NDEP-0611NDEP-0611NDEP-0611NDEP-0611NDEP-0611
VTVTVTVTVTVTVTVTVTVTVTVTVTVTVTVTVTVTVT
VT-05-008VT-05-01 0
VT-05-011
VT-05-012
VT-05-013
VT-05-014
VT-05-015
VT-05-016
VT-05-017
VT-05-018
VT-05-019
VT-05-020
VT-05-021
VT-05-022
VT-05-023
VT-05-024
VT-05-025
VT-05-026
VT-05-027
Sat
SatSatSatSatSatSatSatSatSatSatSatSatSatSatSatSatSatSat
2005
2005
2005
2005
2005
2005
2005
2005
2005
2005
2005
2005
2005
2005
2005
2005
2005
2005
2005
HBR2-10618 SHT 056
HBR2-10618 SHT 056
HBR2-10618 SHT 056
HBR2-10618 SHT 056
HBR2-10618 SHT 056
HBR2-10618 SHT 056
HBR2-10618 SHT 056
HBR2-10618 SHT 056
HBR2-10618 SHT 056
HBR2-10618 SHT 056
HBR2-10618 SHT 056
HBR2-10618 SHT 056
HBR2-10618 SHT 056
HBR2-10618 SHT 056
HBR2-10618 SHT 056
HBR2-10618 SHT 056
HBR2-10618 SHT 056
HBR2-10618 SHT 056
HBR2-10618 SHT 056
9/23/2005
9/2312005
9/23/2005
9/23/20059/23/20059/23/20059/23/20059/23/20059/23/20059/23/20059/23/20059/23/20059/23/20059/23/20059/23/20059/23/20059/23/20059/23/20059/23/2005
18 of 43
INSERVICE EXAMINATION SUMMARYSummary
No.ExamDateComoonent ID Component Description Cateaorv Item Procedure Method/Renort #/Results System ISO Number
. - ------ I - � --1-'-.- ------ -1 - - -
152300
152400
152500
152600
152700Comment:
1441B-N20 RCP B NUT 20 B-G-1 B6.200
144/B-N21 RCP B NUT 21 B-G-1 B6.200
144/B-N22 RCP B NUT 22 B-G-1 B6.200
144/B.N23 RCP B NUT 23 B-G-1 B6.200
144/B-N24 RCP B NUT 24 8-G-1 86.200Exam performed in place, under tension to the requirements of ASME Section Xl, 1995
NDEP-0611 VT VT-05-028
NDEP-0611 VT VT-05-029
NDEP-0611 VT VT-05-030
NDEP-0611 VT VT-05-031
NDEP-0611 VT VT-05-032Edition, thru 1996 Addenda.
SatSatSatSatSat
2005
2005
2005
2005
2005
HBR2-10618 SHT 056
HBR2-10618 SHT 056
HBR2-10618 SHT 056
HBR2-10618 SHT 056
HBR2-10618 SHT 056
9/23/2005
9/23/2005
9/23/2005
9/23/2005
9/23/2005
152800
152900
153000
153100
153200
153300
153400
153500
153600
153700
153800
153900
154000
154100
154200
154300
154400
154500
154600
154700
154800
154900
155000
155100Comment:
144/B-S01 RCP B MAIN FLANGE STD1 B-G-1 86.180 NDEP-0439
144/B-S02 RCP B MAIN FLANGE STO 2 B-G-1 86.180 NDEP-0439
144/B-S03 RCP B MAIN FLANGE STD 3 B-G-1 B6.180 NDEP-0439
144/B-S04 RCP B MAIN FLANGE STD 4 B-G-1 B6.180 NDEP-0439
144/B-SO5 RCP B MAIN FLANGE STD 5 B-G-1 86.180 NDEP-0439
144/B-SO6 RCP B MAIN FLANGE STD 6 B-G-1 B6.180 NDEP-0439
144/B-S07 RCP B MAIN FLANGE STD 7 B-G-1 B6.180 NDEP-0439
144/B-S08 RCP B MAIN FLANGE STD 8 B-G-1 B6.180 NDEP-0439
144/B-S09 RCP B MAIN FLANGE STD 9 B-G-1 B6.180 NDEP-0439
144/B-SIO RCP B MAIN FLANGE STD 10 B-G-1 86.180 NDEP-0439
144/B-S11 RCP B MAIN FLANGE STD 11 B-G-1 86.180 NDEP-0439
144/B-512 RCP B MAIN FLANGE STD 12 B-G-1 B6.180 NDEP-0439
144/B-S13 RCP B MAIN FLANGE STD 13 B-G-1 B6.180 NDEP-0439
144/B-S14 RCP B MAIN FLANGE STD 14 B-G-1 B6.180 NDEP-0439
144/B-S15 RCP B MAIN FLANGE STD 15 B-G-1 86.180 NDEP-0439
144/5-S16 RCP B MAIN FLANGE STD 16 B-G-1 86.180 NDEP-0439
144/B-S17 RCP B MAIN FLANGE STD 17 B-G-1 B6.180 NDEP-0439
144/B-S18 RCP B MAIN FLANGE STD 18 8-G-1 86.180 NDEP-0439
144/B-S19 RCP B MAIN FLANGE STD 19 B-G-1 86.180 NDEP-0439
144/B-S20 RCP B MAIN FLANGE STD 20 B-G-1 B6.180 NDEP-0439
144/B-S21 RCP B MAIN FLANGE STD 21 B-G-1 86.180 NDEP-0439
144/B-S22 RCP B MAIN FLANGE STD 22 B-G-1 B6.180 NDEP-0439
144/B-S23 RCP B MAIN FLANGE STD 23 B-G-1 B6.180 NDEP-0439
144/B-S24 RCP B MAIN FLANGE STD 24 8-G-1 86.180 NDEP-0439Examination was performed to the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.
UT
UT
UT
UT
UT
UT
UTI T
UT
UT
UT
UT
UT
UT
UT
UT
UT
UT
UT
UT
UT
UT
UT
UT
UT-05-001
UT-05-002
UT-05-003
UT-05-004
UT-05-005
UT-05-006
UT-05-007
UT 05-008
UT-05-009
UT-05-010
UT-05-011
UT-OS-012
UT-OS-013
UT-05-014
UT-05-015
UT-OS-016
UT-OS-017
UT-OS-018
UT-OS 019
UT-05-020
UT-05-021
UT-05-022
UT-05-023
UT-05-024
SatSatSatSatSatSatSatSatSatSatSatSatSatSatSatSatSatSatSatSatSatSatSatSat
2005
2005
2005
2005
2005
2005
2005
2005
2005
2005
2005
2005
2005
2005
2005
2005
2005
2005
2005
2005
2005
2005
2005
2005
HBR2-10618 SHT 056
HBR2-10618 SHT 056
HBR2-10618 SHT 056
HBR2-10618 SHT 056
HBR2-10618 SHT 056
HBR2-10618 SHT 056
HBR2-10618 SHT 056
HRR2-10618 SHT 056
HBR2-10618 SHT 056
HBR2-10618 SHT 056
HBR2-10618 SHT 056
HBR2-10618 SHT 056
HBR2-10618 SHT 056
HBR2-10618 SHT 056
HBR2-10618 SHT 056
HBR2-10618 SHT 056
HBR2-10618 SHT 056
HBR2-10618 SHT 056
HBR2-10618 SHT 056
HBR2-10618 SHT 056
HBR2-10618 SHT 056
HBR2-10618 SHT 056
HBR2-10618 SHT 056
HBR2-10618 SHT 056
9/23/2005
9/23/2005
9/23/2005
9/23/2005
9/23/2005
9/23/2005
9/23/2005
9/23/2005
9/23/2005
9/23/2005
9/23/2005
9/23/2005
9/23/2005
9/23/2005
9/23/2005
9/23/2005
9/23/2005
9/23/2005
9/23/2005
9/23/2005
9/23/2005
9/23/2005
9/23/2005
9/23/2005
9/23/2005155200 144/B-SH-BLT RCP B SEAL HOUSE BOLTING B-G-2 87.60 NDEP-0611 VT VT-05-009 SatComment: Exam performed in place, under tension to the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.
2005 HBR2-10618 SHT 056
19 of 43
INSERVICE EXAMINATION SUMMARYSummary
No.Examnst=Component ID ComDonent Descrintion Catenorv ItPm PmrPriurp MPthnr1l/RPnnrt fi/PPQidk, Rvqfiom IMr Nujmhar-11 ...... --------- 1-1- " 1. -,- -1.1
Class 2168800 205A102 TUBESHEET TO STUB BARREL WELD C-A C1.30 NDEP-0450
NDEP-0450NDEP-0450
Comment: Examination was performed to the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda.hand holes and instrumentation taps.
168900 205A/03 STUB BARREL TO LOWER SHELL WELD C-A C1.10 NDEP-0450NDEP-0450NDEP-0450
Comment: Examination was performed to the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda.
UT UT-05-036 Sat 3005 HBR2-10618 SHT 062 9/29/2005UT UT-05-035 Sat 3005 HBR2-10618 SHT 062 9/29/2005UT UT-05-034 Sat 3005 HBR2-10618 SHT 062 9/29/2005
Code Case N-460 invoked for this exam for which 92.37% CRV was achieved due to
UTUTUT
UT-05-037UT-05-038UT-05-039
SatSatSat
3005 HBR2-10618 SHT 0623005 HBR2-10618 SHT 0623005 HBR2-10618 SHT 062
9/28/20059/28/20059/28/2005
169000 205A/04 UPPER SHELL TO LOWER TRANSITIONWELD
C-A C1i10 NDEP-0450NDEP-0450NDEP-0450NDEP-0450NDEP-0450NDEP-0450
UT UT-05-031 Sat 3005 HBR2-10618 SHT 062 9/28/2005UT UT-05-030 Sat 3005 HBR2-10618 SHT 062 9127/2005UT UT-05-033 Sat 3005 HBR2-10618 SHT 062 9/28/2005UT UT-05-028 Sat 3005 HBR2-10618 SHT 062 9/27/2005UT UT-05-029 Sat 3005 HBR2-10618 SHT 062 9/27/2005UT UT-05-032 Sat 3005 HBR2-10618 SHT 062 9/28/2005
Code Case N-460 invoked for this exam for which 98.50% CRV was achieved dueComment: Examination was performed to the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda. .to welded insulation ring pads.
169500 205A/07 UPPER HEAD TO STEAM NOZZLE WELD C-B C2.21 NDEP-0301NDEP-0450NDEP-0450NDEP-0450
Comment: Examination was performed to the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda.
MTUTUTUT
MT-05-002UT-05-063UT-05-064UT-05-065
SatSatSatSat
3005300530053005
HBR2-10618 SHT 062HBR2-10618 SHT 062HBR2-10618 SHT 062HBR2.10618 SHT 062
10/14/200510/15/200510/15/200510115/2005
10/5/2005178500 2121R-WS WELDED BOX RESTRAINT F-A F1.20 NDEP-0613 VT VT-05-043 Eval 3020 HBR2-10618 SHT 071Evaluation Disposition Acceptable: Support has been evaluated as functional, work request (WR 212019) has been generated to remove loose coatings and reapply.
Comment: Examination was performed to the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda. Examination revealed coating degradation - flaking and peeling paint. Support hasbeen evaluated as functional, work request (WR 212019) has been generated to remove loose coatings and reapply.
179500 213/01 SG B NOZZLE TO REDUCING ELBOW C-F-2 C5.51 NDEP-0437NDEP-0437NDEP-0301
Comment: Examination was performed to the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda.
UT UT-05-066 SatUT UT-05-067 SatMT MT-05-001 Sat
3020 HBR2-10618 SHT 0723020 HBR2-10618 SHT 0723020 HBR2-10618 SHT 072
10/15/200510/15/200510/14/2005
20 of 43
INSERVICE EXAMINATION SUMMARYSummary Exam
No. Component ID Component Description Category Item Procedure Method/Report #/Results System ISO Number Date
180800 213/12 PIPE TO ELBOW C-F-2 C5.51 NDEP-0437 UT UT-05-054 Sat 3020 HBR2-10618 SHT 072 10/5/2005NDEP-0437 UT UT-05-055 Sat 3020 HBR2-10618 SHT 072 10/5/2005NDEP-0201 PT PT-05-111 Sat 3020 HBR2-10618 SHT072 10/4/2005
Comment: Examination was performed to the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda. PT performed in lieu of MT due to limited access of whip restraint.
180900 213/13 ELBOW TO PIPE C-F-2 C5.51 NDEP-0437 UT UT-05-058 Sat 3020 HBR2-10618 SHT 072 10/5/2005NDEP-0437 UT UT-05-057 Sat 3020 HBR2-10618 SHT 072 10/5/2005NDEP-0437 UT UT-05-056 Sat 3020 HBR2-10618 SHT 072 10/5/2005NDEP-0201 PT PT-05-112 Sat 3020 HBR2-10618 SHT 072 10/4/2005
Comment: Examination was performed to the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda, PT performed in lieu of MT due to limited access of whip restraint.
182500 213/C SPRING HANGER F-A F1.20 NDEP-0613 VT VT-05-041 Eval 3020 HBR2-10618 SHT 072 10/5/2005Evaluation Disposition Acceptable: Support has been evaluated as acceptable as is, no further action required.
Comment: Examination was performed to the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda. Examination identified there was no scale on spring can. Measured slot length 3.7"Indicator was 2.1" from top of slot. Civil Engineering evaluated the support as acceptable as is, no further action required.
182800 213/F-WS WELDED BOX RESTRAINT F-A F1.20 NDEP-0613 VT VT-05-042 Eva1 3020 HBR2-10618 SHT 072 10/5/2005
Evaluation Disposition Acceptable: Support was evaluated as acceptable as is, however, support will be restored to original design configuration under WR 211601.Comment: Examination was performed to the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda. Examination identified weld (5") is not adhered to the plate/web intersection. Civil
Engineering evaluated the support as acceptable as is: however, support will be restored to original design configuration under WR 211601.
319700 246/03 PIPE TO ELBOW C-F-1 C5.30 NDEP-0201 PT PT-05-107 Sat 2080 HBR2-10618 SHT 112 10/3/2005Comment: Examination was performed to the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda.
319800 246/04 ELBOW TO PIPE C-F-1 C5.30 NDEP-0201 PT PT-05-108 Sat 2080 HBR2-10618 SHT 112 10/3/2005Comment: Examination was performed to the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda.
319900 246/05 PIPE TO ELBOW C-F-1 C5.30 NDEP-0201 PT PT-05-109 Sat 2080 HBR2-10618 SHT 112 1013/2005Comment: Examination was performed to the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda.
320000 246/06 ELBOW TO PIPE C-F-1 C5.30 NDEP-0201 PT PT-05-110 Sat 2080 HBR2-10618 SHT 112 10/3/2005Comment: Examination was performed to the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda.
325300 246/1 U-BOLT TRAPEEZE ROD HANGER F-A F1.20 NDEP-0613 VT VT-05-045 Eval 2080 HBR2-10618 SHT 112 10/6/2005Evaluation Disposition Acceptable: Support has been evaluated as acceptable as is, no further action required.
Comment: Examination was performed to the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda, Examination identified 3/4 thread engagement on clamp to pipe bolting. CivilEngineering has evaluated the support as acceptable as is, no further action required.
325500 246/K-WS WELDED U-BOLT RESTRAINT F-A F1.20 NDEP-0613 VT VT-05-046 Sat 2080 HBR2-10618 SHT 112 10/6/2005Comment: Examination was performed to the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda.
21 of 43
INSERVICE EXAMINATION SUMMARYSummary
No.ExamDateComponent ID Component Description Cateaorv Item Procedure Method/Report #/Results System ISO Numher
332600 247/D SPRING HANGER F-A F1.20 NDEP-0613 VT VT-05-048 Eval 2080 HBR2-10618 SHT 113 10/6/2005Evaluation Disposition Acceptable: Support has been evaluated as acceptable as is, no further actions required.
Comment: Examination was performed to the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda, Examination identified a loose nut on U support to clevis. No Scale On Spring Can,slot is 1.9", pointer is at 1.13". Civil Engineering evaluated the missing load scale as acceptable as is. The clevis pin nut was tightened to enhance margin of threads and tightness.
333600 247/N ANGLE IRON SUPPORT F-A F1.20 NDEP-0613Comment: Examination was performed to the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda.
VT VT-05-047 Sat 2080 HBR2-10618SHT 113 10/6/2005
22 of 43
TAB
C
AUGMENTED
EXAMINATION
SUMMARY
23 of 43
AUGMENTED EXAMINATION SUMMARYSummary Exam
No. Component ID Component Description Category Item Procedure Method/Report #/Results System ISO Number Date
192300 215/79-13-A SIG A NOZZLE TO ELBOW AUGMENT E-1 NDEP-0437 UT UT-05-025 Sat 3050 HBR2-10618 SHT 074 9/26/2005Comment: Augmented examination completed to the requirements of NRC Bulletin No. 79-13, "Cracking in Feedwater System Piping". No recordable indications were noted. Maintained a 5% to
20% ID roll during examination. Scanned 360° of base metal/weld from nozzle taper to 18" on upstream side of elbow.
197200 216/79-13-B S/G B NOZZLE TO ELBOW AUGMENT E-1 NDEP-0437 UT UT-05-026 Sat 3050 HBR2-10618 SHT 075 9/26/2005Comment: Augmented examination completed to the requirements of NRC Bulletin No. 79-13, "Cracking in Feedwater System Piping". No recordable indications were noted. Maintained a 5% to
20% Id roll during examination. Scanned 3600 of base metal/weld from nozzle taper to 18" on upstream side of elbow.
201000 217/79-13-C S/G C NOZZLE TO ELBOW AUGMENT E-1 NDEP-0437 UT UT-05-027 Sat 3050 HBR2-10618 SHT 076 9/26/2005Comment: Augmented examination completed to the requirements of NRC Bulletin No. 79-13, "Cracking in Feedwater System Piping". No recordable indications were noted. Maintained a 5% to
20% Id roll during examination. Scanned 360° of base metal/weld from nozzle taper to 18" on upstream side of elbow.
24 of 43
TAB
D
OWNER' ELECTED
EXAM I NATION
SUMMARY
25 of 43
OWNER ELECTED EXAMINATION SUMMARY
Component NDE Method Exam ISO Exam
Summary No Identification Component Description Category Item Procedure Report # Results System Number Date
There were no Owner Elected exams performed during RO-23 for this NIS-1 reporting period.
26 of 43
TAB
E
PRESERVICE
EXAM INATION
SUMMARY
27 of 43
Pre-Service Examination SummarySummary
No.Exam
System ISO Number DateComponent ID Component Description Category Item Procedure Method/Report #/Results
25950Comment:
25975Comment:
26025Comment:
26050Comment:
26575Comment:
26625Comment:
26650Comment:
26675Comment:
26725Comment:
26750Comment:
26775Comment:
26825Comment:
26850Comment:
26875Comment:
26925Comment:
101C126(a) TOP ROD TRAVEL HOUSING WELD B-0 B14.10 NDEP-0201 PT PT-05-003 SatPreservice examination performed to meet the requirements of ASME Section Xi, 1995 Edition, thru 1996 Addenda.
101C/26(f) BOTTOM CRDM HEAD ADAPTER WELD B-a B14.10 NDEP-0201 PT PT-05-004 SatPreservice examination performed to meet the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda.
II0C/27(a) TOP ROD TRAVEL HOUSING WELD B-a B14.10 NDEP-0201 PT PT-05-005 SatPreservice examination performed to meet the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.
101C127(f) BOTTOM CRDM HEAD ADAPTER WELD B-a B14.10 NDEP-0201 PT PT-05-006 SatPreservice examination performed to meet the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.
101C/28(a) TOP ROD TRAVEL HOUSING WELD B-a B14.10 NDEP-0201 PT PT-05-007 SatPreservice examination performed to meet the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.
IOIC/28(fl BOTTOM CRDM HEAD ADAPTER WELD B-a B14.10 NDEP-0201 PT PT-05-008 SatPreservice examination performed to meet the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.
101C/29(a) TOP ROD TRAVEL HOUSING WELD B-O B14.10 NDEP-0201 PT PT-05-009 SatPreservice examination performed to meet the requirements of ASME Section XI, 1995 Edition. thru 1996 Addenda.
101CI29(fl BOTTOM CRDM HEAD ADAPTER WELD B-a B14.10 NDEP-0201 PT PT-05-010 SatPreservice examination performed to meet the requirements of ASME Section Xi, 1995 Edition, thru 1996 Addenda.
101C/30(a) TOP ROD TRAVEL HOUSING WELD B-a B14.10 NDEP-0201 PT PT-05-011 SatPreservice examination performed to meet the requirements of ASME Section Xi, 1995 Edition, thru 1996 Addenda.
101C/30(f) BOTTOM CRDM HEAD ADAPTER WELD B-a B14.10 NDEP-0201 PT PT-05-012 SatPreservice examination performed to meet the requirements of ASME Section Xi, 1995 Edition, thru 1996 Addenda.
101C/31(a) TOP ROD TRAVEL HOUSING WELD B-a B14.10 NDEP-0201 PT PT-05-013 SatPreservice examination performed to meet the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.
101C131(fl BOTTOM CRDM HEAD ADAPTER WELD B-a B14.10 NDEP-0201 PT PT-05-014 SatPreservice examination performed to meet the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.
101C/32(a) TOP ROD TRAVEL HOUSING WELD B-a B14.10 NDEP-0201 PT PT-05-015 SatPreservice examination performed to meet the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.
101C/32(t BOTTOM CRDM HEAD ADAPTER WELD B-a B14.10 NDEP-0201 PT PT-05-016 SatPreservice examination performed to meet the requirements of ASME Section Xi, 1995 Edition, thru 1996 Addenda.
101C/33(a) TOP ROD TRAVEL HOUSING WELD B-a B14.10 NDEP-0201 PT PT-05-017 SatPreservice examination performed to meet the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.
1005
1005
1005
HBR2-10618 SHT 004
HBR2-10618 SHT 004
HBR2-10618 SHT 004
1005 HBR2-10618 SHT 004
1005 HBR2-10618 SHT 004
1005 HBR2-10618 SHT 004
1005 HBR2-10618 SH i 004
1005 HBR2-10618 SHT 004
1005 HBR2-10618 SHT 004
1005 HBR2-10618 SHT 004
1005 HBR2-10618 SHT 004
1005 HBR2-10618 SHT 004
1005 HBR2-10618 SHT 004
1005 HBR2-10618 SHT 004
1005 HBR2-10618 SHT 004
4/8/2005
4/8/2005
4/8/2005
4/8/2005
4/8/2005
4/8/2005
4i82G05
4/8/2005
4/8/2005
4/8/2005
4/8/2005
4/8/2005
4/8/2005
4/8/2005
4/8/2005
28 of 43
Pre-Service Examination SummaryComponent Description Category Item Procedure Method/Report #/Results
SummaryNo.
Exam- System ISO Number DateComoonent ID
26950Comment:
26975Comment:
27025Comment:
27050Comment:
27075Comment:
27125Comment:
27150Comment:
27175Comment:
27225Comment:
27250Comment:
27275Comment:
27325Comment:
27350Comment:
27375Comment:
27425Comment:
101C/33(f) BOTTOM CRDM HEAD ADAPTER WELD B-0 B14.10 NDEP-0201 PT PT-05-018 SatPreservice examination performed to meet the requirements of ASME Section Xi, 1995 Edition, thru 1996 Addenda.
101C/34(a) TOP ROD TRAVEL HOUSING WELD B-0 B14.10 NDEP-0201 PT PT-05-019 SatPreservice examination performed to meet the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.
101C,/34(f) BOTTOM CRDM HEAD ADAPTER WELD B-0 B14.10 NDEP-0201 PT PT-05-020 SatPreservice examination performed to meet the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.
101C/35(a) TOP ROD TRAVEL HOUSING WELD B-O B14.10 NDEP-0201 PT PT-05-021 SatPreservice examination performed to meet the requirements of ASME Section Xi, 1995 Edition, thru 1996 Addenda.
101C135(f) BOTTOM CRDM HEAD ADAPTER WELD B-0 B14.10 NDEP-0201 PT PT-05-022 SatPreservice examination performed to meet the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.
101C136(a) TOP ROD TRAVEL HOUSING WELD B-0 B14.10 NDEP-0201 PT PT-05-023 SatPreservice examination performed to meet the requirements of ASME Section Xi, 1995 Edition, thru 1996 Addenda.
101C/36(f) BOTTOM CRDM HEAD ADAPTER WELD B-0 B14.10 NDEP-0201 PT PT-05-024 SatPreservice examination performed to meet the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda.
101C/37(a) TOP ROD TRAVEL HOUSING WELD B-0 614.10 NDEP-0201 PT PT-05-025 SatPreservice examination performed to meet the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.
101C/37(f) BOTTOM CRDM HEAD ADAPTER WELD B-O B14.10 NDEP-0201 PT PT-05-026 SatPreservice examination performed to meet the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.
101C/38(a) TOP ROD TRAVEL HOUSING WELD B-O B14.10 NDEP-0201 PT PT-05-027 SatPreservice examination performed to meet the requirements of ASME Section Xi, 1995 Edition, thru 1996 Addenda.
101C/38(fl BOTTOM CRDM HEAD ADAPTER WELD B-0 614.10 NDEP-0201 PT PT-05-028 SatPreservice examination performed to meet the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.
