A PRESENTION ON THE DESIGN OF AN OFFICE BUILDING
Design of Structural Systems CIE-600
By Kalpesh P.
![Page 2: A PRESENTION ON THE DESIGN OF AN OFFICE BUILDING By Kalpesh P.](https://reader035.fdocuments.in/reader035/viewer/2022062619/55182c775503469d318b4e69/html5/thumbnails/2.jpg)
General information about the building Design of Slabs Design of Beams, columns and Foundation Design of shear and retaining walls Design of Stair case Green Engineering and Aesthetics Aspect Material (concrete) Usage Estimation References
Presentation Outline
![Page 3: A PRESENTION ON THE DESIGN OF AN OFFICE BUILDING By Kalpesh P.](https://reader035.fdocuments.in/reader035/viewer/2022062619/55182c775503469d318b4e69/html5/thumbnails/3.jpg)
Building◦ An office building◦ Located in Syracuse ◦ A three-story of 58 ft high building◦ Has three buildings separated by an expansion
joint◦ Two freight, Two passenger elevators◦ Two stair cases
Retaining wall – Height of 10 ft Materials used
◦ Concrete -6000psi and Steel-60000psi ACI and International building codes
adopted
General Information
![Page 4: A PRESENTION ON THE DESIGN OF AN OFFICE BUILDING By Kalpesh P.](https://reader035.fdocuments.in/reader035/viewer/2022062619/55182c775503469d318b4e69/html5/thumbnails/4.jpg)
Top View
Shear Walls
10
2 s
![Page 5: A PRESENTION ON THE DESIGN OF AN OFFICE BUILDING By Kalpesh P.](https://reader035.fdocuments.in/reader035/viewer/2022062619/55182c775503469d318b4e69/html5/thumbnails/5.jpg)
Views of the building
16’
26’
16’
25’ 25’ 25’ 25’
25’25’25’
25’
25’
25’
25’25’
Flat Plate
Flat Slab
Slab with beams
Slab on ground25’25’
25’25’
Parapet 1’
Staircase
Staircase
2 Freight elevators
2 Passenger elevators
![Page 6: A PRESENTION ON THE DESIGN OF AN OFFICE BUILDING By Kalpesh P.](https://reader035.fdocuments.in/reader035/viewer/2022062619/55182c775503469d318b4e69/html5/thumbnails/6.jpg)
2. Slabs Design
Flat plate
Flat Slab
Slab with interior beam
Slab on Ground
![Page 7: A PRESENTION ON THE DESIGN OF AN OFFICE BUILDING By Kalpesh P.](https://reader035.fdocuments.in/reader035/viewer/2022062619/55182c775503469d318b4e69/html5/thumbnails/7.jpg)
Location of Design Slabs
16’
26’
16’
25’ 25’ 25’ 25’
25’25’25’
25’
25’
25’
25’25’
Flat PlateFlat Slab
Slab with beams
Slab on ground
25’25’25’ 25’
![Page 8: A PRESENTION ON THE DESIGN OF AN OFFICE BUILDING By Kalpesh P.](https://reader035.fdocuments.in/reader035/viewer/2022062619/55182c775503469d318b4e69/html5/thumbnails/8.jpg)
Top View
![Page 9: A PRESENTION ON THE DESIGN OF AN OFFICE BUILDING By Kalpesh P.](https://reader035.fdocuments.in/reader035/viewer/2022062619/55182c775503469d318b4e69/html5/thumbnails/9.jpg)
The use of expansion joint
Expansion Joint
![Page 10: A PRESENTION ON THE DESIGN OF AN OFFICE BUILDING By Kalpesh P.](https://reader035.fdocuments.in/reader035/viewer/2022062619/55182c775503469d318b4e69/html5/thumbnails/10.jpg)
The use of expansion joint
Source by Design Handbook: section 4http://www.copper.org/homepage.html
![Page 11: A PRESENTION ON THE DESIGN OF AN OFFICE BUILDING By Kalpesh P.](https://reader035.fdocuments.in/reader035/viewer/2022062619/55182c775503469d318b4e69/html5/thumbnails/11.jpg)
Design Procedure
Using Two-way slabs, Direct Design Method (ACI Code)
Find a load combination Find a slab thickness Obtain a static moment (Mo) Distribution of a static moment Percentage of design moment resisted by
column strip Find As , and Select steel for reinforcement Shear check
![Page 12: A PRESENTION ON THE DESIGN OF AN OFFICE BUILDING By Kalpesh P.](https://reader035.fdocuments.in/reader035/viewer/2022062619/55182c775503469d318b4e69/html5/thumbnails/12.jpg)
Panel Assignment
![Page 13: A PRESENTION ON THE DESIGN OF AN OFFICE BUILDING By Kalpesh P.](https://reader035.fdocuments.in/reader035/viewer/2022062619/55182c775503469d318b4e69/html5/thumbnails/13.jpg)
B C
W
25 ft
W
78
9
25 ft 25 ft
Strip Design
![Page 14: A PRESENTION ON THE DESIGN OF AN OFFICE BUILDING By Kalpesh P.](https://reader035.fdocuments.in/reader035/viewer/2022062619/55182c775503469d318b4e69/html5/thumbnails/14.jpg)
Combination Loads
U = 1.2(D + F + T) + 1.6(L + H) + 0.5(Lr or S or R)
Dead load (D) = 150 psf x thickness of slabTopping load (T) = 20 psfLive load (LL) = 50 psfFinishing load (F) = 20 psfRain load (R) = 62.5 psfSnow load (S) = 46.2 psfRoof live load(Lr) = 12.0 psf
![Page 15: A PRESENTION ON THE DESIGN OF AN OFFICE BUILDING By Kalpesh P.](https://reader035.fdocuments.in/reader035/viewer/2022062619/55182c775503469d318b4e69/html5/thumbnails/15.jpg)
Design Numerical Values
