A. SAADAT & CO.2 Introduction A.Saadat & Co., Consulting Engineers, was established in 1962. It is...

46
A. SAADAT & CO. Consulting Engineers Airconditioning, Refrigeration, Mechanical & Electrical Services Specializing in the Design of airconditioning, refrigeration, mechanical, electrical, plumbing water supply & drainage, fire protection services, Process gases piping, Cogeneration systems, Building automation & management systems, Plants operation & maintenance and Project feasibility studies for Commercial, Industrial & Institutional Buildings Astola Project Head Office Building Getz Pharma Pakistan (Pvt.) Ltd., Karachi. National Bank Of Pakistan, Karachi. Library Building Finance & Trade Centre, Karachi LUMS New Campus, DHA, Lahore Replacement of Co Gen Plant 3-Absorption Chillers Total 1180TR Capacity 3x1MW Gen Sets & 4x800TR Chillers Company Profile

Transcript of A. SAADAT & CO.2 Introduction A.Saadat & Co., Consulting Engineers, was established in 1962. It is...

Page 1: A. SAADAT & CO.2 Introduction A.Saadat & Co., Consulting Engineers, was established in 1962. It is staffed by qualified and experienced Professional Engineers who have worked in USA,

A. SAADAT & CO. Consulting Engineers Airconditioning, Refrigeration, Mechanical & Electrical Services Specializing in the Design of airconditioning, refrigeration, mechanical, electrical, plumbing water supply & drainage, fire protection services, Process gases piping, Cogeneration systems, Building automation & management systems, Plants operation & maintenance and Project feasibility studies for Commercial, Industrial & Institutional Buildings Astola Project Head Office Building Getz Pharma Pakistan (Pvt.) Ltd., Karachi. National Bank Of Pakistan, Karachi. Library Building Finance & Trade Centre, Karachi LUMS New Campus, DHA, Lahore Replacement of Co Gen Plant 3-Absorption Chillers Total 1180TR Capacity 3x1MW Gen Sets & 4x800TR Chillers Company Profile

Page 2: A. SAADAT & CO.2 Introduction A.Saadat & Co., Consulting Engineers, was established in 1962. It is staffed by qualified and experienced Professional Engineers who have worked in USA,

1 Contents. 1. Contents Page-1 2. Introduction Page-2 3. Principal Fields of Activity Page-3 to 4 4. Prominent Projects Since 1962-1985 Page-5 to 7 5. Senior Technical Staff Page-8 to 19 6. List of Notable Projects 1968-2000 & 2000 to 2010 Page-20 to 39 7. Major Projects Undertaken In Last Five Years Page-40 to 43 8. List of Major Projects In Hand Page-44 to 45

Page 3: A. SAADAT & CO.2 Introduction A.Saadat & Co., Consulting Engineers, was established in 1962. It is staffed by qualified and experienced Professional Engineers who have worked in USA,

2 Introduction A.Saadat & Co., Consulting Engineers, was established in 1962. It is staffed by qualified and experienced Professional Engineers who have worked in USA, UK, Europe and Middle East. The main fields of professional services rendered are listed below. Projects handled include internal and external services for all types of Buildings and campuses, industrial and commercial complexes, including multi-storey office buildings, institutional buildings, University Campuses, computer centres, hospitals & medical colleges, hotels, cinema auditoriums, Television and Radio Broadcasting Centres, Laboratories for special research and development, airports, industrial units including Pharmaceuticals Production units, cotton and synthetic fibre yarn spinning and weaving units, paints manufacturing, etc. Mr.Anwar Saadat, Principal of the Company has been associated with HVACR (Heating, Ventilating, Airconditioning, Refrigeration), Mechanical and Electrical Services for various types of Buildings since 1950. He completed B.Sc. Honours (Engineering)from The Punjab College Of Engineering & Technology, Lahore (now University Of Engineering & Technology, Lahore). He topped the list in 1949 in The Punjab University and was awarded Gold Medal. He worked with a HVACR Contracting Firm before leaving for UK on a British Industries Federation 2 years scholarship. During 1952-58, he completed a post graduate course in HVACR Engineering from The National College Of Heating, Ventilating, Refrigeration and Fan Engineering, London (now Institute Of Environmental Engineering, South Bank University), obtained training and worked in UK, Belgium and USA with HVACR Equipment Manufacturers. On returning to Pakistan, he worked as Chief Engineer of a HVACR Contracting Firm till 1962, when he started practicing as a Consulting Engineer. In consideration of services rendered by him to HVACR Engineering in the country, he was elected in 1996 as Founder President of Pakistan HVACR Society. He was elected Vice President of Association of Consulting Engineers Pakistan in 1990, 1995, 1997 and 2001.

Page 4: A. SAADAT & CO.2 Introduction A.Saadat & Co., Consulting Engineers, was established in 1962. It is staffed by qualified and experienced Professional Engineers who have worked in USA,

3 Principal Fields of Activity. The professional services are rendered in all fields of mechanical and electrical engineering with special interest in the following systems: 1. Year-round airconditioning or airconditioning (summer cooling) or winter heating systems. 2. Refrigeration systems for low temperature applications. 3. Mechanical environmental systems including air ventilation/exhaust. 4. Pollution Control. 5. Process piping. 6. Plumbing systems including internal & external cold and hot water supply and drainage systems. 7. Fire Fighting systems including sprinkler systems. 8. Water conservation, water recycling, grey water systems. 9. Irrigation systems. 10. Electrical systems including internal & external electrification & illumination. 11. Communications, fire/smoke detection and alarms, building automation, management & security systems. 12. Self Power Generation, Cogeneration Systems. Pakistan Engineering Council Registration No.CONSULT/521 as Consulting Engineers for Mechanical, Electrical & Chemical Engineering Works. Scope of Services. The scope of services rendered cover all aspects of engineering projects such as: - Consultation - Investigations & Survey - Feasibility & Study Reports - Engineering Design - Working Drawings - Technical Specifications - Bill of Quantities - Contract Documents - Cost Estimates - Evaluation of Bids - Procurement of Equipment & Materials - Construction Supervision

Page 5: A. SAADAT & CO.2 Introduction A.Saadat & Co., Consulting Engineers, was established in 1962. It is staffed by qualified and experienced Professional Engineers who have worked in USA,

4 - Supervision of Commissioning & Testing of Plants & Systems and certification of satisfactory completion of the work - Inspection and Revalidation of existing Systems & Plants - Top Supervision of the Operation & Maintenance Work of Plants

Page 6: A. SAADAT & CO.2 Introduction A.Saadat & Co., Consulting Engineers, was established in 1962. It is staffed by qualified and experienced Professional Engineers who have worked in USA,

5 PROMINENT PROJECTS SINCE 1962 Since 1962, A.Saadat & Co. has been associated as Consultants for Year-Round Airconditioning, Heating & Ventilating, Plumbing, Electrical & Mechanical Systems for a large number of major prestigious Projects in the Country including multi-storey Buildings, Hospitals, Hotels, Institutional Buildings, Industrial Units and Special Installations. To name a few: - Finance & Trade Centre, Karachi which was the largest single Office Block in the Country. - National Assembly Building, Islamabad. - The Aga Khan University Medical Centre, Karachi (Hospital, Medical College and School of Nursing). After completion of the main Project in 1985. ASCo were appointed Consultants for the on-going expan-sions/modifications and new Facilities. - Multi-Storey Office Buildings & Banks: Pakistan Secretariat, Islamabad, Phase-II Buildings. Wapda House, Lahore. The Dawood Centre, Karachi. Shell House, Karachi. State Bank Of Pakistan, Dacca Office Building. National Bank Of Pakistan, 2000 TR Capacity AC plants Head office , I.I. Chundrigar Road Karachi National Bank Of Pakistan: Regional Office Building, Islamabad. National Bank Of Pakistan: Shaheed–E-Millat Karachi. Principal Office Building, Lahore. Regional Office Buildings at Hyderabad, Quetta and Peshawar. USSR Chancery Buildings, Islamabad. Chinese Embassy Buildings, Islamabad. Habib Bank Ltd., Main Building, Quetta. State Life Building No.2, Karachi. State Life Building, Dera Ismail Khan. - SUPARCO Satellite Ground Receiving Stations at Karachi & Chittagong. Communication Lab Facilities (GRS), Islamabad. - Pharma Production Units of major Multi-National Companies requiring special environmental conditions, over 30 Units. Both original and subsequent expansions of the Production Facilities. Abbot Laboratories (Pakistan) Ltd. of U.S.A.

