A Traning Plan

download A Traning Plan

of 36

Transcript of A Traning Plan

  • 7/31/2019 A Traning Plan

    1/36

    TRAINING PLANInstalling computer systems and networks

    Qualification: Computer Hardware Servicing NCII

    TraineesTraining

    Requirements

    TrainingActivity/Task

    Mode ofTraining

    StaffFacilities/Toolsand Equipment

    VenueAssessment

    Method

    Dateand

    Time

    Installingcomputersystems and

    networks1. Plan andprepare forinstallation.

    Installationplanned andprepared toensure that safetymeasures,policies andproceduresfollowed, and thatwork is

    appropriatelysequenced inaccordance withthe industrystandards

    Technicalpersonnelconsulted to

    InternshipModular /Self pace

    IndustryCoordinator

    TrainerKevin F.Liberato

    PersonalProtectiveequipment ( ex.protectiveeyewear, antistatic wrist wrap)

    Electroniclaboratory hand

    tools (assortedpliers, assortedscrew drivers,soldering iron &desoldering tool)

    LAN tester

    Crimping tools

    IBMEastwoodLibis,Pasig City

    Hands-on

    Directobservation

    Practicaldemonstration

  • 7/31/2019 A Traning Plan

    2/36

    ensure that thework coordinatedeffectively withothers involved

    on the worksite

    Computersystems andnetwork devicesobtained inaccordance withthe establishedprocedures andto comply with

    requirements

    Location wheredevices andsystems to beinstalled isdetermined from

    job requirements

    Materials

    necessary tocomplete thework obtained inaccordance withestablishedprocedures andchecked against

    job requirements

    RS 232 pinexertion/extraction tool

    Flashlights

    Mirror(inspection)

    Hand-outs

  • 7/31/2019 A Traning Plan

    3/36

    Tools, equipmentand testingdevices needed tocarry out the

    installation workobtained inaccordance withestablishedprocedures andchecked forcorrect operationand safety

    Preparatory work

    checked toensure that nounnecessarydamage hasoccurred and thatwork complieswithrequirements

    2. Installdevice/

    system/equipments

    Occupationalhealth and safety

    policies andproceduresfollowed ininstallingcomputersystems ,network devices,and peripherals

    InternshipModular /

    Self pace

    IndustryCoordinator

    TrainerKevin F.Liberato

    PersonalProtective

    equipment ( ex.protectiveeyewear, antistatic wrist wrap)

    Electroniclaboratory handtools (assortedpliers, assorted

    IBMEastwood

    Libis,Pasig City

    Hands-on

    Directobservation

    Practicaldemonstration

  • 7/31/2019 A Traning Plan

    4/36

    Computersystems, networkdevices andperipherals

    installed obtainedin accordancewith theestablishedprocedures andto comply withrequirements

    Appropriateprocedures in

    installingcomputersystems, networkdevices andperipheralsachieve inaccordance withrequirementswithout damageor distortion to

    the surroundingenvironment andservices

    Variation todevices/systemsinstallationcarried out inaccordance with

    screw drivers,soldering iron,desoldering tool)

    LAN tester

    Crimping tools

    RS 232 pinexertion/extraction tool

    Flashlights

    Device drivers ,operating system

    Appropriatesoftwareapplicationprograms

    Diagnosticsoftware or

    utilities

    Hand-outs

  • 7/31/2019 A Traning Plan

    5/36

    thecustomer/clientsrequirements

    Unplanned eventsor conditionsresponded to inaccordance to inaccordance withestablishedprocedures

    Approval isobtained in

    accordance withestablishedprocedures fromappropriatepersonnel beforeany contingenciesimplemented

    Ongoing checksof the quality of

    the quality of thework undertakenin accordancewith theestablishedprocedures

    3. Conduct test. Occupationalhealth and safetypolicies and

    InternshipModular /Self pace

    IndustryCoordinator

    Trainer

    PersonalProtectiveequipment ( ex.

    IBMEastwoodLibis,

    Hands-on

    Direct

  • 7/31/2019 A Traning Plan

    6/36

    procedures forinstallingcomputersystems and

    network devicesfollowed.