Types of Slab Flat Plate Flat Slab Slab with Beams
Slab Thickness
9” 8” 7”
Load combination
(U)
226.25 psf
224 psf 203 psf
Static Moment (Mo)
401.61 ft-k
397.62 ft-k 370.90 ft-k
![Page 16: A PRESENTION ON THE DESIGN OF AN OFFICE BUILDING By Kalpesh P.](https://reader035.fdocuments.in/reader035/viewer/2022062619/55182c775503469d318b4e69/html5/thumbnails/16.jpg)
CT1
CT
1y
CT
1y
CT
1y
MB
MB
MB
MB
MB
MB
MB
MB
MB
MB
MB
MB
MB
MB
MB
MB
CTy
CT
2y
CT
2y
CT
2yC
Ty
CTy
CTy
CTy
CT2 CT
CT2CT CT
CTC
By
CB
y
CB
y
CB
y
CB
y
CB
y
CB
1y
CB
1yC
B1y
CB
CB
CB
CB
CB1
CB1CB1
CTCB1
CB
1y
CB
1y
CB1
MT
MT
MT
MT
MT
MT
MT
MT
MT
MT
MT
MT
MB
MB
MB
MB
MB
MB
MB
MBMT MT MT
MT
MB
MB
MB
MB
MB
MBMTMTMT1
MT1
CT
2CT1
CT1
CT1
CT1
CT2 CTCB CB CB1
CT2C
T2
CT
1y
MT
1
CT
2
MT1
MT1
MT1
MT1
MT1
MT
1
CT
1
MT1
CTy
CB
yC
T2y
CB
yC
TyC
B1y
CB
1y
CT
1C
TyC
By
CT
2yC
By
CT
2yC
B1y
CB
1y
CT3CT2CT3CB2 CB2 CB1CB3
CTCT2CB CB CB1CT2
MT
1
MT
1
MT
1
MT
1
MT
1
1 2 3 4 5
EC
DA
B
Flat plate
![Page 17: A PRESENTION ON THE DESIGN OF AN OFFICE BUILDING By Kalpesh P.](https://reader035.fdocuments.in/reader035/viewer/2022062619/55182c775503469d318b4e69/html5/thumbnails/17.jpg)
MT
1
MT
1
CT1
CT
1y
MB
MB
MB
MB
MB
MB
MB
MB
MB
MB
MB
MB
MB
MB
MB
MB
CTy
CT
2y
CT
2y
CT
2yC
Ty
CT
2yC
Ty
CTy
CT2 CT
CT2CT CT
CT
CB
y
CB
y
CB
y
CB
y
CB
y
CB
y
CB
1y
CB
1yC
B1y
CB
CB
CB
CB
CB1
CB1CB1
CTCB1
CB
C1y
CB
1y
CB1
MT
MT
MT
MT
C
MT
MT
MT
MT
MT
MT
MT
MT
MT
MB
MB
MB
MB
MB
MBM
B
MBMT MT MT
MB
MB
MB
MB
MB
MBMTMTMT1
MT1
CT
1y
CT1
CT1
CT1
CT1
CT2 CTCB CB1
CT1
CT
1y
CT
1y
MT1
MT1
MT1
MT1
MT1
MT
1
CT
1y
MT1
CTy
CB
yC
T2y
CB
yC
TyC
B1y
CB
1y
CTc
yC
TyC
By
CT
2yC
By
CT
2yC
BC
y
CB
1y
CTCT2CTCB CB CB1CB1 M
T1
MT
1
MT
1
FD
EB
C
v
M B
MB
MB
MB
MB
MB
MB
MB
MT
MT
CB1CB1
MT
CBCB
MT
MT
MT MT
CB
1y
CB
1y
CB
1y
MT
C B
1y
MT1
CB
y
MT1
CB1 CB1CBCB
MT
1
MT
1
CB
MT
MT
MB
MB
CT
CTy
CTy
CTy
CT2
CT
2y CT
MT1
C B
1y
CT CT
CT
C
CT2 MT
1
MB
MB
MB
MB
CT
CT
C
6 7 8 9 10
Flat plate
![Page 18: A PRESENTION ON THE DESIGN OF AN OFFICE BUILDING By Kalpesh P.](https://reader035.fdocuments.in/reader035/viewer/2022062619/55182c775503469d318b4e69/html5/thumbnails/18.jpg)
MTC is the same as MT but with bar #5 c/c 13.5 in CTCY is the same as CT1Y but with bar #4 c/c 12 inCTC is the same as CTY but with bar # 5 c/c 10 in CBC1Y is the same as CB1Y but with bar # 5 c/c 16 in
Flat plateType Strip Placed
@Specification
Bar No. Spacing (in), Length and type
CT column top 5
CT1 column top 5
CT2 column top 5
CTY column top 5
CT1Y column top 5
CT2Y column top 5
CB column bottom 4
CB1 column bottom 5
CBY column bottom 4
CB1Y column bottom 5
MB middle bottom 4
MT middle top 4
MT1 middle top 4
L= 15.4ft c/c 15 inL= 10.6 ft c/c 15 in
L= 9.5 ft c/c 13 inL= 7.2 ft c/c 13 in
L= 15.4 ft c/c 16inL=10.6 ft c/c 16in
L= 15.4 ft c/c 14inL=10.6 ft c/c 14in
L= 15.4 ft c/c 15inL=10.6 ft c/c 15in
L= 7.5 ft c/c 12 in
L= 25ft c/c 12 in
L= 25ft c/c 20 inL= 26.5ft c/c 20 in
L= 25ft c/c 11.5 in
L= 25ft c/c 21 inL= 26.5ft c/c 21 in
L= 12 ft c/c 12in
L= 25.5ft c/c 24 inL= 17ft c/c 24 in
L= 9.5 ft c/c 12inL= 7.2 ft c/c 12 in
![Page 19: A PRESENTION ON THE DESIGN OF AN OFFICE BUILDING By Kalpesh P.](https://reader035.fdocuments.in/reader035/viewer/2022062619/55182c775503469d318b4e69/html5/thumbnails/19.jpg)
#4 bars@ 12’, L = 7.5’
#4 bars@ 24’ , L = 17’#4 bars@ 24’ , L = 25’
#4 bars@ 24’ , L = 17’#4 bars@ 24’ , L = 25’
#4 bars@ 12’, L = 12’#4 bars@ 12’, L = 12’
#5 bars@ 15’ , L = 15.4’ #5 bars@ 15’ , L = 10.6’#4 bars@ 12’, L = 7.5’
#5 bars@ 20’ , L = 25’#5 bars@ 20’ , L = 26’
#4 bars@ 24’ , L = 17’#4 bars@ 24’ , L = 25’
#5 bars@ 13’ , L = 9.5’ #5 bars@ 13’ , L = 7.2’
#4 bars@ 12’, L = 25’
#5 bars@ 15’ , L = 15.4’ #5 bars@ 15’ , L = 10.6’
#5 bars@ 16’ , L = 15.4’ #5 bars@ 16’ , L = 10.6’
#5 bars@ 21’ , L = 25’#5 bars@ 21’ , L = 26’
#5 bars@ 20’ , L = 25’#5 bars@ 20’ , L = 26’
#4 bars@ 24’ , L = 17’#4 bars@ 24’ , L = 25’
#5 bars@ 15’ , L = 15.4’ #5 bars@ 15’ , L = 10.6’#4 bars@ 12’, L = 7.5’
9’
1 2 3
1 2 3
9’
Column Strip
Middle Strip
Flat Plate
![Page 20: A PRESENTION ON THE DESIGN OF AN OFFICE BUILDING By Kalpesh P.](https://reader035.fdocuments.in/reader035/viewer/2022062619/55182c775503469d318b4e69/html5/thumbnails/20.jpg)
CT1
CT
1y
CT
1y CT
1y
MB
MB
MB
MB
MB
MB
MB
MB
MB
MB
MB
MB
MB
MB
MB
MB
CTy
CT
2y
CT
2y
CT
2yC
Ty
CTy
CTy
CTy
CT2 CT
CT2CT CT
CTC
By
CB
y
CB
y
CB
y
CB
y
CB
y
CB
1y
CB
1yC
B1y
CB
CB
CB
CB
CB1
CB1CB1
CTCB1
CB
1y
CB
1y
CB1
MT
MT
MT
MT
MT
MT
MT
MT
MT
MT
MT
MT
MB
MB
MB
MB
MB
MB
MB
MBMT MT MT
MT
MB
MB
MB
MB
MB
MBMTMTMT1
MT1
CT
2CT1
CT1
CT1
CT1
CT2 CTCB CB CB1
CT2C
T2
CT
1y
MT
1
CT
2
MT1
MT1
MT1
MT1
MT1
MT
1
