Ben Tripousis, Northern Regional Director An Overview of the High-Speed Rail Construction Project Santa Clara Valley Transportation Authority Small Business Networking Event, Gilroy Library
A TRANSFORMATIVE INVESTMENT IN CALIFORNIA’S FUTURE
• California is 8th Largest Economy in the World • Comparable to Northeast Corridor in Terms of Distance, Population
and Complexity • Transformative Investment • Connecting all California Population Centers
HIGH-SPEED RAIL: More Than A Transportation Program
• Curbs Congestion » LAX to SFO is the Busiest Short-Haul Market in US » 1 in 5 Flights out of LA Heads to Bay Area » Six of Top 30 Congested Urban Areas in US Located in California
• Population Growth » Estimated to Reach 50 Million by 2050
• Air Quality/Sustainability » Meets Goals of AB 32/SB 375 » Worst Air Communities in the Country
• Alternatives are Costly » 2-3 Times More Expensive
WHY HIGH-SPEED RAIL IN CALIFORNIA?
• High-Speed Rail Fills a Gap in California’s Infrastructure • Equivalent New Capacity Between SF-LA would cost $158 billion, and
would require: » 4,300 New Highway Lane Miles » 115 Additional Airport Gates » 4 New Runway Terminals
HIGH-SPEED RAIL: A MORE EFFICIENT ALTERNATIVE
CONNECTING CALIFORNIA
• Phase I: » 520 Miles » San Francisco to
Los Angeles/Anaheim
• Regional Improvements » Caltrain Electrification » LA Union Station Passing Tracks » Positive Train Control » Grade Separation
• Funding: » $3.3 Billion Federal and $4.7 Billion Prop 1A » 25% of Future Cap and Trade Proceeds
• Environmental Clearances: » Merced to Fresno: May 2012 » Fresno to Bakersfield: June 2014
• Construction Packages: » CP 1: Executed in August 2013, Under $1 Billion » CP 2-3: Executed June 10, 2015 » CP4: RFP Released and 5 Teams Qualified to Bid
• Official Groundbreaking in January
• Work is Underway
KEY PROGRAM MILESTONES
• Ag Conservation & Preservation » Department of Conservation Solicits Farmland Mitigation Proposals » 5,000 Acres of Permanent Easements in the Central Valley
• Tier 4 Construction Equipment: » Engines Meet Nation’s Most Stringent Standards
• Mitigation with A Difference: » Lazy K Mitigation Site • 530 Acres for Habitat Mitigation Activities
» Westervelt Ecological Services Selected for Habitat Mitigation in Central Valley
• Voluntary Emissions Reduction Agreement (VERA): » MOU with San Joaquin Unified Air Pollution Control District » Zero Net Emissions » Replaces Aging Equipment Including Tractors and Irrigation Pumps
KEY ENVIRONMENTAL MILESTONES
• Electrification of the Caltrain Corridor » Peninsula Corridor Joint Powers Board – Environmental Review
Underway • Transbay Terminal
» Construction Proceeding • Station Area Planning
» Gilroy & San Jose
NORTHERN CALIFORNIA: ELECTRIFICATION & CONNECTIVITY
• Construction Package 1 » 29 Miles Between Madera and Fresno » Work is Underway
• Construction Package 2-3 » 65 Miles Between Fresno and Tulare-Kern County Line » Environmental Clearances Complete » Design-Build Contract Execution Expected in Spring
• Construction Package 4 » 22 Miles Between Tulare-Kern County Line and North of Bakersfield » Environmental Clearances Complete » 5 Teams Qualified to Bid » RFP Released
CENTRAL VALLEY: BACKBONE OF HIGH-SPEED RAIL
• Palmdale to Burbank/Burbank to Los Angeles » Public & Community Feedback » Palmdale: Golden Spike
• Connectivity & Bookend Projects » Southern California Regional Interconnector Project (SCRIP) » Grade Separations
• Station Area Planning » Palmdale, Burbank & LA Union Station
SOUTHERN CALIFORNIA: ACCELERATION & CONNECTIVITY