101C/39(a) TOP ROD TRAVEL HOUSING WELD B-0 B14.10 NDEP-0201 PT PT-05-029 SatPreservice examination performed to meet the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.
101C/39(fl BOTTOM CRDM HEAD ADAPTER WELD B-0 B14.10 NDEP-0201 PT PT-05-030 SatPreservice examination performed to meet the requirements of ASME Section Xi, 1995 Edition, thru 1996 Addenda.
101C/40(a) TOP ROD TRAVEL HOUSING WELD B-0 B14.10 NDEP-0201 PT PT-05-031 SatPreservice examination performed to meet the requirements of ASME Section Xi, 1995 Edition, thru 1996 Addenda.
101C/40(f) BOTTOM CRDM HEAD ADAPTER WELD B-0 B14.10 NDEP-0201 PT PT-05-032 SatPreservice examination performed to meet the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.
29 of 43
1005
1005
1005
1005
1005
1005
1005
1005
1005
1005
1005
1005
1005
1005
1005
HBR2-10618 SHT 004
HBR2-10618 SHT 004
HBR2-10618 SHT 004
HBR2-10618 SHT 004
HBR2-10618 SHT 004
HBR2-10618 SHT 004
HBR2-10618 SHT 004
HBR2-10618 SHT 004
HBR2-10618 SHT 004
HBR2-10618 SHT 004
HBR2-10618 SHT 004
HBR2-10618 SHT 004
HBR2-10618 SHT 004
HBR2-10618 SHT 004
HBR2-10618 SHT 004
4/8/2005
4/8/2005
4/8/2005
4/8/2005
4/8/2005
4/8/2005
4/8/2005
4/8/2005
4/8/2005
4/8/2005
4/8/2005
4/8/2005
4/8/2005
4/8/2005
4/8/2005
Pre-Service Examination SummarySummary
No. Component IDExam
ISO Number DateComoonent Description Cateaorv Item Procedure Method/Report #/Results Svstem
27450Comment:
27475Comment:
27525Comment:
27550Comment:
27575Comment:
101 C/41 (a) TOP ROD TRAVEL HOUSING WELD B-0 B14.10 NDEP-0201 PT PT-05-033 SatPreservice examination performed to meet the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.
10 11C/41 (f) BOTTOM CRDM HEAD ADAPTER WELD B-O B14.10 NDEP-0201 PT PT-05-034 SatPreservice examination performed to meet the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.
101C142(a) TOP ROD TRAVEL HOUSING WELD B-O B814.10 NDEP-0201 PT PT-05-035 SatPreservice examination performed to meet the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda,
1 01 C142(f) BOTTOM CRDM HEAD ADAPTER WELD B-0 B14.10 NDEP-0201 PT PT-05-036 SatPreservice examination performed to meet the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.
101C/43(a) TOP ROD TRAVEL HOUSING WELD B-0 B14.10 NDEP-0201 PT PT-05-037 SatPreservice examination performed to meet the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.
1005
1005
HBR2-10618 SHT 004
HBR2-10618 SHT 004
1005 HBR2-10618 SHT 004
1005 HBR2-10618 SHT 004
27625 410C,'43(01 BOTTOM CRDM HEAD ADAPTER WELD B-O B14.10 NDEP-0201 PT PT-05-038 SatComment: Preservice examination performed to meet the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda.
27650 101C/44(a) TOP ROD TRAVEL HOUSING WELD B-O B14.10 NDEP-0201 PT PT-05-039 SatComment: Preservice examination performed to meet the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.
27675 101C/44(fl BOTTOM CRDM HEAD ADAPTER WELD B-0 B14.10 NDEP-0201 PT PT-05-040 SatComment: Preservice examination performed to meet the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda.
27725 101C/45(a) TOP ROD TRAVEL HOUSING WELD B-0 B14.10 NDEP-0201 PT PT-05-041 SatComment: Preservice examination performed to meet the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.
27750 101C/45(fl BOTTOM CRDM HEAD ADAPTER WELD B-O B14.10 NDEP-0201 PT PT-05-042 SatComment: Preservice examination performed to meet the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda.
27775 101C/62(a) TOP ROD TRAVEL HOUSING WELD B-0 B14.10 NDEP-0201 PT PT-05-043 SatComment: Preservice examination performed to meet the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.
27825 101C/62(f) BOTTOM CRDM HEAD ADAPTER WELD B-0 814.10 NDEP-0201 PT PT-05-044 SatComment: Preservice examination performed to meet the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.
1005 HBR2-10618 SHT 004
1005 HBR2-10618 SHT 004
1005 HBR2-10618 SHT 004
1005 HBR2-10618 SHT 004
1005 HBR2-10618 SHT 004
1005 HBR2-10618 SHT 004
1005 HBR2-10618 SHT 004
1005 HBR2-10618 SHT 004
1005 HBR2-10618 SHT 004
1005 HBR2-10618 SHT 004
4/8/2005
4/8/2005
4/8/2005
4/8/2005
4/8/2005
4/8/2005
4/8/2005
4/8/2005
4/8/2005
4/8/2005
4/8/2005
4/8/2005
4/8/2005
4/8/2005
27850Comment:
27875Comment:
101C/63(a) TOP ROD TRAVEL HOUSING WELD B-0 814.10 NDEP-0201 PT PT-05-045 SatPreservice examination performed to meet the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.
101C/63(f) BOTTOM CRDM HEAD ADAPTER WELD B-0 B14.10 NDEP-0201 PT PT-05-046 SatPreservice examination performed to meet the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.
30 of 43
Pre-Service Examination SummarySummary
No. Component ID Component DescriptionExam
System ISO Number DateCategory Item Procedure Method/Report #/Results
27925 101C/64(a) TOP ROD TRAVEL HOUSING WELD B-0 B14,10 NDEP-0201 PT PT-05-047 SatComment: Preservice examination performed to meet the requirements of ASME Section Xi, 1995 Edition, thru 1996 Addenda.
27950 101C164(f) BOTTOM CRDM HEAD ADAPTER WELD B-0 B14.10 NDEP-0201 PT PT-05-048 SatComment: Preservice examination performed to meet the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda.
27975 101C/65(a) TOP ROD TRAVEL HOUSING WELD B-O B14.10 NDEP-0201 PT PT-05-049 SatComment: Preservice examination performed to meet the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.
28025 101C/65(f) BOTTOM CRDM HEAD ADAPTER WELD B-0 B14.10 NDEP-0201 PT PT-05-050 SatComment: Preservice examination performed to meet the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.
28050 101C/66(a) TOP ROD TRAVEL HOUSING WELD B-0 B14.10 NDEP-0201 PT PT-05-051 SatComment: Preservice examination performed to meet the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.
28075 101C/66(f) BOTTOM CRDM HEAD ADAPTER WELD B-0 B14.10 NDEP-0201 PT PT-05-052 SatComment: Preservice examination performed to meet the requirements of ASME Section XI, 1995 Edition. thru 1996 Addenda.
28125 101C/67(a) TOP ROD TRAVEL HOUSING WELD B-0 B14.10 NDEP-0201 PT PT-05-053 SatComment: Preservice examination performed to meet the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.
28150 101C167(f) BOTTOM CRDM HEAD ADAPTER WELD B-0 B14.10 NDEP-0201 PT PT-05-054 SatComment: Preservice examination performed to meet the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.
28175 101C/68(a) TOP ROD TRAVEL HOUSING WELD B-O B14.10 NDEP-0201 PT PT-05-055 SatComment: Preservice examination performed to meet the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda.
28225 10IC/68(f) BOTTOM CRDM HEAD ADAPTER WELD B-0 B14.10 NDEP-0201 PT PT-05-056 SatComment: Preservice examination performed to meet the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda.
28250 101C/69(a) TOP ROD TRAVEL HOUSING WELD B-0 B14.10 NDEP-0201 PT PT-05-057 SatComment: Preservice examination performed to meet the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda.
28275 101C/69(f) BOTTOM CRDM HEAD ADAPTER WELD B-0 B14.10 NDEP-0201 PT PT-05-058 SatComment: Preservice examination performed to meet the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda.
1005
1005
HBR2-10618 SHT 004
HBR2-10618 SHT 004
1005 HBR2-10618 SHT 004
1005 HBR2-10618 SHT 004
1005 HBR2-10618 SHT 004
1005 HBR2-10618 SHT 004
1005 HBR2-10618 SHT 004
1005 HBR2-10618 SHT 004
1005 HBR2-10618 SHT 004
1005 HBR2-10618 SHT 004
1005 HBR2-10618 SHT 004
1005 HBR2-10618 SHT 004
4/8/2005
4/8/2005
4/8/2005
4/8/2005
4/8/2005
4/8/2005
4/8/2005
4/8/2005
4/8/2005
4/8/2005
4/8/2005
4/8/2005
9/25/2005
9/29/2005
10/3/2005
322800 246/26 PIPE TO VALVE SI-873B WELD C-F-1 C5.30 NDEP-0201 PT PT-05-070 Sat 2080 HBR2-10618 SHT 112Comment: Examination was performed to the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda. Preservice examination due to valve SI-873B replacement.
322900 246/27 VALVE SI-873B TO PIPE C-F-1 C5.30 NDEP-0201 PT PT-05-071 Sat 2080 HBR2-10618 SHT 112Comment: Examination was performed to the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda. Preservice examination due to valve SI-873B replacement
322725 246/42 PIPE TO COUPLING C-F-1 C5.30 NDEP-0201 PT PT-05-061 Sat 2080 HBR2-10618 SHT 112Comment: Examination was performed to the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda. Preservice examination due to valve Sl-873B replacement.
31 of 43
Pre-Service Examination SummarySummary Exam
No. Component ID Component Description Category Item Procedure Method/Report #/Results System ISO Number Date
322775 246/43 COUPLING TO PIPE C-F-1 C5.30 NDEP-0201 PT PT-05-062 Sat 2080 HBR2-10618 SHT 112 9/29/2005Comment: Examination was performed to the requirements of ASME Section Xi, 1995 Edition, thru 1996 Addenda. Preservice examination due to valve SI-8738 replacement.
322925 246/44 PIPE TO COUPLING C-F-1 C5.30 NDEP-0201 PT PT-05-063 Sat 2080 HBR2-10618 SHT 112 9/29/2005Comment: Examination was performed to the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda. Preservice examination due to valve Sl-873B replacement.
322975 246/45 COUPLING TO PIPE C-F-1 C5.30 NDEP-0201 PT PT-05-064 Sat 2080 HBR2-10618 SHT 112 10/3/2005Comment: Examination was performed to the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda. Preservice examination due to valve SI-873B replacement.
330400 247/32 PIPE TO VALVE SI.873A WELD C-F-1 C5.30 NDEP-0201 PT PT-05-072 Sat 2080 HBR2-10618 SHT 113 9/25/2005Comment: Examination was performed to the requirements of ASME Section XI, 1995 Edition, thru 1996 Addenda. Preservice examination due to valve Sl-873A replacement.
330500 247/33 VALVE SIl873ATO PIPE C-F-1 C5.30 NDEP-0201 PT PT-05-073 Sat 2080 HBR2-10618 SHT 113 9/29/2005Comment: Examination was performed to the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda. Preservice examination due to valve Sl-873A replacement.
330600 247/34 PIPE TO COUPLING C-F-1 C5.30 NDEP-0201 PT PT-05-074 Sat 2080 HBR2-10618 SHT 113 9/29/2005Comment: Examination was performed to the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda. Preservice examination due to valve Sl-873A replacement.
330325 247/49 PIPE TO COUPLING C-F-1 C5.30 NDEP-0201 PT PT-05-065 Sat 2080 HBR2-10618 SHT 113 10/7/2005Comment: Examination was performed to the requirements of ASME Section Xl, 1995 Edition, thru 1996 Addenda. Preservice examination due to valve Sl-873A replacement.
330375 247/50 COUPLING TO PIPE C-F-1 C5.30 NDEP-0201 PT PT-05-066 Sat 2080 HBR2-10618 SHT 113 9/29/2005Comment: Examination was performed to the requirements of ASME Section Xl, 1995 Edition, thwu 1996 Addenda. Preservice examination due to valve Sl-873A replacement.
32 of 43
TAB
F
PRESSU RE
TEST
SUMMARY
33 of 43
The table below lists the pressure tests performed from the close date of the previous NIS-1 (May 27, 2004) and the close of the First Period of the
Fourth Ten Year Interval.
SYSTEM DESCRIPTION COMPLETION PROCEDURE RESULTS
DATE
SFPC ISI Pressure Testing of Spent Fuel Cooling System 12/10/2004 *EST-084 SAT
CVCS ISI Pressure Testing of Chemical and Volume Control System Outside Containment 1/14/2005 *EST-131 SAT
SI Inservice Inspection Pressure Testing of SI Pump Discharge Piping 11/30/2004 *EST-078 SAT
SW Inservice Inspection Pressure Testing of Service Water System 1/18/2005 EST-094 SAT
AFW Inservice Inspection Pressure Testing of The Auxiliary Feedwater System 1/19/2005 EST-082 SAT
CVCS inservice Inspection Pressure Testing of Chemical and Volume Control System 1/13/2005 *EST-093 SAT
SI Inservice Inspection Pressure Testing of Spray additive Tank and Associated Piping 2/8/2005 *EST-092 SAT
CCW ISI Pressure Testing of Component Cooling Water System Inside the Auxiliary Building 12/17/2004 EST-088 SAT
FW ISI Pressure Testing of Feedwater System Outside Containment 12/2/2004 EST-077 SAT
MS ISI Pressure Testing of Steam Supply to the SDAFW Pump 9/9/2004 EST-097 SAT
EDGFO ISI Pressure Testing of Diesel Fuel Oil System 11/22/2004 EST-098 SAT
*Includes Bolting Inspection on Borated Systems (invoked Code Case N-533-1)
No deficiencies were noted for the above Engineering Surveillance Tests and all exceptions were addressed by the normal work
request process and retained as permanent records, which may be obtained through the Progress Energy Carolinas, Inc., Document
Control Services.
34 of 43
The table below lists the pressure tests performed to date for the Second Period of the Fourth Ten Year Interval since the last NIS-1 submittal.
SYSTEM DESCRIPTION COMPLETION PROCEDURE RESULTS
DATE
CCW ISI Pressure Testing Of Component Cooling Water To CRD Cooler, RCP-A, B, 9/17/2005 EST-076 SAT
And C, And Excess Letdown Heat Exchanger
SW Inservice Inspection Pressure Testing Of Service Water Inside Containment To 9/17/2005 EST-081 SAT
And From HVH Units 1 Through 4
Si Inservice Inspection Pressure Testing Of SI System and Containment Spray 9/14/2005 *EST-091 SAT
Pump Suction Piping
SG Inservice Inspection Pressure Testing Of The Steam Generator Secondary Side 9/17/2005 EST-128 SAT
And Associated Class 2 Piping
Si Inservice Inspection Pressure Testing Of The SIS Accumulators And Associated 9/17/2005 *EST-129 SAT
Class 2 Piping Inside Containment
RCS Inservice Inspection Pressure Retaining VT-2 Bolting Examination Of Reactor 9/21/2005 **EST-083-1 SAT
Coolant System
RCS Inservice Inspection Pressure Testing Of Reactor Coolant System 10/24/2005 **EST-083-2 SAT
*Includes Bolting Inspection on Borated Systems (invoked Code Case N-533-1)
** EST-083-1 is for bolted connections, EST-083-2 is for pressure testing at the end of the refueling outage.
No deficiencies were noted for the above Engineering Surveillance Tests and all exceptions were addressed by the normal work
request process and retained as permanent records, which may be obtained through the Progress Energy Carolinas, Inc., Document
Control Services.
35 of 43
TAB
G
EXAM I NATION
PERCENTAGE
SUMMARY
36 of 43
CLASS 1 SUMMARY TABLETOTAL INTERVAL INTERVAL INTERVAL NUMBER SCHEDULED/COMPLETED
CATEGORY NUMBER OF NUMBER NUMBER PERCENT 1ST 2 ND 3RD
COMPONENTS REQUIRED COMPLETE COMPLETE PERIOD PERIOD PERIOD
B-A* 2 20 20 0 0% 0/0 0/0 20/0
B-B1 13 5 1 20% 1/1 2/0 2/0
B-D* 36 23 3 13% 3/3 4/0 16/0
B-F 18 18 6 33% 4/4 4/2 10/0
B.G-1* 347 344 96 28% 48/48 48/48 248/0
B-G-2 45 45 21 46% 17/17 13/4 15/0
B-J 721 181 93 51% 64164 73/29 81/0
B-K 53 6 2 33% 2/2 2/0 2/0
B-L-1 9 3 0 0%0 0/0 0(0 3(0
B-L-2 3 0 0 0% 0/0 0/0 0/0
B-M-2 11 3 0 0% 0/0 0/0 0/0
B-N-I 1 1 0 0% 0/0 0/0 1/0
B-N-2 1 1 0 0% 0/0 0/0 1/0
B-N-3 1 1 0 0% 0/0 0/0 1/0
B-O2 56 5 1 20% 1/1 2/0 2/0
B-P 1 7 3 of 7 42% 2/2 3/1 2/0
B-Q 3 TECH SPEC N/A N/A N/A N/A N/A* Deferral Permissible' Code Case N-598 invoked for this Category2 Reactor Head Replaced in RO-23
37 of 43
CLASS 2 SUMMARY TABLE
TOTAL INTERVAL INTERVAL INTERVAL # SCHEDULED/COMPLETED
CATEGORY NUMBER OF NUMBER NUMBER PERCENT 1ST 2 ND 3RD
COMPONENTS REQUIRED COMPLETE COMPLETE PERIOD PERIOD PERIOD
C-A 21 9 6 66% 3/3 3/3 3/0
C-B 26 10 5 50% 4/4 2/1 4/0
C-C 148 9 5 55% 3/3 4/2 2/0
C-D 1 1 0 0% 0/0 1/0 0/0
C-F-I 898 68 28 41% 24/241 26/4 35/0
C-F-2 141 28 15 53% 12/121 11/3 11/0
C-G 4 2 0 : 0 j / 0/0 210
C-H 11 011 (per period) j 14 of 33 42% 11/11 11/3 | 11/0
I Code Case N-598 invoked for this Category
38 of 43
CLASS 1, 2, & 3 SUPPORT SUMMARY TABLE
TOTAL INTERVAL INTERVAL INTERVAL # SCHEDULED/COMPLETED
CATEGORY NUMBER OF NUMBER NUMBER PERCENT 1ST 2ND 3RD
COMPONENTS REQUIRED COMPLETE COMPLETE PERIOD PERIOD PERIOD
F-A F1.101 207 52 27 51% 21/21 22/6 22/0
F-A, F1.201 385 58 30 51% 23/23 27/7 26/0
F-A, F1.301 556 56 29 51% 29/29 25/0 26/0
F-A, F1.401 92 Supports 66 23 34% 22/22 18/1 2610
on44
components
l 1(23 Groups)
' Code Case N-598 invoked for this Category
39 of 43
TAB
H
REPAIR
AND
REPLACEMENT
40 of 43
RO-23 REPAIR/REPLACEMENT SUMMARY REPORT
NIS-2 # Work Order Component ID System Descri tion04-034 338905 CVC-293C 2060 Replacing valve, piping and fitting04-035 525362 CVC-277A 2060 Replacing valve and piping.04-036 510800 CVC-277C 2060 Replacing valve, piping and fitting04-037 586766 CHG-PMP-C 2060 Replaced valve stop.04-038 483464 SW-374 4060 Replaced SW-374 with new valve05-001 168081 01 Capscrew 2060 Replaced bolting on Boric Acid Filter due to boric acid accumulation/corrosion05-002 618922 DG-B-LO-HTX 4060 Replaced Lube Oil HTX End Cover05-003 597678 DG-A-LO-HTX 4060 Replaced Lube Oil Htx End Cover with spare05-004 681666 8-AC-151R-61 7110 Repaired piping line 8-AC-151R-61 by welding05-005 671221 FE-150 2060 Replaced bolting (studs and nuts) due to leakage05-006 628658 EDG-A 4060 Alternate Cooling Water Supply & Discharge Modification05-007 622493 EDG-I 4060 Alternate Cooling Water Supply & Discharge Modification05-008 661742 BA-XFER-PMP-A 2060 Replaced 2 studs and nuts due to leakage.05-009 697587 HVH-8B 4060 Replaced threaded nipples05-010 670842 HVH-8B 4060 Replaced cooling coil, piping, and fittings05-011 768917 SI-870B 2080 Repalced valve disc05-012 615770 SW-8 4060 Replaced valve05-013 624261 SW-7 4060 Replaced valve05-014 651737 SW-375 4060 Replaced Check Valve with rotating spare05-015 189336 SW-377 4060 Replaced check valve with rotating spare05-016 665455 AC-7-34/2 4080 Modified CCW system supports per EC 5573105-017 648715 S6-1B 4060 Replaced inlet and outlet Strainer Flange bolting05-018 759301 RC-525 2005 Replaced valve and piping05-019 664068 SI-873A 2080 Replaced valve and pipe pieces05-020 581883 LTDN-ORIFICE-A 2060 Replaced "A" Letdown restricting orifice05-021 534701 CC-738 4060 Replacing valve05-022 619151 Rx Head 2005 Replaced RVLIS and head vent piping and fittings05-022 619146 1-RC-2501R-99 2005 Replaced RVLIS and Head Vent piping and fittings05-023 558600 RPV Head 1005 Replaced RPV Head05-024 564296 FI-660 4080 Modifying piping section and relocating FI-66005-025 767472 213/F-WS 3020 Weld repair of restraint structure stiffener plate05-026 662477 Snubber #20 2045 Replaced snubber05-027 544849 FCV-478 3050 Replaced one stud and one nut damaged during maintenance
41 of 43
RO-23 REPAIR/REPLACEMENT SUMMARY REPORT
NIS-2 # Work Order Component ID System Description05-028 544818 MS-263A 3020 Replaced valve piston05-029 664066 SI-873B 2080 Replaced valve and pipe pieces05-030 633486 A & B CS Pump 2080 Modified A & B containment spray pump discharge piping05-031 662682 Snubber #23 2060 Replaced snubber05-032 703718 01 S/G A Manway 3005 Replaced bolts with studs/nuts to support temporary repair of mechanical connection05-033 703718 05 S/G A Manway 3005 Replaced Manway cover, threaded inserts and machined Manway pad05-034 703490 S/G A Manway 3005 Replacing studs and nuts installed with bolts05-035 559034 FE-496 3050 Removed and re-welded tack welds for inspection05-036 554808 FE-476 3050 Removed and re-welded tack welds for inspection05-037 664191 Snubber#35 2060 Replaced snubber
42 of 43
ATTACHMENT
I
OWVNERS REPAIR I
REPLACEMENT ACTIVITIES
FORM NIS-2
43 of 43
1995 Edition 1996 Addenda APPENDIX II MANDATORY
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY
As Required by the Provisions of the ASME Code Section Xi
Form NIS 2I
----- ---
1. Owner PROGRESS ENERGY CAROLINAS, INCName
411 FAYETTEVILLE ST.. RALEIGH. NC 27602Address
2. Plant H.B.ROBINSON
Date: 9/1012004
Sheet: I Of 2
Unit: 2Name
3581 WEST Entrance RD: HARTSVILLE, SC 29550Address
3. Work Performed by PROGRESS ENERGY CAROLINAS. INCName
3581 WEST ENTRANCE RD: HARTSVILLE. SC 29550
ESR#:N/A EE:N/AWR/WO:338905 CR:N/A
Repair Organization PO No;Job No;etc.
Type Code Symbol Stamp: N/AAuthorization No.: N/AExpiration Date: N/A
Address
4.
5.
Iticntiffu'Atinn nf 5Rvstpm- rlAInq,' r;4FMI~C.Al Ahnfln Vt IimF rC)ONTPOI qvq.Ti= 2060wwh W w va 1-. F -1-1 - 11 - I - - -- - -- - - -- -
(a) Applicable Construction Code: B 31.1 Edition: 1986 Addenda:N/A Code Case:N/ADesign Specification: CPL-HBR2-M-019
(b) Applicable Edition of Section Xl Used for Repair/Replacement Activity: 1995 Edition 1996 AddendaCode Case: N-416-2
Identification of ComoonentS Ranaired or Renlaced and Redlacement Comoonents6.
Name of Name of Manufacturer National Other Year Corected, ASMEComponent Manufacturer Serial No. Board No. Identification Built Removed, or Code
Installed Stamp(Yes orNo)
CVC-293C Edwards 8K447 NIA Valve 1971 Removed N
CVC-293C Edwards N/A IN/A Valve (HT FOAC) 2004 Installed N
Pipe Ebasco N/A IN/A Pipe 1971 Removed N
Pipe Dubose N/A IN/A Pipe (HT 32789) 2004 Installed N
Fitting Ebasco N/A N/A Elbow 1971 Removed N
Fitting Energy & N/A N/A Elbow (HT KJ) 2004 Installed NProcess Corp. .__ _ _ _ __ _ _ _ _ _ _ _ _ _ _
7. Description of Work: Replacino valve, pipina and fittina
8. Test Conducted: Hydrostatic I:] Pneumatic L-i Nominal Operating Pressure [J Exempt [-l
Other IVT-21 Pressure LNOPI psig Test Temp. INOT1 OF04-034
I V vp
Form NIS2 1995 Edition 1996 AddendaSECTION Xi DIVISION 1
FORM NIS-2 (Back)Sheet 2 of 2.