CT
1
MT1
CTy
CB
yC
T2y
CB
yC
TyC
B1y
CB
1y
CT
1C
TyC
By
CT
2yC
By
CT
2yC
B1y
CB
1y
CT3CT2CT3CB2 CB2 CB1CB3
CTCT2
CB CB CB1CT1
MT
1
MT
1
MT
1
MT
1
MT
1
1 2 3 4 5
EC
DA
B
Flat Slab
![Page 21: A PRESENTION ON THE DESIGN OF AN OFFICE BUILDING By Kalpesh P.](https://reader035.fdocuments.in/reader035/viewer/2022062619/55182c775503469d318b4e69/html5/thumbnails/21.jpg)
G
6 7 8 9 10
MT
1
MT
1
CT1
CT
1y
MB
MB 1
MB
MB 1
MB
MB
MB
MB
MB
MB
MB
MB
MB
MB
MB
MB
CTy
CT
2y
CT
2y
CT
2yC
Ty
CT
2yC
Ty
CTy
CT2 CT
CT2CT CT
CT
CB
y
CB
y
CB
y
CB
y
CB
y
CB
y
CB
1y
CB
1yC
B1y
CB
CB
CB
CB
CB1
CB1CB1
CTCB1
CB
C1y
CB
1y
CB1
MT
MT
MT
MT
C
MT
MT
MT
MT
MT
MT
MT
MT
MT
MB
MB
MB
MB
MB
MBM
B
MBMT MT MT
MB
MB
MB
MB
MB
MBMTMTMT1
MT1
CT
1y
CT1
CT1
CT1
CT1
CT2 CTCB CB1
CT1
CT
1y
CT
1y
MT1
MT1
MT1
MT1
MT1
MT
1
CT
1y
MT1
CTy
CB
yC
T2y
CB
yC
TyC
B1y
CB
1y
CTc
yC
TyC
By
CT
2yC
By
CT
2yC
BC
y
CB
1y
CTCT2CTCB CB CB1CB1 M
T1
MT
1
MT
1
FD
EB
C
v
M B
MB
MB
MB
MB
MB
MB
MB
MT
MT
CB1CB1
MT
CBCB
MT
MT
MT MT
CB
1y
CB
1y
CB
1y
MT
C B
1y
MT1
CB
y
MT1
CB1 CB1CBCB
MT
1
MT
1
CB
MT
MT
MB
MB
CT
CTy
CTy
CTy
CT2
CT
2y CT
MT1
C B
1y
CT CT
CT
C
CT2 MT
1
MB
MB
MB
MB
CT
CT
CFlat Slab
![Page 22: A PRESENTION ON THE DESIGN OF AN OFFICE BUILDING By Kalpesh P.](https://reader035.fdocuments.in/reader035/viewer/2022062619/55182c775503469d318b4e69/html5/thumbnails/22.jpg)
MTC is the same as MT but with bar #5 c/c 13.5 in CBC1Y is the same as CB1Y but with bar # 5 c/c 16 inCTC is the same as CTY but with bar # 5 c/c 10 in MB1 is the same as MB but with bar #4 c/c 24 inCTCY is the same as CT1Y but with bar #4 c/c 12 in
Flat SlabType Strip Placed
@Specification
Bar No. Spacing (in), Length and type
CT column top 5
CT1 column top 5
CT2 column top 5
CTY column top 5
CT1Y column top 5
CT2Y column top 5
CB column bottom 4
CB1 column bottom 5
CBY column bottom 4
CB1Y column bottom 5
MB middle bottom 4
MT middle top 4
MT1 middle top 4
L= 17ft c/c 13 inL= 11 ft c/c 13 in
L= 9.1 ft c/c 12 inL= 6 ft c/c 12 in
L= 17 ft c/c 14inL=11 ft c/c 14in
L= 17 ft c/c 12inL=11 ft c/c 12in
L= 17 ft c/c 13inL=11 ft c/c 13in
L= 6.5 ft c/c 12.5 in
L= 25ft c/c 11 in
L= 25ft c/c 17 inL= 26.5ft c/c 17 in
L= 25ft c/c 10 in
L= 25ft c/c 19 inL= 26.5ft c/c 19 in
L= 12 ft c/c 12.in
L= 25ft c/c 27 inL= 22ft c/c 27 in
L= 9.1 ft c/c 10 inL= 6 ft c/c 10 in
![Page 23: A PRESENTION ON THE DESIGN OF AN OFFICE BUILDING By Kalpesh P.](https://reader035.fdocuments.in/reader035/viewer/2022062619/55182c775503469d318b4e69/html5/thumbnails/23.jpg)
#4 bars@ 12.5’, L = 6.5’
#4 bars@ 27’ , L = 22’#4 bars@ 27’ , L = 25’
#4 bars@ 27’ , L = 22’#4 bars@ 27’ , L = 25’
#4 bars@ 12’, L = 12’#4 bars@ 12’, L = 12’
#5 bars@ 12’ , L = 9.1’ #5 bars@ 12’ , L = 6’
#4 bars@ 11’, L = 25’
#5 bars@ 13’ , L = 17’ #5 bars@ 13’ , L = 17’
#5 bars@ 14’ , L = 17’ #5 bars@ 14’ , L = 11’
#5 bars@ 19’ , L = 25’#5 bars@ 19’ , L = 26.5’
#5 bars@ 17’ , L = 25’#5 bars@ 17’ , L = 26.5’
#4 bars@ 27’ , L = 22’#4 bars@ 27’ , L = 25’
#5 bars@ 10’ , L = 9.1’ #5 bars@ 10’ , L = 6’ #4 bars@ 12.5’, L = 6.5’
8’
1 2 3
1 2 3
8’
Column Strip
Middle Strip
Flat Slab
2’
L = 4.2’L = 4.2’
#5 bars@ 10’ , L = 9.1’ #5 bars@ 10’ , L = 6’ #4 bars@ 12.5’, L = 6.5’
#5 bars@ 17’ , L = 25’#5 bars@ 17’ , L = 26.5’
#4 bars@ 27’ , L = 22’#4 bars@ 27’ , L = 25’
![Page 24: A PRESENTION ON THE DESIGN OF AN OFFICE BUILDING By Kalpesh P.](https://reader035.fdocuments.in/reader035/viewer/2022062619/55182c775503469d318b4e69/html5/thumbnails/24.jpg)
CT1
CT
1
CT
1
CT
1
MB
MB
MB
MB
MB
MB1
MB
1
MB
MB
1
MB
MB
MB1
MB
1
MB1
MB
1
MB1
CT
CT CT
CT
CT
CTy
CT
CT
CT CT
CTCT CT
CTC
By
CB
CB
CB
CB
CB
CB
1
CB
1C
B1
CB
CB
CB
CB
CB1
CB1CB1
CTCB1
CB
1
CB
1
CB1
MT
MT
MT
MT
MT
MT
MT
MT
MT
MT
MT
MT
MB
MB
MB
MB1
MB
MB
MB
MB1MT MT MT
MT
MB
1
MB
MB
1
MB
MB
1
MB1MTMTMT1
MT1
CT
1CT1
CT1
CT1
CT1
CT CTCB CB CB1
CT1C
T1
CT
1
MT
1
CT
1
MT1
MT1
MT1
MT1
MT1
MT
1
CT
1
MT1
CT
CB
CT
CB
CT
CB
1C
B1
CT
1C
TC
BC
TC
By
CT
CB
1
CB
1
CTCTCTCB CB CB1CB1
CTCT2CB CB CB1CT2
MT
1
MT
1
MT
1
MT
1
MT
1
1 2 3 4 5
EC
DA
B
Slab with Beams
![Page 25: A PRESENTION ON THE DESIGN OF AN OFFICE BUILDING By Kalpesh P.](https://reader035.fdocuments.in/reader035/viewer/2022062619/55182c775503469d318b4e69/html5/thumbnails/25.jpg)
G
6 7 8 9 10
MT
1
MT
1
CT1
CT
MB
MBw
MB
MBw
MB
MB
MB
MB
MB
MB
MB
MB
MB
MB1
MB
MB1
CTy
CT
2
CT
CT
CT
CT
CT
CT
CT CT
CTCT CT
CTC
By
CB
CB
y
CB
CB
CB
CB CB
CB
C
CB
CB
CB
CB
CB1
CB1CB1
CTCB1
CB C
B1
CB1
MT
MT
MT
MT
C
MT
MT
MT
MT
MT
MTw
MT
MT
MT
MB
MB
MB
MB1
MB
MB
MB
MB1MT MT MT
MB
MB
MB
MB
MB
MB1MTMTMT1
MT1
CT
1CT1
CT1
CT1
CT1
CT CTCB CB1
CT1
CT
1
CT
1
MT1
MT1
MT1
MT1
MT1
MT
1
CT
1
MT1
CTy
CB