    Circuits andsystems checkedas being isolatedwhere necessaryusing specifiedtestingprocedures

    Parts orconnections ofthe installation orservice thatremoved in orderto conduct thetest stored toprotect againstloss or damage

    and inaccordance withestablishedprocedures

    Unplanned eventsor conditionsresponded to inaccordance with

    Kevin F.Liberato

    protectiveeyewear, antistatic wrist wrap)

    Electroniclaboratory handtools (assortedpliers, assortedscrew drivers,soldering iron,desoldering tool)

    LAN tester

    Crimping tools

    RS 232 pinexertion/extraction tool

    Flashlights

    Sharp pointedtweezers

    Mirror(inspection)

    Hand-outs

    Pasig City observation

    Practicaldemonstrati

    on

  • 7/31/2019 A Traning Plan

    7/36

    the industryrequirements

    Approval

    obtained inaccordance withestablishedprocedures fromappropriatepersonnel beforeany contingenciesare implemented

    Devices/systems

    and/orinstallation testedto terminated inaccordance withthe industryrequirements

    Parts and/orconnectionsremoved for

    testing returnedto pre-testconditions inaccordance withestablishedprocedures

    Final inspectionsundertaken to

  • 7/31/2019 A Traning Plan

    8/36

    ensure that theinstalleddevices/systemsconforms to

    requirements

    Documents inrelation to thetest forwarded toappropriatepersonnel and/orauthority inaccordance withrequirements

  • 7/31/2019 A Traning Plan

    9/36

    FORM 4.2-1.1

    REQUIRED TRAINING FACILITIES FOR WORK-BASED TRAINING

    Installing computer systems and networks

    Trainees TrainingRequirements

    Training Activity/Task Tool Equipment Materials Facilities

    Installing computersystems andnetworks

    1. Plan and prepare

    for installation.

    Installation planned and

    prepared to ensure thatsafety measures, policiesand procedures followed,and that work isappropriately sequencedin accordance with theindustry standards

    Technical personnelconsulted to ensure that

    the work coordinatedeffectively with othersinvolved on the worksite

    Computer systems andnetwork devices obtainedin accordance with theestablished procedures

    Personal

    Protectiveequipment (ex. protectiveeyewear, antistatic wristwrap)

    Electroniclaboratoryhand tools

    (assortedpliers,assortedscrew drivers,soldering iron& disorderingtool)

    LAN tester

    Flashlights

    Hand-outs Service Area

  • 7/31/2019 A Traning Plan

    10/36

    and to comply withrequirements

    Location where devices

    and systems to beinstalled is determinedfrom job requirements

    Materials necessary tocomplete the workobtained in accordancewith establishedprocedures and checkedagainst job requirements

    Tools, equipment andtesting devices needed tocarry out the installationwork obtained inaccordance withestablished proceduresand checked for correctoperation and safety

    Preparatory work checkedto ensure that nounnecessary damage hasoccurred and that workcomplies withrequirements

    Crimpingtools

    RS 232 pinexertion/extractiontool

    Mirror(inspection)

    2. Install device/system/equipments

    Occupational health andsafety policies andprocedures followed in

    PersonalProtectiveequipment (

    LAN tester

    Flashlights

    Devicedrivers ,operating

    Service Area

  • 7/31/2019 A Traning Plan

    11/36

    installing computersystems , networkdevices, and peripherals

    Computer systems,network devices andperipherals installedobtained in accordancewith the establishedprocedures and to complywith requirements

    Appropriate procedures ininstalling computer

    systems, network devicesand peripherals achieve inaccordance withrequirements withoutdamage or distortion tothe surroundingenvironment and services

    Variation todevices/systems

    installation carried out inaccordance with thecustomer/clientsrequirements

    Unplanned events orconditions responded toin accordance to inaccordance with

    ex. protectiveeyewear, antistatic wristwrap)

    Electroniclaboratoryhand tools(assortedpliers,assortedscrew drivers,solderingiron,

    desolderingtool)

    Crimpingtools

    RS 232 pinexertion/extractiontool

    system

    Appropriatesoftware

    applicationprograms

    Diagnosticsoftware orutilities

    Hand-outs

  • 7/31/2019 A Traning Plan

    12/36

    established procedures

    Approval is obtained inaccordance with

    established proceduresfrom appropriatepersonnel before anycontingenciesimplemented

    Ongoing checks of thequality of the quality ofthe work undertaken inaccordance with the

    established procedures3. Conduct test. Occupational health and

    safety policies andprocedures for installingcomputer systems andnetwork devices followed.