Page 7: A. SAADAT & CO.2 Introduction A.Saadat & Co., Consulting Engineers, was established in 1962. It is staffed by qualified and experienced Professional Engineers who have worked in USA,

6 Bayer Pakistan (Pvt) Ltd. of Germany Ciba-Geigy (Pakistan) Ltd. of Switzerland Clariant (Sandoz) Pakistan Ltd. of Switzerland Eli Lilly And Company of U.S.A. GlaxoWellcome Pakistan Ltd. of U.K. Hoechst Pakistan Ltd. of Germany Knoll (Boots) Pharmaceuticals Ltd. of U.K. Merck Sharp & Dhome (Pakistan) Ltd. of U.S.A. Pharmagen Beximco Ltd. of Korea Rhone Poulene (Pakistan) Ltd. of France Searle Pakistan (Pvt) Ltd. of U.S.A. Smith Kline Beecham (Pakistan) Ltd. of U.K. Spenser (Fisons) Pharma (Pvt) Ltd. of U.K. Squibb Pakistan Ltd. of U.S.A. Wyeth Laboratories (Pakistan) Ltd. of U.S.A. - Hotels: Khyber Pearl Continental, Peshawar. Avari Lahore - Ramada Renaissance, Lahore Avari Towers - Ramada Renaissance, Karachi. Hotel Midway House, Karachi Airport, New Block. Serena Hotel, Faisalabad. Serena Hotel, Quetta. Marriott Hotel, Islamabad, New Block. Pearl Continental Hotel, Bhurbun. Pearl Continental Hotel, Lahore. - Industrial Complexes. PIDC Machine Tool Factory, Landhi, Karachi. Security Paper Mill, Karachi. Pakistan Tobacco Co. Ltd. Factories at Akora Khattak & Jhelum. ICI Pakistan Ltd. Paint Factory, Lahore. Thal Jute Mills Ltd., Muzaffargarh. S.G.Fibre Ltd. Polyester Fibre Factory, Karachi. - Cotton Spinning Mills. Dawood Cotton Mill Unit Nos.4, 5 & 6, Landhi, Karachi.

Page 8: A. SAADAT & CO.2 Introduction A.Saadat & Co., Consulting Engineers, was established in 1962. It is staffed by qualified and experienced Professional Engineers who have worked in USA,

7 Kohinoor Spinning Mill, Chakwal. Mahmood Textile Mill, Unit No.3, Muzaffargarh. Margalla Textile Mill, Hasan Abdal. Monnoo Textile Mill, Distt. Lahore. Shahpur Textile Mill, Chunian. - Television Centres and Radio Broadcasting Units. Television Centres at Karachi, Lahore and Quetta. Pakistan Broadcasting Corporation Broadcasting Studios at Hyderabad, Karachi, Multan, Peshawar and Rawalpindi. High Power Transmitter Stations at Hyderabad, Islamabad, Karachi, Multan, Peshawar, Quetta and Rewat.

Page 9: A. SAADAT & CO.2 Introduction A.Saadat & Co., Consulting Engineers, was established in 1962. It is staffed by qualified and experienced Professional Engineers who have worked in USA,

8 CURRICULUM VITAE OF SENIOR TECHNICAL STAFF

Page 10: A. SAADAT & CO.2 Introduction A.Saadat & Co., Consulting Engineers, was established in 1962. It is staffed by qualified and experienced Professional Engineers who have worked in USA,

9 Principal: Engr.ANWAR SAADAT Founder President Pakistan HVACR Society (terms 1996-1999 & 1999-2001) President ASHRAE Pakistan Chapter, 2007-08 Vice President Association of Consulting Engineers, Pakistan (terms 1990-92, 1995-97, 1997-99, 2001-03 & 2005-07) Life Fellow : The Institution of Engineers, Pakistan. Life Member : American Society of Heating, Refrigerating & Airconditioning Engineers Inc., (ASHRAE) U.S.A. Life Fellow : The Institute of Refrigeration, U.K. Registered Professional Engineer with Pakistan Engineering Council. Educational Qualifications The Punjab University. 1946 B.Sc., Government College, Lahore (now Government College University). 1949 B.Sc. Honours (Engineering), The Punjab College of Engineering And Technology, Lahore (now University of Engineering & Technology, Lahore). Topped the list in the University and awarded Gold Medal and Prize. The South Bank University, London. 1953 The National College of Heating, Ventilating, Refrigeration and Fan Engineering, London (now Institute of Environmental Engineering). Awarded Associateship of the College after completing Post Graduate Course and the thesis on `Transfer of Heat and Moisture' was considered as the best. Professional Experience since 1949 - Engineering Teaching : 1 Year - HVACR Equipment Manufacturing : 5 Years - HVACR & Mechanical Contracting : 7 Years - Consulting Engineering HVACR, Mechanical, Plumbing & Electrical Services : since 1962 1949-50 Assistant Professor, Electrical Engineering Department, The Punjab College of Engineering And Technology, Lahore.

Page 11: A. SAADAT & CO.2 Introduction A.Saadat & Co., Consulting Engineers, was established in 1962. It is staffed by qualified and experienced Professional Engineers who have worked in USA,

10 1950-52 Design and installation of 400 TR capacity airconditioning plant for the Pakistan Security Printing Corporation, Malir, Karachi. 1954-55 The Lightfoot Refrigeration Co. Ltd., Wembley, U.K. Design and installation of cold storage, process refrigeration and airconditioning plants, sizes upto 500 TR (ton refrigeration). 1955-56 Society Gregg D'Europe, Lot, Bruxelles, Belgium. Technical Adviser (AC&R) supervising cold storage, refrigeration and airconditioning applications for Transport both rail and road. 1957-58 (a) Worthington Corporation, Harrison N.J., U.S.A. HVACR Equipment manufacturer. (b) The Standard Refrigeration Co. Inc. San Juan, Puerto Rico 350 TR capacity high velocity induction system airconditioning installation of Hotel La Concha, San Juan. 1956-62 Jaleel Brothers Ltd., Karachi. Chief Engineer, numerous cold storage and airconditioning projects, design and installation. Some of the notable jobs, State Bank of Pakistan, Head Office Building, Karachi (740 TR) Penicillin Factory PIDC, Daudkhel (200 TR), 950 seat Godeon Cinema (110 TR), Montgomery Cold Storage, Montgomery (Storage capacity 1000 tons fresh products). 1962-todate Practicing as a Consulting Engineer Principal of A.Saadat & Co.

Page 12: A. SAADAT & CO.2 Introduction A.Saadat & Co., Consulting Engineers, was established in 1962. It is staffed by qualified and experienced Professional Engineers who have worked in USA,

11 Engr.ANWAR SAADAT is a registered Professional Engineer and Principal of A.Saadat & Co., Consulting Engineers. He has been practicing as a Consulting Engineer for Airconditioning, Ventilation, Refrigeration, Mechanical, Plumbing and Electrical Services for Commercial, Industrial and Institutional Buildings since 1962. He has been associated as a Consulting Engineer with a great majority of notable Projects executed in the country. These include Pakistan Secretariat Buildings and National Assembly Building, Islamabad, Wapda House,Lahore, various Buildings of National Bank of Pakistan, various Buildings of State Life Insurance Corporation, various Broadcasting Studios and Transmitter Stations of Pakistan Broadcasting Corporation, Television Centres at Karachi and Lahore, Lahore Hilton Hotel, Avari Towers Hotel, Karachi, Serena Hotels at Faisalabad and Quetta, Pearl Continental Hotels at Karachi, Lahore & Rawalpindi, Production Facilities of many Multinational Pharmaceutical Companies, Khyber Teaching Hospital Peshawar and many Buildings of The Aga Khan University Campus, Karachi since 1976. He had previously worked as Chief Engineer of Jaleel Brothers Ltd., Karachi, a HVACR Contractors. Earlier he had worked with The Lightfoot Refrigeration Co. Ltd., London, UK, Society Gregg D'Europe, Bruxelles, Belgium, Worthington Corporation, Harison, NJ, USA and The Standard Refrigeration Co. Inc, San Juan, Puerto Rico. He played a key role in the formation of the Pakistan HVACR Society in 1996. In recognition of services rendered by him to HVACR Engineering in the country since 1950, he was elected as Founder President of Pakistan HVACR Society in 1996 and reelected in 1999. Being Principal of one of pioneer Consulting Engineering firm in the Country, he was elected Vice President of the Association of Consulting Engineers, Pakistan for the terms 1990-92, 1995-97, 1997-99 & 2001-03. He is a Fellow of Institution of Engineers, Pakistan, Fellow of The Institute of Refrigeration, UK, and Life Member of American Society of Heating, Refrigerating & Airconditioning Engineers, USA. He is B.Sc. Honours (Engineering) and Gold Medalist from The Punjab College of Engineering & Technology, Lahore (now designated The University of Engineering & Technology), B.Sc. from Government College, Lahore (now designated Government College University), and an Associate of The National College of Heating, Ventilating, Refrigeration and Fan Engineering, London, UK (now designated Institute of Environmental Engineering, South Bank University), for which he had submitted a thesis titled "Transfer of Heat and Moisture".