Remarks: See WO 338905 turnover packageApplicable Manufacturer's Data Reports to be attached
CERTIFICATE OF COMPLIANCE
I certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code, Section Xi.
Type Code Symbol Stamp N/A
Certificate uthonzato _ N/A
Signed ISI ENGINEER Date 9/1312004Owner or Owner's Designee, Title
CERTIFICATE OF INSERVICE INSPECTION
1, the undersigned, holding a valid commission issued try the National Board of Boiler and Pressure Vessel Inspectors and the
State or Province of North Carolina and employed by HSBCT of HARTFORD, CONNECTICUT have
inspected the components described in this Owner's Report during the period 31112004 to 9/13/2004 and state that to the best
of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners
Report in accordance with the requirements of the ASMIE Code, Section Xi.
By signing this certificate neither the Inspector or his employer makes any warranty, expressed or implied, concerning the
examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer
shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with
this inspection.
_______Commissions NC 1507Insector Signature National Board, State, Province, and Endorsements
Date:9/1 3/2004
04 034
.
1995 Edition 1996 Addenda APPENDIX It MANDATORY
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY
As Required by the Provisions of the ASME Code Section XI
Form NIS 2
1. Owner PROGRESS ENERGY CAROLINAS, INCName
411 FAYETTEVILLE ST., RALEIGH, NC 27602
Datae 9/24/2004
Sheet: 1 of 2Address
LA D 93f'tE3KIetrK12. P lAnt# Unit: 2.. . _Name
3581 WEST Entrance RD: HARTSVILLE. SC 29550Address
3. Work Performed by PROGRESS ENERGY CAROLINAS. INCName
3581 WEST ENTRANCE RD: HARTSVILLE, SC 29550
ESR#:N/A EE:N/AWRtWO:525362 CR;N/A
Repair Organization PO No;Job No;etc.
Type Code Symbol Stamp: Nt/AAuthorization No.: N/AExpiration Date: NWA
4.
5.
Address
Identification of System: Class:2 CHEMICAL AND VOLUME CONTROL SYSTEM 2060
(a) Applicable Construction Code: B 31.1 Edition: 1986 Addenda:N/A Code Case:N/ADesign Specification: CPL-HBR2-M-019
(b) Applicable Edition of Section Xl Used for Repair/Replacement Activity: 1995 Edition 1996 AddendaCode Case: N-416-2
6. Identification of Components Hepaired or Replaced and He lacement Components
Name of Name of Manufacturer National Other Year Corrected, ASMEComponent Manufacturer Serial No. Board No. Identification Built Removed, or Code
Installed Stamp(Yes orNO)
CVC-277A Edwards 17ANE N/A Valve 2001 Removed N
CVC-277A Edwards 22AVU N/A Valve (HT FOCA) 2004 Installed N
Piping Maintenance N/A N/A Piping 2001 Removed N
Piping Dubose N/A NIA Piping (HT 32789 2004 Installed N
7. Description of Work: Replacing valve and Dioir g.
8. Test Conducted: Hydrostatic E] Pneumatic ] Nominal Operating Pressure fX] Exempt [-3
Other [VT 21 Pressure INOP1 psig Test Temp. INOT1 °F04-035
Form NIS2 1995 E[dition 1996 AddendaSECTION Xi DIVISION 1
FORM NIS-2 (Back)Sheet 2 of 2.
9. Remarks: See WO 525362 turnover Dpckac eApplicable Manufacturer's Data Reports to be attached
CERTIFICATE OF COMPLIANCE
I certify that the statements made In the report are correct and this conforms to the requirements of the ASME Code, Section Xi.
Type Code Symbol Stamp W/A
Certificato. _ N/A
Signed 4 ISI ENGINEER Date 9/24/2004Owner or Owner's Designee, Title
CERTIFICATE OF INSERVICE INSPECTION
1, the undersigned, holding a valid commission Issued by the National Board of Boiler and Pressure Vessel Inspectors and the
State or Province of North Carolina and employed by HSBCT of HARTFORD. CONNECTICUT have
inspected the components described in this Owner's Report during the period 3/412004 to 9/2412004 and state that to the best
of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's
Report in accordance with the requirements of the ASME Code, Section Xi.
By signing this certificate neither the Inspector or his employer makes any warranty, expressed or implied, concerning the
examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer
shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with
this inspection.
__ ______Commissions NC 1507nspectsPrgnature National Board, State, Province, and Endorsements
Date:9124/2004
04-035
I 0
1995 Edition 1996 Addenda APPENDIX II MANDATORY
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY
As Required by the Provisions of the ASME Code Section Xi
Form NIS 2
1. Owner PROGRESS ENERGY CAROLINAS, INCName
411 FAYETTEVILLE ST.. RALEIGH, NC 27602Address
2. Plant. H.B.ROBINSONName
3581 WEST Entrance RD: HARTSVILLE, SC 29550Address
3. Work Performed by PROGRESS ENERGY CAROLINAS, INCName
3581 WEST ENTRANCE RD: HARTSVILLE, SC 29550
Date: 9/2412004
Sheet: 1 of 2
Unit: 2
ESR#:NIA EE:NIAWRIWO:510800 CR:N/A
Repair Organization PO NoJob No;etc.
Type Code Symbol Stamp: N/AAuthorization No.: NIAExpiration Date: N/A
Address
Identification of System: Class:24.
5.
CHEMICAL AND VOLUME CONTROL SYSTEM 2060----_ . _. ,, _, ._, .................. _ . _ _ _, ............... _ _ .... _ _ _ . _ . ................ _ _ _ _ _
(a) Applicable Construction Code: B 31.1 Edition: 1986 Addenda:N/A Code CaseDesign Specification: CPL-HBR2-M-419
(b) Applicable Edition of Section Xi Used for Flepair/Replacement Activity: 1995 Edition 1996 AddendaCode Case: N-416-2
:N/A
6. Identification of Cnmnonnnts R~nairod or RenIlir-Ad and Ranlanamant CnmnnnAnt.a
0Name of Name of Manufacturer National Other Year Corrected, ASMEComponent Manufacturer Serial No. Board No. Identification Built Removed, or Code
Installed Stamp(Yes orNo)
CVC-277C Edwards 08AFH N/A Valve 1998 Removed N
CVC-277C Edward 48AYV N/A Valve (HT 2004 Installed N_ ___ SONO)
Piping Maintenance N/A N/A Piping 1998 Removed N
Piping Dubose N/A N/A Piping (HT 2004 Installed N__________________________32789) _ _ _ _ _ _
Fitting Maintenance N/A N/A Elbow 1998 Removed N
Fitting E&P Corp. N/A N/A Elbow (HT KJ) 2004 Installed N
7. Description of Work: Replacing valve. Pioina and fittina
8. Test Conducted: Hydrostatic -1 Pneumatic Uj Nominal Operating Pressure LXJ Exempt [-3
Other [VT-21 Pressure [NOP1 psig Test Temp. [NOTl IF04-036
S
W I
Form NIS2 1995 Edition 1996 AddendaSECTION Xi DIVISION 1
FORM NIS-2 (Back)Sheet dof 2e
I9. Remarks: See WO 510800 turnover packaneApplicable Manufacturer's Data Reports to be attached
CERTIFICATE OF COMPLIANCE
I certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code, Section Xl.
Type Code Symbol Stamp NWA
Certificate O<tflyza o0 N/A
Signed A -- ISI ENGINEER Date 9/24/2004Owrer or Owners Designee, Title
CERTIFICATE OF INSERVICE INSPECTION
1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the
State or Province of North Carolina and employed by HSBCT of HARTFORD, CONNECTICUT have
inspected the components described in this Owner's Report during the period 2/24/2004 to 9/24/2004 and state that to the
best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this
Owners Report in accordance with the requirements of the ASME Code, Section Xl.
By signing this certificate neither the Inspector or his employer makes any warranty, expressed or implied, concerning the
examinations and corrective measures described In this Owners Report. Furthermore, neither the Inspector nor his employer
shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with
this inspection.
Date:9/24/2004
01OA--, Commissions NC 1507
National Board, State, Province, and Endorsements
04-036
1995 Edition 1996 Addenda APPENDIX II MANDATORY
FORM NIS-2 OWNER'S REPORT FOR REPAIRIREPLACEMENT ACTIVITY
As Required by the Provisions of the ASME Code Section Xi
Form NIS 2
1. Owner PROGRESS ENERGY CAROLINAS. INCName
411 FAYETTEVILLE ST.. RALEIGH. NC 27602
Date: Q92412004
Sheet: 1 of 2Address
U D Qf%0)Kl.rfK2. F9I-nt101~ Pk .J.f.,,I.J..U
Name
3581 WEST Entrance RD: HARTSVILLE. SC 29550Address
3. Work Performed by PROGRESS ENERGY CAROLINAS. INCName
3581 WEST ENTRANCE RD: HARTSVILLE. SC 29550
Unit: 2
ESR#:N/A EE:N/AWRWJO:586766 CR:N/A
Repair Organization PO No;Job No;etc.
Type Code Symbol Stamp: NWAAuthorization No.: NWAExpiration Date: NMA
Address
4.
5.
Identification of System: Class:2 CHEMICAL AND VOLUME CONTROL SYSTEM 2060
(a) Applicable ConstructionCode,: B 31.1 Edition: 1986 Addenda:N/A Code Case:N/ADesign Specification: 717319
(b) Applicable Edition of Section Xl Used for Repair/Replacement Activity: 1995 Edition 1996 AddendaCode Case: N/A
6. Identification of Compoens Repaired or Replaced and Replacement Components
Name of Name of Manufacturer National Other Year Corrected, ASMEComponent Manufacturer Serial No. Board No. Identification Built Removed, or Code
Installed Stamp(Yes orNo)
CHG-PMP-C Union N/A N/A Valve Stop 1996 Removed N
CHG-PMP-C Union NA N/A Valve Stop 2004 Installed N
7. Description of Work: Redaced valve stop.
8. Test Conducted: Hydrostatic El Pneumatic I U Nominal Operating Pressure Ug Exempt l-l
Other 1I Pressure [NOP] psig Test Temp. INOTI 0F04.037
9
----
Form NIS2 1995 Edition 1996 AddendaSECTION Xl DIVISION 1
FORM NIS-2 (Back)Sheet 2 of 2.
9. Remarks: See 586766 turnover oackaae.Applicable Manufacturer's Data Reports to be attached
CERTIFICATE OF COMPUANCE
I certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code, Section Xi.
Type Code Symbol Stamp N/A
Certificate oI `o N/A
Signed A 044.. ISI ENGINEER Date 924/2004Owner or Owner's Designee, Title
CERTIFICATE OF INSERVICE INSPECTION
1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the
State or Province of NorLth Carolina and employed by HSBCT of HARTFORD. CONNECTICUT have
inspected the components described in this Owner's Report during the period 7/15/2004 to 9/24/2004 and state that to the
best of my knowledge and belief, the Owner has pertormed examinations and taken corrective measures described in this
Owner's Report in accordance with the requirements od the ASME Code, Section Xl.
By signing this certificate neomer the Inspector or his employer makes any warranty, expressed or implied, concerning the
examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer
shall be liable in any manner for any personal injury or property damage or a loss of any kind arising Irom or connected with
this inspection.
0"10. (iX7L Comiss-ions NC' S157'- Ihspt~3s Sinaturo
Date:"1412004
National Board, State, Province, and Endorsements
04-037
1995 Edition 1996 Addenda APPENDIX If MANDATORY
FORM NIS-2 OWNER'S REPORT FOR REPAIRIREPLACEMENT ACTIVITY
As Required by the Provisions of the ASME Code Section Xi
Form NIS 2
1. Owner PROGRESS ENERGY CAROLINAS INCName
411 FAYETTEVILLE ST., RALEIGH. NC 27602
Date: 12/712004_._. . . .____
Sheet: 1 Of 2Address
2. Plant H.B.ROBINSONName
3581 WEST Entrance RD: HARTSVILLE, SC 29550Address
3. Work Performed by PROGRESS ENERGY CAROLINAS. INCName
3581 WEST ENTRANCE RD: HARTSVILLE. SC 29550
Unit: 2
ESR#:NIA EE:N/AWRfWO:4483464 CR:N/A
Repair Organization PO No;Job No;etc.
Type Code Symbol Stamp: NIAAuthorization No.: N/AExpiration Date: NIA
Address
Identification of System: Class:34.
5.
CICOX/If- W^AYTF OV4TrIA Araf%,- -- -- , I - . ---
(a) Applicable Construction Code: B31.1 Edition: 1967 Addenda:N/A Code CasEDesign Specification: HBR-12053
(b) Applicable Edition of Section Xl Used for Repair/Replacement Activity: 1995 Edition 1996 AddendaCode Case: W1A
~:N/A
6. Identification f Components Repaired or Replaced and Replacement Components
Name of Name of Manufacturer Nalional Other Year Corrected, ASMEComponent Manufacturer Serial No. Board No. Identification Built Removed, or Code
Installed Stamp(Yes orNo)
SW-374 Crane N/A N/A Check Valve 1971 Removed N
SW-374 Crane D2693 N/A Check Valve 2004 Installed N
7. Description of Work: Reolaced SW-374 with new valve
8. Test Conducted Hydrostatic j] Pneumatic L U Nominal Operating Pressure A)I Exempt l-l
Other M-2] Pressure INOPP psig Test Temp. 1NOTQ OF04-038
t
Form NIS2 1995 Edition 1996 AddendaSECTION Xi DIVISION 1
FORM NIS-2 (Back)Sheet 2 of L
9. Remarks: See WO 483464 turnover packageApplicable Manufacturer's Data Reports to be attached
CERTIFICATE OF COMPLIANCE
I certify that the statements made In the report are correct and this conforms to the requirements of the ASME Code, Section Xi.
Type Code Symbol Stamp NIA
Certificatf at o N/A
Signed 4 ISI ENGINEER Date 12/7/2004Owner or Owner's Designee, Title
CERTIFICATE OF INSERVICE INSPECTION
1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the
State or Province of North Carolina and employed by HSBCT of HARTFORD. CONNECTICUT have
inspected the components described in this Owners Report during the period 9/2712004 to 1217/2004 and state that to the
best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this
Owners Report in accordance with the requirements of the ASME Code, Section Xi.
By signing this certificate neither the Inspector or his employer makes any warranty, expressed or implied, concerning the
examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer
shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with
this inspection.
F P522 .i___ _ Commissions NC 1507I Int ror's Stlature National Board, State, Province, and Endorsements
Date:1217/2004
04-038
1995 Edition 1996 Addenda APPENDIX II MANDATORY
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY
As Required by the Provisions of the ASME Cede Section Xl
Form NIS 2
1. Owner PROGRESS ENERGY CAROLINAS INCName
411 FAYETTEVILLE ST.. RALEIGH. NC 27602Address
2. Plant H.B.ROBINSON
Date:- 21412005
Sheet: t of 2
Unit: 2Name
3581 WEST Entrance RD; HARTSVILLE, SC 295550Address
3. Work Performed by PROGRESS ENERGY CAROLINAS. INCName
3581 WEST ENTRANCE RD: HARTSVILLE, SC 29550
ESR#:NIA EE:N/AWRNWO:168081 01 CR:NIA
Repair Organization PO No;Job No:etc.
Type Code Symbol Stamp: N/AAuthorization No.: NWAExpiration Date: N/A
Address
Identification of System: Class:2 I4.
5.
C:HEMICAL AND VOLUME CONTROL SYSTEM 2060----_, _ _ ._ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
(a) Applicable Construction Code: B 31.1 Edition: 1967 Addenda:NlA Code CaseDesign Specification: CPL-XXXX-M-001
(b) Applicable Edition o Section Xl Used for Repair/Replacement Activity: 1995 Edition l9 AddendaCode Case: NWA
;:N/A
R Idrpntiffiratinn nf Crnmrwnn~nt- Ranairerl nr R~nlnpzrn sandi Ranlainamant (romnnnant-q
Name of Name of Manufacturer National Other Year Corrected, ASMEComponent Manufacturer Serial No. Board No. Identification Built Removed, or Code
Installed Stamp(Yes orNo)
Capscrew Maintenance N/A N/A Boric-Acid-FLT 1998 Removed N__ Bolting
Capscrew HC Warner NA N/A Boric-Acid-FLT 2004 Installed NBolting
Nut Maintenance N/A NIA Boric-Acid-FLT 1998 Removed N__ _ ,Bolting
Nut Nova N/A N/A Boric-Acid-FLT 2004 Installed NBolting
7. Description of Work: Replaced bolting on Boric Acid Filter due to boric acid accumulation/corrosion
8. Test Conducted: Hydrostatic U Pneumatic LI Nominal Operating Pressure fj Exempt pXq
Other U Pressure [WAI psig Test Temp. INWA1 0F05.001
S
Form NIS2 1995 Edition 1996 AddendaSECTION Xl DIVISION 1
FORM NIS-2 (Back)Sheet 2 of 2.
9. Remarks: See 168081 01 turnover package.Applicable Manufacturer's Data Reports to be attached
CERTIFICATE OF COMPLIANCE
I certify that the statements made In the report are correct and this conforms to the requirements of the ASME Code, Section Xi.
Type Code Symbol Stamp N/A
Certificate N/A
Signed T4L 1 A : . (- ISI ENGINEER Date 2y4e200Owner or Owner's Designee, Title
CERTIFICATE! OF INSERVICE INSPECTION
1. the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the
State or Province of North Carolina and employed by HSBCT of HARTFORD. CONNECTICUT have
inspected the components described in this Owner's Report during the period 916/2003 to 24/2005 and state that to the best
of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's
Report in accordance with the requirements of the ASME Code, Section Xl
By signing this certificate neither the Inspector or his employer makes any warranty, expressed or Implied, concerning the
examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer
shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with
this inspection.
________Commissions NC 1507rp s Signature National Board, State, Province, and Endorsements
Date:214/2005
0-001
1995 Edition 1996 Addenda APPENDIX II MANDATORY
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY
As Required by the Provisions of the ASME Code Section Xl
Form NIS 2
1. Owner PROGRESS ENERGY CAROLINAS, INCName
411 FAYETTEVILLE ST., RALEIGH. NC 27602Address
2. Plant H.B.ROBINSONName
3581 WEST Entrance RD: HARTSVILLE. SC 29550Address
3. Work Performed by PROGRESS ENERGY CAROLINAS. INCName
3581 WEST ENTRANCE RD: HARTSVILLE. SO 29550
Date: 612212005
Sheet: 1 of 2
Unit: 2
EC#:N/A EE:NIAWR/WO:61 8922 CR:N/A
Repair Organization PO No:Job No;etc.
Type Code Symbol Stamp: NIAAuthorization No.: NIAExpiration Date: NIA
4.
5.
Address
Identification of System: Class:3 SERVICE WATER SYSTEM 4060
(a) Applicable Construction Code: 831.1 Edition 1967 Addenda:N/A Code Case:N/ADesign Specification: 729-063-16
(b) Applicable Edition of Section XI Used for Repair/Replacement Activity: 1995 Edition 1996 AddendaCode Case: N/A
Identification of Comoonents Reoaired or Reolaced and Reolacement Comoonents6.
Name of Name of Manufacturer National Other Year Corrected, ASMEComponent Manufacturer Serial No. Board No. Identification Built removed, or Code
Installed Stamp(Yes orNo)
DG-B-LO-HTX Fairbanks Morse N/A N/A HTX End Cover 1971 Removed N
DG-B-LO-HTX Fairbanks Morse N/A N/A HTX End Cover 2005 Installed N
7.
8.
Description of Work: Replaced Lube Oil HTX End Cover
Test Conducted: Hydrostatic U1 Pneumatic L] Nominal Operating Pressure UX Exempt [-l
Other jVT-1 Pressure [NOPj psig Test Temp. [NOT]° F05-002
9
Form NIS2 1995 Edition 1996 AddendaSECrION Xl DIVISION 1
FORM NIS-2 (Back)Mk Sheet 2 of 2.
9. Remarks: See WO 618922 turnover packaoeApplicable Manufacturer's Data Reports to be attached
CERTIFICATE OF COMPLIANCE
I certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code, Section Xi.
Type Code Symbol Stamp N/A
Certificate ojctf o. N/A
Signed 4 . ISI ENGINEER Date 61212005Owner or Owner's Designee, Title
CERTIFICATE OF INSERVICE INSPECTION
1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the
State or Province of North Carolina and employed by HSBCT of HARTFORD. CONNECTICUT have
inspected the components described in this Owner's Report during the period 2/712005 to 6/22/2005 and state that to the best
of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's
Report in accordance with the requirements of the ASIVIE Code, Section Xl.
By signing this certificate neither the Inspector or his employer makes any warranty, expressed or implied, concerning the
examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer
shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with
this inspection.
Kd|n sQ,____ Commissions NC 1507Inspecs Siaure National Board, State, Province, and Endorsements
Date:6/2212005
05-002
S1995 Edition 1996 Addenda APPENDIX II MANDATORY
FORM NIS-2 OWNER'S REPORT FOR REPAIRtREPLACEMENT ACTIVITY
As Required by the Provisions of the ASME Code Section Xi
Form NIS2
1. Owner PROGRESS ENERGY CAROUNAS INCName
411 FAYETTEVILLE ST.. RALEIGH. NC 27602
nnt.-. &rsn"fVsvx
Sheet: 1 of 2Address
14 R DfVI0et'nK2. PZlfin# Unit: 2lw.� I
Name
3581 WEST Entrance RD: HARTSVILLE, SC 29550Address
3. Work Performed by PROGRESS ENERGY CAROLINAS. INCName
3581 WEST ENTRANCE RD: HARTSVILLE, SC 29550
EC#:N/A EE:N/AWRIWO:597678 CR:N/A
Repair Organization PO No;Job No;etc.
Type Code Symbol Stamp::N/AAuthorization No.: N/AExpiration Date: N/A
Address
Identification of System: Class:34.
5.
RlFIX/r'C:. WAT170 RYRTFMK Afn-1
(a) Applicable Construction Code: B 31.1 Edition: 1967 Addenda:N/A Code CastDesign Specification: 729-063-16
(b) Applicable Edition of Section Xi Used for Repair/Replacement Activity: 1995 Edition 1996 AddendaCode Case: N/A
):N/A
6 fidantifir~tinn ^f (~nmra~nuntk Ra~nsiraud mr Rcrnisked jnn.1 Ranlw~anpnt Cr~jnnnnc~ntr,
Name of Name of Manufacturer National Other Year Corrected, ASMEComponent Manufacturer Serial No. Board No. Identification Built lRemoved, or Code
Installed Stamp(Yes orNo)
DG-A-LO-HTX Fairbanks Morse N/A N/A HTX End Cover 1971 Removed N
DG-A-LO-HTX Fairbanks Morse N/A N/A HTX End Cover 2005 Installed N
7. Description of Work: Rerdaced Lube Oil Htx Erd Cover with snare
8. Test Conducted Hydrostatic LUj Pneumatic U ] Nominal Operating Pressure 2g Exempt f-]
Other [T-21 Pressure INOPI psig Test Temp. lNOTi °F05-003
Form NIS2 1995 Edition 1996 Addenda
SECTION Xl DIVISION 1
FORM NIS-2 (Back)
Sheet 2 of 2.
9. Remarks: See 597678 turnover packageApplicable Manufacturer's Data Reports to be attached
CERTIFICATE OF COMPUANCE
I certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code, Section XI.
Type Code Symbol Stamp N/A
Cenificti0Me io. NIA
Signed 16 ISI ENGINEER Date 6120/2005Owner or Owner's Designee, Title
CERTIFICATE OF INSERVICE INSPECTION
I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the
State or Province of North Carolina and employed by HSBCT of HARTFORD. CONNECTICUT have
inspected the components described In this Owneres Report during the period 2/4/2005 to 6/2012005 and state that to the best
of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's
Report in accordance with the requirements of the ASME Code, Section Xl.
By signing this certificate neither the Inspector or his employer makes any warranty, expressed or implied, concerning the
examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer
shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with
this inspection.
7______Commissions NC 1507Inspe s Sig e National Board, State, Province, and Endorsements
Date:6/20/2005
.5.03
e
1995 Edition 1996 Addenda APPENDIX II MANDATORY
FORM NIS-2 OWNER'S REPORT FOR REPAIRIREPLACEMENT ACTIVITY
As Required by the Provisions of the ASME Code Section Xi
Form NIS 2
1. Owner PROGRESS ENERGY CAROLINAS. INCName
411 FAYETTEVILLE ST.. RALEIGH. NC 27602Address
2. Plant H.B.ROBINSONName
3581 WEST Entrance RD: HARTSVILLE, SC 29550Address
3. Work Performed by PROGRESS ENERGY CAROLINAS. INCName
3SS1 WEST ENTRANCE RD: HARTSVILLE SC 29550
Date: 6/20/2005
Sheet: 1 of 2
Unit 2,. L
EC#:60405 EE:N/AWR/WO:681666 CR:t52423
Repair Organization PO No;Job No;etc.
Type Code Symbol Stamp: N/AAuthorization No.: N/AExpiration Date: N/A___- - ._ .___.___ __ -_-
4.
5.
Address
Identification of System: Class:3 SPENT FUEL PIT COOLING SYSTEM 7110
(a) Applicable Construction Code: B31.1 Edition: 1967 Addenda:N/A Code Case:N/ADesign Specification: CPL-HBR2-M-048
(b) Applicable Edition of Section Xl Used for Repair/Replacement Activity: 1995 Edition 1996 AddendaCode Case: N-416-2
Identification of Comoonents Renaired or Renlaced and Rnelacement Comnonents6.