    Circuits and systemschecked as being isolatedwhere necessary using

    specified testingprocedures

    Parts or connections ofthe installation or servicethat removed in order toconduct the test stored toprotect against loss ordamage and in

    PersonalProtectiveequipment (ex. protectiveeyewear, antistatic wristwrap)

    Electronic

    laboratoryhand tools(assortedpliers,assortedscrew drivers,solderingiron,desoldering

    LAN tester Hand-outs Service Area

  • 7/31/2019 A Traning Plan

    13/36

    accordance withestablished procedures

    Unplanned events or

    conditions responded toin accordance with theindustry requirements

    Approval obtained inaccordance withestablished proceduresfrom appropriatepersonnel before anycontingencies are

    implemented

    Devices/systems and/orinstallation tested toterminated in accordancewith the industryrequirements

    Parts and/or connectionsremoved for testing

    returned to pre-testconditions in accordancewith establishedprocedures

    Final inspectionsundertaken to ensure thatthe installeddevices/systems conforms

    tool)

    Crimpingtools

    RS 232 pinexertion/extractiontool

    Flashlights

    Sharp pointedtweezers

    Mirror(inspection)

  • 7/31/2019 A Traning Plan

    14/36

    to requirements

    Documents in relation tothe test forwarded to

    appropriate personneland/or authority inaccordance withrequirements

  • 7/31/2019 A Traning Plan

    15/36

    TRAINING PLANDiagnosing and troubleshoot computer system

    Qualification: Computer Hardware Servicing NCII

    TraineesTraining

    Requirements

    TrainingActivity/Task

    Mode ofTraining

    StaffFacilities/Toolsand Equipment

    VenueAssessment

    Method

    Dateand

    Time

    Diagnosing andtroubleshootcomputersystem

    1. Plan &prepare fordiagnosis offaults ofcomputersystems.

    Faults and errorof computersystem properlydetermined.

    Tools(hardware/software) identified inaccordance withits uses andfunctions.

    Safetyprecautionsestablished inaccordance withworkplaceprocedures.

    InternshipModular /Self pace

    IndustryCoordinator

    TrainerKevin F.Liberato

    Tools:Screw drivers(assorted)Pliers (assorted)Soldering ironWrenchesUtility softwareComputersystem

    Policies andprocedures:Procedures andguidelinesSafetyprecautions

    IBMEastwoodLibis,Pasig City

    Hands-on

    Directobservation

    Practicaldemonstration

  • 7/31/2019 A Traning Plan

    16/36

    2. Diagnosefaults ofcomputersystem

    Components orparts of computersystem clearlyidentified

    Functions of thecomputersystemsexplained

    Faults andfailures of thecomputersystems

    diagnosed baseon the jobrequirements

    InternshipModular /Self pace

    IndustryCoordinator

    TrainerKevin F.

    Liberato

    Tools:Screw drivers(assorted)Pliers (assorted)