Page 13: A. SAADAT & CO.2 Introduction A.Saadat & Co., Consulting Engineers, was established in 1962. It is staffed by qualified and experienced Professional Engineers who have worked in USA,

12 Engr. FAROOQ AHMAD Technical Director of the Company. He has a wide ranging professional career of over 32 years, having obtained his Engineering Degree in 1977 from The Punjab University, Lahore. He is a registered Professional Engineer with Pakistan Engineering Council. He joined A.Saadat & Co. in 1988 and has been responsible for designing of HVACR, Mechanical & Plumbing Systems, preparation of working drawings, specifications, BOQ and tender documents, and top supervision of the work of the Contractors. He has been associated with a number of notable Projects including 300 Room Extension of Pearl Continental Hotel, Lahore, new Campus of Lahore University of Management Sciences, Lahore, Production and other facilities of multi national Pharmaceutical Companies such as GlaxoSmithKline Pakistan Ltd., Aventis Pakistan Ltd. & Barrett Hodgson Pakistan Ltd., multi storey office buildings and industrial units. His responsibilities include coordination with Owners, Architects and other Consultants for the Project and supervision of the work of Engineers & Draughtsmen of his Group. 1. Educational Qualifications: 1971 B.Sc. from Government College Lahore. 1975 B.Sc. (Engineering) in Chemical Engineering from The Institute Of Chemical Engineering & Technology,University Of Punjab, Lahore. Secured Second Position in the University. Merit Scholarships 1967-69 High School Performance Scholarship. 1969-72 Pakistan Railway Sponsorship. 1972-75 Punjab University Talent Scholarship. 2. Professional Affiliations: Registered as a Professional Engineer with Pakistan Engineering Council. 3. Professional Experience since 1976:

Page 14: A. SAADAT & CO.2 Introduction A.Saadat & Co., Consulting Engineers, was established in 1962. It is staffed by qualified and experienced Professional Engineers who have worked in USA,

13 1976 Interim Assignment as a Lecturer for six months with The University Of The Punjab, Lahore. 1977-78 Post-Graduate Practical Training with Dawood Hercules Chemicals Ltd., Lahore, for fifteen months. Plant Capacity was 1100 Tons of Urea per Day. 1978-80 Worked as Efficiency Engineer with The Electricity Corporation, Tripoli, Libya for their West Tripoli Power Station. This is one of the major Power Stations in North Africa with a Generating Capa-city of 5x65 MW electric power and included a Captive Seawater Desalination Plant of 2x11250 Cu.m per Day Capacity. 1980-88 Was employed by Saline Water Conversion Corporation, Jeddah,Saudi Arabia as Efficiency Engineer for Desalination Plant and Power House, Jeddah, Phase-III. This Plant had a Generating Capacity of 4x62 MW electric power and 4x22000 Cu.m per Day Of Sweet Water production from Red Sea. 1988-todate A.Saadat & Co., Consulting Engineers.

Page 15: A. SAADAT & CO.2 Introduction A.Saadat & Co., Consulting Engineers, was established in 1962. It is staffed by qualified and experienced Professional Engineers who have worked in USA,

14 Engr. HAFIZ YASIR KHAN 1. Educational Qualifications: 2012 B.E. in Mechanical Engineering from NED University of Engineering & Technology, Karachi. Computer Skill: Professional Courses: Two months professional training on AutoCAD. Other Courses: MS Office including MSWord, MS Excel, MS Power Point. 2. Professional Affiliations: Registered as a Registered Engineer with Pakistan Engineering Council, Registration No. MECH-27869. 3. Professional Experience: 2012(1 Year) National Technologies Inc, as Project Engineer. 2013, todate A.Saadat & Co., Consulting Engineers, as Design Engineer.

Page 16: A. SAADAT & CO.2 Introduction A.Saadat & Co., Consulting Engineers, was established in 1962. It is staffed by qualified and experienced Professional Engineers who have worked in USA,

15 Engr. MUHAMMAD ZAMAN 1. Educational Qualifications: 2012 B.Tech. in Mechanical Engineering from Pimsat University of Engineering & Technology, Karachi. Computer Skill: Professional Courses: Two months professional training on AutoCAD. Other Courses: MS Office including MSWord, MS Excel, MS Power Point. 2. Professional Experience: 2012(2 Years) Y.H. Associates, Consulting Engineers, as Project Engineer. 2013, todate A.Saadat & Co., Consulting Engineers, as Senior Project Engineer.

Page 17: A. SAADAT & CO.2 Introduction A.Saadat & Co., Consulting Engineers, was established in 1962. It is staffed by qualified and experienced Professional Engineers who have worked in USA,

16 Engr. HAMID HUSSAIN 1. Educational Qualifications: 2010 B. Tech. (Hons) in Mechanical Engineering from Newport Institute Of Communications & Economics Karachi. Computer Skill: Professional Courses: Two months professional training on AutoCAD. Other Courses: MS Office including MSWord, MS Excel, MS Power Point. 2. Professional Affiliations: The life member of Pakistan HVACRSociety jointly organized by Ashrae Pakistan Chapter. 3. Professional Experience: 2010 (1 Years) Y.H. Associates, Consulting Engineers, as a Design Engineer. 2011 (2 Years) Saudi Oger Ltd. (Saudia Arabia) as a Project Engineer. 2013, todate A. Saadat & Co., Consulting Engineers, as Senior Project Engineer.

Page 18: A. SAADAT & CO.2 Introduction A.Saadat & Co., Consulting Engineers, was established in 1962. It is staffed by qualified and experienced Professional Engineers who have worked in USA,

17 Engr. SALEEM AHMED 1. Educational Qualifications: 1984 Diploma of Associate Engineer from Sindh Board of Technical Education (Medal of Excellence) in Refrigeration & Air Conditioning. 1990 Bachelor of Technology in MECHANICAL from NED University of Engineering & Technology, Karachi. Computer Skill: Professional Courses: Two months professional training on AutoCAD. MS Office including MSWord, MS Excel, MS Power Point. 2. Technical Courses From : Cooling & Heating Loads Calculation HVAC System Design , Air & Water Side Design 3. Technical Trainings: 4. Professional Affiliations: Member of HVACR Society – Pakistan. 5. Professional Experience: 1984 to todate 32 Years in Air conditioning System Design, Erection, monitoring, & commissioning of AC plants. Major Projects Executed : - Complete Design , execution & commissioning of of AC system of HIMS building at Bun Murad Hamdard University Karachi - Execution , monitoring & commissioning of 1400 TR Direct Fired Absorption system for NICL Building Karachi. - Technical advisory services to Gardez Hospital Afganistan. - Complete Design , Execution & commissioning of of AC system of 600 TR Capacity at UCH Power-II Project ( 11 Buildings) including Smoke Control System – Dera Murad Jamali Baluchistan. 2017, todate A.Saadat & Co., Consulting Engineers, as General Manager.

Page 19: A. SAADAT & CO.2 Introduction A.Saadat & Co., Consulting Engineers, was established in 1962. It is staffed by qualified and experienced Professional Engineers who have worked in USA,

18 Engr. MAAZ AHMED RAZA 1. Educational Qualifications: 2006 B.E. in Mechanical Engineering from National University of Science & Technology. Computer Skill: Professional Courses: Two months professional training on AutoCAD. Other Courses: MS Office. 2. Professional Affiliations: Registered as a Registered Engineer with Pakistan Engineering Council, Registration No. MEC. 3. Professional Experience: Apr-12-Aug-13 Trainee Engineer at Tapal Energy (Pvt.) Ltd. Nov-13-July-14 Project Engineer at M.G Engineering Associates. November 2017 to date A.Saadat & Co., Consulting Engineers, as Design Engineer.

Page 20: A. SAADAT & CO.2 Introduction A.Saadat & Co., Consulting Engineers, was established in 1962. It is staffed by qualified and experienced Professional Engineers who have worked in USA,

19 Engr. TALHA JAWAID 1. Educational Qualifications: 2017 B.E Mechanical Engineering from NED University of Engineering & Technology. Computer Skill: Professional Courses: Two months professional training on AutoCAD. Other Courses: AutoCAD, HAP Software, Ansys, MS Office 2. Professional Affiliations: Registered as a Registered Engineer with Pakistan Engineering Council, Registration No. MECH-38597. 3. Professional Experience: 2018, todate A.Saadat & Co., Consulting Engineers, as Assistant Design Engineer.

Page 21: A. SAADAT & CO.2 Introduction A.Saadat & Co., Consulting Engineers, was established in 1962. It is staffed by qualified and experienced Professional Engineers who have worked in USA,

20 LIST OF NOTABLE PROJECTS executed by A.SAADAT & CO. Consulting Engineers - Pharmaceutical Production Units - Multi-Storey Office & Other Purposes Buildings - Government Buildings And Embassies - Banks And Insurance Companies - Hotels - Television, Radio, Auditoriums And Cinemas - Hospitals, Laboratories And Special Applications - Computer Centres - Industrial Complexes - Cotton & Synthetic Fibre Spinning & Weaving Units

Page 22: A. SAADAT & CO.2 Introduction A.Saadat & Co., Consulting Engineers, was established in 1962. It is staffed by qualified and experienced Professional Engineers who have worked in USA,

21 PHARMACEUTICAL PRODUCTION UNITS PROJECTS FROM 1968 to 2000 1. Sandoz Pakistan Ltd.: (a) New Pharmaceutical Factory, Jamshoro. 230TR absorption type central plant with different systems for individual production areas and laboratories. (b) Jamshoro Factory Pharma Production Extension - Airconditioning. (c) Syrup Production Building, Jamshoro - Process Piping. (d) Laboratory, Bahria Complex, Karachi - Plumbing. (e) Warehouse Expansion,Jamshoro Factory - Airconditioning. (f) Scientific Centre, Korangi, Karachi - Airconditioning. 2. Ciba-Geigy Pakistan Ltd.: (now Noavrtis Pharma Pakistan Ltd.) (a) Pharmaceutical Factory, Karachi. 110 TR central plant with different systems for individual production areas and Laboratory. (b) Multi Divisional Warehouse,Ciba House, Karachi Electrical & Airconditioning. (c) New Pharma Liquid & Ointment Section, Ciba House, Karachi - Airconditioning & Electrical. (d) Administration Block, Ciba House, Karachi - Airconditioning & Electrical Works. (e) Emergency Generator installation for Pharma Production, Ciba House, Karachi. (f) Pharma Production Facility Renovation Project - Airconditioning, Mechanical & Electrical. 3. Abbott Laboratory (Pak) Ltd.: (a) Pharmaceutical Factory, New Production Areas, Karachi. Airconditioning, mechanical and plumbing systems. Extension-I, 230TR capacity reciprocating compressor type central plant. Extension-II, 400 TR capacity absorption type central plant with different systems for individual production areas and Laboratory. (b) New Tablet Department, Pharma Production, Airconditioning & Ventilation Systems.