yC
TC
BC
TyC
BC
CB
CT
1C
TyC
By
CT
CB
CT
C B
C
CB
CTCTCTCB CB CB1CB1 M
T1
MT
!
MT
1
FD
EB
C
v
M B
MB1
MB
MB
MB
MB
MB
MB1
MT
MT
CB1CB1
MT
CBCB
MT
MT
MT MT
CB
1
CB
1
CB
1
MT
C B
1
MT1
CB
MT1
CB1 CB1CBCB
MT
1
MT
1
CB
MT
MT
MB
w
MB1
CT
CT
CT
CTy
CT2
CT
CT
MT1
C B
1
CT CT
CT
CT2 MT
1
MB
MB
MB
MB
CT
CT
Slab with Beams
![Page 26: A PRESENTION ON THE DESIGN OF AN OFFICE BUILDING By Kalpesh P.](https://reader035.fdocuments.in/reader035/viewer/2022062619/55182c775503469d318b4e69/html5/thumbnails/26.jpg)
Type Strip Placed @
Specification
Bar No. Spacing (in), Length and type
CT column top 3
CT1 column top 3
CB column bottom 3
CB1 column bottom 3
MT middle top 3
MT1 middle top 3
MB middle bottom 3
MB1 middle top 3
L= 15.4ft c/c 17 inL= 10.6 ft c/c 17 in
L= 9.5 ft c/c 17 inL= 7.2 ft c/c 17 in
L= 7.5 ft c/c8.5in
L= 25ft c/c 8.5 in
L= 25ft c/c 17 inL= 26.5ft c/c 17 in
L= 12 ft c/c 6.5 in
L= 25.5ft c/c 17 inL= 17ft c/c 17 in
L= 25.5ft c/c 15 inL= 17ft c/c 15 in
MTC is the same as MT1 but with bar #5 c/c 10.5 inMTW is the same as MT but with bar # 4 c/c 20 inMBW is the same as MB but with bar #4 c/c 24
Slab with Interior Beams
![Page 27: A PRESENTION ON THE DESIGN OF AN OFFICE BUILDING By Kalpesh P.](https://reader035.fdocuments.in/reader035/viewer/2022062619/55182c775503469d318b4e69/html5/thumbnails/27.jpg)
#3 bars@ 8.5’, L = 7.5’
#3 bars@ 17’ , L = 17’#3 bars@ 17’ , L = 25.5’
#3 bars@ 15’ , L = 17’#3 bars@ 15’ , L = 25.5’
#3 bars@ 6.5’, L = 12’#3 bars@ 6.5’, L = 12’
#3 bars@ 17’ , L = 9.5’ #3 bars@ 17’ , L = 7.2’
#3 bars@ 8.5’, L = 25’
#3 bars@ 15’ , L = 15.4’ #3 bars@ 15’ , L = 10.6’
#3 bars@ 17’ , L = 15.4’ #3 bars@ 17’ , L = 10.6’
#3 bars@ 17’ , L = 25’#3 bars@ 17’ , L = 26.5’
#3 bars@ 17’ , L = 25’#3 bars@ 17’ , L = 26’
#3 bars@ 15’ , L = 17’#3 bars@ 15’ , L = 25.5’
#3 bars@ 17’ , L = 9.5’ #3 bars@ 17’ , L = 7.2’ #3 bars@ 8.5’, L = 7.5’
7’
1 2 3
1 2 3
7’
Column Strip
Middle Strip
Slab with Beams
#3 bars@ 17’ , L = 9.5’ #3 bars@ 17’ , L = 7.2’
#3 bars@ 8.5’, L = 7.5’
#3 bars@ 17’ , L = 25’#3 bars@ 17’ , L = 26’
#3 bars@ 15’ , L = 17’#3 bars@ 15’ , L = 25.5’
![Page 28: A PRESENTION ON THE DESIGN OF AN OFFICE BUILDING By Kalpesh P.](https://reader035.fdocuments.in/reader035/viewer/2022062619/55182c775503469d318b4e69/html5/thumbnails/28.jpg)
Slab on ground
Slab thickness = 6”
Using minimum shrinkage and temperature reinforcement (As = 0.0018bh)
Rebar # 3 @ 10” on center in two directions
Placing rebar at 2” lower the top of the slab
![Page 29: A PRESENTION ON THE DESIGN OF AN OFFICE BUILDING By Kalpesh P.](https://reader035.fdocuments.in/reader035/viewer/2022062619/55182c775503469d318b4e69/html5/thumbnails/29.jpg)
• Beams• Edge beams • Interior Beams
• Columns • Column at a corner• Exterior Columns• Interior columns
• Footing• Footing under a corner column• Footing under an edge column• Footing under an interior column• Common footing
Design of Beams,Columns and Footings
![Page 30: A PRESENTION ON THE DESIGN OF AN OFFICE BUILDING By Kalpesh P.](https://reader035.fdocuments.in/reader035/viewer/2022062619/55182c775503469d318b4e69/html5/thumbnails/30.jpg)
Graphical Representations
![Page 31: A PRESENTION ON THE DESIGN OF AN OFFICE BUILDING By Kalpesh P.](https://reader035.fdocuments.in/reader035/viewer/2022062619/55182c775503469d318b4e69/html5/thumbnails/31.jpg)
Loading on beams: Depends on their location in a floor and along a story
The loads may include Loads from Slabs Self weight of beams Weight of walls or attachments that directly lie
or attached on the beams Parapet Walls Curtain walls Partition walls
Beam Design
![Page 32: A PRESENTION ON THE DESIGN OF AN OFFICE BUILDING By Kalpesh P.](https://reader035.fdocuments.in/reader035/viewer/2022062619/55182c775503469d318b4e69/html5/thumbnails/32.jpg)
Load Transfer to beams
Load transfer from slabs
Load transfer from curtain walls slabs
![Page 33: A PRESENTION ON THE DESIGN OF AN OFFICE BUILDING By Kalpesh P.](https://reader035.fdocuments.in/reader035/viewer/2022062619/55182c775503469d318b4e69/html5/thumbnails/33.jpg)
Summary of Loading on Edge Beams
Floor level
Factored Design loads
Due to parapet wallUdl- k/ft
Due to self weight of beam stem/webUdl- k/ft
Due to glass curtain wallsUdl – k/ft
Weight from slabs ( triangular) w (k/ft)
Flat plate 0.09 0.11 0.072 2.82Flat slab 0 0.125 0.144 2.79Floor with beams
0 0.141 0.189 2.61
Grade beams
0 0.251 0.117 0
![Page 34: A PRESENTION ON THE DESIGN OF AN OFFICE BUILDING By Kalpesh P.](https://reader035.fdocuments.in/reader035/viewer/2022062619/55182c775503469d318b4e69/html5/thumbnails/34.jpg)