    WrenchesUtility software

    Materials:ConnectorsAdaptorsDiskettesCD ROM

    Computer

    system:Complete set ofworkingcomputerSpare of allcomponents

    Testingdevices:Multi-meter

    OscilloscopeAppropriatesoftware

    IBMEastwoodLibis,Pasig City

    Lecture-demonstration

    Self-pacedinstruction

    3. Repairdefects incomputersystems &networks

    Defectivecomponentsproperly replacedand corrected

    Error in networks

    InternshipModular /Self pace

    IndustryCoordinator

    TrainerKevin F.Liberato

    Tools:Screw drivers(assorted)Pliers (assorted)Soldering ironWrenches

    IBMEastwoodLibis,Pasig City

    Lecture-demonstration

    Self-pacedinstruction

  • 7/31/2019 A Traning Plan

    17/36

    clearly identifiedand repaired inline withstandard

    procedures

    Defectivecomponentsidentified andseparated toother components

    Utility softwareCrimping tools

    Computer

    system:ServersWorkstationsPrinters

    Policies andprocedures:Procedures andguidelines

    Testingdevices:Multi-testerOscilloscope

    Groupdiscussion

    4. Test systems& networks.

    Computersystems andnetworks aretested inaccordance withthe job

    requirements

    Information areshared from onecomputer toanother asprimaryrequirement incomputer

    InternshipModular /Self pace

    IndustryCoordinator

    TrainerKevin F.Liberato

    Computersystem:ServersWorkstationsPrinters

    Policies andprocedures:Procedures andguidelines fortesting

    Testingdevices:Network cable

    IBMEastwoodLibis,Pasig City

    Hands-onapplication

    Directobservation

    Practicaldemonstration

  • 7/31/2019 A Traning Plan

    18/36

    networking

    Reports areprepared and

    completedaccording to thecompanyrequirements

    testerHubs

    Others:

    Papers (forreportgeneration)AC line (tosupply power)

  • 7/31/2019 A Traning Plan

    19/36

    FORM 4.2-1.1

    REQUIRED TRAINING FACILITIES FOR WORK-BASED TRAINING

    Diagnosing and troubleshoot computer system

    Trainees TrainingRequirements

    Training Activity/Task Tool Equipment Materials Facilities

    Diagnosing andtroubleshootcomputer system

    1. Plan & prepare fordiagnosis of faults ofcomputer systems.

    Faults and error of

    computer system properlydetermined.

    Tools (hardware/software)identified in accordancewith its uses andfunctions.

    Safety precautionsestablished in accordance

    with workplaceprocedures.

    Tools:

    Screw drivers(assorted)Pliers(assorted)Soldering ironWrenchesUtilitysoftware

    Computer

    system

    Policies and

    procedures:ProceduresandguidelinesSafetyprecautions

    Service Area

    2. Diagnose faults ofcomputer system

    Components or parts ofcomputer system clearlyidentified

    Functions of thecomputer systemsexplained

    Tools:Screw drivers(assorted)Pliers(assorted)Wrenches

    Computersystem:Complete setof workingcomputerSpare of allcomponents

    Materials:ConnectorsAdaptorsDiskettesCD ROM

    Service Area

  • 7/31/2019 A Traning Plan

    20/36

    Faults and failures of thecomputer systemsdiagnosed base on the job

    requirements

    Testingdevices:Multi-meter

    OscilloscopeAppropriatesoftwareUtilitysoftware

    3. Repair defects incomputer systems &networks

    Defective componentsproperly replaced andcorrected

    Error in networks clearly

    identified and repaired inline with standardprocedures

    Defective componentsidentified and separatedto other components

    Tools:Screw drivers(assorted)Pliers(assorted)

    Soldering ironWrenchesUtilitysoftwareCrimpingtools

    Computersystem:ServersWorkstationsPrinters

    Testingdevices:Multi-testerOscilloscope

    Policies andprocedures:Proceduresandguidelines

    Service Area

    4. Test systems &networks.

    Computer systems andnetworks are tested inaccordance with the jobrequirements

    Information are sharedfrom one computer toanother as primaryrequirement in computer

    Computersystem:ServersWorkstationsPrinters Testingdevices:Network cabletester

    Computersystem:ServersWorkstationsPrinters Testingdevices:Network cabletester

    Policies andprocedures:Proceduresandguidelines fortesting

    Others:Papers (for

    Service Area

  • 7/31/2019 A Traning Plan

    21/36

    networking

    Reports are prepared andcompleted according to

    the companyrequirements

    Hubs Hubs reportgeneration)AC line (tosupply

    power)

  • 7/31/2019 A Traning Plan

    22/36

    TRAINING PLANConfiguring computer systems & networks

    Qualification: Computer Hardware Servicing NCII

    TraineesTraining

    Requirements

    TrainingActivity/Task

    Mode ofTraining

    StaffFacilities/Toolsand Equipment

    VenueAssessment

    Method

    Dateand

    Time

    Configuringcomputersystems &networks

    1. Plan &prepare forconfiguration.

    Configuredcomputersystems andnetworksidentified fromthe Job/ServiceOrder orinstructions.