Name of Name of Manufacturer National Other Year Corrected, ASMEComponent Manufacturer Serial No. I3oard No. Identification Built Removed, or Code
Installed Stamp(Yes orNo)
8-AC-15IR-61 Ebasco N/A N/A Pipe 1971 Corrected N
7.
8.
Description of Work: Repaired Diping line 8-AC-151R-61 by weldina
Test Conducted: Hydrostatic UL Pneumatic 1.] Nominal Operating Pressure PQ Exempt [-I
Other IVT-2 Pressure [NOPM psig Test Temp. INOT] IF05-004
Form NIS2 1995 Edition 1996 AddendaSECTION Xl DIVISION 1
FORM NIS-2 (Back)Sheet 2 of 2.
9. Remarks: See WO 681666 turnover PackageApplicable Mantuacturer's Data Reports to be attached
CERTIFICATE OF COMPLIANCE
I certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code, Section Xi.
Type Code Symbol Stamp N/A
Certfia!N o N/A
Signed 4 G o L.C Q ISI ENGINEER Date 6/20/2005Owner or Owners Designee, Title
CERTIFICATE OF INSERVICE INSPECTION
1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the
State or Province of North Carolina and employed by HSBCT of HARTFORD, CONNECTICUT have
inspected the components described in this Owner's Report during the period 3/3/2005 to 6120/2005 and state that to the best
of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's
Report in accordance with the requirements of the ASMIE Code, Section Xi.
By signing this certificate neither the Inspector or his employer makes any warranty, expressed or implied, concerning the
examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer
shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with
this inspection.
________Commissions NC 1507ns National Board, State, Province, and Endorsements
Date:6/2012005
05004
1995 Edition 1996 Addenda APPENDIX II MANDATORY
FORM NIS-2 OWNER'S REPORT FOR REPAIRIREPLACEMENT ACTIVITY
As Required by the Provisions of the ASME Code Section Xi
Form NIS 2
1111111=1
1. Owner PROGRESS ENERGY CAROLINAS. INC -Q.v.
Name
411 FAYETTEVILLE ST.. RALEIGH- NC 27602 Sheet: 1 of 2....... ............ _ _ ___ Y .......... a__. _ ......... _ _ . ____
Address
2. Plant H.B.ROBINSONName
3581 WEST Entrance RD: HARTSVILLE, SC 29550Address
3. Work Performed by PROGRESS ENERGY CAROLINAS. INCName
3581 WEST ENTRANCE RD: HARTSVILLE. SC 29550
Unit: 2
EC#:N/A EE:NIAWRIWO:671221 CR:NIA
Repair Organization PO No;Job No;etc.
Type Code Symbol Stanp. N/AAuthorization No.: N/AExpiration Date: N/A
Address
Identification of System: Class:24.
5.
rfLWrChAt'A1 Akin Ini[ I IMFA 1r.%iT~nl QVQTFkA OrnA2:V - --.- -1 - . - . -11,
(a) Applicable Construction Code: B 31.1 Edition: 1967 Addenda:N/A Code CaseDesign Specification: CPL-XXXX-M-001
(b) Applicable Edition of Section Xi Used for Repair/Replacement Activity+. 1995 Edition 1996 AddendaCode Case: N/A
):N/A
6. Identiication of Components Repaired or Replaced and Replacement Components
Name of Name of Manufacturer National Other Year Corrected, ASMEComponent Manufacturer Serial No. Board No. Identirication Built Removed, or Code
Installed Stamp(Yes orNo)
FE-150 Maintenance N/A N/A Studs 1998 Removed N
FE-150 Mackson NIA N/A Studs 2005 Installed N
FE-150 Maintenance N/A N/A Nuts 1998 Removed N
FE-150 Mackson N/A N/A Nuts 2005 Installed N
7. Description of Work: Replaced BoIting (Studs and Nuts) due to leakage
8. Test Conducted: Hydrostatic El Pneumatic L U Nominal Operating Pressure I U Exempt [XI
Other [ Pressure [A psig Test Temp. [N/Al OF05-005
Form NIS2 1995 Edition 1996 AddendaSECTION XI DIVISION 1
FORM NIS-2 (Back)Sheet 2 of 2.
9. Remarks: See WO 671221 turnover packageApplicable Manufacturer's Data Reports to be attached
CERTIFICATE OF COMPUANCE
I certify that the statements made In the report are correct and this conforms to the requirements of the ASME Code. Section Xl.
Type Code Symbol Stamp N/A
Certificate ofv No. N/A
Signed 4 ISI ENGINEER Date 6/2212005Owner or Owner's Designee, Title
CERTIFICATE OF INSERVICE INSPECTION
I. the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the
State or Province of North Carolina and employed by HSBCT of HARTFORD, CONNECTICUT have
inspected the components described in this Owner's Report during the period 3/28/2005 to 6/22/2005 and state that to the
best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this
Owner's Report in accordance with the requirements of the ASME Code, Section Xl.
By signing this certificate neither the Inspector or his employer makes any warranty, expressed or Implied, concerning the
examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer
shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with
this inspection.
- _v __'_ _ Commissions NC 1507ins " gnature National Board, State, Province, and Endorsements
Date:6/2212005
05-005
I
-;-wX7
1995 Edition 1996 Addenda APPENDIX II MANDATORY
FORM NIS-2 OWNER'S REPORT FOR REPAIRIREPLACEMENT ACTIVITY
As Required by the Provisions of the ASME Code Section Xi
Form NIS 2
1. Owner PROGRESS ENERGY CAROLINAS. INCName
411 FAYETTEVILLE ST.. RALEIGH, NC 27602Address
2. Plant H.B.ROBINSONName
3581 WEST Entrance RD; HARTSVILLE. SC 29550Address
3. Work Performed by PROGRESS ENERGY CAROLINAS. INCName
3581 WEST ENTRANCE RD: HARTSVILLE. SC 29550
Date: 824/2005
Sheet: 1 of 2
Unit, 2
EC#:59019 EE:NIAWR/WO:628658 CR:167663
Repair Organization PO No;Job No;etc.
Type Code Symbol Stamp: NIAAuthorization No.: N/AExpiration Date: NIA
Address
Identification of System: Class:34.
5.
iFR'IN WATR CVCT=IR Anon-- .. I � I - - - -11.
(a) Applicable Construction Code: B 31.1 Edition: 1967 Addenda:N/A Code CaseDesign Specification: See EC 59019
(b) Applicable Edition of Section XI Used for Repair/Replacement Activity: 1995 Edition 1996 AddendaCode Case: N-416-2
e:N/A
6. Identification of Components Repaired or Replaced and Replacement Components
Name of Name of Manufacturer National Other Year Corrected. ASMEComponent Manufacturer Serial No. Board No. Identification Built Removed, or Code
Installed Stamp(Yes orNo)
EDG-A Fairbanks Morse N/A N/A Jacket Water 1971 Removed NHTX Covers
4-CW-488 Maintenance N/A N/A Alt. Cooling 2005 Installed NPiping
EDG-A Fairbanks Morse N/A N/A After Coolant 1971 Removed NHTX Covers
6-CW-487 Maintenance NIA NIA Alt. Cooling 2005 Installed NPiping
7. Description of Work: Alternate Cooling Water SuOplV & Discharge Modification
8. Test Conducted: Hydrostatic 1.U Pneumatic L:] Nominal Operating Pressure f:J Exempt l-l
Other IVT2/@3 Pressure [NOPI psig Test Temp. INOT] 0F05-006
Form NIS2 1995 Edition 1996 AddendaSECTION XI DIVISION 1
FORM NIS-2 (Back)Sheet 2 of 2.
9. Remarks: See WO 628658 turnover DackageApplicable Manutacturer's Data Reports to be attached
CERTIFICATE OF COMPUANCE
I certify that the statements made In the report are correct and this conforms to the requirements of the ASME Code, Section XI.
Type Code Symbol Stamp N/A
Certifiat No. N/A
Signed ISI ENGINEER Date 8/2412005Owner or Owners Designee, Tite
CERTIFICATE OF INSERVICE INSPECTION
I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the
State or Province of North Carolina end employed by HSBCT of HARTFORD. CONNECTICUT have
inspected the components described in this Owner's Report during the period 12/612004 to 8/24/2005 and state that to the
best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this
Owners Report in accordance with the requirements of the ASME Code, Section Xl.
By signing this certificate neither the Inspector or his employer makes any warranty, expressed or implied, concerning the
examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer
shall be liable in any manner for any personal Injury or property damage or a loss of any kind arising from or connected with
this inspection.
____ LCommissions NC 1507Ines sigriture National Board, State, Province, and Endorsements
Date:8/2412005
05-006
k
1995 Edition 1996 Addenda APPENDIX II MANDATORY
FORM NIS-2 OWNER'S REPORT FOR REPAIRIREPLACEMENT ACTIVITY
As Required by the Provisions of the ASME Code Section Xi
Form NIS 2
1. Owner PROGRESS ENERGY CAROLINAS. INCName
411 FAYETTEVILLE ST., RALEIGH, NC 2760'2
Date: 8/24/2005
Sheet: 1 of 2Address
2. Plant H.B.ROBINSONName
3581 WEST Entrance RD: HARTSVILLE, SC 29550Address
3. Work Performed by PROGRESS ENERGY CAROLINAS. INCName
3581 WEST ENTRANCE RD: HARTSVILLE. 'SC 29550
Unit: 2
EC#:59017 EE:NIAWR/WO:622493 CR:167663
Repair Organization PO No;Job No;etc.
Type Code Symbol Stamp: N/AAuthorization No.: NIAExpiration Date: N/A
TFM 406r0
Address
Identification of System: Class:34.
5.
SFRVICF WATFR RYS
(a) Applicable Construction Code. B 31.1 Edition: 1967 Addenda:N/A Code CaseDesign Specification: See EC 59017
(b) Applicable Edition of Section Xi Used for Repair/Replacement Activity: 1995 Edition 1996 AddendaCode Case: N-416-2
i:N/A
6. Identification of Cornponents Repaired or Re -aced and Re lacement Components
Name of Name of Manufacturer National Other Year Corrected, ASMEComponent Manufacturer Serial No. Board No. Identification Built Removed, or Code
Installed Stamp(Yes orNo)
EDG-B Fairbanks Morse N/A N/A Jacket Water 1971 Removed N._ HTX Covers
4-CW-486 Maintenance N/A N/A Alt. Cooling 2005 Installed NPiping
EDG-B Fairbanks Morse N/A N/A After Coolant 1971 Removed NHTX Covers
6-CW-460 Maintenance N/A N/A Alt. Cooling 2005 Installed N___ __ __ __ _ _ __ __ __ _ , P iping __ _ _ _ _ __ _ _ _
7. Description of Work: Alternate Cooling Water Supply & Discharge Modification
8. Test Conducted: Hydrostatic L-] Pneumatic U Nominal Operating Pressure 1 Exempt l-l
Other EVT-?J3 Pressure INOPJ psig Test Temp. INO1 'F05-007
Form NIS2 1995 Edition 1996 AddendaSECTION Xl DIVISION 1
FORM NIS-2 (Back)Sheet 2 of .2.
9. Remarks: See WO 622493 turnover packaaeApplicable Manufacturer's Data Reports to be attached
CERTIFICATE OF COMPLIANCE
I certify that the statements made In the report are correct and this conforms to the requirements of the ASME Code, Section Xl.
Type Code Symbol Stamp N/A
CertificateLAuatezbion No. N/A
Signed A = ISI ENGINEER Date 8/24/2005Owner or Owner's Designee, Title
CERTIFICATE OF INSERVICE INSPECTION
1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the
State or Province of North Carolina and employed by HSBCT of HARTFORD. CONNECTICUT have
inspected the components described In this Owner's Report during the period 1218/2004 to 824/2005 and state that to the
best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this
Owner's Report In accordance with the requirements of the ASME Code, Section Xl.
By signing this certificate neither the Inspector or his employer makes any warranty, expressed or implied, concerning the
examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer
shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with
this inspection.
A_______ Commissions NC 1507Ins Signature National Board, State, Province, and Endorsements
Date:8/2412005
05-007
LS-
1995 Edition 1996 Addenda APPENDIX II MANDATORY
FORM NIS-2 OWNER'S REPORT FOR REPAIRPREPLACEMENT ACTIVITY
As Required by the Provisions of the ASME Code Section Xl
Form NIS 2
1. Owner PROGRESS ENERGY CAROLINAS INCName
411 FAYETTEVILLE ST.. RALEIGH. NC 27602Address
2. Plant H.B.ROBINSONName
3581 WEST Entrance RD: HARTSVILLE. SC 29550Address
3. Work Performed by PROGRESS ENERGY CAROLINAS. INCName
3581 WEST ENTRANCE RD: HARTSVILLE, SC 29550
Date: 6/30/2005
Sheet: 1 of 2
Unit: 2
EC#:N/A EE:NIAWR/WO:661742 CR:147748
Repair Organization PO No;Job No;etc.
Type Code Symbol Stamp: N/AAuthorization No.: N/AExpiration Date: N/A
Address
Identification of System: Class:24.
5.
CHEMICAL AND VOLUME CONTROL SYSTEM 2060----_ . _ _ _ _ _ _ _ _ _ _ _ _
(a) Applicable Construction Code: B 31.1 Edition: 1967 Addenda:N/A Code CaseDesign Specification: CPL-XXXX-M-001
(b) Applicable Edition of Section Xl Used for lepair/Replacement Activity: 1995 Edition 1996 AddendaCode Case: N/A
e:N/A
6. Identification of Components Repaired or Replaced and Replacement Components
Name of Name of Manufacturer National Other Year Corrected, ASMEComponent Manufacturer Serial No. Board No. Identification Built Removed, or Code
Installed Stamp(Yes orNo)
BA-XFER- Maintenance UA N/A Discharge Flange 1998 Removed NPMP-A BoltingBA-XFER- Mackson N/A N/A Discharge Flange 2005 Installed NPMP-A StudsBA-XFER- Anchor Darling N/A NA Discharge Flange 2005 Installed NPMP-A Nuts
- . = __________________
7. Description of Work: Replaced 2 studs and nuts due to leakage.
B. Test Conducted: Hydrostatic 1-1 Pneumatic 1j Nominal Operating Pressure LJ Exempt [-I
Other [M-1 I Pressure IN/Al psig Test Temp. IN/l I F05-008
.I
Form NIS2 1995 Edition 1996 AddendaSECTION Xl DIVISION I
FORM NIS-2 (Back)Sheet 2 of 2.
9. Remarks: See WO 661742 turnover packaaeApplicable Manufacturer's Data Reports to be attached
CERTIFICATE OF COMPUANCE
I certify that the statements made In the report are correct and this conforms to the requirements of the ASME Code, Section XI.
Type Code Symbol Stamp N/A
Certificate oftoil No. M/A
Signed_ ISI ENGINEER Date 6130/2005Owner or Owner's Designee, Title
CERTIFICATE OF INSERVICE INSPECTION
1. the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the
State or Province of North Carolina and employed by HSBCT of HARTFORD. CONNECTICUT have
inspected the components described In this Owner's Report during the period 3/28/2005 to 6130/2005 and state that to the
best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this
Owner's Report in accordance with the requirements od the ASME Code, Section Xl.
_ By signing this certificate neither the Inspector or his employer makes any warranty, expressed or implied, concerning the
examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer
shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with
this inspection.
ths ip ( Commissions NC 1507)Insrs7 nature National Board, State, Province, and Endorsements
Date:6/30/2005
05-008
e1995 Edition 1996 Addenda APPENDIX II MANDATORY
FORM NIS-2 OWNER'S REPORT FOR REPAIRIREPLACEMENT ACTIVITY
As Required by the Provisions of the ASME Code Section Xi
Form NIS 2
1. Owner PROGRESS ENERGY CAROLINAS, INCName
411 FAYETTEVILLE ST.. RALEIGH. NC 27602Address
2. Plant H.B.ROBINSON
Date: 1014/2005
Sheet: 1 of 2
Unit: 2Name
3581 WEST Entrance RD: HARTSVILLE, SC 29550Address
3. Work Performed by PROGRESS ENERGY CAROLINAS. INCName
3581 WEST ENTRANCE RD: HARTSVILLE, SC 29550
EC#:N/A EEMAWRIWO:697587 CR:N/A
Repair Organization PO No;Job No;etc.
Type Code Symbol Stamp: N/AAuthorization No.: N/AExpiration Date: N/A
Address
Identification of System: Class:3 i4.
5.
SERVICE WATER SYSTEM 4060
(a) Applicable Construction Code: B 31.1 Edition: 1967 Addenda:N/A Code CaseDesign Specification: N/A
(b) Applicable Edition of Section Xl Used for Repair/Replacement Activity: 1995 Edition 1996 AddendaCode Case: NIA
rN/A
6. Identification of ComponentS Repaired or Repaced and Re lacement Components
Name of Name of Manufacturer National Other Year Corrected, ASMEComponent Manufacturer Serial No. l3oard No. Identification Built Removed, or Code
Installed Stamp(Yes orNo)
HVH-8B Maintenance N/A N/A Inlet flange nipple 1997 Removed N
HVH-8B Maintenance N/A NIA Inlet flange nipple 2005 Installed N
7. Description of Work: Redlaced threaded niopl s
8. Test Conducted. Hydrostatic IU Pneumatic Uj Nominal Operating Pressure mJ Exempt [-H
Other IT-21 Pressure INOPi psig Test Temp. fNOr, 'F05-009
Form NIS2 1995 Edition 1996 AddendaSECTION Xl DIVISION 1
FORM NIS-2 (Back)Sheet 2 of 2.
9. Remarks: See WO 697587 turnover packace.Applicable Manufacturer's Data Reports to be attached
CERTIFICATE OF COMPUANCE
I certify that the statements made In the report are correct and this conforms to the requirements of the ASME Code, Section Xl.
Type Code Symbol Stamp N/A
Certificate t No. N/A
Signed ISI ENGINEER Date 10/4/2005Owner or Owner's Designee, Title
CERTIFICATE OF INSERVICE INSPECTION
1. the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the
State or Province of North Carolina and employed by HSBCT of HARTFORD. CONNECTICUT have
inspected the components described in this Owner's Report during the period 4/1/2005 to 10/4/2005 and state that to the
best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this
Owner's Report in accordance with the requirements of the ASME Code, Section Xl.
By signing this certificate neither the Inspector or his employer makes any warranty, expressed or implied, concerning the
examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer
shall be liable in arny manner for any personal injury or property damage or a loss of any kind arising from or connected with
this inspection.
_______Commissions NC 1507nrsC sp ib e National Board, State, Province, and Endorsements
Date:1 0/4/2005
05-009
1995 Edition 1996 Addenda APPENDIX II MANDATORY
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY
As Required by the? Provisions of the ASME Code Section Xi
Form NIS 2
01. Owner PROGRESS ENERGY CAROLINAS. INC
Name
411 FAYETTEVILLE ST.. RALEIGH. NC 2760:Address
2. Plant H.B.ROBINSONName
3581 WEST Entrance RD: HARTSVILLE, SC 29550Address
3. Work Performed by PROGRESS ENERGY CAROLINAS. INCName
3581 WEST ENTRANCE RD: HARTSVILLE. SC 29550
Date: 10/4/2005
Sheet: 1 of 2
Unit:
EC#:60189 EE:N/AWR/WO:670642 CR:N/A
Repair Organization PO No;Job No;etc.
Type Code Symbol Stamp: N/AAuthorization No.: N/AExpiration Date: N/A
Address
Identification of System: Class:34.
5.
SERVICE WATER SYSTEM 4060
(a) Applicable Construction Code: B31.1 Edition: 1967 Addenda:N/A Code Case.Design Specification:
(b) Applicable Edition of Section Xi Used for Repair/Replacement Activity: 1995 Edition 1996 AddendaCode Case: N-416-2
Identification of Comronents Reoaired or Renlaced and Realacement Comoonents
:N/A
6.
Name of Name of Manufacturer National Other Year Corrected, ASMEComponent Manufacturer Serial No. Board No. Identification Built Removed, or Code
Installed Stamp(Yes orNo)
HVH-BB H. K. Porter Co N/A N/A Cooling Coil 1997 Removed N
HVH-8B Mario 038006 NIA Cooling Coil 2005 Installed N
1 1/2-CW-399 Maintenance N/A N Piping 1971 Removed N
1 1/2-CW-399 Maintenance N/A N Piping 2005 Installed N
1 1/2-CW-400 Maintenance N/A N Piping 1971 Removed N
1 1/2-CW-400 Maintenance N/A N Piping 2005 Installed N
.J , , _ I _ _ _ =====
7. Description of Work: Replaced cooling coil. piiina., and fittinos
8. Test Conducted: Hydrostatic E Pneumatic U. Nominal Operating Pressure LM Exempt I-)
Other IVTI21 Pressure rNOPI psig Test Temp. [NOT) OF05-010
Form NIS2 1995 Edition 1996 AddendaSECTION XI DIVISION 1
FORM NIS-2 (Back)
0
Sheet 2 of 2.
9. Remarks: See WO 670842 turnover packace.Applicable Manufacturer's Data Reports to be attached
CERTIFICATE OF COMPLIANCE
I certify that the statements made In the report are correcd and this conforms to the requirements of the ASME Code. Section XI.
Type Code Symbol Stamp N/A
Certificate cuuenzao F A N/A
Signed -4 %A - IRI ENG.INEER Date two5jOwner or Owner's Designee, Title
CERTIFICATE OF INSERVICE INSPECTION
1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the
State or Province of North Carolina and employed by HSBCT of HARTFORD. CONNECTICUT have
inspected the components described in this Owner's Report during the period 7/13/2005 to 10/4/2005 and state that to the
best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this
Owners Report in accordance with the requirements of the ASME Code, Section XI.
By signing this certificate neither the Inspector or his employer makes any warranty, expressed or Implied, concerning the
examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer
shall be liable in any manner for any personal injury cr property damage or a loss of any kind arising from or connected with
this inspection.
'Inspet i% wre-Commissions NC 1507National Board, State, Province, and Endorsements
Date:10/4/2005
05"010
1995 Edition 1996 Addenda APPENDIX II MANDATORY
FORM NIS-2 OWNER'S REPORT FOR REPAIRIREPLACEMENT ACTIVITY
As Required by the Provisions of the ASME Code Section XI
form NIS 2
1. Owner PROGRESS ENERGY CAROLINAS, INCName
AlI FAYFTTFVIII F ST. RAI FIGH.M NC 276029
Dnate: 1 01/200fl5cow.1- --YE--Y
Sheet: 1 Of 2....... - -... ... .--
Address
SI = nMIblf.NKI2. Ffot-U29 IL
Name
3581 WEST Entrance RD.: HARTSVILLE. SC 29550Address
3. Work Performed by PROGRESS ENERGY CAROLINAS. INCName
3581 WEST ENTRANCE RD: HARTSVILLE, SC 29550Address
Unit: 2
EC#:N/A EE:N/AWRMO.:768917 CR:N/A
Repair Organizatlon PO No;Job No;etc.
Type Code Symbol Stamp: N/AAuthorization No.: N/AExpiration Date: N/A
4.
5.
Identification of System: Class:2 'SAFFTY IN.JFC1TION SYSTFM 2080
(a) Applicable Construction Code: B 31.1 Edition: 1967 Addenda:N/A Code CasEDesign Specification: N/A
(b) Applicable Edition of Section XI Used for Repair/Replacement Activity: 1995 Edition 1996 AddendaCode Case: N/A
i:N/A
6. Identification of Comoonents Reoaired or Replaced and Reolacement Comoonents
Name of Name of Manufacturer National Other Year Corrected, ASMEComponent Manufacturer Serial No. Board No. Identification Buii Removed, or Code
Installed Stamp(Yes orNo)
SI-870B Anchor Darling N/A N/A Valve Disc 1971 Removed N
SI-870B Anchor Darling N/A N/A Valve Disc 2005 Installed N
7. Description of Work: Replaced valve disc
8. Test Conducted: Hydrostatic I I Pneumatic L U Nominal Operating Pressure U-) Exempt [XJ
Other U. Pressure f[/4 psig Test Temp. IN/Al OF05-011
1Form NIS2 1995 Edition 1996 AddendaSECTION Xi DIVISION 1 9
FORM NIS-2 (Back)
. Sheet 2 of 2.
9. Remarks: See WO 768917 turnover DackaoeApplicable Manufacturer's Data Reports to be attached
CERTIFICATE OF COMPUANCE
I certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code, Section Xi.
Type Code Symbol Stamp N/A
Certificate 0LA"flhrztr+c4o NtA
Signed J ISI ENGINEER Date 10/17/2005Owner or Owner's Designee, Title
CERTIFICATE OF INSERVICE INSPECTION
1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the
State or Province of North Carolina and employed by HSBCT of HARTFORD. CONNECTICUT have
inspected the components described in this Owner's Report during the period 10/82005 to 10/17/2005 and state that to the
best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this
Owner's Report in accordance with the requirements of the ASME Code, Section Xi.
