A template for the Title Sheet is available on the CFL ... · Insert Name and Logo for A/E Firm...
Transcript of A template for the Title Sheet is available on the CFL ... · Insert Name and Logo for A/E Firm...
![Page 1: A template for the Title Sheet is available on the CFL ... · Insert Name and Logo for A/E Firm here SPECIFICATIONS: "STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES](https://reader034.fdocuments.in/reader034/viewer/2022050209/5f5bee475b2fd67c8878bf9b/html5/thumbnails/1.jpg)
DEP
ART
M
ENT
OF TRANSPORT
ATIO
N
UNIT
E
D STATES OF AME
RIC
A
PLANS FOR PROPOSED
PROJECT MANAGER
APPROVED:
DATE:
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
DENVER, COLORADO
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
FOR
PLANS PREPARED BY
Insert Name and Logo for A/E Firm here
SPECIFICATIONS:
"STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS
AND BRIDGES ON FEDERAL HIGHWAY PROJECTS, FP-03,
U.S. CUSTOMARY UNITS"
RECOMMENDED:
DIVISION ENGINEER, CENTRAL FEDERAL LANDS HIGHWAY DIVISION
DATE:
NATIONALPARK
SERVICE
Department
of the Interior
U.S. DEPARTMENT OF THE INTERIOR
NATIONAL PARK SERVICE
NV PRA-LAME 1(6), 1(7), & 2(1)
NORTHSHORE ROAD ANDLAKE MEAD BOULEVARD
LAKE MEAD NATIONAL RECREATION AREA
CLARK COUNTY
SCHEDULE A LENGTH 8.29 miles
SCHEDULE B LENGTH 8.73 miles
SUPERINTENDENT, LAKE MEAD NATIONAL RECREATION AREA
NPS PMIS NO.: 54621
CFL PM
DESIGN DESIGNATIONS:
ADT (2006) -----------
ADT (2026) -----------
DHV ------------------
D --------------------
T --------------------
V --------------------
e(max) ---------------
ADT (2006) -----------
ADT (2026) -----------
DHV ------------------
D --------------------
T --------------------
V --------------------
e(max) ---------------
ADT (2006) -----------
ADT (2026) -----------
DHV ------------------
D --------------------
T --------------------
V --------------------
e(max) ---------------
NGI
TE
D
EE
RE
TSI
GE
R
ST
A
LA
NE N
E
IG
NE
RE
EN
EIV IL
EXM
C
OF
OSSE IOR F NP
ER’S
AM
ALP
EXAMPLE
PE STAMP
~
~
CF
L S
AM
PL
E P
LA
N S
HE
ET
SUNRISE MTN.
SH 147
REDSTONE
(NO WATER)
ECHO BAY
L A K E M E DA B
O
U L VE A R D
NORTH
HO R E RO DA
S
MESQUITE, NV
62.758 mi
LAS VEGAS, NV12 mi from end of project
FRENCHMAN MTN.
EAST LAS
VEGASLAVA BUTTE
BO
ULD
ER H
WY
.
SH
582
US 9
3/
US 9
5
ALAN BIBLE
VISITOR CENTER
BOULDER
CITY
US
95 US 93
PARK
HEADQUARTERS
E
LA
KE
M
AE
DDR I
V
E
SH
416
L
AK
ES
HO
RE
D
R
LA K
ME A
I-40
77.05 mi
BAKER, CA
80 mi from
end of project
HENDERSON,NV
CALLVILLE BAY
D
US 93
HOOVER
DAM
KINGMAN, AZ
55 mi from end of
project
OREGON IDAHO
UT
AH
AR
IZO
NA
CA
LIFO
RN
IA
ELY
RENO
CARSON
CITY
LAS
VEGAS
WINNEMUCCA
KEY MAP OF NEVADA
INTERSTATE
80
INTERSTATE
15
INTERSTATE
80
9395
50
93
9393
695
TYPE OF CONSTRUCTION:
Drainage, pavement rehabilitation,
and asphalt surfacing
560
920
150
50%
1%
50 mph
8.0%
1991
2478
372
60%
1%
50 mph
8.0%
1730
2153
323
40/60
1%
50 mph
8.0%
U.S. CUSTOMARY DIMENSIONS:
Slopes are expressed as RISE:RUN
ST A1REG A12PROJECT NUMBER
PROJECT NAME
OVERTON, NV
20 mi from end of project
REG STATE PROJECTSHEET
NO.
TOTAL
SHEETS