Loaded Edge frame for analysis of Edge Beam actions
SAP 2000 is used for analysis
![Page 35: A PRESENTION ON THE DESIGN OF AN OFFICE BUILDING By Kalpesh P.](https://reader035.fdocuments.in/reader035/viewer/2022062619/55182c775503469d318b4e69/html5/thumbnails/35.jpg)
Loaded frame for analysis of Interior Beam actions
Loading diagram (axis 1B-2B-3B-4B-5B) for the purpose of calculating additional moments due to self weight of beam
Loading diagram (axis 1B-2B-3B-4B-5B) for the purpose of calculating shear in internal beams due to loads from slab
![Page 36: A PRESENTION ON THE DESIGN OF AN OFFICE BUILDING By Kalpesh P.](https://reader035.fdocuments.in/reader035/viewer/2022062619/55182c775503469d318b4e69/html5/thumbnails/36.jpg)
Longitudinal Reinforcement(edge beams)◦ Bending ( two types
of sections need to be considered)
Design Actions and sections
Moments (kips-ft)Beams @level
A1support
A1-A2span
A2support
A2-A3span
A3support
A3-A4span
A4support
A4-A5span
A5support
Flat plate 66.75 76.01 118.74 59.64 103.49 59.64 118.74 76.01 66.75Flat Slab 90.53 65.43 110.00 60.2 105.26 60.2 110 65.43 90.53Slab w/beams
74.42 68.6 111.71 57.58 100.73 57.88 111.71 68.6 74.42
Ground 18.21 9.77 19.5 9.45 19.29 9.45 19.5 9.77 18.21
• Shear Reinforcment • Vertical shear• Torsional shear
( for the case of edge beams)
![Page 37: A PRESENTION ON THE DESIGN OF AN OFFICE BUILDING By Kalpesh P.](https://reader035.fdocuments.in/reader035/viewer/2022062619/55182c775503469d318b4e69/html5/thumbnails/37.jpg)
Check depth for moment and shear capacity Calculate reinforcements
◦ Longitudinal reinforcement ( for moment and torsion if applicable)
◦ Shear reinforcements for ( vertical shear and torsion if applicable)
The max torsion in the beams was found to be smaller than the torsion capacity requirement for the x-section for torsion to be neglected
The shear reinforcement was found to be governed by the max spacing as per ACI requirement
i.e. for #3 double leg stirrups @ 6.75 in on center-to-center
Procedures of Beam Design
![Page 38: A PRESENTION ON THE DESIGN OF AN OFFICE BUILDING By Kalpesh P.](https://reader035.fdocuments.in/reader035/viewer/2022062619/55182c775503469d318b4e69/html5/thumbnails/38.jpg)
Reinforcement summary for edge beams for frame shown earlier
Longitudinal Reinforcement
bw(in)= 12 d(in)= 13.5
Beam (bw=12 in; d=14.5in) A1 A2 A3 A4 A5
Support Moment -66.18 -119.6 -103 -119.6 -66.18
Span Moment 76.56 59.8 59.8 76.56
Req'd reinf.(in2), supp 1.1912 2.1528 1.854 2.1528 1.19124
Req'd reinf.(in2), span 1.2939 1.01062 0 1.01062 1.293864
Min. reinf 0.54 0.54 0.54 0.54 0.54 0.54 0.54 0.54 0.54
Reinf Provide 1.1912 1.2939 2.1528 1.01062 1.854 1.01062 2.1528 1.293864 1.19124
Bar # used 7 7 8 7 8 7 8 7 7
area of bar 0.6 0.6 0.79 0.6 0.79 0.6 0.79 0.6 0.6
#bars req'd 1.9854 2.1564 2.7250633 1.68437 2.346835 1.684367 2.725063 2.15644 1.9854
bars used 2#7 2#7+1#6 3#8 2#7 2#8 + 1 #6 2#7 2#8 +1#7 2#7+1#6 2#7
Note: Similar tabular calculations are made for all beams
![Page 39: A PRESENTION ON THE DESIGN OF AN OFFICE BUILDING By Kalpesh P.](https://reader035.fdocuments.in/reader035/viewer/2022062619/55182c775503469d318b4e69/html5/thumbnails/39.jpg)
![Page 40: A PRESENTION ON THE DESIGN OF AN OFFICE BUILDING By Kalpesh P.](https://reader035.fdocuments.in/reader035/viewer/2022062619/55182c775503469d318b4e69/html5/thumbnails/40.jpg)
INTERIOR BEAMS
![Page 41: A PRESENTION ON THE DESIGN OF AN OFFICE BUILDING By Kalpesh P.](https://reader035.fdocuments.in/reader035/viewer/2022062619/55182c775503469d318b4e69/html5/thumbnails/41.jpg)
![Page 42: A PRESENTION ON THE DESIGN OF AN OFFICE BUILDING By Kalpesh P.](https://reader035.fdocuments.in/reader035/viewer/2022062619/55182c775503469d318b4e69/html5/thumbnails/42.jpg)
Loads ◦ Moments and axial forces from frame analyis◦ Self-weight of columns
Frame is braced Check slenderness of the column Calculated magnified moments Design for Reinforcement is made using
STAAD.etc , using the ACI code
Column Design
![Page 43: A PRESENTION ON THE DESIGN OF AN OFFICE BUILDING By Kalpesh P.](https://reader035.fdocuments.in/reader035/viewer/2022062619/55182c775503469d318b4e69/html5/thumbnails/43.jpg)
Column AttachmentsThird story corner column
Third story edge
column
First story interior column
![Page 44: A PRESENTION ON THE DESIGN OF AN OFFICE BUILDING By Kalpesh P.](https://reader035.fdocuments.in/reader035/viewer/2022062619/55182c775503469d318b4e69/html5/thumbnails/44.jpg)
Column loadings & Reinforcements Column@ level
Column type
Design actions Magnified actionsReinforcement