Page 23: A. SAADAT & CO.2 Introduction A.Saadat & Co., Consulting Engineers, was established in 1962. It is staffed by qualified and experienced Professional Engineers who have worked in USA,

22 (c) New Liquid Manufacturing Deptt. - Airconditioning. (d) Factory Canteen - Ventilation & Exhaust Air System. (e) New Personnel Facilities Building - Plumbing. (f) New Injectable Department - Airconditioning And Mechanical. (g) Administration Block - Airconditioning. (h) Renovation & Upgrading Of Pharma Production Facility - Aircondi-tioning & Mechanical Systems. (i) Upgrading Of Airconditioning Systems of Pharma Low RH Areas. Karachi. 4. Wyeth Laboratories (Pak) Ltd.: (Now Pfizer Pakistan Ltd.) (a) New Pharma Production Building, Lahore Factory. Airconditioning and mechanical systems. 420TR capacity centrifugal compressor type central plant with different systems for individual production areas and Laboratory. (b) Old Pharma Production Block, Airconditioning Systems - Modifications and Upgrading. 5. Wellcome Pakistan Ltd./GlaxoWellcome Pakistan Ltd/GSK: (a) New Pharmaceutical Factory, F/268, SITE, Karachi. Airconditioning and mechanical systems. 370TR capacity absorption type central plant with different systems for individual production areas. (b) New Office Block, F/268, SITE, Karachi - Airconditioning. (c) TMP Expansion Project, F/268, SITE, Karachi - Airconditioning & Fire Fighting System. (d) Extension Of Warehouse And Offices, F/268, SITE - Airconditioning. (e) Installation of 2nd 370TR absorption type chiller for enhancement of central plant capacity, F/268, SITE, Karachi. (f) Aleem House (New Warehouse & Offices), Islamabad - Airconditioning. (g) New Warehouse & Offices, Lahore - Airconditioning. (h) Refurbishment of Pharma Production Facility, D/43,SITE, Karachi - Airconditioning & Mechanical Systems. (i) New Warehouse & Offices, Sukkur - Airconditioning.

Page 24: A. SAADAT & CO.2 Introduction A.Saadat & Co., Consulting Engineers, was established in 1962. It is staffed by qualified and experienced Professional Engineers who have worked in USA,

23 (j) Proposed Sterile Production Facility at F/268, SITE, Karachi. The design, working drawings, specifications & BOQ for airconditioning, ventilation and mechanical systems and process piping were completed. (k) (i) New Tablet Building, SITE. (ii) West Wharf Renovation Project. 6. Squibb Pakistan Ltd.: (Now GSK Pakistan Ltd.) (a) New Pharmaceutical Factory,Karachi. Airconditioning, mechanical and plumbing systems. 350 TR capacity reciprocating compressor type central plant with different systems for individual production areas and warehouse. (b) Pharma Factory, Karachi, Extension, Sterile Testing Area - Airconditioning. (c) Sterile Production Area - Airconditioning System Upgrading. 7. Hoechst Pakistan Ltd.: (Now Sanofi- Aventis Pakistan Ltd.) (a) Pharmaceutical Factory, Korangi, Karachi Expansion of Production Areas. Airconditioning and mechanical systems. 450 TR capacity absorption type central plant with different systems for individual production areas. (b) Administration Building,Korangi Factory - Airconditioning & Electrical Works. (c) Pesticide Formulation Plant, Korangi Factory - Electrical Work. (d) ATA Laboratory, Korangi Factory - Electrical Work. (e) Central Store Extension, Korangi Factory, - Electrical Works. (f) TH Plant Korangi Factory - Electrical/Evaporative Water Cooling Systems. (g) Korangi Factory Ampule Filling Room Renovation - Airconditioning. (h) Korangi Factory Substation Expansion-Electrical Works. (i) Korangi Factory - Cooling Tower For Industrial Plant Cooling Water System. (j) Haemaccel Plant,Korangi Factory - Airconditioning, Mechanical & Electrical. (k) Administration Building Extension, Korangi Factory - Airconditioning. (l) Central Store Units 1, 2 & 3 - Electrical. (m) AgrEvo Projects, Korangi Factory - Airconditioning.

Page 25: A. SAADAT & CO.2 Introduction A.Saadat & Co., Consulting Engineers, was established in 1962. It is staffed by qualified and experienced Professional Engineers who have worked in USA,

24 8. Knoll Pharmaceuticals Ltd.formerly Boots Co.(Now Abbott Laboratory (Pak) Ltd ) (a) Pharmaceutical Factory,New Production Buildings,Korangi Karachi. Airconditioning, mechanical and plumbing systems. 370 TR capacity reciprocating compressor type central plant with different systems for individual production areas. (b) Korangi Factory Pharma Production Facility Extension Phases 1 & 2 - Airconditioning, Mechanical & Plumbing. (c) New Q.C.Facilities, Korangi Factory - Airconditioning. (d) Korangi Factory, Farley Manufacturing Facility - Airconditioning & Plumbing. 9. Searle Pakistan (Pvt) Ltd.: (a) New Pharmaceutical Factory,SITE, Karachi. Airconditioning,mechanical and plumbing systems. 200TR capacity reciprocating compressors type central plant with different systems for individual production areas. (b) Karachi Factory Warehouse & Liquid Manufacturing Expansion - Airconditioning & Plumbing. (c) Karachi Factory Production Facility Expansion and Upgrading - Airconditioning & Mechanical. 10. Gelcap (Pakistan) Ltd., Capsule Manufacturing Plant, HITE - Airconditioning. 11. S.J.&G.Fazal Ellahie Ltd., Pharmaceutical Factory,Extention, Karachi - Airconditioning. 12. May & Baker (Rhone Poulenc Rorer Pakistan (Pvt) Ltd.) (Now Sanofi- Aventis Pakistan Ltd.) New Pharma Production Block,Wah Cantt Factory - Airconditioning, Mech-anical And Plumbing Works. 13. Eli Lilly Gohar Pharma Products Factory, SITE, Karachi - Airconditioning, Mechanical, Plumbing & Electrical. 14. Bayer Pakistan (Pvt) Ltd.: (a) Q.C.Laboratory, Karachi - Airconditioning. (b) New Pharma Production Facility, SITE, Karachi - Airconditioning, Mechanical, Plumbing & Electrical. (c) New Solid Dose/Cream Production Facility - Airconditioning, Mechanical, Plumbing & Electrical. 15. Ali Gohar Pharmaceuticals (Pvt) Ltd., Pharma Production Factory, SITE,

Page 26: A. SAADAT & CO.2 Introduction A.Saadat & Co., Consulting Engineers, was established in 1962. It is staffed by qualified and experienced Professional Engineers who have worked in USA,

25 Karachi - Airconditioning, Mechanical & Plumbing. 16. Merck Sharp & Dohme Of Pakistan Ltd., Pharma Factory, SITE, Karachi - Airconditioning & Mechanical Systems for: (a) Production Facility Expansion Phases 1 & 2. (b) New Liquid Deptt. 17. Leonine Pharmaceutical Products Factory, Lahore - Airconditioning. 18. Saitex Pharmaceutical Factory, Karachi - Airconditioning 19. Parke Davis Pharmaceutical Factory(Now Pfizer Pakistan Ltd.), Karachi Renovation Of Airconditioning & Ventilation Systems. 20. Brooks Pharmaceutical Laboratories, Karachi Factory - Airconditioning System Renovation. 21. Century Pharmaceutical Factory, Karachi - Airconditioning, Mechanical & Plumbing Systems. 22. Atco Laboratories Sterile Production And Packaging Area, Karachi Factory - Airconditioning. 23. Pacific Pharma Factory, Lahore - Airconditioning. 24. Efroze Chemical Industries (Pvt) Ltd. ORS Area, Karachi Factory- Airconditioning. 25. Pharmagen Beximco Ltd, New Pharma Factory, Lahore - Airconditioning. 26. Bosch Pharmaceuticals (Pvt) Ltd., Pharma Production Factory, Karachi - Airconditioning. 27. Organon Karachi Factory Sterile Area & Microbiological Laboratory - Airconditioning. 28. Spencer Pharma (formerly Fisons), Karachi Factory: (a) Main Production Facility-Airconditioning & Mechanical. (b) New Injectable Deptt. - Airconditioning. 29. Pharmatec Pakistan (Pvt) Ltd., (formerly Sterling Products), Pharma Factory, Karachi - Upgrading of Airconditioning System. 30. Smith Kline-Beecham Of Pakistan Ltd. (Now GSK Pakistan Ltd.): (a) Landhi Factory, Augmentin Facility and New Tablet manufacturing unit - Airconditioning.