By signing this certificate neither the Inspector or his employer makes any warranty, expressed or Implied, concerning the
examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer
shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with
this inspection. _
) - | b sCommissions NC 1507National Board, State, Province, and Endorsements'1nspe�gn�u�re
Date: 1 0/1 7/2005
05411
1995 Edition 1996 Addenda APPENDIX II MANDATORY
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY
As Required by the! Provisions of the ASME Code Section Xi
OForm NIS 2
1. Owner PROGRESS ENERGY CAROLINAS. INCName
411 FAYETTEVILLE ST.. RALEIGH. NC 27602Address
2. Plant H.B.ROBINSONName
3581 WEST Entrance RD: HARTSVILLE. SC 29550Address
3. Work Performed by PROGRESS ENERGY CAROLINAS. INCName
3581 WEST ENTRANCE RD: HARTSVILLE. SC 29550
Date: 10/18/2005
Sheet: 1 of 2
Unit: 2
EC#:N/A EE:N/AWR/WO:61 5770 CR:NIA
Repair Organization PO No;Job No;etc.
Type Code Symbol Stamp: N/AAuthorization No.: N/AExpiration Date: NWA_ . . , .. , . . _ .
-
0
Address
4. Identification of System: Class:3 SERVICE WATER SYSTEM 4060
5. (a) Applicable Construction Code: B 31.1 Edition: 1967 Addenda:N/A Code Case:NfADesign Specification:
(b) Applicable Edition of Section Xi Used for Repair/Replacement Activity: 1995 Edition 1996 AddendaCode Case: N/A
6. Identification of Components Repaired or Replaced and Replacement Components
Name of Name of Manufacturer National Other Year Corrected, ASMEComponent Manufacturer Serial No. Board No. Identification Built Removed, or Code
Installed Stamp(Yes orNO)
SW-8 Allis Chalmers N/A N/A Butterfly Valve 1971 Removed N
SW-8 Allis Chalmers 01 N/A Butterfly Valve 2005 Installed N
7.
8.
Description of Work: Replaced valve
Test Conducted: Hydrostatic E Pneumatic L-] Nominal Operating Pressure fJ Exempt [1-
Other IVT-21 Pressure INOPI psig Test Temp. INOT! OF05-012
I
Form NIS2 1995 Edition 1996 AddendaSECTION Xi DIVISION 1
FORM NIS-2 (Back)Sheet 2 of 2.
9. Remarks: See WO 615770 turnover packaoe.Applicable Manufacturer's Data Reports to be attached
CERTIFICATE OF COMPLIANCE
I certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code. Section XI.
Type Code Symbol Stamp N/A
Certfficate pfAvVlz_ No. N/A
Signed A 4 ISI ENGINEER Date 10/18/2005Owner or Owner's Designee, Title
CERTIFICATE OF INSERVICE INSPECTION
I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the
State or Province of North Carolina and employed by HSBCT of HARTFORD. CONNECTICUT have
inspected the components described in this Owner's Report during the period 9/12/2005 to 10118/2005 and state that to the
best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this
Owner's Report In accordance with the requirements cf the ASME Code, Section Xi.
By signing this certificate neither the Inspector or his employer makes any warranty, expressed or Implied, concerning the
examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer
shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with
this inspection.
________Commissions NC 1507Inspect National Board, State, Province, and Endorsements
Date:10/18/2005
05-012
1995 Edition 1996 Addenda APPENDIX II MANDATORY
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY
As Required by the Provisions of the ASME Code Section Xi
Form NIS 2
1. Owner PROGRESS ENERGY CAROLINAS, !NCName
411 FAYETTEVILLE ST.. RALEIGH. NC 27602Address
2. Plant H.B.ROBINSONName
3581 WEST Entrance RD: HARTSVILLE, SC 29550Address
3. Work Performed by PROGRESS ENERGY CAROLINAS. INCName
3581 WEST ENTRANCE RD: HARTSVILLE, SC 29550
Date: 10/18/2005
Sheet: 1 of 2
Unit:_
FC#:NJA
2
FF4JJAAn . vrr _ _ _
wawn-;oso;:r fnI&IIAVWVW .'.:4i1 Ml.rm
Repair Organization PO No;Job No;etc.
Type Code Symbol Stamp: N/AAuthorization No.: N/AExpiration Date: NWA
Address
4. Identification of System: Class:3 SERVICE WATER SYSTEM 4060
5. (a) Applicable Construction Code: B 31.1 Edition: 1967 Addenda:N/A Code Case:NIADesign Specification:
(b) Applicable Edition of Section XI Used for Repair/Replacement Activity: 1995 Edition 1996 AddendaCode Case: N/A
6. IdentIfication of Components Repaired or Replaced and Replacement Components
Name of Name of Manufacturer National Other Year Corrected, ASMEComponent Manufacturer Serial No. Board No. Identification Built Removed, or Code
Installed Stamp(Yes orNo)
SW-7 Allis Chalmers N/A N/A Butterfly Valve 1971 Removed N
SW-7 Allis Chalmers 01 N/A Butterfly Valve 2005 Installed N
7.
8.
Description of Work: Replaced valve
Test Conducted: Hydrostatic U 1 Pneumatic U 1 Nominal Operating Pressure [g Exempt [-l
Other IVT-21 Pressure [NOPi psig Test Temp. INOTI *F05-013
Form NIS2 1995 Edition 1996 AddendaSECTION Xi DIVISION I
FC)RM NIS-2 (Back)Sheet 2 of 2.
9. Remarks: See WO 624261 turnover packaceApplicable Manufacturers Data Reports to be attached
CERTIFICATE OF COMPLIANCE
I certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code, Section Xi.
Type Code Symbol Stamp N/A
Certificatfato No. NIA
Signed I iSI ENGINEER Date 10/18/2005Owner or Owner's Designee, Title
CERTIFICATE OF INSERVICE INSPECTION
1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the
State or Province of North Carolina and employed by HSBCT of HARTFORD. CONNECTICUT have
inspected the components described in this Owner's Report during the period 9/13/2005 to 1011812005 and state that to the
best of my knowledge and belief. the Owner has performed examinations and taken corrective measures described in this
Owner's Report in accordance with the requirements of the ASME Code, Section XI.
By signing this certificate neither the Inspector or his employer makes any warranty, expressed or implied, conceming the
examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer
shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with
this inspection.
(_2.__ Commissions NC 1507Inspect3S ature National Board, State, Province, and Endorsements
Date:10/1812005
05-013
1995 Edition 1996 Addenda APPENDIX II MANDATORY
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY
As Required by the Provisions of the ASME Code Section Xi
* Form NIS 2
1. Owner PROGRESS ENERGY CAROLINAS. INCName
411 FAYETTEVILLE ST.. RALEIGH. NC 27602
no -* 4^114 0stnnncLU'al. I U? I UofUU.J
Sheet: 1 of 2Address
2. Plant H.B.ROBINSONName
3581 WEST Entrance RD: HARTSVILLE, SC .9550Address
3. Work Performed by PROGRESS ENERGY CAROLINAS. INCName
3581 WEST ENTRANCE RD: HARTSVILLE. SC 29550
Unit: 2
EC#:N/A EE:N/AWRMWO:651 737 CR:N/A
Repair Organization PO No;Job No;etc.
Type Code Symbol Stamp: NIAAuthorization No.: NIAExpiration Date: NIA
Address
4. Identification of System: Class:3 SERVICE WATER SYSTEM 4060
5. (a) ApplicableConstructionCode: B 31.1 Edition. 1967 Addenda:N/A Code Case N/ADesign Specification:
(b) Applicable Edition of Section Xi Used for Repair/Replacement Activity: 1995 Edition 1996 AddendaCode Case: N/A
6. Identification of Components Repaired or Reolaced and Replacement Components
Name of Name of Manufacturer National Other Year Corrected, ASMEComponent Manufacturer Serial No. Board No. Identifcation Built Removed, or Code
installed Stamp(Yes orNO)
SW-375 Crane N/A N/A Check Valve 1971 Removed N
SW-375 Crane N/A N/A Check Valve 1971 Installed N
7.
8.
Description of Work: Replaced Check Valve with rotating spare
Test Conducted: Hydrostatic U Pneumatic U. Nominal Operating Pressure LXJ Exempt [-]
Other [IVT-21 Pressure INOP! psig Test Temp. INOTI 'F05-014
Form NIS2 1995 Edition 1996 AddendaSECTION Xl DIVISION 1
FORM NIS-2 (Back)* Sheet 2 of 2.
9. Remarks: See W0651737 turnover packaae. Replacement valve previously at SW-374 location (ref WO 483464)Applicable Manufacturer's Data Reports to be attached
CERTIFICATE OF COMPLIANCE
I certify that the statements made In the report are correcit and this conforms to the requirements of the ASME Code, Section XI.
Type Code Symbol Stamp N/A
Certificate9LAueiftie o.a N/A
Signed ISI ENGINEER Date 10/1812005Owner or Owners Designee, Title
CERTIFICATE OF INSERVICE INSPECTION
I. the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the
State or Province of North Carolina and employed by HSBCT of HARTFORD. CONNECTICUT have
inspected the components descnbed in this Owners Report during the period 10/10/2005 to 10/18/2005 and state that to the
best of my knowledge and belief, the Owner has peiformed examinations and taken corrective measures described in this
Owner's Report in accordance with the requirements cf the ASME Code. Section Xl.
By signing this certificate neither the Inspector or his employer makes any warranty, expressed or implied, concerning the
examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer
shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with
this inspection.
__________Commissions NC 1507nspec sr re National Board, State. Province, and Endorsements
Date:10/18/2005
05-014
1995 Edition 1996 Addenda
i
APPENDIX II MANDATORY
FORM NIS-2 OWNER S REPORT FOR REPAIR/REPLACEMENT ACTIVITY
As Required by the Provisions of the ASME Code Section XI
Form NIS 2
I
1. Owner PROGRESS ENERGY CAROLINAS. INCName
411 FAYETTEVILLE ST.. RALEIGH. NC 2760:2Address
2. Plant H.B.ROBINSONName
3581 WEST Entrance RD: HARTSVILLE. SC 29550Address
3. Work Performed by PROGRESS ENERGY CAROLINAS. INCName
3581 WEST ENTRANCE RD: HARTSVILLE, SC 29550
Date: 10/18/2005----------
Sheet: 1 Of 2
Unit: 2
EC#:N/A EE:NJAWRNVO:189336 CR:N/A
Repair Organization PO No;Job No;etc.
Type Code Symbol Stamp: N/AAuthorization No.: N/AExpiration Date: N/A
Address
Identification of System: Class:34.
5.
9;ERVICE WATER SYSTEM 4060
(a) Applicable Construction Code: B 31.1 Edition: 1967 Addenda:N/A Code CaseDesign Specification: HBR2-12053
(b) Applicable Erition ot Section Xl Used for Repair/Replacement Activity: 1995 Edition 1996 AddendaCode Case: NIA
:NIA
It6. Identicaton o Coponents Repaired or Replaced and He l a 2cement Components
Name of Name of Manufacturer National Other Year Corrected, ASMEComponent Manufacturer Serial No. Board No. Identiication Buil Removed, or Code
Installed Stamp(Yes orNo)
SW-377 Crane N/A NWA Check Valve 1971 Removed N
SW-377 Crane N/A N/A Check Valve 1971 Installed N
7. Description of Work: Reolaced check valve with rotating spare
8. Test Conducted: Hydrostatic 1j Pneumatic IzJ Nominal Operating Pressure [XJ Exempt 1-]
Other rVT-21 Pressure fNOP1 psig Test Temp. [NOT] °F05-015
Form NIS2 1995 Edition 1996 AddendaSECTION Xl DIVISION 1 .
FORM NIS-2 (Back)Sheet 2 of 2.
9. Remarks: See WO 189336 turnover cackape. Reeplacement valve oreviouslv at SW-375 location (ref WO 651737)Applicable Manufacturer's Data Reports to be attached
CERTIFICATE OF COMPLIANCE
I certify that the statements made In the report are correct and this conforms to the requirements of the ASME Code, Section Xl.
Type Code Symbol Stamp NIA
Certificate &As= 0o. N/A
Signed ISI ENGINEER Date 10/1812005
Owner or Owners Designee, Title
CERTIFICATE OF INSERVICE INSPECTION
1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the
State or Province of North Carolina and employed by HSBCT of HARTFORD. CONNECTICUT have
inspected the components described in this Owner's Report during the period 9/14/2005 to 10/18/2005 and state that to the
best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this
Owner's Report in accordance with the requirements of the ASME Code, Section Xl.
By signing this certificate neither the Inspector or his employer makes any warranty, expressed or Implied, concerning the
examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer
shall be flable In any manner for any personal Injury or property damage or a loss of any kind arising from or connected with
this inspection.
__ __ Commissions NC 1507lnspect P*atur, National Board, State. Province, and Endorsemnets
Date:10/18/2005
05-015
V
1995 Edition 1996 Addenda
0APPENDIX II MANDATORY
FORM NIS-2 OWNER'S R:EPORT FOR REPAIR/REPLACEMENT ACTIVITY
As Required by the Provisions of the ASME Code Section Xi
Form NIS 2
1. Owner PROGRESS ENERGY CAROLINAS. INCName
411 FAYETTEVILLE ST.. RALEIGH, NC 27602
Date: 10/22/2005
Sheet: 1 of 4Address
Li R 3lRoIMOIkPd2. P1-4,n-lal f ,tn~ ~ _
Name
3581 WEST Entrance RD: HARTSVILLE, SC 29550Address
3. Work Performed by PROGRESS ENERGY CAROLINAS. INCName
3581 WEST ENTRANCE RD: HARTSVILLE, 'C 29550
Unit: 2
EC#:55731 EE:NIAWRIWO:665455 CR:11 1506
Repair Organization PO No;Job No;etc.
Type Code Symbol Stamp: N/AAuthnz7atinn No.: MIAExpiration Date: N/A
Address
1rla-CM-r-in -f C0-4m ^I- c4. f'VNILACL"NKMM1, (VfI IKIIt WAY=TFD OVC TFI Au"ilvi~vr Ul--sen.bascv~~~ I .. II~ VV W I cn I I -- CM v
5. (a) Applicable Construction Code: B 31.1 Edition: 1967 Addenda:N/A Code Case:N/ADesign Specification: GID/R87038/0003
(b) Applicable Edition of Section XI Used for Repair/Replacement Activity: 1995 Edition 1996 AddendaCode Case: N/A
6. tdentification of Components Repaired or ReF acet and Replacement Com ents -
Name of Name of Manufacturer National Other Year Corrected, ASMEComponent Manufacturer Serial No. Board No. Identificatbon Buit Removed, or Code
Installed Stamp(Yes orNo)
AC-7-34/2 Ebasco N/A N/A Support 1971 Corrected N
AC-7-38/16B Ebasco N/A N/A Restraint 1971 Corrected N
AC-8-35/7 Ebasco NWA NIA Restraint 1971 Corrected N
AC-8-35/23 Ebasco N/A N/A Restraint 1971 Corrected N
AC-8-35/24 Ebasco NA N/A Restraint 1971 Corrected N
AC-7-38B Ebasco N/A N/A Restraint 1971 Corrected N
. I _ . S - - -- - , -
7. Description of Work: Modified CCW system suicorts per EC 55731
8. Test Conducted: Hydrostatic LU Pneumatic L-U Nominal Operating Pressure 'LI Exempt fXJ
Other JVT-31 Pressure IN/Al psig Test Temp. [N/Al °F05-016
1995 Edition 1996 Addenda
0~APPENDIX II MANDATORY
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY
As Required by tho Provisions of the ASME Code Section Xi
Form NIS 2
1. Owner PROGRESS ENERGY CAROLINAS, INCName
411 FAYETTEVILLE ST.. RALEIGH. NC 27602Address
2. Plant H.B.ROBINSONName
3581 WEST Entrance RD: HARTSVILLE. SC 29550Address
3. Work Performed by PROGRESS ENERGY CAROLINAS. INCName
3581 WEST ENTRANCE RD: HARTSVILLE. SC 29550
Date: I 10010mr5. w vs--^avvz
Sheet: 2 of 4
Unit: 2
EC#:55731 EE:N/AWR/WO:665455 CR:1115 06
Repair OrganIzation PO No;Job No;etc.
Type Code Symbol Stamp: NIAAuthorization No.: NJAExpiration Date: N/A
4.
5.
Address
Identification of System: Class:2 C OMPONENT COOLING WATER SYSTEM 4080
(a) Applicable Construction Code: B 31.1 Edition: 1967 Addenda:N/A Code Case:N/ADesign Specification: GID/R87038/0003
(b) Applicable Edition of Section Xi Used for Repair/Replacement Activity: 1995 Edition 1996 AddendaCode Case: NIA
06. Identification of Comrnents Repaired or Replaced and Re lacement Components
Name of Name of Manufacturer National Other Year Corrected, ASMEComponent Manufacturer Seral No. Board No. Identification Built Renmoed, or Code
Installed Stamp(Yes orNo)
AC-8-H4 Ebasco N/A NIA Support 1971 Corrected N
AC-8-35122 Ebasco N/A N/A Restraint 1971 Corrected N
AC-7-3714 Ebasco N/A N/A Restraint 1971 Corrected N
AC-7-3 Ebasco N/A N/A Restraint 1971 Corrected N
AC-7-38J5J Ebasco NIA N/A Restraint 1971 Corrected N
AC-9-H15 Ebasco N/A NIA Support 1971 Corrected N
AC-9-H18 Ebasco N/A NIA Restraint 1971 Corrected N
AC-8-35110 Ebasco N/A N/A Restraint 1971 Removed N
AC-8-35/4 Ebasco N/A NIA Restraint 1971 Removed N
AC4-35/3 Ebasco N/A N/A Restraint 1971 Removed N
7. Description of Work: Modified CCW system supports oer EC 55731
8. Test Conducted: Hydrostatic U Pneumatic 1U. Nominal Operating Pressure Uj Exempt [XI
Other Dg.3] Pressure IN/A1 psig Test Temp. INIA) °F05-016
91995 Edition 1996 Addenda
.APPENDIX li MANDATORY
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY
As Required by tho Provisions of the ASME Code Section XI
Form NiS 2
1. Owner PROGRESS ENERGY CAROLINAS. INCName
411 FAYETTEVILLE ST.. RALEIGH. NC 27602Address
2. Plant H.B.ROBINSON
n%.#.- inio)9ftw;VQrasu. w -
Sheet: 3 of 4
Unit: 2Name
3581 WEST Entrance RD: HARTSVILLE. SC 29550Address
3. Work Performed by PROGRESS ENERGY CAROLINAS. INCName
3581 WEST ENTRANCE RD: HARTSVILLE, SC 29550
EC#:55731 EE:NIAWRIWO:665455 CR:1111506
Repair Organization PO No;Job No;etc.
Type Code Symbol Stamp. N/AAuthorizatinn Nno. NIA
_: _ .- :-Expiration Date: N/A
Address
Identification of System: Class:24.
5.
(,OMPONENT COOLING WATER SYSTEM 4080_ . _ .... _ . _ . . _ _ _ _ ... _ ... .. _ .. _ . _ . = ... . _ _
(a) Applicable Construction Code: B_31.1 Edition: 1967 Addenda:N/A Code Cas4Design Specification: GID1R87038/0003
(b) Applicable Edition of Section XI Used for Repair/Replacement Activity: 1995 Edition 1996 AddendaCode Case: N/A
;:N/A
6. Identification or conponents Hepaired or R aced and R acement Components
Name of Name of Manufacturer National Other Year Corrected, ASMEComponent Manufacturer Serial No. Board No. Identification Built Removed, or Code
Installed Stamp(Yes orNo)
AC-9-36/7 Ebasco N/A N/A Support 1971 Removed N
AC-7-37/1 1J Ebasco N/A N/A Restraint 1971 Removed N
AC-8-35/25 Ebasco N/A N/A Support 1971 Removed N
AC-8-343 Ebasco N/A N/A Restraint 1971 Removed N
AC-8-H10 Ebasco NIA N/A Support 1971 Removed N
AC-9-38Ff7 Ebasco N/A N/A Restraint 1971 Removed N
AC-9-38F/H4 Ebasco N/A N/A Restraint 1971 Removed N
AC-7-H15 Ebasco NIA N/A Restraint 1971 Removed N
AC-7-H2 Ebasco N/A N/A Restraint 1971 Removed N
AC-8-H11 Ebasco NIA N/A Support 1971 Removed N
7. Description of Work: Modified CCW system s ineorts per EC 55731
8. Test Conducted: Hydrostatic LI. Pneumatic fjj Nominal Operating Pressure U Exempt [XI
Other IT-31 Pressure [ /Al psig Test Temp. IN[Al °F05-016
Form NIS2 1995 Edition 1996 AddendaSECTION XI DIVISION 1
t
FORM NIS-2 (Back)Sheet 4 of 4.
9. Remarks: See WO 665455 and EC55731 turnover oackaaesApplicable Manufacturer's Data Reports to be attached
CERTIFICATE OF COMPUANCE
I certify that the statements made in the report are correc: and this conforms to he requirements of fee ASME Code, Section XI.
Type Code Symbol Stamp N/A
Certific ata No. N N/A
Signed 4 ISI ENGINEER Date 10/22/2005Owner or Owner's Designee, Title
CERTIFICATE OF INSERVICE INSPECTION
I. the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the
State or Province of North Carolina end employed by HSBCT of HARTFORD. CONNECTICUT have
inspected the components described in this Owners Report during the period 5/13/2005 to 10/22/2005 and state that to the
best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this
Owner's Report in accordance with the requirements of the ASME Code, Section XI.
By signing this certificate neither the Inspector or his employer makes any warranty, expressed or implied, concerning the
examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer
shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with
this inspection.
this inseCommissions NC 1507
Inspect s Spature National Board, State, Province, and Endorsements
Date:10/2212005
05.016
Form NIS 21995 Edition 1996 Addenda APPENDIX II MANDATORY
FORM NIS-2 OWNER'S REPORT FOR REPAIRIREPLACEMENT ACTIVITY
As Required by the Provisions of the ASME Code Section Xl
1. Owner PROGRESS ENERGY CAROLINAS. INCName
411 FAYETTEVILLE ST.. RALEIGH. NC 27602Address
2. Plant HKB.ROBINSONName
3581 WEST Entrance RD: HARTSVILLE. SC 29550Address
3. Work Performed by PROGRESS ENERGY CAROLINAS. INCName
35R1 WFST ENTRANCE RD, HARTSVILLF SC 29S50
n~i.-. I r0snrsBaby. w Woof two
Sheet: 1 Of 2
Unit: 2
EC#:62401 EE:NIAWR/WO:648715 CR:N/A
Repair Organization PO No;Job No;etc.
Type Code Symbol Stamp: N/AAuthorization No.: N/AExpiration Date: N/A
-- -----Address
4. Identification of System: Class:3 SERVICE WATER SYSTEM 4060
5. (a) Applicable Construction Code: B 31.1 Edition: 1967 Addenda:N/A Code Case:N/ADesign Specification: CPL-XXXX-M-001
(b) Applicable Edition of Section XI Used for Repair/Replacement Activity: 1995 Edition 1996 AddendaCode Case: NIA
6. Identification of Components Repaired or Replaced and Replacement Components
Name of Name of Manufacturer National Other Year Corrected, ASMEComponent Manufacturer Serial No. Board No. Identification Built Removed, or Code
Installed Stamp(Yes orNO)
S641B Maintenance N/A N/A Strainer bolting 1971 Removed N
S6-1B Mackson N/A N/A Strainer bolting 2005 Installed N
__
a _______________ a ________________ ________ a _____________
7.
8.
Description of Work: Replaced inlet and outlet Strainer Flange bolting
Test Conducted: Hydrostatic L I Pneumatic I) Nominal Operating Pressure L-] Exempt l-l
Other [1 Pressure f.W1 psig Test Temp. IN/Al OF
05-017
Form NIS2 1995 Edition 1996 AddendaSECTION Xl DIVISION 1
FORM NIS-2 (Back)Sheet 2 of L
9. Remarks: See WO 648715 turnover packaaeApplicable Manufacturer's Data Reports to be attached
CERTIFICATE OF COMPUANCE
I certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code, Section Xi.
Type Code Symbol Stamp N/A
Certificate f No. N/A
Signed S181 ENGINEER Date 10123/2005Owner or Owner's Designee, Title
CERTIFICATE OF INSERVICE INSPECTION
1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the
State or Province of North Carolina and employed by HSBCT of HARTFORD. CONNECTICUT have
inspected the components described In this Owner's Report during the period 1011/2005 to 10/23/2005 and state that to the
best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this
Owner's Report In accordance with the requirements of the ASME Code, Section XI.
By signing this certificate neither the Inspector or his employer makes any warranty, expressed or Implied, concerning the
examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer
shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with
this inspection.
(217_____ _ Commissions NC 1507lsp6g nature National Board, State, Province, and Endorsements
Date:10/23/2005
05-017
FormNIS 21995 Edition 1996 Addenda APPENDIX II MANDATORY
FORM MS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY
As ReqWired by tht? Provisions of the ASME Code Section XII - --
1. Owner PROGRESS ENERGY CAROLINAS. INCName
411 FAYElTEVILLE ST.. RALEIGH. NC 27602Address
2. Plant H.B.ROBINSONName
3581 WEST Entrance RD: HARTSVILLE, SC 29550Address
3. Work Performed by PROGRESS ENERGY CAROLINAS. INCName
3581 WEST ENTRANCE RD: HARTSVILLE. 'C 29550
Dat ta Ini"laonfWW. * vl - cvw
Sheet: 1 of 2
Unit: 2
EC#:N/A EE:N/AWR!WO:759301 CR:N/A
Repair Organization PO No;Job No;etc.