requiredP (kips) Mx(k-ft) My(k-ft) Mx(k-ft) My(k-ft)
Third st. short 41.1 66.75 66.75 66.75 66.75 8#8 bars
Second st. short 84.44 49.75 49.75 49.75 49.75 4#8 bars
First st slender 127.67 24.26 24.26 24.26 24.26 4#8 bars
foundation short 141.39 4.88 4.88 4.88 4.88 4#8 barsColumn@ level
Column type
Analysis actions Magnified actionsReinforcement
requiredP (kips) Mx(k-ft) My(k-ft) Mx(k-ft) My(k-ft)
Third st. short 81.04 0 114.89 7.43 114.89 6#8 bars
Second st. short 163.65 4.12 56.87 13.9 56.87 4#8 bars
First st slender 244.14 2.35 28.48 28.66 28.66 4#8 bars
Foundation short 255 .48 0 21.65 21.65 4#8 barsColumn@ level
Column type
Design actions Magnified actionsReinforcement
requiredP (kips) Mx(k-ft) My(k-ft) Mx(k-ft) My(k-ft)
Third stor. short 144.67 0 0 13.1 13.1 4#8 bars
Second st. short 287.93 0 0 27.68 27.68 4#8 bars
first slender 425.2 0 0 75.17 75.17 8#8
foundation short 427.5 0 0 44 44 8#8 bars
CORNER COLUMN
EDGECOLUMN
INTERIORCOLUMN
![Page 45: A PRESENTION ON THE DESIGN OF AN OFFICE BUILDING By Kalpesh P.](https://reader035.fdocuments.in/reader035/viewer/2022062619/55182c775503469d318b4e69/html5/thumbnails/45.jpg)
Column Reinforcement
Corner Column
InteriorColumn
Edge Column
![Page 46: A PRESENTION ON THE DESIGN OF AN OFFICE BUILDING By Kalpesh P.](https://reader035.fdocuments.in/reader035/viewer/2022062619/55182c775503469d318b4e69/html5/thumbnails/46.jpg)
Loading
Loading from Column
Surcharge loadFloor loading
Soil load resting on the footing
Footing Loading &Design
![Page 47: A PRESENTION ON THE DESIGN OF AN OFFICE BUILDING By Kalpesh P.](https://reader035.fdocuments.in/reader035/viewer/2022062619/55182c775503469d318b4e69/html5/thumbnails/47.jpg)
Critical Sections Bearing pressure distribution
Loading
Critical section for two way shear
Critical section for one way shear
Critical section for bending
![Page 48: A PRESENTION ON THE DESIGN OF AN OFFICE BUILDING By Kalpesh P.](https://reader035.fdocuments.in/reader035/viewer/2022062619/55182c775503469d318b4e69/html5/thumbnails/48.jpg)
FootingReinforcement
![Page 49: A PRESENTION ON THE DESIGN OF AN OFFICE BUILDING By Kalpesh P.](https://reader035.fdocuments.in/reader035/viewer/2022062619/55182c775503469d318b4e69/html5/thumbnails/49.jpg)
![Page 50: A PRESENTION ON THE DESIGN OF AN OFFICE BUILDING By Kalpesh P.](https://reader035.fdocuments.in/reader035/viewer/2022062619/55182c775503469d318b4e69/html5/thumbnails/50.jpg)
Retaining wall• Purpose• Behavior of wall Components• Design Sequence• Drainage System• Reinforcement Detailing
![Page 51: A PRESENTION ON THE DESIGN OF AN OFFICE BUILDING By Kalpesh P.](https://reader035.fdocuments.in/reader035/viewer/2022062619/55182c775503469d318b4e69/html5/thumbnails/51.jpg)
Retaining structures hold back soil or other loose material where an abrupt change in ground elevation occurs.
Behavior of Retaining wall Wall – T at rear face & C at front face. Heel - T at upper face & C at bottom face. Toe - T at bottom face & C at upper face. Shear Key – provides to resistance to sliding.
Purpose
![Page 52: A PRESENTION ON THE DESIGN OF AN OFFICE BUILDING By Kalpesh P.](https://reader035.fdocuments.in/reader035/viewer/2022062619/55182c775503469d318b4e69/html5/thumbnails/52.jpg)
![Page 53: A PRESENTION ON THE DESIGN OF AN OFFICE BUILDING By Kalpesh P.](https://reader035.fdocuments.in/reader035/viewer/2022062619/55182c775503469d318b4e69/html5/thumbnails/53.jpg)
Loads:
Due to surcharge - 0.363 kip/ft2 ( Acting Downward)
Active earth pressure – 2.4kip/ft2(Acting Horizontally) Determined the dimensions of retaining wall. Checked length of heel & toe for stability against sliding & overturning.• F.O.S against overturning =3.92>2• F.O.S against sliding = 2>1.5 Calculated base soil pressure.• Base Soil Pressure:
Pmax = 1.66 Ksf
Pmin = 0.62 Ksf Provided Shear Key. Checked Stem thickness. Checked Heel & Toe thickness. Reinforcement:
Design Sequence
Component Main Reinforcement
Distribution Reinforcement
Shrinkage Reinforcement
Distribution Reinforcement
Stem #5@8” #3@11” #3@12” #3@11”
Heel #5@8” #4@8” #4@12” #4@12”
Toe #5@8” #4@8” #4@12” #4@12”
![Page 54: A PRESENTION ON THE DESIGN OF AN OFFICE BUILDING By Kalpesh P.](https://reader035.fdocuments.in/reader035/viewer/2022062619/55182c775503469d318b4e69/html5/thumbnails/54.jpg)
Footing Detailing
![Page 55: A PRESENTION ON THE DESIGN OF AN OFFICE BUILDING By Kalpesh P.](https://reader035.fdocuments.in/reader035/viewer/2022062619/55182c775503469d318b4e69/html5/thumbnails/55.jpg)
Purpose• To release the hydrostatic pressure.