• Program Planning • Project Management • Preliminary Engineering • Project Planning and Environmental Approval • ROW Acquisition • Design • Construction • Contract Compliance • Operations & Maintenance
DELIVERY PHASES
PROGRAM MANAGEMENT ORGANIZATION MIXES PUBLIC AND PRIVATE EXPERTISE
Chief Program Manager and Deputy
Chief Program Manager
Design & Construction
CEO
Real Property Environment
Program Management Team
Private ~90% total staff
Public ~10% total staff
Regional Consultants
Project Management
Contract Compliance
Operations and
Maintenance
Transportation / Commercial
Planning Engineering
Risk Manager
Project and Construction Management
Rail Delivery Partner
Program Delivery Integration
Transitioning to
• 30% Goal for Small Business
Participation » 10% Disadvantaged Business
Enterprises (DBE) » 3% Disabled Veteran Business
Enterprises (DVBE)
SMALL BUSINESS PROGRAM
• Preliminary/Construction Phase Jobs
» Planners – Transportation, Environmental Urban » Engineers – Civil, Mechanical/Industrial, Rail Architectural, Computer,
Geotechnical Electrical » Managers/Workers – Contracts, Compliance, Project, Program, Risk » Surveyors » Estimators » Right of Way Agents » Outreach/Public Relations » Construction Workers/Trades
HIGH-SPEED RAIL JOBS
• Post Construction/Permanent Jobs
» Trainset Procurement » Railcar Manufacturer/Assembly » Operation Planners » Station Managers/Workers » Passenger Service/Reservation Agents » Train Operators/Workers » Train Dispatchers/Signaling » Train/System Security » Maintenance Engineers » Maintenance Workers – Infrastructure, Train, Station, Track
HIGH-SPEED RAIL JOBS
• Approximately 65 Miles
• East American Avenue in Fresno to One Mile North of the Kern/Tulare County Line
• Includes At-Grade and Aerial Structure – Six Viaducts, Six Bridges, One Undercrossing and 30 Overhead Structures
• June 2015: $1.2 Billion Contract Executed with Dragados/Flatiron
• Limited Notice to Proceed issued
• PCM: Arcadis
CONSTRUCTION PACKAGE 2-3
• Approximately 22 Miles
• One Mile North of Kern/Tulare County Line to Poplar Avenue
• Estimated Contract Value $400-500 Million
• At-grade and aerial sections, three grade separations, realignment of local roads and BNSF tracks
• Timeline » May 27: RFP Released » Fall: Proposals Due » Early 2016: Authority Board Awards
Contract
CONSTRUCTION PACKAGE 4
• June 9: Authority Board Awards Contract to Parsons Brinckerhoff Team
• Parsons Brinkerhoff – Multinational Engineering and Design Firm » Network Rail Consulting – United Kingdom Network Rail Manager » LeighFisher – Global Management Consulting Firm
• Expands Role of Program Management Team (PMT) from Planning and Preliminary Design to Include Program Management, System Integration and Delivery » Program Delivery and Operations » Accelerating Sections Concurrently to Deliver System Sooner » Integration High-Speed Rail Sections and Stations
• Contract Expires in 2022 » Corresponds with Planned High-Speed Rail Operations
RAIL DELIVERY PARTNER
• Average Americans: » 6% Decrease in Miles Driven in 2011 vs. 2004
• Drivers 16-34 Years: » 23% Less Miles Driven from 2001 to 2009
• Ownership Alternatives: » Bike, Zip Car, Lyft, Uber, Mega Bus
• Embrace Public Transport » Los Angeles Metro and Metrolink » BART and Muni (Bay Area) » Amtrak
MILLENNIAL GENERATION
• Support and Educate Others on this Transformative Investment in California’s Future
• #Iwillride Social Media Campaign » Engage & Educate
• #Iwillride Youth Advocacy Campaign » Increase Millennial Support
SOCIAL MEDIA: #IWILLRIDE
THANK YOU
Ben Tripousis, Northern Regional Director (408) 277-1085 [email protected]