    Planned andprepared jobrequirements.

    Followed OHSpolicies andprocedures of jobrequirements.

    InternshipModular /Self pace

    IndustryCoordinator

    TrainerKevin F.Liberato

    OH & S policiesand procedure- OH & S policies- Manuals

    Computersystems andnetworks- 1 Server- Peripherals- 1 DesktopComputers

    Materials- Wires andCables- AppropriateSoftware

    IBMEastwoodLibis,Pasig City

    Hands-onapplication

    Directobservation

    Practicaldemonstration

  • 7/31/2019 A Traning Plan

    23/36

    Checkedcomputersystems andnetworks

    configurationwith specifiedrequirements.

    Checkednecessary tools,equipmentmaterials

    - ComputerStorage Media

    Tools

    - Pliers- Philips screwdriver

    Equipment/testing devices- Computer

    Personal

    protectiveequipment- Anti-staticwrist wrap

    2. Configurecomputersystems andnetworks.

    AppropriatePersonalProtectiveEquipment areused and OHSpolicies and

    proceduresfollowed

    Normal functionof systems andnetworks checkedin accordancewithmanufacturers

    InternshipModular /Self pace

    IndustryCoordinator

    TrainerKevin F.Liberato

    OH & S policiesand procedures- OH & S policies- Manuals

    Computer

    systems andnetworks- 1 Server- Peripherals- 1 DesktopComputers

    Materials- Wires and

    IBMEastwoodLibis,Pasig City

    Hands-onapplication

    Directobservation

    Practicaldemonstration

  • 7/31/2019 A Traning Plan

    24/36

    instructions

    Fault or problemin the systems

    and networksdiagnosed in linewith the standardoperatingprocedures.

    Computersystems andnetworksconfigured in line

    with the standardoperatingprocedures

    Cables- AppropriateSoftware- Computer

    Storage Media

    Tools- Pliers- Philips screwdriver

    Equipment/testing devices

    - Computer

    Personalprotectiveequipment- Anti-staticwrist wrap

    3. Inspect &test configuredcomputer

    systems &networks.

    Final inspectionsare undertaken toensure that the

    configurationdone on thesystems andnetworksconforms with themanufacturesinstruction/manual

    InternshipModular /Self pace

    IndustryCoordinator

    Trainer

    Kevin F.Liberato

    OH & S policiesand procedures- OH & S policies

    - Manuals

    Computersystems andnetworks- 1 Server- Peripherals- 1 DesktopComputers

    IBMEastwoodLibis,

    Pasig City

    Hands-onapplication

    Directobservation

    PracticalDemonstration

  • 7/31/2019 A Traning Plan

    25/36

    Computersystems andnetworks arechecked toensure safeoperation.

    Report isprepared andcompletedaccording tocompanyrequirements.

    Materials- Wires andCables- AppropriateSoftware- ComputerStorage Media

    Tools- Pliers- Philips screwdriver

    Equipment/testing devices- Computer

    Personalprotectiveequipment- Anti-staticwrist wrap

  • 7/31/2019 A Traning Plan

    26/36

    FORM 4.2-1.1

    REQUIRED TRAINING FACILITIES FOR WORK-BASED TRAINING

    Configuring computer systems & networks

    Trainees TrainingRequirements

    Training Activity/Task Tool Equipment Materials Facilities

    Configuringcomputer systems& networks

    1. Plan & prepare for

    configuration.

    Configured computer

    systems and networksidentified from the

    Job/Service Order orinstructions.

    Planned and prepared jobrequirements.

    Followed OHS policiesand procedures of job

    requirements.

    Checked computersystems and networksconfiguration withspecified requirements.

    Checked necessary tools,

    Tools

    - Pliers- Philipsscrew driver

    Personalprotectiveequipment- Anti-staticwrist wrap

    Computer

    systems andnetworks- 1 Server- Peripherals- 1 DesktopComputers

    Equipment/testing devices- Computer

    OH & S

    policies andprocedure- OH & Spolicies- Manuals

    Materials- Wires andCables- Appropriate

    Software- ComputerStorageMedia

    Service Area

  • 7/31/2019 A Traning Plan

    27/36

    equipment materials

    2. Configurecomputer systemsand networks.

    Appropriate PersonalProtective Equipment areused and OHS policiesand procedures followed

    Normal function ofsystems and networkschecked in accordancewith manufacturersinstructions

    Fault or problem in thesystems and networks

    diagnosed in line with thestandard operatingprocedures.