Provided perforated 8” diameter pipe laid along the base of the wall &surrounded by gravels(stone filter)
Drainage System
![Page 56: A PRESENTION ON THE DESIGN OF AN OFFICE BUILDING By Kalpesh P.](https://reader035.fdocuments.in/reader035/viewer/2022062619/55182c775503469d318b4e69/html5/thumbnails/56.jpg)
Introduction Specification of Elevator Design Consideration Shear wall slab & footing Reinforcement detailing
Shear wall
![Page 57: A PRESENTION ON THE DESIGN OF AN OFFICE BUILDING By Kalpesh P.](https://reader035.fdocuments.in/reader035/viewer/2022062619/55182c775503469d318b4e69/html5/thumbnails/57.jpg)
To resist lateral forces due to wind To provide additional strength during earthquake Shear walls often are placed in Elevator or Staircase areas
Elevator Specification
Introduction
No. of person
Rated capacity(kg)
Rated speed(m/s)
Car internal
Ceiling height
Passenger Elevator
15 1000 1.5 5.9’x4.92’ 7.3’
Freight Elevator
- 1200 1.5 7.22’x7.4’
![Page 58: A PRESENTION ON THE DESIGN OF AN OFFICE BUILDING By Kalpesh P.](https://reader035.fdocuments.in/reader035/viewer/2022062619/55182c775503469d318b4e69/html5/thumbnails/58.jpg)
Design Consideration Calculated wind load which is 26psf by using ACI code( Ps =λ I Ps30)
Vu< φVn
Calculated maximum shear strength permitted by φVn = φ 10 √fc hwd Calculated shear Strength provided by concrete is
Vc = 3.3 √fc hwd + Nu d/4 lw
Vu<<φVc (No Shear reinforcement required) Calculating Area of steel which is governed by Minimum Reinforcement
in wall in our case Section has been checked by PCAcol. Provided Minimum wall Reinforcement governed by ACI.
• Vertical reinforcement Ast = 0.0012.b.dProvided #3@ 10
• Horizontal reinforcement Ast = 0.002.b.d Provided #3@ 6’
![Page 59: A PRESENTION ON THE DESIGN OF AN OFFICE BUILDING By Kalpesh P.](https://reader035.fdocuments.in/reader035/viewer/2022062619/55182c775503469d318b4e69/html5/thumbnails/59.jpg)
Shear wall detailing
![Page 60: A PRESENTION ON THE DESIGN OF AN OFFICE BUILDING By Kalpesh P.](https://reader035.fdocuments.in/reader035/viewer/2022062619/55182c775503469d318b4e69/html5/thumbnails/60.jpg)
Slab• Design Steps
◦ Load – 250k
◦ As =
◦ Reinforcement provided #5@ 6” (Both Direction)
Footing• Design Steps
• Loads & moments calculated at the base of footing• Calculated factored Soil pressure = Factored load/Area• Desiged footing as a strip• Integrated 3 beams
Shear wall Slab & footing Design
![Page 61: A PRESENTION ON THE DESIGN OF AN OFFICE BUILDING By Kalpesh P.](https://reader035.fdocuments.in/reader035/viewer/2022062619/55182c775503469d318b4e69/html5/thumbnails/61.jpg)
Machine room Slab detailing
![Page 62: A PRESENTION ON THE DESIGN OF AN OFFICE BUILDING By Kalpesh P.](https://reader035.fdocuments.in/reader035/viewer/2022062619/55182c775503469d318b4e69/html5/thumbnails/62.jpg)
Shear wall Footing
![Page 63: A PRESENTION ON THE DESIGN OF AN OFFICE BUILDING By Kalpesh P.](https://reader035.fdocuments.in/reader035/viewer/2022062619/55182c775503469d318b4e69/html5/thumbnails/63.jpg)
Footing& Shear wall connection
![Page 64: A PRESENTION ON THE DESIGN OF AN OFFICE BUILDING By Kalpesh P.](https://reader035.fdocuments.in/reader035/viewer/2022062619/55182c775503469d318b4e69/html5/thumbnails/64.jpg)
Staircase Shear Wall Footing for shear wall
Design
![Page 65: A PRESENTION ON THE DESIGN OF AN OFFICE BUILDING By Kalpesh P.](https://reader035.fdocuments.in/reader035/viewer/2022062619/55182c775503469d318b4e69/html5/thumbnails/65.jpg)
![Page 66: A PRESENTION ON THE DESIGN OF AN OFFICE BUILDING By Kalpesh P.](https://reader035.fdocuments.in/reader035/viewer/2022062619/55182c775503469d318b4e69/html5/thumbnails/66.jpg)
Staircase is designed as cantilever Stairs Load Calculated using Total Load= (L.L+ Floor to Floor Finish + Self
Weight of Waist Slab + Weight of Step) Moment was calculated and tension is on the top Steel Area = Ast =Mu/ φ Fy (d-0.5a) Shrinkage and Temperature reinforcement is calculated
using Area of Shrinkage = 0.0018 x b x d Development Length Check was made by using formula
Design Steps
![Page 67: A PRESENTION ON THE DESIGN OF AN OFFICE BUILDING By Kalpesh P.](https://reader035.fdocuments.in/reader035/viewer/2022062619/55182c775503469d318b4e69/html5/thumbnails/67.jpg)
Description Bar size designation & Spacing
Location
Main reinforcement in Tread
#7 @ 4.5” In the Tension zone of tread
Main reinforcement in Midlanding
#4 @ 4.5” In Midlanding Span
Shrinkage Cracking and temperature reinforcement
#3 @ 7” In Tread & Waist slab in both direction
Reinforcement
Shrinkage Cracking and temperature reinforcement is provided to minimize the cracking and tie the Structure together and achieve Structural integrity
Development Length is provided because to develop the required stress in bar
![Page 68: A PRESENTION ON THE DESIGN OF AN OFFICE BUILDING By Kalpesh P.](https://reader035.fdocuments.in/reader035/viewer/2022062619/55182c775503469d318b4e69/html5/thumbnails/68.jpg)
![Page 69: A PRESENTION ON THE DESIGN OF AN OFFICE BUILDING By Kalpesh P.](https://reader035.fdocuments.in/reader035/viewer/2022062619/55182c775503469d318b4e69/html5/thumbnails/69.jpg)
![Page 70: A PRESENTION ON THE DESIGN OF AN OFFICE BUILDING By Kalpesh P.](https://reader035.fdocuments.in/reader035/viewer/2022062619/55182c775503469d318b4e69/html5/thumbnails/70.jpg)
Shear Wall
SHEAR WALL IS A STRUCTURAL ELEMENT USED TO RESIST LATERAL/HORIZONTAL/SHEAR FORCES PARALLEL TO THE PLANE OF THE WALL
![Page 71: A PRESENTION ON THE DESIGN OF AN OFFICE BUILDING By Kalpesh P.](https://reader035.fdocuments.in/reader035/viewer/2022062619/55182c775503469d318b4e69/html5/thumbnails/71.jpg)
Calculation of wind load which is 26psf by using ACI code Ps =λ I Ps30
Vu< φVn