Page 27: A. SAADAT & CO.2 Introduction A.Saadat & Co., Consulting Engineers, was established in 1962. It is staffed by qualified and experienced Professional Engineers who have worked in USA,

26 (b) SITE Factory, Upgrading of Airconditioning System. 31. Ferozsons Laboratories Ltd., Nowshera Factory - New Tablet Manufacturing Block - Airconditioning. 32. Barrett Hodgson Pakistan (Pvt) Ltd, Airconditioning and Mechanical Services. Phase-I: (a) New Production Facility (b) Penicillin Production Facility (c) Veterinary Protection Facility. Phase-II: Cephalosporine Production Facility. 33. Remington Pharmaceutical Industries (Pvt Ltd. Airconditioning and Mechanical Services for New factory at Multan Road Lahore. PROJECTS FROM 2000 to 2010 34. Abbott Laboratory (Pak) Ltd.: (a) HVAC, Mechanical and Plumbing systems for Effervesce Tablet and Ointment Production Areas. At Landhi Factory Area. (b) HVAC, Mechanical and Plumbing systems Dispensing Areas at Landhi & Korangi Factories, including Airconditioning of existing warehouses. (c) HVAC, Mechanical and Plumbing systems for extension & up-grading of Liquids Area Production Area. At Korangi Factory. Including extension of Central Plant Equipment.(cGMP Project). 35. Ali Gohar Pharmaceuticals (Pvt) Ltd.: (a) HVAC, Mechanical and Plumbing systems for New Sterile Facility. (b) HVAC & Mechanical Systems for Renovation of Solids and Liquid production Areas. Including Extension of Central Plant by 250 TR Direct Fired water chiller. (c) Replacement of exiting HVAC equipment for Pharma Production Areas.

Page 28: A. SAADAT & CO.2 Introduction A.Saadat & Co., Consulting Engineers, was established in 1962. It is staffed by qualified and experienced Professional Engineers who have worked in USA,

27 36. Bayer Pakistan Ltd.: HVAC Systems for Micro Laboratory. 37. Bayer Crop Sciences Pakistan Ltd.: Extension of Central Plant & HVAC System for office Areas. 38. Bf- Bio Sciences Pakistan Ltd. (Ferozsons) Near Riawind (a) HVAC, Mechanical & Plumbing Systems for New factory at Sunder Road, Lahore. (b) Airconditioning, Mechanical & Plumbing Systems for New Head office Building at Sunder Road, Lahore. 39. Barrett Hodgson Pakistan (Pvt) Ltd, (a) Extension of Central Plant, addition of 200TR Direct Fired Absorption water chiller and ancillary works. (b) HVAC for New Pharma Packing at Second Floor. 40. Consolidated Chemical Laboratories (Pvt) Ltd. (CCL) Lahore HVAC Systems for New Product Manufacturing Area. 41. CCL Pharmaceutical (Pvt.) Ltd., Lahore. HVAC Systems for New Dry Power Area at Kot-lakh-pat Factory. 42. CSH Pharmaceutical (Pvt.) Ltd., Lahore. HVAC, Mechanical & Plumbing Systems for New Factory at Ferozpur Road. 43. Eli Lilly Gohar Pharma Products Factory, SITE, Karachi . (a) Up-grading of Central Plant and Up-grading of HVAC system for Production facility. (b) Replacement of Existing AHUs and Dehmidifiers for HVAC system of Production Facility. 44. GSK Pakistan Ltd. SITE, F-268 Factory.(formerly Wellcome) (a) Up-grading & Renovation of HVAC & Mechanical Systems for Liquids Production Areas. (b) HVAC & Mechanical Systems for Blister Packing Areas.

Page 29: A. SAADAT & CO.2 Introduction A.Saadat & Co., Consulting Engineers, was established in 1962. It is staffed by qualified and experienced Professional Engineers who have worked in USA,

28 (c) Airconditioning systems for Raw Material storage area. (d) HVAC & Mechanical Systems for New Penicillin Block. (e) Up-grading and Extension of Central Plant for Liquids Block. (addition of 450 TR direct Fired Dual fuel water chiller and ancillary work) (f) HVAC & Mechanical Systems for Bottle Packing area. (g) HVAC & Mechanical Systems for Additional Primary and secondary Packing Areas in tablet Block. West Wharf Factory. (a) Up-grading & Renovation of HVAC & Mechanical Systems for Sterile Areas. (b) Relocation and Extension of Central Plant for West Wharf Production facility. (350 TR x 2 DGF water chillers and ancillary equipment) (c) Extension of Central Plant for West Wharf Production facility. (addition of 350 TR, DGF water chillers and ancillary equipment) Korangi Factory.(formerly Bristol Mayer Squibb) (a) HVAC, Mechanical & Plumbing Systems for Extension of Lactam Production facility. (b) Extension and Relacation of Central Plant for Production facility. (450x 2 TR, DF dual fuel water chillers and ancillary equipment) 45. Herbion Pakistan Ltd. A. Karachi Factory. (a) Phase-I, Up-grading of HVAC and Mechanical systems for production facility at ground floor. (b) Phase-II, Up-grading of HVAC and Mechanical systems for production facility at First & Second floors. B. Lahore Factory. HVAC, Mechanical and Plumbing systems for new production facility at Sunder Industrial Area Lahore. 46. Hilton Pharma (Pvt) Ltd. Korangi , Karachi HVAC, Mechanical and Plumbing systems for new production facility.

Page 30: A. SAADAT & CO.2 Introduction A.Saadat & Co., Consulting Engineers, was established in 1962. It is staffed by qualified and experienced Professional Engineers who have worked in USA,

29 47. Hodgson Pharma (Pvt) Ltd. Port Qasim , Karachi HVAC, Mechanical and Plumbing systems for new production facility at Port Qasim Industrial Area Karachi. 48. Kaizen Pharma (Pvt) Ltd. Port Qasim , Karachi HVAC, Mechanical and Plumbing systems for new production facility at Port Qasim Industrial Area Karachi 49. Nexter Pharma (Pvt) Ltd. Port Qasim, Karachi HVAC, Mechanical and Plumbing systems for new production facility at Port Qasim Industrial Area Karachi. 50. Novartis Pharma Pakisan Ltd. A. Karachi Factory. (a) Air-conditioning of existing raw material and finished goods warehouses. B. Jamshoro Factory. (a) Up-Grading of HVAC & Mechanical systems for Dispensing Areas and production facility. (b) Air-conditioning of New finished goods warehouse. (c) HVAC, Mechanical and Plumbing systems for New Solids Block. 51. Platinum Pharma Pakisan Ltd. Port Qasim, Karachi: (a) HVAC, Mechanical and Plumbing systems for New Cephalosporin Block. (b) Up-grading HVAC, Mechanical and Plumbing systems for Liquids and Solids systems and Extension of Central Plant Equipment by addition of 320RT Gas Fired Water chiller and ancillary equipment. 52. Pharmatec Pakistan (Pvt) Ltd.: Extension of Central Plant Equipment by additional Direct fired Water chiller and ancillary equipment and Airconditiong of New Warehouse. 53. Sami Pharma Pakistan Ltd. SITE Karachi: (a) HVAC, Mechanical and Plumbing systems for New Bio Pharma Block.

Page 31: A. SAADAT & CO.2 Introduction A.Saadat & Co., Consulting Engineers, was established in 1962. It is staffed by qualified and experienced Professional Engineers who have worked in USA,

30 (b) HVAC, Mechanical and Plumbing systems for New Pharma Production Block. (c) New Central Plant for New Bio and Parma Production Blocks. 54. Sanofi-Aventis Pakistan Ltd.: (a) HVAC, Plumbing and Mechanical Services for Renovation & Up grading of Sterile Production Area. (b) HVAC, Plumbing and Mechanical Services for Renovation & Up grading of Solids Production Area. (c) HVAC, Plumbing and Mechanical Services for New Building of Clafron (Cephalosporin) Production facility. (d) HVAC, Plumbing and Mechanical Services for Renovation & Up grading of Haemaccel Production Area. (e) HVAC, Plumbing and Mechanical Services for Renovation & Up grading of Haemaccel Production Area. (f) Up-Grading and Extension-1 of Central Plant. (Addition of 400 TR Water Steam operated water Chiller. (g) Up-Grading and Extension-2 of Central Plant. (Addition of 450 TR Water Direct Gas operated water Chiller. (h) HVAC, Plumbing and Mechanical Services for Extension of Haemaccel Plant. (i) Fire Fighting Sprinkler system for Existing Raw Materials and Finished Goods warehouse. (j) HVAC, Plumbing and Mechanical Services for Renovation & Up grading of Solids Primary & Secondary Packing Production Area. (Job in hand) 55. Wyeth Laboratories (Pak) Ltd (Now Pfizer Pakistan Ltd.) Up-grading of Central Plant and HVAC Systems for Liquids Area.