Type Code Symbol Stamp: N/AAuthorization No.: N/AExpiration Date: N/A
Address
Identification of System: Class:1 I4.
5.
FIEACTOR COOLANT SYSTEM 2005
(a) Applicable Construction Code: B 31.1 Edition: 1967 Addenda:N/A Code CaseDesign Specification: CPL-HBR2-M-048
(b) Appicable Edition of Section Xl Used for Repair/Replacement Activity 1995 EditIon 1996 AddendaCode Case: N-416-2
eN/A
6. Identification of Comoonents Renaired or Reolaced and Renlacement Comnonents
Name of Name of Manufacturer National Other Year Corrected, ASMEComponent Manufacturer Serial No. Board No. Idertification Buift Removed, or Code
Installed Stamp(Yes orNo)
RC-525 Edwards N/A N/A Globe valve 2004 Removed N
RC-525 Edwards N/A N/A Globe valve 2005 Installed N
Piping Dubose N/A N/A 3/4'-RC-28A 2004 Removed N
Piping Dubose N/A NIA 3/4--RC-28A 2005 Installed N
I I 4 I.
7. Description of Work: Replaced valve and piping
8. Test Conducted: Hydrostatic [1d Pneumatic U Nominal Operating Pressure IX] Exempt (-J
Other IVT-21 Pressure [NOPl psig Test Temp. [NOT! F05-018
Form NIS2 1995 Edition 1996 AddendaSECTION Xi DIVISION 1
FORM NIS-2 (Back)Sheet 2 of 2.
9. Remarks: See WO 697587 turnover packaoeApplicable Manufacturer's Data Reports to be attached
CERTIFICATE OF COMPUANCE
I certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code, Section Xi.
Type Code Symbol Stamp N/A
Certifilal No. NIA
Sigred A ISI ENGINEER Date 0 0Owner or Owners Designee, Title
CERTIFICATE OF INSERVICE INSPECTION
1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the
State or Province of North Carolina and employed by HSBCT of HARTFORD. CONNECTICUT have
inspected the components described in this Owner's Report during the period 9/23/2005 to 10/24/2005 and state that to the
best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this
Owner's Report in accordance with the requirements of the ASME Code, Section XI.
By signing this certificate neither the Inspector or his employer makes any warranty, expressed or implied, concerning the
examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer
shall be liable In any manner for any personal injury or property damage or a loss of any kind arising from or connected with
this inspection.
________Commissions NC 1507S?6alu e National Board, State, Province, and Endorsements
Date:10/2412005
0-01 8
1995 Edition 1996 Addenda APPENDIX II MANDATORY
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY
As Required by the Provisions of the ASME Code Section Xi
Form NIS 2
1. Owner PROGRESS ENERGY CAROLINAS. INCName
411 FAYETTEVILLE ST.. RALEIGH. NC 27602Address
2. Plant H.B.ROBINSONName
3581 WEST Entrance RD: HARTSVILLE, SC .9550Address
3. Work Performed by PROGRESS ENERGY CAROLINAS. INCName
3581 WEST ENTRANCE RD: HARTSVILLE. SC 29550
na4- 4 flrI'flA3.'-L,.. EwaLk.
Sheet: 1 Of 2
Unit: 2
EC#:N/A EE:N/AWRIWO:664068 CR:NtA
Repair Organization PO No;Job No;etc.
Type Code Symbol Stamp: N/AAuthorizaton No.: N/AExpiration Date: NtA
Address
Identification of System: Class:24.
S.
CACL-rV IKI Or'TlKI 0V0TFrU oN'tar0-1 .. llvv�� I IWI. %�- I %11. -...
(a) Applicable Construction Code: B 31.1 Edition: 1967 AddendaN/A Code CaseDesign Specification: CPL-HBR2-M-048
(b) Applicable Edition of Section Xl Used for Repair/Replacement Activity. 1995 Edition 1996 AddendaCode Case: N-416-2
e:NlA
6. Identification of Components Repaired or Repiaced and Replacement Components
Narmeof Name of Manufacturer National Other Year Corrected. ASMEComponent Manufacturer Serial No. Board No. Identification Built Removed, or Code
Installed Stamp(Yes orNo)
Si-873A Edwards N/A N/A Check valve 1971 Removed N
Sl-873A Edwards 40BCG N/A Check valve 2005 Installed N
Piping Ebasco NIA N/A 2-SI-65 1971 Removed N
Piping Dubose N/A NWA 2-SI-65 2005 Installed N
7. Description of Work: Replaced valve and pine pieces
8. Test Conducted: Hydrostatic LIj Pneumatic 1 1 Nominal Operating Pressure QXJ Exempt (-]
Other [EPT Pressure lN~'PJ psig Test Temp. [WOTI °F05-019
- s1Form NIS2 1995 Edition 1996 Addenda
SECTION Xi DIVISION 1
FORM NIS-2 (Back)Sheet 2 of 2.
9. Remarks: See WO 664068 turnover packace.Applicable Marufacturer's Data Reports to be attached
CERTIFICATE OF COMPUANCE
I certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code, Section Xl.
Type Code Symbol Stamp N/A
Certificate pLAthem No. N/A
Signed ISI ENGINEER Date 10/23/2005Owner or Owner's Designee, Title
CERTIFICATE OF INSERVICE INSPECTION
1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the
State or Province of North Carolina and employed by HSBCT of HARTFORD. CONNECTICUT have
inspected the components described in this Owner's Report during the period 9/13/2005 to 10/2312005 and state that to the
best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this
Owner's Report in accordance with the requirements cif the ASME Code, Section Xl.
By signing this certificate neither the Inspector or his employer makes any warranty, expressed or implied, concerning the
examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer
shall be liable in any manner for any personal Injury or property damage or a loss of any kind arising from or connected with
this inspection.
________Commissions NC 1507nsp 's tgnature National Board, State, Province, and Endorsements
Date:10/23/2005
05-019
Form NIS 2
.1995 Edition 1996 Addenda APPENDIX II MANDATORY
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY
As Required by the Provisions of the ASME Code Section XiI
1. Owner PROGRESS ENERGY CAROLINASJ INGName
411 FAYETTEVILLE ST.. RALEIGH. NC 27602Address
2. Plant H.B.ROBINSONName
3581 WEST Entrance RD: HARTSVILLE, SC' 29550Address
3. Work Performed by PROGRESS ENERGY CAROLINAS. INCName
3581 WEST ENTRANCE RD: HARTSVILLE. SC 29550
Date: 10/25/2005
Sheet:
Unit:-
1 of 2
2
EC#:N/A EE:NfAWRMWO:581883 CR:N/A
Repair Organization PO NoWJob No:etc.
Type Code Symbol Stamp: NIAAuthorization No.: N/AExpiration Date: N/A
Address
Identification of System: Class:24.
5.
r-LJ~Alf'Ad AKfl Vnl~i I IP&A= fYrdT~elI QVQT=&R Orn1. - . -- '. - - - . - - - -
(a) Applicable Construction Code: B31.1 Edition: 1967 Addenda:N.A Code CaseDesign Specification: 883D391
(b) Applicable Edition o Section Xl Used for Repair/Replacement Activity: 1995 Edition 1996 AddendaCode Case: N-416-2
:N/A
06. Identition d Components Hepaired or Heplaced and Heplacement uompnents
Name of Name of Manufacturer National Other Year Corrected, ASMEComponent Manufacturer Serial No. Board No. Identification Built Removed, or Code
Installed Stamp(Yes orNo)
LTDN- Westinghouse N/A N/A Restricting orifice 1971 Removed NORIFICE-ALTDN- Energy Steel & N/A N/A Restricting orifice 2005 Installed NORIFICE-A Supply
7. Description of Work: Replaced 'A' Letdown restricting orifice
8. Test Conducted: Hydrostatic I Pneumatic U ] Nominal Operating Pressure %J Exempt (-I
Other IVT-21 Pressure [NOPI psig Test Temp. INOTI 0F05-020
0
Form NIS2 1995 Edition 1996 AddendaSECTION Xi DIVISION 1
FORM NIS-2 (Back)0 Sheet 2 of 2.
9. Remarks: See WO 581883 turnover packageApplicable Manufacturer's Data Reports to be attached
CERTHIrCATE OF COMPLIANCE
I certify that the statements made In the report are correct and this conforms to the requirements of the ASME Code, Section Xl.
Type Code Symbol Stamp N/A
Certificate o0 e Yo. N/A
Signed 4 ISI ENGINEER Date 1012512005Owner or Owner's Designee, rifle
CERTIFICATE OF INSERVICE INSPECTION
1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the
State or Province of North Carolina and employed by HSBCT of HARTFORD. CONNECTICUT have
inspected the components described In this Owner's Report during the period 11/16/2004 to 10125/2005 and state that to the
best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this
Owner's Report In accordance with the requirements of the ASME Code, Section Xl.
By signing this certificate neither the Inspector or his employer makes any warranty, expressed or implied, concerning the
examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer
shall be liable in any manner for any personal Injury or property damage or a loss of any kind arising from or connected with
this inspection.
/ pAAg; c_ ___GCommissions NC 1507Inspect ture National Board, State, Province, and Endorsements
Date:10125/2005
05020
1995 Edition 1996 Addenda APPENDIX II MANDATORY
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY
As Required by the Provisions of the ASME Code Section XI
FForm NIS 2
1. Owner PROGRESS ENERGY CAROLINAS. INCName
411 FAYETTEVILLE ST.. RALEIGH. NC 27602Address
2. Plant H.B.ROBINSONName
3581 WEST Entrance RD; HARTSVILLE. SC 29550Address
3. Work Performed by PROGRESS ENERGY CAROLINAS. INC
n11.1 1 fliY;)N%Uutu. wcwcwv
Sheet: 1 of 2
Unit: 2
EC#:51 861 EE:NAWR/WO:534701 CR:N/A
Repair Organization PO No-Job No;etc.
Type Code Symbol Stamp: NAAuthorization No.: N/AExdration Data: NIA
NameS5R1 WFST ENTRANCE RD: HARTSVILLE SC 2'5wO- ----- _Y.. _.._. . _._. _ . _ . .
_ . _
4.
5.
Address
Identification of System: Class:3 C OMPONENT COOLING WATER SYSTEM 4060
(a) Applicable Construction Code: B 31.1 Edition: 1967 Addenda:NlA Code Case:NlADesign Specification: CPL-HBR2-M-26
(b) Applicable Edition of Section XI Used for Repair/Replacement Activity: 1995 Edition 1996 AddendaCode Case: N-416-2
Identification of flnmnnnants Rpnaired or Rpnlaacd and Ronlanpmant Comnonents6
Name of Name of Manufacturer National Other Year Corrected. ASMEComponent Manufacturer Serial No. Board No. Wdentificatlon BuIlt Removed, or Code
Installed Stamp(Yes orNo)
CC-738 Ebasco N/A N/A Check Valve 1971 Removed N
CC-738 Velan 50S N/A Check Valve 2004 Installed N
7.
8.
Description of Work: Replacing valve
Test Conducted: Hydrostatic U Pneumatic U-) Nominal Operating Pressure EXJ Exempt [-J
Other [VT-21 Pressure MNOPM psig Test Temp. I[NOT OF05-021
Form NIS2 1995 Edition 1996 AddendaSECTION Xl DIVISION 1
FORM NIS-2 (Back)Sheet 2 of 2.
9. Remarks: See WO 534701 turnover packageApplicable Manufacturer's Data Reports to be attached
CERTIFICATE OF COMPLIANCE
I certify that the statements made In the report are correct and this conforms to the requirements of the ASME Code, Section Xi.
Type Code Symbol Stamp N/A
Certificate k n No. N/A
Signed - ISI ENGINEER Date 10/25/2004Owner or Owner's Designee, Tile
CERTIFICATE OF INSERVICE INSPECTION
1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the
State or Province of North Carolina and employed by I-SBCT of HARTFORD. CONNECTICUT have
inspected the components described In this Owner's Report during the period 4/15/2004 to 10/25/2004 and state that to the
best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this
Owner's Report in accordance with the requirements of the ASME Code, Section Xi.
By signing this certificate neither the Inspector or his employer makes any warranty, expressed or implied, concerning the
examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer
shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with
this inspection.
G ______ Commissions NC 1507In" Sgnature National Board, State, Province, and Eniorsements
Date:10/25/2004
05-021
>r- %
I1995 Edition 1996 Addenda APPENDIX II MANDATORY
FORM NIS-2 OWNER'S RElPORT FOR REPAIRIREPLACEMENT ACTIVITY
As Required by thep Provisions of the ASME Code Section Xi
FormNIS2
1. Owner PROGRESS ENERGY CAROLINAS. INCName
411 FAYETTEVILLE ST.. RALEIGH. NC 2760:2Address
2. Plant H.B.ROBINSONName
3581 WEST Entrance RD: HARTSVILLE, SC 29550Address
3. Work Performed by PROGRESS ENERGY CAROLINAS. INCName
3581 WEST ENTRANCE RD: HARTSVILLE. ;C 29550
Date: 1217/2005
Sheet: 1 of 2
Unit:_ 2
EC#:56266 EE:NIAWRWO:6191461619161 CR:NtA
Repair Organization PO No;Job No;etc.
Type Code Symbol Stamp:. NtAAuthorization No.: NWAExpiration Date: N/A
4.
S.
Address
Identification of System: Class:1 REACTOR COOLANT SYSTEM 2005
(a) Applicable Construction Code: ASME III Edition: 1965 Addenda:NlA Code Case:N/ADesign Specification: 418A12
(b) Applicable Edition of Section Xl Used for Repair/Replacement Activity: 1995 Edition 1996 AddendaCode Case: N/A
.W
6. Identirt or caGponens Repaired or aeplaced and Heacement Components
Name of Name of Manufacturer National Other Year Corrected. ASMEComponent Manufacturer Serial No. Board No. Identification Built Removed, or Code
Installed Stamp(Yes orNO)
1-RC-2501R- Westinghouse NIA N/A RVUS Piping 1971 Removed N991-RC-2501R- Westinghouse N/A N/A RVUS Piping 2005 Installed N99
3t4-RC- Westing house N/A N/A RPV Head Vent 1971 Removed N2501 R-27 piping_3/4-RC- Westinghouse N/A N/A RPV Head Vent 2005 Installed N2501R-27 PipingRC-578 Ebasco N/A N/A Valve 1971 Removed N
7. Description of Work: Replaced RVUS and Head Vent piping and fittinas as part of RPV Head Replacement
8. Test Conducted: Hydrostatic L-] Pneumatic frI Nominal Operating Pressure ri Exempt pq
Other L Pressure [WLAJ psig Test Temp. INtA] 0F05.022
Form NIS2 1995 Edition 1996 AddendaSECTION XI DIVISION 1
S
FORM NIS-2 (Back)Sheet 2 of 2
9. Remarks: See WO 619146/619151 and EC 56266 turnover PackaaesApplicable Manufacturer's Data Reports to be attached
CERTIFICATE OF COMPLIANCE
I certify that the statements made in the report are correci: and this conforms to the requirements of the ASME Code, Section Xl.
Type Code Symbol Stamp N/A
Certificate d As zibeiiaeo. N/A
Sitned % IMrI FNGINFFR Date 19fli7/2S;
Owner or Owner's Designee, Title
CERTIFICATE OF INSERVICE INSPECTION
I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the
State or Province of North Carolina and employed by HSBCT of HARTFORD. CONNECTICUT have
inspected the components described in this Owner's Report during the period 9/21/2005 to 12/7/2005 and state that to the
best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this
Owner's Report in accordance with the requirements of the ASME Code, Section Xl.
By signing this certificate neither the Inspector or his; employer makes any warranty, expressed or Implied, concerning the
examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer
shall be liable In any manner for any personal injury C; property damage or a loss of any kind arising from or connected with
this inspection.
/72 u ( Commissions NC 1507
0
- nspect 5s S~l6nature National Board, State, Province, and Endorsements
Date:12/712005
05-022
eForm NIS 21995 Edition 1996 Addenda APPENDIX II MANDATORY
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY
As Required by the Provisions of the ASME Code Section Xl1�111
1. Owner PROGRESS ENERGY CAROLINAS, INCName
411 FAYETTEVILLE ST.. RALEIGH. NC 27602Address
2. Plant H.B.ROBINSON
Date: I fIOPnnfl'. | W - W - VVO
Sheet: 1 Of 2
Unit: 2Name
3581 WEST Entrance RD: HARTSVILLE, SC 29550Address
3. Work Performed by PROGRESS ENERGY CA!ROLINAS. INCName
3581 WEST ENTRANCE RD: HARTSVILLE. ;C 29550
EC#:56266 EE:N/AWRIWO:558600 CR:N/A
Repair Organization PO No:Job No;etc.
Type Code Symbol Stamp: N/AAuthorization No.: N/AExpiration Date: N/A
4.
5.
Address
Identification of System: Class:1 REACTOR VESSEL 1005
(a) Applicable Construction Code: ASME ll Edition: 1998 Addenda:2000 Code CaseDesign Specification: 418A12
(b) Applicable Edition of Section XI Used for Repair/Replacement Activity: 1995 Edition 1996 AddendaCode Case: N/A
e:N-525
6. Identifieation of Comnonnnntq Rpnairert nr Ranlacrpti and Renlanamont rnmonnentaq
Name of Name of Manufacturer National Other Year Corrected, ASMEComponent Manufacturer Seriat No. Board No. Identfication Built Removed, or Code
Installed Stamp(Yes orNo)
RPV Head Westinghouse 66109 2928 N/A 1971 Removed Y
RPV Head Westinghouse B-VH-N12 5853 N/A 2005 Installed Y
. .
7. Description of Work: Redlaced RPV Head
8. Test Conducted: Hydrostatic L-1 Pneumatic U.. Nominal Operating Pressure LXJ Exempt H-
Other IVT-21 Pressure iNOPI psig Test Temp. MNOT °F05-023
I -If II '�51
Form NIS2 1995 Edition 1996 AddendaSECTION Xl DIVISION 1
FORM NIS-2 (Back)Sheet 2 of 2.
9. Remarks: See Form N-2 for NB Number 5853 (Attached)Applicable Manufacturer's Data Reports to be attached
CERTIFICATE OF COMPLIANCE
I certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code, Section Xi.
Type Code Symbol Stamp N/A
Certificate 0 No. N/A
Signed 4 4m- IS ISI ENGINEER Date 10/26/2005Owner or Owner's Designee, Title
CERTIFICATE OF INSERVICE INSPECTION
1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the
State or Province of North Carolina and employed by HSBCT of HARTFORD. CONNECTICUT have
inspected the components described in this Owner's Report during the period 9/21/2005 to 10/26/2005 and state that to the
best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this
Owner's Report in accordance with the requirements of the ASME Code, Section Xi.
By signing this certificate neither the Inspector or his employer makes any warranty, expressed or Implied, concerning the
examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer
shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with
this inspection.
>___a__ _Commissions NC 1507Ins ore Signature National Board, State, Province, and Endorsements
Date:10/2612005
05-023
|Record No.I -ioH-- -0-FORM N-2 CERTIFICATE HOLDERS' DATA REPORT FOR IDENTICAL
NUCLEAR PARTS AND APPURTENANCESAs Required by the Provisions of the ASME Code, Section L
Not to Exceed One Day's ProductionPg.1 Iof
1. Manulacture andoerfed by MITSUBISHI HEAW IIWSTRIES, LTD. KOBE SHIPYARD & MACHINERY WORKS1t-, WADASAIt1CHO 1l.CHOME, HYOGO-KU, KOBE 652-8585 JAPANmsnead ma ms dNPTcMIs Holda4
2. Manufacred for PROGRESS NEtRGYCAROUNAS. UJC./POWGRESS ENERGYSERVICE C0JPANY LC 411 Flvie ~ MauL 9aP, Nno2760- ui addrss of pu4hant
3. Location ot Insallation H.B. Robinson Nudear Power leneration Faclity Urnt 2 3851 West Entrance Rord Hattviile, SC USA 29550(- -ii ad-m
4. Type L5IDS001 Rsv.2 SA508 Gr.3 CLI 80 to 105 ksl -L5-01 DS =0 Rev.2 2005__ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Wavf no.) (eana. Spo.) Dona* ,trPm (11 (tt4
6. ASME Code, Section II. Division1: 1998 AOO 1 N525(4 dda dd a Ic.C m)
6. Fabricated In accordance with ConsL Spec. (Dv.2 only) - evislon - Datetno
7. Remarks: 45 control rod drive mechanism (CRDMl oenetratons. 45 CRDM assembles.2 vaent ninnw (one for RVHVS. ona fne RVIS). 45 nIlda funnALq. Intemart Cdaddna 2 dosura h PartA kavwavs- 2 einsura head Mifinn hij s8 ioud SuPport structu O throuch-holes for i
5._ __ . .. _ . _. _ yy_. y . �w,-
8. Non. thickness (n) 7.95 Mn. desIgn thickness In.) 7.76 Dia.lD(ft&In.) 12'4.8" Laengthoverall(ftIn.) 28'7.19'
9. Whonpplicabe. Cercate Holders' Data Repons re attached for each Item of this report
Part orApputtenancePart or Appurtenance
Serial Number
13"'H_12
NationalBoard No.
In Numerical Order
853 _(1)12)(3)(4)(5)(6)O')(8)(1)
(11)12)
(13)(14)(16)
(16)(17)(18)
(19)(2)(21)(22)
(23)(24)
M
I_-
below blankI
I 1 I-A CRDMassembly cons of the toowing.
- Pressure housing essembly- Latch housIng- Rod travel housing
4 fiux ings- Latch assembly
NationalPaIt or Appurtenance Board No.
Serial Number In Numerical Order
826)
(2 7) , _ _ __._._ _ _ __. _
#29)t30)
t32)(331 _ _ _ _ _ _
4) _ _ _ _ _ _ _ _
(35) _ _ _ _ _ _
(37) -. _.
(381
40) _ _41)i __ _ __ _ __ _ __ _
42) .r._ _ _ _ _ _ _ _ _ _ _ _
(43) . _ _ _ _ _ _
(44) __ _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _
(45)__ _ _ _ _ _ _ _
(46) - _ _ _ _ _ _ _
(47) _ _ _ _ _ _ _ _ _
49) __ _ _ __ _ _ _ __ _ _ _
(5 )_ _ _ _ _ _ _ _ _ ___________________________________________I_____________________.
10. Design pressure 2500 psal Temp. 650 *F. Hydro. Test pressure 3205 pa. at imp. 68 'F.C 2485 PuWl C P3le.)
Suepnltmel Intrxrrna intheoinn olfits, skches, orsdrawinsmay beused proided (I) sze Is 3 'auxt, (2) normatonintes 2and 3ontis Da Report
Is Inctuded on each rea. (3) each sheet Is nubetred and ihe mumabr of sheet Is recorded at the top of thls form.
(7198) This form (EOOD40) may be obtained frorm the Order Dept., ASME. 22 Law DrIve. Box 2300. Fairfeld. NJ 07007-2300
RRVCIr PECI RB.Robinsotr2 t P.O.3382 0039I MMI Section 2 - Page I
FORM N-2 (Back - Pg 2 of _;j
Certificate Holder's SWral Nos. _ -VH-N12 through
CERT11:CATION OF DESIGN
Design specifications cerfied by Harshad C. Jambusarla P.E. State SC Reg. no. 20824
Design report, certified by DulaOC. Bhominck PE State SC Reg. no. 21082
CERTIFICATE OF COMPUANCE
Reactor Vessel Closure Head with 45 Control RodWe certify that the statements made In this report are correct and that this (these) Drive Mechanismconforms to the rules of construction of the ASME Code, Serxn M, Division t.
NPT Certificate ofAuthorization No. N-2327 Evpires December a,2007
MtTSUBISHI HEAWI INDUSTRIES, LTD.Date k (rO oS Name KOBESHIPYARD&MACHINERYWORKS Signed _ _ _ _ __ _ _ _
INPT CWIF.Mte Hol
CERTIFICATE OF INSPECTION
1. the undersigned, holding a valid corwmlsion Issued by tie National Board of Boiler and Pressure Vassel Inspectors and the State orProvince Of PA and employed by HARTFORD STEAM BOILER OF CONNECTICUT
of HiTFORD. CT have inspected these Items described in tis Data Report on MAY 10.2005 , andstate that to the best of my knowledge and belief, the Certificade Holder has fabricated these parts or appurtenances In accordance with theASME Code, Section M, Division 1. Each part listed has been authorized for stamping on the date shown above.By signing this certificates, neither the Inspector nor his employer makes any wanenty, expressed or implied, concerning the equipment
described in thts Data ReporL Furthermore, neither the hispector nor his employer shall be liable In any manner for any personal biury orproperty damage or loss of any kind arising from or connected with this pectiorn.
Date / y /O4oO S' Signed Commissions Rt,&A3) o ,Z 39-:t4c I. Pd, endorh) wid or powd no.
