A case study on how Agile was used successfully within a PRINCE2 project for roll out of a finance solution. It shows the benefits of an Agile approach, and how it was managed within the PRINCE2 method. Presented as a case study at the Project Challenge masterclass, Antony della Porta is one of the most experienced consultants in Agile Project Management, and is an accredited PRINCE2 and Agile trainer. For more information on the presentation or to use the materials please email [email protected]

Transcript of A real life case study of using Agile within the PRINCE2 method

Page 1: A real life case study of using Agile within the PRINCE2 method

PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.

Project Challenge 2013

Presentation by Antony Della Porta

Lead Trainer Training Byte Size Ltd

Page 2: A real life case study of using Agile within the PRINCE2 method

Case Study on Using

AgilePM

in a

PRINCE2 Project

This presentation will be taking a look at a project where

“Agile Project Management” and PRINCE2 methods of

project delivery were successfully employed together. The

project was for the delivery a new bandwidth usage protocol

configuration onto a Bank’s National Network to enable

Application bandwidth prioritization usage as the new

applications, and hence teller system, was being moved to

Java functionality.

Agile Project Management and PRINCE2® In Projects Agile Project Management and

PRINCE2® In Projects

Page 3: A real life case study of using Agile within the PRINCE2 method

PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.

Presenter

• Over 25 years experience of working in project delivery,

rescue and consultancy roles

• Major verticals such as Finance, Travel, Media and

Pharmaceuticals.

• Established trainer in delivering courses in Project

Management methodologies, and courses relevant to the

delivery and realisation of business strategy.

• Started using PRINCE2®, in earnest, over 14 years ago,

along with Agile Project management

• Successfully managed and implemented a number of

PRINCE2® -AgilePM projects

• APMG accredited and member of Institute of Consultants

Antony C. Della Porta

Page 4: A real life case study of using Agile within the PRINCE2 method

PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.

Training ByteSize

• Training Bytesize Ltd is the largest provider of multi-lingual

online bespoke project management training courses in

English, German, Polish, French, Spanish and Arabic.

• APMG accredited Courses that offer a really interactive

way to learn, using audio, animation, interactive

exercises and exam simulators.

• The team is one of the most experienced in the Project

and Programme industry and have been responsible for

developing courses used by over 5,000 companies

worldwide

• Specialists in developing e-learning for the fastest

growing project management qualifications

• International presence in the UK, Germany, Poland,

Denmark, Australia, USA

Specialists in Project and

Programme Management Training

Page 5: A real life case study of using Agile within the PRINCE2 method

PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.

Introduction to Relationship between

PRINCE2 and AgilePM methodologies

• The following slide will show a graphic view of

the correlation of processes in PRINCE2 and

the Phases employed by Atern Agile Project

Management

• AgilePM established with PRINCE2

• Correlation of the Processes/Stages to

Phases/Increments

• Relationship of plans and lifecycles

Agile Project Management and

PRINCE2® In Projects

Page 6: A real life case study of using Agile within the PRINCE2 method

PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.

Process Overview of PRINCE2 and AgilePM

Key: AgilePM; PRINCE2®

Page 7: A real life case study of using Agile within the PRINCE2 method

PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.

The Project -

A Bank Network Upgrade

• Part of bank teller system replacement programme to employ Java based

applications

• Network to introduce QoS (Quality of Service) banding

– Gold for high demand applications (40% b/w)

– Silver for general demand applications (next 30%)

– Bronze – backoffice applications (20% b/w)

• QoS was a new concept indicating that the required solution to Prioritize traffic

would have to evolve

• Scope was two years old so requirements would have to be reviewed as well as

equipment

• Proof of Concept (PoC)facilities no longer available from the incoming Telco

(Optus)so alternative had to be sourced

• PoC was allocated one (1) month to complete defining, testing and piloting the

Gold, Silver and, as Could, Bronze.

• Estimates for Effort would be broad as new functionality and no known active

solution for this type of network

Page 8: A real life case study of using Agile within the PRINCE2 method

PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.

• Initial Project Start Up employing PRINCE2® as the primary methodology

• Stage 1- (P2) Initiating a Project used to setup and review Project in detail

• Stage 2 - (P2) Redefine current scope, Pre Project phase for Stage 3, Tenders for Integrators

• Stage 3 – (APM) Define and Develop requirements for technical solution, deploy 1st Pilot

• Stage 4 – (APM-P2) Refine Technical solution (Pilot feedback), 1st Pilot - Engage Integrator

• Stage 5 – (APM-P2) Refine Technical solution (Pilot feedback), 2nd Pilot - Plan National Roll-Out

• Stage 6 – (P2) First group of Retail Banks for Live Upgrade

• Stage 7 – (P2) Upgrade remaining 345 retail branches Nationwide

The Project Plan -

Page 9: A real life case study of using Agile within the PRINCE2 method

PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.

• Initial Project Start Up employing PRINCE2® as the primary methodology

• Stage 1- (P2) Initiating a Project used to setup and review Project in detail

• Stage 2 - (P2) Seek Integrators and Hardware requirements

SU and Stages 1-2 – PRINCE2 – High Level

Page 10: A real life case study of using Agile within the PRINCE2 method

PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.