    Computer systems andnetworks configured inline with the standardoperating procedures

    Tools- Pliers- Philipsscrew driver

    Personalprotectiveequipment- Anti-staticwrist wrap

    Computersystems andnetworks- 1 Server- Peripherals- 1 DesktopComputers

    Equipment/testing devices- Computer

    OH & Spolicies andprocedures- OH & Spolicies- Manuals

    Materials- Wires andCables- AppropriateSoftware- Computer

    StorageMedia

    Service Area

    3. Inspect & testconfigured computer

    systems & networks.

    Final inspections areundertaken to ensure that

    the configuration done onthe systems and networksconforms with themanufacturesinstruction/manual

    Computer systems andnetworks are checked toensure safe operation.

    Tools- Pliers

    - Philipsscrew driver

    Personalprotectiveequipment- Anti-staticwrist wrap

    Computersystems and

    networks- 1 Server- Peripherals- 1 DesktopComputers

    Equipment/testing devices- Computer

    OH & Spolicies and

    procedures- OH & Spolicies- Manuals

    Materials- Wires andCables- Appropriate

    Service Area

  • 7/31/2019 A Traning Plan

    28/36

    Report is prepared andcompleted according tocompany requirements.

    Software- ComputerStorageMedia

  • 7/31/2019 A Traning Plan

    29/36

    TRAINING PLANMaintaining computer systems & networks

    Qualification: Computer Hardware Servicing NCII

    TraineesTraining

    Requirements

    TrainingActivity/Task

    Mode ofTraining

    StaffFacilities/Toolsand Equipment

    VenueAssessment

    Method

    Dateand

    Time

    Maintainingcomputersystems &networks

    1. Plan &prepare for themaintenance ofcomputersystems &networks.

    1. Maintenanceplanned andprepared withOHS policies andprocedures.

    2. The materials,tools, equipmentsand testingdevices obtained

    and checked.

    3. Computersystems andnetworkschecked,identified andmaintained with

    InternshipModular /Self pace

    IndustryCoordinator

    TrainerKevin F.Liberato

    OHS guidelinesand policies.

    PCspecifications

    Networkdesigns

    Schematic

    Diagrams

    Books/magazines

    Manuals

    IBMEastwoodLibis,Pasig City

    Hands-on

    Directobservation

    Practicaldemonstration

  • 7/31/2019 A Traning Plan

    30/36

    specifications andrequirements toconform withmanufacturers.

    2. Maintaincomputersystems.

    1. The normalfunctions ofcomputersystems arechecked andtested.

    2. Thescheduled/periodic maintenance

    and cleaning areperformed.

    3. Therepairs/replacements and suddenbreakdownsresponded inaccordance withestablished

    procedures.

    InternshipModular /Self pace

    IndustryCoordinator

    TrainerKevin F.Liberato

    PCspecification

    SchematicDiagrams

    Personalprotectiveequipments- Gloves and

    goggles- Masks- Anti-staticwrist wraps

    Materials- Contactcleaners/ soapor detergents- Dust brush

    - Chamois orrags- Basin/ water

    Diagnosticssoftware andCD-ROMs

    Tools and test

    IBMEastwoodLibis,Pasig City

    Hands-on

    Directobservation

    Practical

  • 7/31/2019 A Traning Plan

    31/36

    equipments- Slotted headscrewdriver- Philips headscrewdriver- Long nosedpliers- Allen bitwrench- Multi-tester

    Spare parts

    3. Maintainnetwork

    systems.

    1. The normalfunctions of

    network systemschecked andtested.