Page 32: A. SAADAT & CO.2 Introduction A.Saadat & Co., Consulting Engineers, was established in 1962. It is staffed by qualified and experienced Professional Engineers who have worked in USA,

31 INDUSTRIAL COMPLEXES 1. Pakistan (PIDC) Machine Tool Factory, Landhi, Karachi. Airconditioning of Special Production Shops and Administration Block, reciprocating compressor type central chilled water plant with fan-coil units and airhandling units. 2. Security Paper Mill, Karachi, Airconditioning, Ventilation and Humidification of special bank note paper manufacturing factory, 250 TR centrifugal compressor type water chilling plant with airhandling units for airconditioning and air washers for humidification system. 3. Pakistan Tobacco Company Ltd.: (i) Akora Khattak Factory Complex. (a) Evaporative cooling systems for PMD extension,CPD, CST, CMD extensions Phases 1 & 2,Tobacco Store and Administration Block. (b) Airconditioning Systems for CMD, Printing Department & Filter Rod Section. (c) Dust Extraction System for GLT-87. (ii) Jhelum Factory Complex. (a) Evaporative cooling systems for CMD and Printing Department. (b) Airconditioning Systems for CMD & CPD Sections, Loga Max Enclosures Phase-1 & 2. (iii) Airconditioning of Offices at Karachi & Islamabad. (iv) Tobacco Storage Warehouse, EPZ, Karachi - Ventilation System. 4. Pakistan Cables Ltd. Factory, SITE, Karachi: (a) Laboratory and Office Block - Airconditioning. (b) New Upcast Plant, Evaporative cooling and mechanical refrigeration water cooling systems for process cooling. (c) Aluminium Anodising Plant, upgrading of chilled water system for process cooling. 5. Allawala Brothers Ltd., Dry Battery Cell Manufacturing Factory, Karachi, Airconditioning of production area and laboratory. 6. National Beverages Ltd., Karachi. Water chilling system for bottled soft drink

Page 33: A. SAADAT & CO.2 Introduction A.Saadat & Co., Consulting Engineers, was established in 1962. It is staffed by qualified and experienced Professional Engineers who have worked in USA,

32 (7 up, etc,) manufacturing. 7. Pakistan Oxygen Ltd., West Wharf Complex, Karachi, Office Block - Airconditioning. 8. Continental Biscuits Ltd., Biscuits Factory at Sukkur-Airconditioning of Production Areas & Offices and subsequent Production Areas Extension Nos.1 & 2. 9. Berger Paints Ltd., Karachi Factory. (a) Laboratory - Airconditioning. (b) Paint Manufacturing Facility - Ventilation & Exhaust Air Systems. 10. Adamjee Polycrafts Ltd. Factory, HITE-Chilled Water Systems for Process cooling. 11. ICI Pakistan Ltd.: (i) Lahore Paints Factory. (a) Kansai Paint Plant, Airconditioning, Cold Storage & Dust Extraction Systems. (b) Paint Manufacturing Area. Upgrading of Dust Extraction & Collection and ventilation systems. (ii) Karachi Factory, Vapour Extract Systems. (iii) Soda Ash Manufacturing Complex, Khewra. (a) Turbo Generator Hall upgrading of evaporative cooling system. (b) Kiln Area Dust Extraction & Recovery Systems Phase 1&2. 12. Crescent Greenwood Ltd.,Garment Stitching Unit, Sheikhupura, Air-conditioning.

Page 34: A. SAADAT & CO.2 Introduction A.Saadat & Co., Consulting Engineers, was established in 1962. It is staffed by qualified and experienced Professional Engineers who have worked in USA,

33 COTTON & SYNTHETIC FIBRE SPINNING & WEAVING UNITS (Note: Mostly Humidification Cum Evaporative Cooling Systems are installed. Airconditioning System where installed is identified) 1. Thal Jute Mill, Muzaffargarh. 2. Island Textile Mill, Kotri. 3. Apollo Textile Mill, Muzaffargarh. 4. Monnoo Group. (a) Margalla Textile Mill, Hasan Abdal. (b) Rawal Textile Mill, Distt. Sheikhupura. (c) Olympia Blanded Fibre Mill Nos.1&2, Distt. Sheikhupura. (d) Qureshi Textile Mill, Mian Channu. (e) Monnoo Textile Mill, Distt. Lahore. (f) Lahore Spinning Mills, Chunian. 5. Kohinoor Group. (a) Kohinoor Spinning Mill, Chak Bazaid. (b) Chakwal Textile Mill, Chakwal. 6. Nagina Cotton Mill, Kotri. 7. Consolidated Textile Mill, Larkana. 8. Sapphire Fibre Mill, Distt. Sheikhupura. 9. Gulshan Spinning Mill, Distt. Multan. 10. Ibrahim Textile Mill, Shahkot. 11. Sohail Textile Mill, Distt. Sheikhupura. 12. Jamia Textile Mill, Karachi. 13. Dost Mohammad Cotton Mill, Karachi. 14. Dawood Group, Dawood Cotton Mills, Landhi, Karachi. (a) Spinning Unit IV.

Page 35: A. SAADAT & CO.2 Introduction A.Saadat & Co., Consulting Engineers, was established in 1962. It is staffed by qualified and experienced Professional Engineers who have worked in USA,

34 (b) Spinning Unit V. (c) Spinning Unit VI. 15. Indus Textile Mill Nos.1, 2 & 3, Hyderabad. 16. Modern Textile Mill, Hyderabad. 17. Norrie Textile Mill, Norriabad. 18. Shahdadkot Textile Mill Spinning Section, Shahdadkot. 19. Mahmood Textile Mills, Muzaffargarh. (a) New Unit 2. (b) Renovation of Unit 1. 20. Shahpur Textile Mill, Chunian. 21. Deewan Group. (a) Dewan Textile Mill, Kotri. (b) Khalid Textile Mill, Kotri. 22. Premium Textile Mill, Nooriabad, New Finishing Deptt. 23. Premier Tobacco Industries Ltd., Mandra Factory. 24. Ajax Industries Ltd. Korangi Mills, Open End Spinning Department - Airconditioning. 25. S.G.Fibres Ltd., Synthetic Fibres, Mill Expansion Unit Nos. 2, 3 & 4 - Airconditioning.

Page 36: A. SAADAT & CO.2 Introduction A.Saadat & Co., Consulting Engineers, was established in 1962. It is staffed by qualified and experienced Professional Engineers who have worked in USA,

35 HOSPITALS, LABORATORIES AND SPECIAL APPLICATIONS 1. Central Telegraph House, Islamabad. Year-round airconditioning, absorption type central water chilling plant with low velocity air distribution system. 2. Pakistan Space & Upper Atmosphere Research Commission. (a) Research & Instrumentation Laboratory, SUPARCO Plant, Karachi including Extensions 1 & 2 - Airconditioning. (b) Geomagnetic Hut, Sparcent, Karachi - Airconditioning. (c) Communication Lab. Facilities (GRS), Islamabad - Airconditioning. (d) Aerospace Institute Building, Islamabad - Airconditioning. 3. Pakistan Telegraph & Telephone Department. (a) Airconditioning Systems for four telephone exchanges. (b) Satellite Earth Station, Deh Mandro,Karachi.Year-round airconditioning, 100 TR plant. 4. Khyber Teaching Hospital, Peshawar Phase 1 & 2. Year-round airconditioning, winter heating and ventilation systems, 350 & 1050 TR absorption type central plants. 5. Businessman Trust Hospital, Lahore. Airconditioning, Ventilation & Evaporative cooling systems. 6. The Aga Khan University Medical Centre, Karachi - Airconditioning, Mechanical & Plumbing Systems. (a) Main Buildings Construction, 4x870TR capacity airconditioning plant commissioned in 1985. (b) Since 1986, have been associated with different extension programmes including School of Nursing Expansion and New Block for Magnetic Resource Images (MRI) and Radiology. 7. Lady Dufferin Hospital, Karachi. Airconditioning Of 1st Floor Operation Rooms, New Block. 8. Children's Hospital Quetta - Year round Aiconditioning. 9. Sindh Institute of Urology and Transplantation, New Dewan Farooq Medical Complex - Airconditioning.

Page 37: A. SAADAT & CO.2 Introduction A.Saadat & Co., Consulting Engineers, was established in 1962. It is staffed by qualified and experienced Professional Engineers who have worked in USA,

36 COMPUTER CENTRES 1. WAPDA, Main Computer Centre, Wapda House, Lahore - Airconditioning. 2. National Bank of Pakistan. (a) Computer Centre, Head Office Building, Karachi - Airconditioning. (b) Computer Centre, Main Branch Building, Lahore - Airconditioning. (c) Zonal Office Building,Islamabad, Computer Centre - Airconditioning. 3. State Life Insurance Corporation Computer Centre, S.L. Building No.2, Karachi – Airconditioning. 4. Muslim Commercial Bank Ltd., MCB Computer Centre, S.L. Building No.2, Karachi - Airconditioning. 5. Computer Centre, Shell House, Karachi - Airconditioning. 6. Karachi Port Trust, Computer Centre, Head Office Building, Karachi – Airconditioning & Electrical. 7. IBM Computer Centre, Avari Plaza, Karachi - Airconditioning. 8. Lever Brothers (Pakistan) Ltd., Computer Centre,Avari Plaza, Karachi - Airconditioning. 9. Allied Bank of Pakistan Ltd., Computer Centre, Jubilee Insurance House, Karachi - Airconditioning.