Pre Project

• Stage 2

o Review current scope (2 years old at this point)

o Define resource requirements (original Proof of Concept facilities no longer valid)

o Define Approach for PoC delivery (AgilePM) for Stage 3

o Plan Stage 3 - AgilePM Feasibility/Foundations and then move into first Development Phase

(Exploration and Engineering Timeboxes)

SU and Stages 1-2 – PRINCE2 - Detail

• Starting Up a Project: document and sign-off Project Brief and

Approach - Use a hybrid of methodology using PRINCE2 and Agile

• Initiating a Project: Usual IP activities and preparing Stage 2 ,

planning the project to engage both delivery approaches: Agile

for the PoC and PRINCE2 for the main rollout and overall

Organisation and governance mapping for Roles and

Responsibilities

Page 11: A real life case study of using Agile within the PRINCE2 method

PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.

• Stage 3 – (APM) Define and Develop requirements for technical solution,

deploy 1st and 2nd Pilots to check initial design

Stage 3 – AgilePM managed Increment (P2 stage) HighLevel

Page 12: A real life case study of using Agile within the PRINCE2 method

PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.

• Use Feasibility/Foundations to define and prioritize the requirements to be delivered

over how many increments.

• Approach was to build the “Gold” application configuration requirements during the

1st increment and deploy into the 1st Pilot

• Feedback on the 1st Pilot (HeadOffice branch) was fed back to 2nd Timebox for further

refinement

• 2nd Pilot used for checking Telco configurations and hence full “Gold” function

Stage 3 – AgilePM Development Phase

Page 13: A real life case study of using Agile within the PRINCE2 method

PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.

• Agile: Refine Technical solution (Pilot feedback), 2nd Pilot

• PRINCE2: Engage Integrator, Preparations for Hardware builds and

configuration

Stage 4 – Joint AgilePM and PRINCE2

Page 14: A real life case study of using Agile within the PRINCE2 method

PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.

Agile:

• Refine Technical solution for Gold using Pilot feedback (1st Pilot)

• Commence development of configurations for Silver and Bronze

• Deploy Silver and Bronze solutions and commence 2nd Pilot

PRINCE2 • Engage Integrator

• Start planning the roll-out stages 6 and 7 with Integrator

• Define and order hardware requirements

Stage 4 - PRINCE2 managed stage – AgilePM Develop solution

Page 15: A real life case study of using Agile within the PRINCE2 method

PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.

• AgilePM - Refine Technical solution (Pilot feedback), 2nd Pilot

• PRINCE2 - Plan National Roll-Out in detail

Stage 5 - PRINCE2 managed stage – AgilePM - Develop solution

Page 16: A real life case study of using Agile within the PRINCE2 method

PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.

AgilePM

• Timeboxes under this Development Increment used to

• Refine Silver and Bronze applications • Develop other requirements (including any dropped from earlier Timeboxes)

• Complete Pilot stage and sign-off developed solution now ready for

Deployment and hand back to PRINCE2

PRINCE2

• Finalize plans for 1st Stage roll-out in Stage 6

• Ensure resources in place and hardware (replacement network) preconfigured

Stage 5 - PRINCE2 managed stage – AgilePM Develop solution

Page 17: A real life case study of using Agile within the PRINCE2 method

PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.

• Stage 6 – (P2) First group of Retail Banks for Live Upgrade

• Stage 7 – (P2) Upgrade remaining 345 retail branches Nationwide

Stages 6 and 7 - PRINCE2 managed stages: Main Project Roll-Out

Page 18: A real life case study of using Agile within the PRINCE2 method

PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.

• Stage 6 - Upgrade the first 20 Branches spread nationally: 5 a night 4

nights

• Stage 7 – On successful completion of Stage 6 and sign-off, follow rest of

the Roll-out plan and upgrade the remaining 345 Nation-wide branches

• Post Project – Agile to monitor the success of the Bandwidth Prioritization

Stages 6 and 7 - PRINCE2 managed stages: Main Project Roll-Out

Post Project

MP

Controlling

a Stage

Work

Packag

e1

Stage

6

S

t

a

g

e

B

o

u

n

d

a

r

y

MP

Controlling

a Stage

Work

Packag

e1

C

l

o

s

i

n

g

P

r

o

j

e

c

t

Stage

7

Page 19: A real life case study of using Agile within the PRINCE2 method

PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.

Summary of Presentation

• PRINCE2 and Atern AgilePM can be used to deliver projects of

varying delivery requirements and needs

• Most projects are probably in reality managed this way

• There are some direct correlations between the

processes/phases of both methodologies

• Not necessary to marry these up directly, more important to

know and understand how each can be best employed for

each project

Page 20: A real life case study of using Agile within the PRINCE2 method

PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.

Contact Details

Antony della Porta - Training Byte Size Ltd

Mobile: +44 7533 240 675

Office: +44 (0)1270 653111

Email: [email protected]

The Dowery, 22 Barker Street, Nantwich,

Cheshire CW5 5TE

Page 21: A real life case study of using Agile within the PRINCE2 method

PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.

Any Questions on the implementation

of Agile Project Management or how

to use Agile PM in a PRINCE2

environment please contact us for

further information

+44 (0)1270 653111

[email protected]