A R C H I T E C T S E M I N A R
WEBER+THOMPSON Founded-1987
B.Arch: University of Hawaii
Studied under Jorn Utzon and Arata Isozaki
Chairman of Washington State Board for Architects, Downtown Seattle Design Review Board, Ethics & Practice Committee of Seattle AIA
Corporate member of the AIA
B.Arch: University of Hawaii
Master of Arts in Environmental Design from the University of Washington
Nearly 35 years of architectural and planning experience, specializing in high-density, urban infill and mixed-use buildings.
Blaine J. Weber Scott E Thompson
Philosophy
UNDERSTANDING CLIENTS VISION
TEAMWORK
SUSTAINABLE STRATEGIES
THE TERRY THOMAS
A Big Science Experiment
Courtyard concept + Hi-Tech
for natural ventilation
No HVAC !!!
LEED Ratings
CI Version 2 :Platinum
CS : Gold
Goal : Green + occupant comfort +aesthetic
Revisiting History and Reinventing it
Features
WATER EFFICIENCYlow-flow fixtures waterless urinals30% water saved during everyday operation
ENERGY AND ATMOSPHERE
Minimizing need for artificial lighting , through building design and windows layout. Lighting is controlled by daylight and occupancy sensors and set on timers to efficiently measure and deliver light. These strategies allow us to reduce the wattage/sq ft to 35% below the base line of one watt/sq ft.
All equipment is Energy Star rated
All the CRT computer monitors were replaced with Flat Panel LCD Monitors to create a projected 59% plug load energy savings.
50% of the office's energy consumption will be green power.
MATERIALS AND RESOURCES
Restrained use of materials- The exposed structure of the building minimizes the use of additional finish materials.Interior materials were limited only to what is functional to express building systems, promote airflow and reduce future material waste. There are no materials that do not contribute to the building's overall performanceMaterial's sourcing- Flooring from the existing demolished building was creatively reused as an art piece in Reception Space.Wood siding left over from the construction of the core & shell building was reused as windowsills throughout the office space.Interior wood doors -wood harvested from sustainably managed forests.Materials high in recycled content such as steel, glass, particleboard, Homasote panels, acoustic ceiling tiles and carpet is used throughoutWorkstations and task chairs are green guard certified.Multitasking Systems- Light reflector panels are also acoustical control over workstationsTack-able panels are for display and for sound absorptionConference room ceilings are light reflectors, sound absorbers and aesthetic surface treatmentsCarpets describe work areas and provide additional sound control.Recycling - A recycling program that is easily accessible involves collection and sorting of all recycled materials including composting.
INDOOR ENVIRONMENTAL QUALITY
Thermal comfort
Day lighting
Fresh air
The circulation paths - along the glass on the outside and on the courtyard. mitigates extremes in light, temperature and solar gain, and optimizes ventilation at the workstations
Operable windows, sunshades and perimeter radiant heating allow individuals to control the temperature of their space.
Workstations have a maximum height of 42" to allow all employees to have direct outside views.
Indirect light minimizes glare and provides soft, even lighting, while high efficiency task lights provide individual control of light levels on the work surfaces.
Predominantly light colors are used (white walls, white furnishings, white work surfaces, and light colored partitions) to enhance day lighting.
CO2 sensors throughout the offices control exterior louvers delivering fresh air into the space. Adhesives, sealants, paints, coatings and primers are low VOC (including furniture)
Interesting Facts
Recycled 93% of the building it replaced.
Exterior staircase. Single slow elevator to discourage using it.
Bathing facility to encourage cycling
Tackles Sick Building Syndrome
Temp > 85 F only for 1% of office hours since April 2008
Survey shows 100% occupants satisfied with indoor comfort , ventilation, air quality etc.
Total energy saving of 42% while running. Achieved at $145/sq ft @ 3pc extra cost over normal building.
Floor plate and ceiling height adjusted to optimize daylight and ventilation
White color used predominantly in interiors to allow daylighting
Drilled and punctured beams reduce structural load.
Intelligent Features
LOUVERS
Co2 censors – to maintain right concentration of co2.
Thermostats to regulate the natural light.
Night flushing of Co2.
Coupled with fluorescent lights which dim or brighten.
Exterior Binds automated, controlled by rooftop censors.
Radiators placed on the façade improve air flow and heating
East and West facades-custom designed glass sunshades -reduce solar gain -allow natural light
Restrooms – motion sensing light switches, water metering, waterless urinals, water saving toilets.