Page 38: A. SAADAT & CO.2 Introduction A.Saadat & Co., Consulting Engineers, was established in 1962. It is staffed by qualified and experienced Professional Engineers who have worked in USA,

37 TELEVISION, RADIO, AUDITORIUMS AND CINEMAS 1. Television Centre,Karachi. Year-round airconditioning, 440TR absorption type central water chilling plant with low velocity air distribution system and special noise proof systems for the Studios. 2. Television Centre, Lahore. Year-round airconditioning, 330 TR absorption type central plant with low velocity air distribution system and special noise proof systems for the Studios. 3. TV Transmitter Station, Murree. Winter heating system. 4. TV Rebroadcasting Stations at Thano Bula Khan, Sukesar, and Cherat. Packaged type air cooled airconditioning systems. 5. Central Film Laboratory, Television Centre, Karachi. Aircooled airconditioning system. 6. Melody Cinema, Islamabad. Year-round airconditioning system, 120 TR electric operated chilled water plant. 7. Auditorium, Cultural Centre, Municipal Corporation, Lyallpur. Electric operated packaged type units. 8. Shabistan Cinema, Rawalpindi. Electric operated packaged airconditioners. 9. Auditorium, PIA Head Office Building, Karachi. Air cooled packaged airconditioners. 10. Pakistan Broadcasting Corporation. Broadcasting Studios, Electric operated special noise proof airconditioning systems for New Studios at Karachi, Multan,Rawalpindi,Peshawar, Khyber, Khairpur, Faisalabad, Bahawalpur, Loralai, Zhob and Muzaffarabad. 11. Pakistan Broadcasting Corporation. High Power Transmitter Stations, Airconditioning systems for new Stations at Hyderabad, Multan, Quetta, Rawalpindi, Muzaffarabad, Lawrencepur, Khuzdar, Lahore, Islamabad, Rewat, Karachi, Peshawar and Skardu. 12. Pakistan Broadcasting Corporation. Airconditioning Systems for Staff Training and Technical Training Schools, Islamabad. 13. PBC Village Broadcasting Station, Gilgit - Airconditioning.

Page 39: A. SAADAT & CO.2 Introduction A.Saadat & Co., Consulting Engineers, was established in 1962. It is staffed by qualified and experienced Professional Engineers who have worked in USA,

38 HOTELS 1. Pakistan House, Islamabad. 250 Room Hotel, Capital Development Authority. Year-Round airconditioning 360 TR absorption system with fan-coil units in the guest rooms. 2. PIA Motels at Twelve different locations in East & West Pakistan. Year round airconditioning, winter heating and ventilation systems. 3. Khyber Intercontinental Hotel, Peshawar. Year round airconditioning system, 400 TR absorption type plant with air distribution systems and fan-coil units. 4. New PIA Flight Kitchen,Karachi. Year-round airconditioning and ventilation systems and cold storage room. 5. Motel Complex, Naran, Kaghan Valley,Pakistan Tourism Develop-l ment Corporation. Winter heating system. 6. Avari Lahore Hotel (formerly Lahore Hilton). Airconditioning, mec-hanical, plumbing and electrical systems. 900TR capacity central airconditioning plant, 3000KVA capacity substation and 2000 KVA full back up generator units. 7. Avari Towers Ramada Renaissance Hotel, Karachi. Airconditioning, mechanical, plumbing and electrical systems. 750TR capacity absorption type central airconditioning plant, 3500KVA capacity substation and 2500KVA full back up generator units. 8. Hotel Midway House, Karachi Airport New Block. Airconditioning, mechanical and plumbing systems. 405TR capacity reciprocating compressor type central plant. 9. Serena Hotel, Quetta - Airconditioning, mechanical,plumbing and electrical systems. 200 TR capacity reciprocating compressor type central plant. 10. Serena Hotel, Faisalabad - Airconditioning, mechanical, plumbing and electrical systems. 200TR capacity reciprocating compressor type central plant. 11. Pearl Continental Hotel - Karachi. Airconditioning and Mechanical Systems as part of Renovation works of Main Lobby, Shopping Area, Meeting Rooms and Chandni Lounge.

Page 40: A. SAADAT & CO.2 Introduction A.Saadat & Co., Consulting Engineers, was established in 1962. It is staffed by qualified and experienced Professional Engineers who have worked in USA,

39 12. Pearl Continental Hotel - Lahore . New 289 Guest room block with 1000 person capacity Convention Hall Meeting Rooms, four restaurants, BOH areas including Kitchens, Laundry, etc. Airconditioning, mechanical, plumbing and electrical systems. 1800TR capacity direct gas fired absorption type central plant, 3800KW full back up generating sets. 13. Pearl Continental Hotel - Bhoorbun . Airconditioning, mechanical, plumbing and electrical systems. Packaged airconditioners, incremental type guest room airconditioners, 1500KVA substation, 600KVA emergency supply generator sets.

Page 41: A. SAADAT & CO.2 Introduction A.Saadat & Co., Consulting Engineers, was established in 1962. It is staffed by qualified and experienced Professional Engineers who have worked in USA,

40 MAJOR PROJECTS UNDERTAKEN IN LAST 5 YEARS S.No. Brief Description Remarks 1. Airconditioning, Mechanical System and Ancillary Works For cGMP Upgrade Project, Abbott Laboratories (Pak) Ltd., Korangi Factory, Karachi. Completed in April 2012 2. HVAC & Mechanical Services for Production Factory at CSH Pharmaceuticals Pvt. Ltd. Lahore. Completed in May 2012 3. HVAC & Mechanical Systems for Phase II At Herbion Pakistan (Pvt) Ltd., Korangi Factory, Karachi. Completed in June 2012 4. Dehumidification of Sterile Area at GlaxoSmithKline Pakistan Ltd., Korangi Factory, Karachi. Completed August 2012 5. HVAC, Plumbing & Mechanical Works For Lactam Building Extension at Korangi Factory (Ex-BMS), GlaxoSmithKline Pakistan Ltd., Karachi. Completed in November 2012 6. Upgrading of Tablet Coating Area for Zantac Aqueous Coating Project at GlaxoSmithKline Pakistan Ltd., Korangi Industrial Area, Karachi. Completed in February 2013 7. Airconditioning Systems, Mechanical & Ancillary Works for Phase-I, Pharma Factory at Bin Qasim Industrial Area, Kaizen Pharmaceuticals (Pvt.) Ltd., Karachi Completed in February 2013 8. Modifications of Existing Chilled & Condenser Water Piping & Ancillary Work for Central Plant Room at Novartis Pharma, Jamshoro Factory. Completed in July 2013 9. Airconditioning, Mechanical and Ancillary Works for New Solids Block at Novartis Pharma (Pakistan) Ltd., Jamshoro. Completed in May 2013 10. Airconditioning System and Ancillary Works for Effervescent Area Expansion Project at Abbott Laboratories Pakistan Ltd., Shahrae Pakistan, Karachi. Completed in May 2013 11. Airconditiong, Mechanical & Ancillary Works at Sanofi Aventis Pakistan Ltd., Korangi Indutrial Area, Karachi. Miscellaneous Projects. i) Wet Granulation Suite Upgradation ii) Sterile Area Renovation iii) FG Warehouse 56 Tons Capacity iv) Fire Fighting Works Completed in July 2013

Page 42: A. SAADAT & CO.2 Introduction A.Saadat & Co., Consulting Engineers, was established in 1962. It is staffed by qualified and experienced Professional Engineers who have worked in USA,

41 12. Energy Conservation and Carbon Dioxide Emission Control by Use of High COP/Efficiency and Environment friendly Equipment etc. at Landhi factory Phase-I, Abbott Laboratories (Pak) Ltd., Karachi.i Completed in December 2013 13. HVAC Work at Route2 Health (Pvt.) Ltd., 99, CCA, DHA, Phase 4, Lahore Completed in April 2014 14. Mechanical & Plumbing/ Drainage for New Consulate General of Turkey, Karachi, Pakistan. Completed in May 2014 15. Chilled & Condenser Water Piping and Ancillary Works for Airconditioning Central Plant Extension at Barrett Hodgson Pakistan (Pvt) Ltd., F-607, S.I.T.E. Factory, Karachi. Completed in May 2014 16. Chilled & Condenser Water Systems and Ancillary Works for 400 TR Direct Gas Fired Dual Fuel Absorption Water Chiller and Cooling Tower for Central Plant Extension at Sanofi Aventis Pakistan Ltd., Korangi Industrial Area, Karachi. Completed in October 2014 17. HVAC & Mechanical Works, GlaxoSmithKline Pakistan Ltd., Miscellaneous Projects, at SITE Area Factory, Karachi. 1) Separation of Chemical & Micro Lab in Penicillin & Tablet Block 2) Off Hour Airconditioning of Tablet Block Areas 3 Supply & Installation of Steam Generating Boiler Completed in December 2014 18. Dehumidification System in Solid Manufacturing Areas and Replacement of Existing Airhandling Units for Compression & Granulation Areas at AGP (Pvt) Ltd., S.I.T.E., Karachi. Completed in January 2015 19. Airconditioning, Mechanical Systems and Ancillary Works for HEPA-1 at Hilton Pharma (Pvt.) Ltd., Korangi Industrial Area, Karachi. Completed in February 2015 20. Expansion of Airconditioning Systems at National Bank of Pakistan, Head Office Building, Karachi. Completed in April 2015 21. Extension of 450 TR DGF Chiller in Central Plant Rooms, HVAC System For Warehouse At Pharmatech Pakistan (Pvt) Ltd., Karachi. Completed in June 2015