    2. Thescheduled/periodic maintenanceand cleaningperformed.

    3. Therepairs/replacements and suddenbreakdownsresponded inaccordance withestablished

    InternshipModular /

    Self pace

    IndustryCoordinator

    TrainerKevin F.Liberato

    PC andnetwork

    specification

    Network Cablesand peripherals- UTP Cat. 5cables- UTP Cat.3cables- RJ 45 modularplug

    - Hubs/switches- Modem/router

    Network layoutand schematicdiagrams

    Personalprotective

    IBMEastwood

    Libis,Pasig City

    Hands-on

    Directobservation

    Practicaldemonstration

  • 7/31/2019 A Traning Plan

    32/36

    equipments- Gloves andgoggles- Masks- Anti-staticwrist wraps

    Materials- Contactcleaners/ soapor detergents- Dust brush- Chamois orrags

    - Basin/ water

    Diagnosticssoftware andCDROMs

    Tools and testequipments- Slotted headscrewdriver

    - Philips headscrewdriver- Long nosedpliers- Allen bitwrench- Crimping tool- Cable tester- Multi-tester

  • 7/31/2019 A Traning Plan

    33/36

  • 7/31/2019 A Traning Plan

    34/36

    FORM 4.2-1.1

    REQUIRED TRAINING FACILITIES FOR WORK-BASED TRAININGMaintaining computer systems & networks

    Trainees TrainingRequirements

    Training Activity/Task Tool Equipment Materials Facilities

    Maintainingcomputer systems& networks

    1. Plan & prepare for

    the maintenance ofcomputer systems &networks.

    1. Maintenance planned

    and prepared with OHSpolicies and procedures.

    2. The materials, tools,equipments and testingdevices obtained andchecked.

    3. Computer systems andnetworks checked,

    identified and maintainedwith specifications andrequirements to conformwith manufacturers.

    Equipment/

    testing devices- Computer

    OHS

    guidelinesand policies.

    PCspecifications

    Networkdesigns

    SchematicDiagrams

    Books/magazines

    Manuals

    Service Area

    2. Maintain 1. The normal functions Personal Diagnostics PC Service Area

  • 7/31/2019 A Traning Plan

    35/36

    computer systems. of computer systems arechecked and tested.

    2. The scheduled/periodicmaintenance and cleaningare performed.

    3. Therepairs/replacements andsudden breakdownsresponded in accordancewith establishedprocedures.

    protectiveequipments- Gloves andgoggles- Masks- Anti-staticwrist wraps

    Tools andtestequipments- Slotted headscrewdriver- Philips headscrewdriver- Long nosedpliers- Allen bitwrench- Multi-tester

    Spare parts

    software andCD-ROMs

    Equipment

    - Multi-tester

    Spare parts

    specification

    SchematicDiagrams

    Materials- Contactcleaners/soap ordetergents- Dust brush- Chamois orrags- Basin/water

    3. Maintain networksystems.

    1. The normal functionsof network systems

    checked and tested.

    2. The scheduled/periodicmaintenance and cleaningperformed.

    3. Therepairs/replacements andsudden breakdowns

    Personalprotective

    equipments- Gloves andgoggles- Masks- Anti-staticwrist wraps

    Tools andtest

    NetworkCables and

    peripherals- UTP Cat. 5cables- UTP Cat.3cables- RJ 45modular plug-Hubs/switche

    PC andnetwork

    specification

    Networklayout andschematicdiagrams

    Materials- Contact

    Service Area

  • 7/31/2019 A Traning Plan

    36/36

    responded in accordancewith established

    equipments- Slotted headscrewdriver- Philips headscrewdriver- Long nosedpliers- Allen bitwrench- Crimpingtool- Cable tester- Multi-tester- Spare cables

    s-Modem/router

    cleaners/soap ordetergents- Dust brush- Chamois orrags- Basin/water

    Diagnosticssoftware andCDROMs

    4. Inspect & testconfigured/repairedcomputer system &networks.

    1. Computer system andnetwork checked toensure safe operation.

    2. Final inspection andtesting taken to conformwith manufacturerspecifications.

    3. Reports prepared and

    completed to companyregulations.

    Tools andtestequipments- Slotted headscrewdriver- Philips headscrewdriver- Long nosedpliers- Allen bit

    wrench

    PCspecification

    SchematicDiagrams

    Diagnosticssoftware andCDROMs

    Books/manuals/magazines

    Service Area