RRVCtr PEC I IBRobinson-2 t P.0.3382-0039 1 MIS 2Section 2 - Page 2
r
FORM N-2 (3 of
C Certificate Holder's Serial Nos. B-VHWNI2 Uttough -
Manufactured for PROGRESS ENERGY CAROUNAS. INC. IPROGRESS ENERGY SEX COMIPANY. tiC 411 Fawlee S. Mli.t Raln. Cic 27D2Van* ld ress d g prchaint
Location of instafation H.B. Robinson Nuclear Power Generation Facility Urit 2 3851 West Entrance Road Harvt-le, SC USA 29560#Wmi. aid addmess
RHVCHW PEC I HiRRobinson-2 I P.0.3382-00391 MHI Section 2 - Page 3
jm,'� , ,
e1995 Edition 1996 Addenda APPENDIX It MANDATORY
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY
As Required by the Provisions of the ASME Code Section Xl
Form NIS 2
1. Owner PROGRESS ENERGY CAROLINAS. INCName
411 FAYETTEVILLE ST., RALEIGH. NC 2760
Date: 1 1/ S/2005nrw. . ,. ,<
Sheet: 1 of 3Address
Li D Dt^0lhI.I1^K12. PPi -0�K I
Name
3581 WEST Entrance RD: HARTSVILLE, SC 29550Address
3. Work Performed by PROGRESS ENERGY CAROLINAS. INCName
3581 WEST ENTRANCE RD: HARTSVILLE, SC 29550Address
Unit: 2
EC#:58305 EE:N/AWR/WO:564296 CR:N/A
Repair Organization PO No;Job No~etc.
Type Code Symbol Stamp: N/AAuthorization No.: NWAExpiration Date: NWA
4.
5.
Identification of System: Class:3 I1'.A13DI% i&jrT (ttV IKf- VATFr 0V0TSrU ANrbn�W-v W-11- .. - �rl � I � I ""I 1�v
(a) Applicable Construction Code: B 31.1 Edition: 1967 Addenda:N/A Code CaseDesign Specification: N/A
(b) Applicable Edition of Section Xl Used for lepair/Replacement Activity: 1995 Edition 1996 AddendaCode Case: N-416-2
:N/A
6. Identifi ation of Componen Repaired or acedand Replacement Components
Name of Name of Manufacturer National Other Year Corrected, ASMEComponent Manufacturer Serial No. Board No. Identification Bunt Removed, or Code
Installed Stamp(Yes orNo)
FI-660 Ebasco N/A NWA Flow Indicator 1971 Removed N
Fl-660 Brooks N/A N/A Flow Indicator 2005 Installed N
FE-660 Ebasco N/A N/A Flow Element 1971 Removed N
CC-934 Velan 05-003-1 N/A Globe Valve 2005 Installed N
CC-734A Ebasco NVA N/A Globe Valve 1971 Removed N
CC-734A Velan MMOO84 N/A Globe Valve 2005 Installed N
7. Description of Work: Modifvina piving section and relocatinq FI-660
8. Test Conducted: Hydrostatic L ] Pneumatic [ 1 Nominal Operating Pressure W Exempt 'X]
Other VT21 Pressure INOPI psig Test Temp. [NOT] °F05024
e1995 Edition 1996 Addenda APPENDIX II MANDATORY
FORM NIS-2 OWNER'S REPORT FOR REPAIRIREPLACEMENT ACTIVITY
As Required by the Provisions of the ASME Code Section Xi
Form NIS 2
1. Owner PROGRESS ENERGY CAROLINAS. INCName
411 FAYETTEVILLE ST.. RALEIGH. NC 27602Address
2. Plant H.B.ROBINSON
n.#-. 41 1 .1MrnrI #I 1-�
Sheet: 2 of 3
Unit:_ 2Name
3581 WEST Entrance RD: HARTSVILLE. SC 29550Address
3. Work Performed by PROGRESS ENERGY CAROLINAS. INCName
3581 WEST ENTRANCE RD: HARTSVILLE, SC 29550
EC4:58305 EE:N/AWRIWO:564296 CR:N1A
Repair Organization PO NoJob No;etc.
Type Code Symbol Stamp: N/AAuthorization No.: N/AExpiration Date: NWA
Address
Identification of System: Class:34.
5.
COMPONENT COOLING WATER SYSTEM 408Q
(a) ApplicableConstructionCode: B3.1 Edition: 1967 Addenda:N/A Code CaseDesign Specification: N/A
(b) Applicable Edition of Section Xl Used for Repair/Replacement Activity: 1995 Edition 1996 AddendaCode Case: N-416-2
:NtA
6. Identification of Components Repaired or Hep-- and Repacement Componts-
Name of Name of Manufacturer National Other Year Corrected, ASMEComponent Manufacturer Serial No. Board No. Identificaton Built Removed, or Code
Installed Stamp(Yes orNo)
CC-734B Ebasco NIA N/A Globe Valve 1971 Removed N
CC-734B Velan MMOOB4 NIA Globe Valve 2005 Installed N
3-AC-152N- Ebasco N/A N/A 3 Piping 1971 Removed N
3-AC-152N- Maintenance N/A NIA 3" Piping 2005 Installed N
2-AC-152N Ebasco N/A N/A 2" Piping 1971 Removed N
2-AC-152N Maintenance N/A N/A 2 Piping 2005 Installed N
7. Description of Work: Modifying vivino section and relocating FI-660
8. Test Conducted: Hydrostatic H Pneumatic U1 Nominal Operating Pressure [X Exempt [XJ
Other IVT-21 Pressure 1N0P] psig Test Temp. (NOT] OF05-024
Form NIS2 1995 Edition 1996 AddendaSECTION XI DIVISION 1
FC)RM NIS-2 (Back)Am Sheet 3 of 3.
9. Remarks: See WO 564296/EC58305 turnover packaaesApplicable Manufacturer's Data Reports to be attached
CERTIFICATE OF COMPUANCE
I cerfify that the statements made In the report are correct and this conforms to the requirements of the ASME Code, Section XI.
Type Code Symbol Stamp N/A
Certificate = zao. N/A
Signed A ISI ENGINEER Date 11/16/2 5Owner or Owner's Designee, Title
CERTIFICATE OF INSERVICE INSPECTION
1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the
State or Province of North Carolina and employed by HSBCT of HARTFORD. CONNECTICUT have
inspected the components described in this Owners Report during the period 9/19/2005 to 11/1612005 and state that to the
best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this
Owner's Report in accordance with the requirements c the ASME Code, Section XI.
By signing this certificate neither the Inspector or his employer makes any warranty, expressed or implied, concerning the
examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer
shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with
this inspection.
° 0 6. Commissions NC 1507InsW ofSinature National Board, State. Province, and Endorsements
Date:1 1116/2005
05-024
1995 Edition 1996 Addenda
.APPENDIX II MANDATORY
FORM NIS-2 OWNER'S REPORT FOR REPAIRIREPLACEMENT ACTIVITY
As Required by the Provisions of the ASME Code Section XI
Form NiS 2
I - --
1. Owner PROGRESS ENERGY CAROLIN!S. INCName
411 FAYETTEVILLE ST.. RALEIGH, NC 27602Address
2. Plant H.B.ROBINSONName
3581 WEST Entrance RD: HARTSVILLE, SC 29550Address
3. Work Performed by PROGRESS ENERGY CAROLINAS, INCName
3581 WES(T FNTRANCE RD: HARTSVI I F 2 RC 95509;A
na#- I1 It PonlonnizJOl*. I IM-
Sheet: I of 2
Unit: 2
EC#:N/A EE:NIAWR/WO:767472 CR:N/A
Repair Organization PO No;Job No;etc.
Type Code Symbol Stamrp; NIAAi thriMatinn No NIA
I....r.a..i Da...Expiration Date:, N/A--- , ---- -- -- -----
4.
5.
Address
Identification of System: Class:2 MAIN STEAM SYSTEM 3020
(a) Applicable Construction Code: AISC Edition: NIA Addenda:NJA Code Case:N/ADesign Specification:
(b) Applicable Edition of Section XI Used for Repair/Replacement Activity: 1995 Editon 1996 AddendaCode Case: N/A
Identifiticaifn of Comoonents Renairnd or Reoilacrd and Rdanpement onmoonents6.
Name of Name of Manufacturer National Other Year Corrected. ASMEComponent Manufacturer Serial No. Board No. Identification Built Removed, or Code
Installed Stamp(Yes orNo)
213iF-WS Ebasco N/A N/A Piping restraint 1971 Corrected N_ _ _ _ _ _ _ _ _ _M S-11B-b _ _ _
7.
8.
Description of Work: Weld repair of restraint structure stiffener plate
Test Conducted: Hydrostatic LI] Pneumatic L-] Nominal Operating Pressure f] Exempt H
Other IVT-31 Pressure [N/A] psig Test Temp. fN/Al °F05-025
Form NIS2 1995 Edition 1996 AddendaSECTION Xi DIVISION 1
FORM NIS-2 (Back)At Sheet 2 of 2.
9. Remarks: See WO 767472 turnover eackace.Applicable Manufacturer's Data Reports to be attached
CERTIFICATE OF COMPLIANCE
I certify that the statements made In the report are corred and this conforms to the requirements of the ASME Code, Section Xi.
Type Code Symbol Stamp N/A
Certficat at No. N/A
Signed CISI ENGINEER Date 1218/2005Owner or Owner's Designee, Title
CERTIFICATE! OF INSERVICE INSPECTION
1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the
State or Province of North Carolina and employed by HSBCT of HARTFORD. CONNECTICUT have
inspected the components described in this Owner's Report during the period 10/6/2005 to 12/8/2005 and state that to the
best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this
Owner's Report in accordance with the requirements of the ASME Code, Section XI.
By signing this certificate neither the Inspector or his employer makes any warranty, expressed or implied, concerning the
examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer
shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with
this inspection.
(_ ______ Commissions NC 1507Inspe aesgnature National Board, State, Province, and Endorsements
Date:1 2/8/2005
05-025
1995 Edition 1996 Addenda APPENDIX II MANDATORY
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY
As Required by the Provisions of the ASME Code Section Xi
Form NIS 2
1. Owner PROGRESS ENERGY CAROLINAS INCName
411 FAYETTEVILLE ST.. RALEIGH. NC 27602Address
2. Plant H.B.ROBINSONName
3581 WEST Entrance RD: HARTSVILLE. SC 29550Address
3. Work Performed by PROGRESS ENERGY CAROLINAS. INCName
3581 WEST ENTRANCE RD: HARTSVILLE. SC 29550
Date: 1212/2005
Sheet: 1 Of 2
Unit: 2
EC#:NIA EE:NIAWR/WO 662477 CR:N/A
Repair Organization PO No;Job No;etc.
Type Code Symbol Stamp: NIAAuthorization No.: N/AExpiration Date: NWA
4.
5.
Address
Identification of System: Class:2 RESIDUAL HEAT REMOVAL SYSTEM 2045
(a) Applicable Construction Code: B 31.1 Edition: 1967 Addenda:N/A Code Case:N/ADesign Specification: N/A
(b) Applicable Edition of Section Xi Used for RepairlReplacement Activity: 1995 Edition 1996 AddendaCode Case: N/A
6. Identification of Components Repaired or Replaced and Re lacement Components
Name of Name of Manufacturer National Other Year Corrected, ASMEComponent Manufacturer Serial No. Board No. Identification Built Removed, or Code
Installed Stamp(Yes orNo)
Snubber #20 Grinnell 3221 N/A Hydraulic 1998 Removed NSnubber
Snubber #20 Grinnell 34439 N/A Hydraulic 2005 Installed NSnubber ____
7.
B.
Description of Work: Replaced snubber
Test Conducted: Hydrostatic El Pneumatic I U Nominal Operating Pressure U Exempt [-]
Other [IT-31 Pressure KN/AI psig Test Temp. [WA] 'F05-026
Form NIS2 1995 Edition 1996 AddendaSECTION Xi DIVISION 1
FORM NIS-2 (Back)Sheet 2 of 2.
9. Remarks: See WO 662477 turnover package and EST-033Applicable Manufacturer's Data Reports to be attached
CERTIFICATE OF COMPUANCE
I certify that the statements made hI the report are correct and this conforms to the requirements of the ASME Code, Section Xl.
Type Code Symbol Stamp N/A
CertificatNO N/A
Signed 4 C ISI ENGINEER Date 12/9/2005Owner or Owner's Designee, Title
CERTIFICATE OF INSERVICE INSPECTION
1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the
State or Province of North Carolina and employed by HSBCT of HARTFORD. CONNECTICUT have
inspected the components described in this Owner's Report during the period 10/8/2005 to 12/9(2005 and state that to the
best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this
Owners Report in accordance with the requirements of the ASME Code, Section Xi.
By signing this certificate neither the Inspector or his employer makes any warranty, expressed or implied, concerning the
examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer
shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with
this inspection.
____ ___Commissions NC 1507I-ns--,ris Sl ature National Board, State, Province, and Endorsements
Date:12/9/2005
05-026
e
1995 Edition 1996 Addenda
0ftAPPENDIX II MANDATORY
FORM NIS-2 OWNER'S REPORT FOR REPAIRIREPLACEMENT ACTIVITY
As Required by the Provisions of the ASME Code Section Xl
10 Form NIS 2
�111
1. Owner PROGRESS ENERGY CAROLINASU INCName
411 FAYETTEVILLE ST.. RALEIGH. NC 27602_
Date: i122/n00wow. . cows
Sheet: 1 of 2Address
Li e 0r%01rt1Nj%2. PI.--.1I4% .I.tJ II.% U
Name
3581 WEST Entrance RD: HARTSVILLE. SC 29550Address
3. Work Performed by PROGRESS ENERGY CAROLINAS. INCName
3581 WEST ENTRANCE RD: HARTSVILLE- SC 29550
Unit: 2
EC#:N/A EE:N/AWRIWO,544849 CR:NJA
Repair Organizatin PO No;Job No~etc.
Type Code Symbol Stamp: N/AAuthorization No.: N/AExpiration Date: N/A
A 3050
Address
Identification of System: Class:34.
5.
FFF WATFR qYqTFP... ----
_ . _
(a) Applicable Construction Code: B 31.1 Edition: 1967 Adenda:N/A CodeCaseDesign Specification: 5379-01397 SH1
(b) Applicable Edition of Section Xl Used for Repair/Replacement Activity: 1995 Edition 1996 AddendaCode Case: NWA
e:N/A
6. Identification of Components Repaired or Replaced and Replacement Components= - - � - U = a
Name of Name of Manufacturer Nahonal Other Year Corrected. ASME
NameotComponent
Name SnManufacturer
ManufacturerSerial No.
Natioa'Board No.
OtherIdentification
YearBuilt
Corrected SRemoved, orInlstalled
ASMECodeStamp(Yes orNo)
FCV-478 Copes-Vulcan N/A NA Bonnet Stud 1971 Removed N
FCV-478 Copes Vulcan NIA N/A Bonnet Stud 1986 Installed N
FCV-478 Copes Vulcan N/A NA Bonnet Nut 1971 Removed N
FCV-478 Mackson NA NIA Bonnet Nut 2001 Installed N
7. Description of Work: Replaced one stud and one nut damaged during maintenance.
8. Test Conducted: Hydrostatic U1 Pneumatic U Nominal Operating Pressure Il Exempt N
Other [] Pressure IN/AI psig Test Temp. IN/Al 'F05-O027
Form NIS2 199S Edition 1996 AddendaSECTION XI DIVISION 1
FORM NIS-2 (Back)Sheet 2 of 2.
9. Remarks: See WO 544849 turnover packaceApplicable Manufacturer's Data Reports to be attached
CERTIFICATE OF COMPUANCE
I certify that the statements made in the report are correcs and this conforms to the requirements of the ASME Code, Section XI.
Type Code Symbol Stamp N/A
Certlficati of Autotion No. N/A
Signed- A IS ENGINEER Date 12/5/2005Owner or Owners Designee, Title
CERTIFICATE OF INSERVICE INSPECTION
1, the undersigned, holding a valid commission issued by the National Board of Boler and Pressure Vessel Inspectors and the
State or Province of North Carolina and employed by HSBCT of HARTFORD. CONNECTICUT have
inspected the components described in this Owner's Report during the period 9/2 005 to 12/5/2005 and state that to the
best of my knowledge and belief, the Owner has peilormed examinations and taken corrective measures described in this
Owner's Report In accordance with the requirements of the ASME Code, Section XI.
By signing this certificate neither the Inspector or his employer makes any warranty, expressed or implied, concerning the
examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer
shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with
this inspection.-
ths in n Commissions NC 1507Inspect Snature National Board, State, Province, and Endorsements
Date:1 2/5/2005
05-027
- 1'.
I
0ND1995 Edition 1996 Addenda APPENDIX II MANDATORY
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY
As Required by the Provisions of the ASME Code Section Xl
Form NIS 2
1. Owner PROGRESS ENERGY CAROLINAS. INCName
411 FAYETTEVILLE ST.. RALEIGH, NC 27602Address
2. Plant H.B.ROBINSONName
3581 WEST Entrance RD: HARTSVILLE. SC 29550Address
3. Work Performed by PROGRESS ENERGY CAROLINAS. INCName
3581 WEST ENTRANCE RD: HARTSVILLE, S;C 29550
Date: 12/2/2005
Sheet: 1 of 2
Unit: 2
EC#:N/A EE:N/AWR/WO:544818 CR:N/A
Repair Organization PO NoJob No;etc.
Type Code Symbol Stamp: N/AAuthorization No.: NWAExpiration Date: N/A
A '13020
Address
irtantifi1p-tienn ei qviqtnm. I KRAIN ATFAM qVRTFIJ4.
5. (a) Applicable Construction Code: B31.1 Edition: 1967 Addenda:N/A Code Case;N/ADesign Specification:
(b) Applicable Edition of Section XI Used for Repair/Replacement Activity: 1995 Edition 1996 AddendaCode Case: N/A
Identification of Comoonents Renaired or Renlaced and Renlacement Cornnonants6.=- *_:-- ----_______ _ _ =-
Name of Name of Manufacturer National Other Year Corrected, ASMEComponent Manufacturer Serial No. Board No. Identification Built Removed, or Code
Installed Stamp(Yes orNo)
MS-263A Vogt N/A N/A Piston 1971 Removed N
MS-263A Vogt N/A N/A Piston 1991 Installed N
__ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ____ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
7.
8.
Description of Work: replaced valve piston
Test Conducted: Hydrostatic fj Pneumatic [U] Nominal Operating Pressure [1U Exempt I-)
Other [N/Al Pressure "Ad psig Test Temp. IN/Al 0F05.028
Form NIS2 1995 Edition 1996 AddendaSECTION Xi DIVISION .
FORM NIS-2 (Back)A1 Sheet 2 of 2
9. Remarks: See WO 544818 turnover MackageApplicable Manufacturer's Data Reports to be attached
CERTIFICATE OF COMPLIANCE
I certify that the statements made In the report are correct and this conforms to the requirements of the ASME Code, Section XI.
Type Cede Symbol Stamp N/A
Certificatepl ateo. . N/A
Signed ISI ENGINEER Date 12/5/2005Owner or Owner's Designee, Title
CERTIFICATE: OF INSERVICE INSPECTION
1. the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the
State or Province of North Carolina and employed by HSBCT of HARTFORD, CONNECTICUT have
inspected the components described in this Owners Report during the period 9/2512005 to 12/5/2005 and state that to the
best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this
Owner's Report in accordance with the requirements of the ASME Code, Section Xi.
*P By signing this certificate neither the Inspector or his employer makes any warranty, expressed or implied, concerning the
examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer
shall be liable in any manner for any personal injury Co property damage or a loss of any kind arising from or connected with
this inspection.
9___ ____ Commissions NC 1507Ins atSignature National Board, State, Province, and Endorsements
Date:1215/2005
05-028
1995 Edition 1996 Addenda APPENDIX II MANDATORY
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY
As Required by the Provisions of the ASME Code Section Xl
Form NIS 2
1. Owner PROGRESS ENERGY CAROLINAS. INCName
411 FAYETTEVILLE ST.. RALEIGH, NC 2760:2
r%-- 41n(YU;ffwattr
Sheet: I of 2Address
WI R 0f%0M1frNI2. PlantName
3581 WEST Entrance RD: HARTSVILLE, SC 29550Address
3. Work Performed by PROGRESS ENERGY CAROLINAS. INCName
3581 WEST ENTRANCE RD: HARTSVILLE. SC 29550
Unit: 2
EC#:N/A EE:NIAWRNVO:664066 CR:N/A
Repair Organization P0 No-Job No;etc.
Type Code Symbol Stamp: NMAAuthorization No.: NIAExpiration Date: N/A
4.
5.
Address
Identification of System: Class:2 SAFETY INJECTION SYSTEM 2080
(a) Applicable Construction Code: B 31.1 Edition: 1967 Addenda:N/A Code Case: NIADesign Specification: CPL-HBR2-M-048
(b) Applicable Edition of Section Xl Used for Repair/Replacement Activity 1995 Edition 1996 AddendaCode Case: N-416-2
6. Identification of Components Repaired or Replaced and Replacement Components
Name of Name of Manufacturer National Other year Corrected. ASMEComponent Manufacturer Serial No. Board No. Identification Buit Removed, or Code
Installed Stamp(Yes orNo)
SI-873B Edwards N/A N/A Check valve 1971 Removed N
SI-873B Edwards SONC24 N/A Check valve 2005 Installed N
Piping Ebasco N/A N/A 2-SI-64 1971 Removed N
Piping Dubose N/A N/A 2-SI-64 2005 Installed N
7. Description of Work: Replaced valve and opie rieces
8. Test Conducted. Hydrostatic f U Pneumatic LI Nominal Operating Pressure [X) Exempt [-l
Other [FP Pressure MP] psig Test Temp. [NOfl 0F05-029
Form NIS2 1995 Edition 1996 AddendaSECTION Xl DIVISION 1
FORM NIS-2 (Back)Sheet 2 of 2.
9. Remarks: See WO 664066 turnover packageApplicable Manufacturer's Data Reports to be attached
CERTIFICATE OF COMPLIANCE
I certify that the statements made In the report are correct: and this conforms to the requirements of the ASME Code, Section XI.
Type Code Symbol Stamp N/A
Cerfific N/A
Signed A4 t ISI ENGINEER Date 12/7/2005Owner or Owner's Designee, Tie
CERTIFICATE- OF INSERVICE INSPECTION
I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the
State or Province of North Carolina and employed by HSBCT of HARTFORD. CONNECTICUT have
inspected the components described in this Owner's Report during the period 9/1312005 to 12/7/2005 and state that to the
best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this
Owner's Report in accordance with the requirements of the ASME Code. Section Xl.
By signing this certificate neither the Inspector or his employer makes any warranty, expressed or implied, concerning the
examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer
shall be liable in any manner for any personal Injury or property damage or a loss of any kind arising from or connected with
this inspection.
___ _ _Commissions NC 1507pecJ SIgature National Board, State, Province, and Endorsements
Date: 12(7/2005
05-029
'I
1995 Edition 1996 Addenda APPENDIX II MANDATORY
FORM NIS-2 OWNER'S RElPORT FOR REPAIRIREPLACEMENT ACTIVITY
As Required by the Provisions of the ASME Code Section Xl
Form NIS 2
1. Owner PROGRESS ENERGY CAROLINAS INCName
411 FAYETTEVILLE ST.. RALEIGH. NC 27602
Data: 121612F0lonw.w. s.v__
Sheet: 1 of 3Address
14 n MrIMKI0r2. F0l...lM t I*LJftlI*Kl
Name
3581 WEST Entrance RD: HARTSVILLE, SC :9550Address
3. Work Performed by PROGRESS ENERGY CAROLINAS. INCName
3581 WEST ENTRANCE RD; HARTSVILLE, SC 29550
Unit: 2
EC#:58640 EE:N/AWR/WO:633486 CR;N/A
Repair Organization PO No;Job No;etc.
Type Code Symbol Stamp: N/AAuthorization No.: N/AExpiration Date: N/A
4.
5.
Address
Identification of System: Class:2 SAFETY INJECTION SYSTEM 2080
(a) Applicable Construction Code: 831.1 Edition: 1967 Addenda:N/A Code Case:Nl/ADesign Specification: CPL-HBR2-M-048
(b) Applicable Edition of Section Xl Used for Repair/Replacement Activity: 1995 Edition 1996 AddendaCode Case: NI1A
Identification of ComDonents Repaired or Renlaced and Reolacement Comoonents6.
Name of Name of Manufacturer National Otler Year Correed, ASMEComponent Manufacturer Serial No. Board No. Identification Buift Removed, or Code
Installed Stamp(Yes orNO)
6-SI-30 Maintenance N/A NIA Piping 2004 Removed N
6-SI-30 Maintenance N/A N/A Piping 2005 Installed N
6-SI-31 Maintenance N/A N/A Piping 2004 Removed N
6-SI-31 Maintenance N1A N/A Piping 2005 Installed N
4-SI-244 Maintenance N/A N/A Piping 2004 Removed N
4-SI-244 Maintenance N/A NIA Piping 2005 Installed N
7. Description of Work: Modified 'A and *B- Conlainment Spray Pump discharae pipin
8. Test Conducted: Hydrostatic jM Pneumatic Lj Nominal Operating Pressure U Exempt [-
Other IVT-21 Pressure 13751 psig Test Temp. [NOT] °F05-030
4-
1995 Edition 1996 Addenda APPENDIX II MANDATORY
FORM NIS-2 OWNER'S REPORT FOR REPAIRIREPLACEMENT ACTIVITY
As Required by the Provisions of the ASME Code Section Xi
Form NIS 2
I-
1. Owner PROGRESS ENERGY CAROLINAS. INGName
411 FAYETTEVILLE ST.. RALEIGH. NC 27602
Dnte: 12/6F/200w9.