Page 43: A. SAADAT & CO.2 Introduction A.Saadat & Co., Consulting Engineers, was established in 1962. It is staffed by qualified and experienced Professional Engineers who have worked in USA,

42 22. Airconditioning, Mechanical, Plumbing And Ancillary Works Biotech & General Pharma Building at SAMI Pharmaceuticals (Pvt.) Ltd., F-145, S.I.T.E, Karachi. Completed in July 2015 23. Airconditioning System & Ancillary Work for Raw Material Warehouse at Abbott Laboratories (Pakistan) Ltd., Landhi Factory, Karachi. Completed in July 2015 24. HVAC, Mechanical Systems & Ancillary Works at Herbion Pakistan (Pvt) Ltd., Sundar Industrial Estate-Lahore. Completed in August 2015 25. 200TR DGF Water Chiller, HVAC & Mechanical Work For New Factory at Hudson Pharma, Bin Qasim Industrial Area, Karachi. Completed in August 2015 26. Proposed Pharma Facilities and Warehouse for M/s. ATCO Laboratories (Pvt.) Ltd., Plot No. B-18, S.I.T.E., Karachi Completed in September 2015 27. Supply & Installation of Additional Water Chiller, Cooling Tower, Piping and Ancillary Works for Penicillin Block at GlaxoSmithKline Pakistan Ltd., F-268, S.I.T.E. Factory. Completed in October 2015 28. Airconditioning System and Ancillary Works for Liquids Extension at Abbott Laboratories Pakistan Ltd., Korangi Factory, Karachi. Completed on December 2015 29. Airconditioning Systems and Ancillary Works for Liquid Warehouse at Sanofi Aventis Pakistan Ltd.,.Korangi Industrial Area, Karachi. Completed on February 2016 30. HVAC & Mechanical Works For Novartis Pharma (Pakistan) Ltd., Jamshoro Factory, i) Up-Gradation of Qalsan Area ii) Up-Gradation of Red (Coloured) Area iii) Central Plant Room Extension iv) Rerouting of Service Bridge Area Completed on June 2016 31. Airconditioning System for Proposed Inhaler Facility at Getz Pharma (Pvt.) Ltd., Korangi Industrial Area, Karachi. Completed on June 2016 32. HVAC Remediation for Tablet Block Phase 1 at Abbott Laboratories (Pakistan) Ltd., Landhi, Karachi. Completed on August 2016 33. HVAC System for Lyophilizer Filling & Sealing Area at Landhi Factory, Abbot Laboratories (Pakistan) Ltd., Karachi. Completed on August 2016 34. Supply of Chemical Dehumidifier for ENO Area, at GlaxoSmithKline Pakistan Ltd., 35-Docyard Road, West Wharf, Karachi. Completed on August 2016

Page 44: A. SAADAT & CO.2 Introduction A.Saadat & Co., Consulting Engineers, was established in 1962. It is staffed by qualified and experienced Professional Engineers who have worked in USA,

43 35. Airconditioning, Mechanical Systems and Ancillary Works for HEPA-2 at Hilton Pharma (Pvt.) Ltd., Korangi Industrial Area, Karachi. Completed in November 2016 36. Airconditioning System for Central Depot at Landhi Factory, Abbott Laboratories (Pakistan) Ltd., Karachi. Completed in February 2017

Page 45: A. SAADAT & CO.2 Introduction A.Saadat & Co., Consulting Engineers, was established in 1962. It is staffed by qualified and experienced Professional Engineers who have worked in USA,

44 LIST OF MAJOR PROJECTS IN HAND S.No. Brief Description 1. HVAC & Mechanical Works for Consolidation of Sterile Area and Upgrading of Tablet Area in Non Lactam Block, GlaxoSmithKline Pakistan Ltd., Korangi Factory, Karachi. 2. HVAC and Mechanical Works for ASTOLA Projects at Getz Pharma (Pvt.) Ltd., Korangi Industrial Area, Karachi. 3. Airconditioning Systems and Ancillary Works for Cephalosporin Building at Barrett Hodgson Pakistan (Pvt) Ltd., F-423, S.I.T.E. Factory, Karachi. 4. Airconditioning and Ancillary Works for Production Area at Ground Floor, Techno Ampoules (Pvt.) Ltd., Korangi Industrial Area, Karachi. 5. Airconditioning Systems And Ancillary Works For New Warehouse at SAMI Pharmaceuticals (Pvt.) Ltd., F-140A, S.I.T.E, Karachi. 6. Airconditioning Systems & Ancillary Work for Micro Lab at GlaxoSmithKline Pakistan Ltd., Korangi Factory Karachi. 7. Airconditioning Systems and Ancillary Work for Liquid Upgrade Project at Abbott Laboratories (Pakistan) Ltd., Landhi Factory, Karachi. 8. Airconditioning Systems & Ancillary Work for Spansules Area, at GlaxoSmithKline Pakistan Ltd., 35-Docyard Road, West Wharf, Karachi. 9. Supply & Installation of AHUs and Ancillary Work for Lactam & Non Lactam Block Warehouse at GlaxoSmithKline Pakistan Ltd., Korangi Industrial Area, Karachi 10. Upgrade Work at Martin Dow Ltd., Korangi Industrial Area, Karachi. 11. Airconditioning Systems & Ancillary Work for Choco Tech & Others Areas at Hilal Foods (Pvt) Ltd., Plot No. 23 & 24, Sector 15, Korangi Industrial Area, Karachi. 12. OSD, Sterile and Lotion Facilities Alongwith Utility Block For ATCO Laboratories Ltd., at Plot No. B-18, S.I.T.E., Karachi. 13. Upgrade of HVAC & Mechanical System for OSD and Warehouse at Searle Company Ltd., F-319, S.I.T.E., Karachi. 14. HVAC & Mechanical Work for Raw Material Ware house at Abbott Laboratories (Pakistan) Ltd., Landhi Factory, Karachi. 15. Supply & Installation of AHU, Coiling Coil and Ancillary Work for Fluid Bed Dryer at Abbott Laboratories (Pakistan) Ltd., Landhi Factory, Karachi. 16. HVAC Work for Capsule and AVT area in Tablet Building at Abbott Laboratories (Pakistan) Ltd., Landhi Factory, Karachi. 17. Airconditioning & Ancillary Work for SVP Area Abbott Laboratories (Pakistan) Ltd., Landhi Factory, Karachi. 18. Ventilation & Mechanical Services and Fire Fighting System as per FM Recommendations at Reckitt Benckiser Pakistan Ltd., S.I.T.E., Karachi.

Page 46: A. SAADAT & CO.2 Introduction A.Saadat & Co., Consulting Engineers, was established in 1962. It is staffed by qualified and experienced Professional Engineers who have worked in USA,

45 S.No. Brief Description 19. Supply & Installation/Modification of RO Water Treatment Plant Systems for Effluent Water Reuse in Boiler Feed an Cooling Water Systems at Sanofi Aventis Pakistan Ltd., Korangi Industrial Area, Karachi. 20. HVAC & Mechanical Works for Gate Office Extension at GlaxoSmithKline Pakistan Ltd., Korangi Industrial Area, Karachi 21. HVAC & Mechanical Works for Hinucon Production Facility at Korangi Industrial Area, Karachi 22. Designing, Procurement and Installation of Water Chillers and Cooling Towers for the Existing OSD and Sterile Manufacturing Facility at Getz Pharma (Pvt) Ltd. Korangi Industrial Area, Karachi 23. HVAC & Mechanical Works for New Factory at Asian Continental, D-32, S.I.T.E., Super Highway, Karachi. 24. Getz Pharma Pakistan (Pvt.) Ltd., Karachi. – ASTOLA Project 25. Air conditioning & Mechanical Systems And Ancillary Works for New Pharma Block Extension at ATCO Laboratories Ltd., Plot No. B-18, S.I.T.E, Karachi. 26. Replacement work of 400 TR Direct Gas Fired Absorption plants including Cooling Towers , Chilled & Condenser water Pumps Allied Piping Net work Etc at Shell Pakistan , Shell House Clifton Karachi 27. Air conditioning, Mechanical Systems And Ancillary Works For New Sterile Area At Barrett Hodgson Pakistan (Pvt.) Ltd., F-423, SITE, Karachi. 28. Air conditioning, Mechanical Systems And Ancillary Works For Renovation of Tablet Area At Barrett Hodgson Pakistan (Pvt.) Ltd., F-423, SITE, Karachi. 29. Supply Of 2250USgpm x 4 Cooling Towers and Ancillary Works For Plant Room Extension at Aga Khan University and Medical College Foundation, Stadium Road, Karachi. 30. Air conditioning & Mechanical Systems And Ancillary Works For Lab Area and 1st Floor Lab Area at Martin Dow Ltd., Korangi Industrial Area, Karachi.