Sheet: 2 of 3Address
i- R l=f.1CNN:K82. F11-4fmilt
Name
3581 WEST Entrance RD: HARTSVILLE, SC 29550Address
3. Work Performed by PROGRESS ENERGY CAROLINAS. INCName
3581 WEST ENTRANCE RD: HARTSVILLE. SC 29550
Unit: 2
EC#:58640 EE:NIAWR/WO:633486 CR:NtA
Repair Organization PO No;Job No;etc.
Type Code Symbol Stamp. N1AAuthorization No.: NIAExpiration Date: NtA
Address
4.
5.
Identification of System: Class:2 SAFETY INJFCTION SYSTFM 2080
(a) Applicable Construction Code: B 31.1 Edition: 1fl7 Addenda:N/A Code CaseDesign Specification: CPL-HBR2-M-048
(b) Applicable Edition of Section Xl Used for Repair/Replacement Activity: 1995 Edition 1996 AddendaCode Case: NWA
e:NlA
6. Identification of Comoonents Reoaired or Replaced and Replacement Components
Name of Name of Manufacturer National Other Year Corrected. ASMEComponent Manufacturer Serial No. Board No. Identification Built Removed, or Code
Installed Stamp(Yes orNo)
4-SI-245 Maintenance N/A N/A Piping 2004 Removed N
4-SI-245 Maintenance N/A N/A Piping 2005 Installed N
2-SI-151 Maintenance NtA N/A Piping 2004 Removed N
2-SI-151 Maintenance NtA N/A Piping 2005 Installed N
2SI-152 Maintenance N/A N/A Piping 2004 Removed N
2-SI-152 Maintenance N/A N/A Piping 2005 Installed N
7. Description of Work: Modified A' and 813 Containment Spray Pumo discharge Piing
8. Test Conducted: Hydrostatic LXJ Pneumatic U Nominal Operating Pressure EJ Exempt [-]
Other [VT-21 Pressure f3751 psig Test Temp. [NOT1 IF05-030
-I
Form NIS2 1995 Edition 1996 AddendaSECTION Xi DIVISION 1
FORM NIS-2 (Back)* Sheet 3 of 3
9. Remarks: See WO 633486 and EC 58640 turnover packagesApplicable Manufacturer's Data Reports to be attached
CERTIFICATE OF COMPUANCE
I certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code, Section Xi.
Type Code Symbol Stamp N/A
Certificat c t No. N/A
Signed 4 ISI ENGINEER Date 12/6/2005Owner or Owner's Designee, Title
CERTIFICATE OF INSERVICE INSPECTION
I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the
State or Province of North Carolina and employed by HSBCT of HARTFORD. CONNECTICUT have
inspected the components described in this Owners Report during the period 4/21/2005 to 1216/2005 and state that to the
best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this
Owner's Report in accordance with the requirements of the ASME Code. Section Xi.
By signing this certificate neither the Inspector or his employer makes any warranty, expressed or implied, concerning the
examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer
shall be liable In any manner for any personal injury or property damage or a loss of any kind arising from or connected with
this inspection.
is *____ Commissions NC 1507Insdoer gegnature National Board, State, Province, and Endorsements
Date:121612005
05-030
1995 Edition 1996 Addenda
0Af
APPENDIX 1i MANDATORY
FORM NIS-2 OWNER'S REPORT FOR REPAIRJREOLACEMENT ACTIVITY
As Required by the Provisions of the ASME Code Section Xi
* Form NIS 2
1. Owner PROGRESS ENERGY CAROLINAS, INCName
411 FAYETTEVILLE ST.. RALEIGH. NC 27602
Oa~t: 191/219MM* - -- --
Sheet: 1 of 2Address
Li D nMfClK12. PI-*.pu.. F I.
Name
3581 WEST Entrance RD: HARTSVILLE, SC 29550Address
3. Work Performed by PROGRESS ENERGY CAROLINAS. INCName
3581 WEST ENTRANCE RD: HARTSVILLE, SC 29550
Unit: 2
EC#:N/A EE:N/AWR/WO:662682 CR:NIA
Repair Organization PO No-Job No;etc.
Type Code Symbol Stamp: N/AAuthorization No.: NWAExpiration Date: N/A
4.
5.
Address
Identification of System: Class:2 C:HEMICAL AND VOLUME CONTROL SYSTEM 2060
(a) Applicable Construction Code: B31.1 Edition: 1967 Addenda:N/A Code Case:NIADesign Specification: N/A
(b) Applicable Edition of Section Xl Used for Repair/Replacement Activity: 1995 EdItion 1996 AddendaCode Case: N/A
6. Identification of Components Repaired or Re laced and Replacement Components
Name of Name of Manufacturer National Other Year Corrected, ASMEComponent Manufacturer Serial No. Board No. Identification Built Removed, or Code
Installed Stamp(Yes orNo)
Snubber #23 Grinnell 34033 N/A Hydraulic 1998 Removed NSnubber
Snubber #23 Grinnell 35487 NIA Hydraulic 2005 Installed NSnubber
,_v
7. Description of Work: Replaced snubber
8. Test Conducted: Hydrostatic U1 Pneumatic U 1 Nominal Operating Pressure U] Exempt [-J
Other IVT-3/Functionafl Pressure IN/Al psig Test Temp. INA] OF05-031
Form NIS2 1995 Edition 1996 AddendaSECTION Xi DIVISION 1
FORM NIS-2 (Back)Sheet 2 of L
9. Remarks: See WO 662682 turnover packageApplicable Manufacturer's Data Reports to be attached
CERTIFICATE OF COMPUANCE
I certify that the statements made In the report are correci and this conforms to the requirements of the ASME Code, Section Xl.
Type Code Symbol Stamp N/A
Certificate { NIA
Signed 4 8- ISI ENGINEER Date 12/5/2005Owner or Owners Designee, Title
CERTIFICATE: OF INSERVICE INSPECTION
I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the
State or Province of North Carolina and employed by HSBCT of HARTFORD. CONNECTICUT have
inspected the components described in this Owner's Report during the period 101812005 to 12/512005 and state that to the
best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this
Owner's Report in accordance with the requirements of the ASME Code, Section Xl.
By signing this certificate neither the Inspector or his employer makes any warranty, expressed or implied, concerning the
examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer
shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with
this inspection.
°a4 ________Commissions NC 1507Ins Itef Signature National Board, State, Province, and Endorsements
Date:1 2/5/2005
05i031
1995 Edition 1996 Addenda
0APPENDIX 11 MANDATORY
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY
As Required by thei Provisions of the ASME Code Section Xi
Form NIS 2
1. Owner PROGRESS ENERGY CAROLINAS. INCName
411 FAYETTEVILLE ST.. RALEIGH. NC 27602Address
2. Plant H.8.ROBINSON
Date: 1215/2005-------
Sheet: 1 Of 2
Unit:_ 2Name
3581 WEST Entrance RD: HARTSVILLE. SC O9550I Address
3. Work Performed by PROGRESS ENERGY CAROLINAS. INCName
3581 WEST ENTRANCE RD: HARTSVILLE, SC 29550
EC#:60960 EE:NtAWR/WO:703718 01 CR:NIA
Repair Organization PO No;Job No;etc.
Type Code Symbol Stamp: N/AAuthorization No.: NIAExpiration Date:- N/A
4.
5.
Address
Identification of System: Class:2 STEAM GENERATOR SYSTEM 3005
(a) Applicable Construction Code: ASME III Edition: 1965 AddendaJNIA Code Case-N/ADesign Specification: N/A
(b) Applicable Edition of Section Xl Used for Repair/Replacement Activity: 1995 Edition 1996 AddendaCode Case: N/A
b. Identification of Components Hepaired or Heplsced and He xacement Cornponents
Name of Name of Manufacturer National Other Year Corrected. ASMEComponent Manufacturer Serial No. Board No. Identification Built Removed, or Code
Installed Stamp(Yes orNo)
S/G A Westinghouse N/A N/A Bolts 1984 Removed NManwayS/G A Mackson N/A N/A Studs 2005 Installed NManway . -
SIG A Nova N/A N/A Nuts 2005 Installed NManway
7. Description of Work: Replaced bolts with studsfnuts to support temporary repair of mechanical connection.
8. Test Conducted: Hydrostatic 1U Pneumatic U. Nominal Operating Pressure LI Exempt [XI
Other INIA] Pressure fWAI psig Test Temp. fN/A1 °F05-032
Form NIS2 1995 Edition 1996 AddendaSECTION Xi DIVISION 1
FORM NIS-2 (Back)Sheet 2 of 2.
9. Remarks: See WO 703718 01 and EC 60960 turnover oackaoesApplicable Manufacturer's Data Reports to be attached
CERTIFICATE OF COMPUANCE
I certify that the statements made In the report are correct and this conforms to the requirements of the ASME Code, Section XI.
Type Code Symbol Stamp N/A
Certif 4Axrtz No. N/A
SignedA G W I 151 ENGINEER Date 12/5/2005Owner or Owner's Designee, Title
CERTIFICATE OF INSERVICE INSPECTION
1, the undersigned, holding a valid commission Issued by the National Board of Boiler and Pressure Vessel Inspectors and the
State or Province of North Carolina and employed by HSBCT of HARTFORD. CONNECTICUT have
inspected the components described in this Owner's Report during the period 5/4/2005 to 12/5/2005 and state that to the best
of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's
Report in accordance with the requirements of the ASMIE Code, Section Xi.
By signing this certificate neither the Inspector or his employer makes any warranty, expressed or implied, concerning the
examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer
shall be liable in any manner for any personal injury om property damage or a loss of any kind arising from or connected with
this inspection.
0______Commissions NC 1507Inspe s Agnature National Board, State, Province, and Endorsements
Date:12/512005
05032
0
0
1995 Edition 1996 Addenda APPENDIX II MANDATORY
FORM NIS-2 OWNER'S REPORT FOR REPAIRIREPLACEMENT ACTIVITY
As Required by the Provisions of the ASME Code Section Xl
Form NIS 2
1. Owner PROGRESS ENERGY CAROLINAS. INCName
411 FAYETTEVILLE ST.. RALEIGH. NC 27602Address
2. Plant H.B.ROBINSONName
3581 WEST Entrance RD: HARTSVILLE. SC 29550Address
3. Work Performed by PROGRESS ENERGY CAROLINAS. INCName
3581 WEST ENTRANCE RD: HARTSVILLE, SC 29550
Date: 12/5/2005
Sheet: 1 of 2
Unit: 2
EC#:N/A EE:N/AWRIWO:703718 05 CR:N/A
Repair Organization PO No;Job No;etc.
Type Code Symbol Stamp: N/AAuthorization No.: N/AExpiration Date: N/A
4.
5.
Address
Identification of System: Class:2 STEAM GENERATOR SYSTEM 3005
(a) Applicable Construction Code: ASME III Edition: 1965 Addenda:N/A Code Case:N/ADesign Specification: N/A
(b) Applicable Edition of Section Xl Used for Repair/Replacement Activity: 1995 Edition 1996 AddendaCode Case: N/A
Identification of Comnonents Repaired or Renalced and Renlacement Comronants6.
Name of Name of Manufacturer National Other Year Corrected. ASMEComponent Manufacturer Serial No. Board No. Identification Built Removed, or Code
Installed Stamp(Yes orNo)
S/G A Westinghouse N/A N/A Manway Cover 1984 Removed NManwaySIG A Westinghouse A-0011 N/A Manway Cover 1993 Installed NManwayS/G A Nova N/A N/A Threaded Inserts 2005 Installed NManway .. _
7.
8.
Description of Work: Reolaced Manwav cover, threaded inserts and machined Manwav Dad and cover sealing surfaces
Test Conducted: Hydrostatic LI Pneumatic L-] Nominal Operating Pressure Q9 Exempt [-]
Other [VT-21 Pressure [NOPI psig Test Temp. INOQ1 OF05-033
a
A
Form NIS2 1995 Edition 1996 AddendaSECTION Xi DIVISION 1
FORM NIS-2 (Back)
e
Sheet 2 of 2.
9. Remarks: See WO 703718 turnoerepackageApplicable Manufacturer's Data Reports to be attached
CERTIFICATE OF COMPLIANCE
I certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code. Section Xi.
Type Code Symbol Stamp NWA
Cerificat t No. NIA
Signed -A A U- IS! ENGINEER Date 12/512005Owner or Owner's Designee, Title
AftW
CERTIFICATE OF INSERVICE INSPECTION
1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the
State or Province of North Carolina and employed by HSBCT of HARTFORD. CONNECTICUT have
inspected the components described in this Owner's Report during the period 8/23/2005 to 12/5/20Q5 and state that to the
best of my knowledge and belief, the Owner has pelrormed examinations and taken corrective measures described in this
Owner's Report in accordance with the requirements of the ASME Code, Section Xi.
By signing this certificate neither the Inspector or his employer makes any warranty, expressed or Implied, concerning the
examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer
shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with
this inspection.
7'(~zU4 (Commissions NC 1507f-nspecto(dyture National Board, State, Provnce, and Endorsements
Date: 1 215/2005
05-033
- fi -
1995 Edition 1996 Addenda APPENDIX II MANDATORY
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY
As Required by the Provisions of the ASME Code Section Xl
* Form NIS 2
1. Owner PROGRESS ENERGY CAROLINAS, INCName
411 FAYETTEVILLE ST., RALEIGH. NC 27602Address
2. Plant H.B.ROBINSONName
3581 WEST Entrance RD: HARTSVILLE. SC' 29550Address
3. Work Performed by PROGRESS ENERGY CAPROLINAS. INCName
35A1 WEST FNTRANCEF Rnl: HARTAVII I F Prl 29550
Date: 12/5/2005
Sheet: 1 of 2
Unit: 2
EC#:NIA EE-NIAWR/WO:703490 CR:N/A
Repair Organization PO No;Job No;etc.
Type Code Symbol Stamp: N/AAuthorization No.: NIAExpiration Date: NIA
Address-. r,
4. Identification of System: Class:2 STEAM GENERATOR SYSTEM 3005
5. (a) Applicable Construction Code: ASME Ill Edition: 1965 Addenda:N/A Code Case:N/ADesign Specification:
(b) Applicable Edition of Section Xi Used for Repair/Replacement Activity: 1995 Edition 1996 AddendaCode Case: N/A
6. Identification of Comoonents Repaired or Replaced and Reolacement Comnonents
Name of Name of Manufacturer National Other Year Corrected, ASMEComponent Manufacturer Serial No. Board No. Identification Built Removed, or Code
Installed Stamp(Yes orNo)
S/G A Mackson N/A N/A Studs 2005 Removed NManway_S/G A Nova NWA A Nuts 2005 Removed NManway
S/G A Westinghouse N/A N/A Bolts 1992 Installed NManway . =
7.
8.
Description of Work, Reolacing studs and nuts installed Per EC 60963 and WO 70371 8 01 with bolts
Test Conducted: Hydrostatic lU, Pneumatic Ij Nominal Operating Pressure Ij Exempt [X]
Other IN/A1 Pressure [lNA psig Test Temp. IN/Al 0F05-034
0.
Form NIS2 1995 Edition 1996 AddendaSECTION XI DIVISION 1
FORM NIS-2 (Back)Sheet 2 of 2.
9. Remarks: See WO 703490 turnover oackageApplicable Manufacturer's Data Reports to be attached
CERTIFICATE OF COMPUANCE
I certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code, Section XI.
Type Code Symbol Stamp N/A
IOL-f- lrlk t WLI IWA
iSigned 'A a C ' - ISI ENGINEER Date 12/5J2005Owner or Owners Designee, Title
CERTIFICATE: OF INSERVICE INSPECTION
1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the
State or Province of North Carolina and employed by HSBCT of HARTFORD. CONNECTICUT have
inspected the components described in this Owners Report during the period 9/1912005 to 1215/2005 and state that to the
best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this
Owner's Report in accordance with the requirements of the ASME Code, Section XI.
By signing this certificate neither the Inspector or his employer makes any warranty, expressed or Implied, concerning the
examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer
shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with
this inspection.
SI X ________Comnmissions NC 1507nsper ignature National Board, State, Province, and Endorsements
Date:12/512005
05-034
Form NIS 2
S1995 Edition 1996 Addenda APPENDIX II MANDATORY
FORM NIS-2 OWNER'S REPORT FOR REPAIRIREPLACEMENT ACTIVITY
As Required by thi Provisions of the ASME Code Section XI
1. Owner PROGRESS ENERGY CAROLINAS, INCName
411 FAYETTEVILLE ST., RALEIGH. NC 27602Address
2. Plant H.B.ROBINSONName
3581 WEST Entrance RD: HARTSVILLE, SC 29550Address
3. Work Performed by PROGRESS ENERGY CAROLINAS. INCName
3581 WEST ENTRANCE RD: HARTSVILLE. SC 29550
Date: 12/6/2005
Sheet: I Of 2
Unit: 2
EC#:NJA EE:N/AWR/WO:554808 CR:N/A
Repair Organization PO No;Job No;etc.
Type Code Symbol Stamp: N/AAuthorization No.: N/AExpiration Date: N/A
-
Address
4. Identification of System: Class:3 FEED WATER SYSTEM 3050
5. (a) Applicable Construction Code: B 31.1 Edition: 1967 Addenda:N/A Code Case:N/ADesign Specification:
(b) Applicable Edition of Section XI Used for RepairlReplacement Activity: 1995 Edition 1996 AddendaCode Case: N/A
6. Identification of Comoonents Reoaired or Reolaced and Reolacement Comoonents
Name of Name of Manufacturer National Other Year Corrected, ASMEComponent Manufacturer Serial No. Board No. Identification Built Removed, or Code
Installed Stamp(Yes orNo)
FE-496 Maintenance N/A N/A Venturi tack 1971 Removed Nwelds
FE-496 Maintenance NA N/A Venturi tack 2005 Installed Nwelds
7.
8.
Description of Work: Removed and re-welded Venuri tack welds for inspection
Test Conducted: Hydrostatic Uj Pneumatic U1 Nominal Operating Pressure 1.1 Exempt [X]
Other IN/Al Pressure 04/Al psig Test Temp. [INA1 IF05M035
Form NIS2 1995 Edition 1996 AddendaSECTION Xi DIVISION 1
FORM NIS-2 (Back)Sheet 2 of 2.
9. Remarks: See WO 554808 turnover DackacteApplicable Manufacturer's Data Reports to be attached
CERTIFICATE OF COMPLIANCE
I certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code, Section XI.
Type Code Symbol Stamp N/A
Certificate - i-on . N/A
Signed 'A a Q L- ISI ENGINEER Date 12/612005Owner or Owner's Designee, Title
.
CERTIFICATE: OF INSERVICE INSPECTION
I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the
State or Province of North Carolina and employed by HSBCT of HARTFORD. CONNECTICUT have
inspected the components described in this Owner's Report during the period 10/9/2005 to 12/6/2005 and state that to the
best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this
Owner's Report in accordance with the requirements of the ASME Code, Section Xi.
By signing this certificate neither the Inspector or his employer makes any warranty, expressed or implied, concerning the
examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer
shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with
this inspection.
NC 1507National Board, State, Province, and Endorsements
Date: 1 26/2005
05-035
Form NIS 21995 Edition 1996 Addenda APPENDIX If MANDATORY
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY
As Required by the Provisions of the ASME Code Section Xl
1. Owner PROGRESS ENERGY CAROLINAS. INCName
411 FAYETTEVILLE ST.. RALEIGH. NC 27602Address
2. Plant H.B.ROBINSONName
3581 WEST Entrance RD: HARTSVILLE, SC 29550Address
3. Work Performed by PROGRESS ENERGY CAROLINAS. INCName
3581 WEST ENTRANCE RD: HARTSVILLE. SC 29550
Date: i 5pinrintz
Sheet: 1 of 2
Unit: 2
EC#:N/A EE:N/AWRIWO:559034 CR:NIA
Repair Organization PO No;Job No;etc.
Type Code Symbol Stamp: N/AAuthorization No.: N/AExpiration Date: NIA
-
Address
4. Identification of System: Class:3 FEED WATER SYSTEM 3050
5. (a) Applicable Construction Code: B 31.1 Edition: 1967 Addenda:N/A Code Case: N/ADesign Specification:
(b) Applicable Edition of Section Xi Used for Repair/Replacement Activity: 1995 Edition 1996 AddendaCode Case: N/A
6. Identification of Comoonents Reoaired or Replaced and Replacement Comoonents= ~ ~~ =, ___a _ ____. =, _ ,=----,-,:,
Name of Name of Manufacturer National Other Year Corrected. ASMEComponent Manufacturer Serial No. Board No. Identification Built Removed, or Code
Installed Stamp(Yes orNo)
FE-476 Maintenance N/A NA Venturi tack 1971 Removed N.welds
FE-476 Maintenance N/A N/A Venturi tack 2005 Installed Nwelds l
7.
a.
Description of Work: Removed and re-welded tack welds for inspection
Test Conducted: Hydrostatic 1:1 Pneumatic EJ Nominal Operating Pressure U 1 Exempt [X]
Other [N/A] Pressure L" psig Test Temp. INIA1 OF05-036
Form NIS2 1995 Edition 1996 AddendaSECTION Xi DIVISION 1
FORM NIS-2 (Back)Sheet 2 of 2.
9. Remarks: See WO 559034 turnover oackaoeApplicable Manufacturer's Data Reports to be attached
CERTIFICATE OF COMPUANCE
I certify that the statements made In the report are correct and this conforms to the requirements of the ASME Code, Section Xl.
Type Code Symbol Stamp N/A
Certifica N/A
Signed 4 ISI ENGINEER Date 1216/2005Owner or Owner's Designee, Title
CERTIFICATE OF INSERVICE INSPECTION
1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the
State or Province of North Carolina and employed by HSBCT of HARTFORD, CONNECTICUT have
inspected the components described in this Owners Report during the period 10/9/2005 to 12/6/2005 and state that to the
best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this
Owner's Report in accordance with the requirements of the ASME Code, Section XI.
By signing this certificate neither the Inspector or hi; employer makes any warranty, expressed or implied, concerning the
examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer
shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with
this inspection..
this insp n Commissions NC 1507Irlspecto, k nature National Board, State, Province, and Endorsements
Date: 12/6/2005
054036
80<4 :
1995 Edition 1996 Addenda APPENDIX II MANDATORY
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY
As Required by tho Provisions of the ASME Code Section Xl
Form NIS 2
1. Owner PROGRESS ENERGY CAROLINAS. INCName
411 FAYETTEVILLE ST., RALEIGH. NC 27602Address
2. Plant H.B.ROBINSONName
3581 WEST Entrance RD: HARTSVILLE, SC 29550Address
3. Work Performed by PROGRESS ENERGY CAROLINAS, INCName
3581 WEST ENTRANCE RO: HAPTSVILLE. SC 29550
nrl-- t -5F7^flnfrIu.1- - ,,w
Sheet: 1 of 2
Unit: 2
EC#:N/A EE:N/AWR/WO:664191 CR:N/A
Repair Organization PO No.Job No;etc.
Type Code Symbol Stamp: N/AAuthorization No.: N/AExpiration Date. NMA
Address
4. Identification of System. Class:2 CHEMICAL AND VOLUME CONTROL SYSTEM 2060
5. (a) Applicable Construction Code: B 31.1 Edition: 1967 Addenda:N/A Code Case:N/ADesign Specification:
(b) Applicable Edition of Section Xl Used for Flepair/Replacement Activity: 1995 Edition 1996 AddendaCode Case: N/A
6. Identification of Components Repaired or Replaced and Reolacement CGononents
Name of Name of Manufacturer National Other Year Corrected, ASMEComponent Manufacturer Serial No. Board No. Identification Built Removed, or Code
Installed Stamp(Yes orNo)
Snubber #35 Grinnell 32212 NWA Hydraulic 1998 Removed N__ __ _ Snubber _
Snubber #35 Grinnell 34607, NA Hydraulic 2005 Installed N__ Snubber
4 4 5- .4 4 5
4 4 I- 4 + 1 4
___________________________ .5. _______________________________ .4 ___________________________ L = - . a- ___________________________ . = = . -± __________________ I ____________________________
7.
8.
Description of Work: Replaced snubber
Test Conducted: Hydrostatic U 1 Pneumatic 1U Nominal Operating Pressure U Exempt 1-)
Other [VTJ81 Pressure [l/Aj psig Test Temp. tIN/Al OF05-037
I
Form NIS2 1995 Edition 1996 AddendaSECTION XI DIVISION 1
FORM NIS-2 (Back)Sheet 2 of 2.
9. Remarks: See WO 664191 turnover packaaeApplicable Manufacturer's Data Reports to be attached
CERTIFICATE OF COMPLIANCE
I certify that the statements made In the report are correct and this conforms to the requirements of the ASME Code, Section XI.
Type Code Symbol Stamp N/A
CiW N/A
Signed ISI ENGINEER Date 1217/2005Owner or Owner's Designee, Title
CERTIFICATE OF INSERVICE INSPECTION
1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the
State or Province of North Carolina and employed by HSBCT of HARTFORD. CONNECTICUT have
inspected the components described in this Owners Report during the period 10/8/2005 to 12/7I2005 and state that to the
best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this
Owner's Report in accordance with the requirements of the ASME Code, Section XI.
By signing this certificate neither the Inspector or his employer makes any warranty, expressed or Implied, concerning the
examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer
shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with
this inspection.
Commissions NC 1507Inspe tre National Board, State, Province, and Endorsements
Date:121712005
05-037