Calculating maximum shear strength permitted by φVn = φ 10 √fc hwd Calculating shear Strength provided by Vc = 3.3 √fc hwd + Nu d/4 lw
Vu<<φVc (No Shear reinforcement required) Calculating Area of steel which is governed by Minimum Reinforcement in
wall in our case Minimum Reinforcement Wall Vertical Reinforcement Ast = 0.0012 x b x d Therefore providing # 3@ 7” Horizontal Reinforcement Ast =0.002 x b x d Therefore providing #3@ 10”
Design Steps
![Page 72: A PRESENTION ON THE DESIGN OF AN OFFICE BUILDING By Kalpesh P.](https://reader035.fdocuments.in/reader035/viewer/2022062619/55182c775503469d318b4e69/html5/thumbnails/72.jpg)
![Page 73: A PRESENTION ON THE DESIGN OF AN OFFICE BUILDING By Kalpesh P.](https://reader035.fdocuments.in/reader035/viewer/2022062619/55182c775503469d318b4e69/html5/thumbnails/73.jpg)
![Page 74: A PRESENTION ON THE DESIGN OF AN OFFICE BUILDING By Kalpesh P.](https://reader035.fdocuments.in/reader035/viewer/2022062619/55182c775503469d318b4e69/html5/thumbnails/74.jpg)
![Page 75: A PRESENTION ON THE DESIGN OF AN OFFICE BUILDING By Kalpesh P.](https://reader035.fdocuments.in/reader035/viewer/2022062619/55182c775503469d318b4e69/html5/thumbnails/75.jpg)
Loading◦Loading from Wall◦Surcharge load◦Soil load resting on the footing
Footing for Shear Wall
![Page 76: A PRESENTION ON THE DESIGN OF AN OFFICE BUILDING By Kalpesh P.](https://reader035.fdocuments.in/reader035/viewer/2022062619/55182c775503469d318b4e69/html5/thumbnails/76.jpg)
![Page 77: A PRESENTION ON THE DESIGN OF AN OFFICE BUILDING By Kalpesh P.](https://reader035.fdocuments.in/reader035/viewer/2022062619/55182c775503469d318b4e69/html5/thumbnails/77.jpg)
Loading at the Footing
![Page 78: A PRESENTION ON THE DESIGN OF AN OFFICE BUILDING By Kalpesh P.](https://reader035.fdocuments.in/reader035/viewer/2022062619/55182c775503469d318b4e69/html5/thumbnails/78.jpg)
Design Steps
Loading Moment calculated at the base of footing Find Area required =Load/Net Pressure Calculating factored Net Pressure Check for shear for the depth Vu < ø Vc
Calculated Steel area using Ast= Mn/fyjd Comparing with the minimum steel we get the minimum reinforcement in
the footing as #5 @ 7” Here we are providing the shrinkage temperature reinforcement #5 @ 7” Checked for Development Length is done
Footing for Shear Wall
![Page 79: A PRESENTION ON THE DESIGN OF AN OFFICE BUILDING By Kalpesh P.](https://reader035.fdocuments.in/reader035/viewer/2022062619/55182c775503469d318b4e69/html5/thumbnails/79.jpg)
![Page 80: A PRESENTION ON THE DESIGN OF AN OFFICE BUILDING By Kalpesh P.](https://reader035.fdocuments.in/reader035/viewer/2022062619/55182c775503469d318b4e69/html5/thumbnails/80.jpg)
Green building is the practice of increasing the efficiency with which buildings use resources energy, water and materials
Helps in Minimizing Environment aspect like generation of pollution at the source risk to
human health and the environment
What is Green engineering?
![Page 81: A PRESENTION ON THE DESIGN OF AN OFFICE BUILDING By Kalpesh P.](https://reader035.fdocuments.in/reader035/viewer/2022062619/55182c775503469d318b4e69/html5/thumbnails/81.jpg)
Materials Function Application
Glazing Curtain Wall System
Weather protection & Insulation
Glass on all exterior surface
Roof Garden Plantation & Aesthetics
On Roof
Sewage Treatment Plant
To Generate Methane as an energy
Drainage Treatment of Building
Paints Environmental Friendly
All interior portion
Lighting Less Energy Consumption
Both Interior & Exterior
Water Proofing Water proof structure For Concrete & Masonry
What Aspect we have considered in Green Engineering & what function does it play?
![Page 82: A PRESENTION ON THE DESIGN OF AN OFFICE BUILDING By Kalpesh P.](https://reader035.fdocuments.in/reader035/viewer/2022062619/55182c775503469d318b4e69/html5/thumbnails/82.jpg)
Function & Control
Airtight and weather resistant Air leakage control Rain Penetration Control by Pressure plate
Heat Loss by Cap connection Condensation Control Fire Safety
Glazing Curtain wall system
![Page 83: A PRESENTION ON THE DESIGN OF AN OFFICE BUILDING By Kalpesh P.](https://reader035.fdocuments.in/reader035/viewer/2022062619/55182c775503469d318b4e69/html5/thumbnails/83.jpg)
Basically consist of component like Mullions vertical Frame & rails horizontal mullions Vision Glass, insulation Hardware components – Anchors, Aluminum connector,
Settings blocks, Corner blocks, Pressure plates, caps, gaskets
Fixing System & Components
![Page 84: A PRESENTION ON THE DESIGN OF AN OFFICE BUILDING By Kalpesh P.](https://reader035.fdocuments.in/reader035/viewer/2022062619/55182c775503469d318b4e69/html5/thumbnails/84.jpg)
Glass Size Specification
![Page 85: A PRESENTION ON THE DESIGN OF AN OFFICE BUILDING By Kalpesh P.](https://reader035.fdocuments.in/reader035/viewer/2022062619/55182c775503469d318b4e69/html5/thumbnails/85.jpg)
Function Environmental Friendly
Fixing System
Modules with Plantation Slip Sheet /Root Barrier Water Proof roof deck
http://www.liveroof.com/ Load Consideration Load due to Modular system live roof plantation in the roof is taken consideration in slab design as 20 Psf
Roof Garden
![Page 86: A PRESENTION ON THE DESIGN OF AN OFFICE BUILDING By Kalpesh P.](https://reader035.fdocuments.in/reader035/viewer/2022062619/55182c775503469d318b4e69/html5/thumbnails/86.jpg)
Advantage It generates Methane which can be used as a Source of
Energy. We can use the piping to send to appropriate location It is an Custom make and modular in size Maintenance and Operation cost is economical It maintains the BOD & COD level of Water is obtained
Sewage Treatment Plant
![Page 87: A PRESENTION ON THE DESIGN OF AN OFFICE BUILDING By Kalpesh P.](https://reader035.fdocuments.in/reader035/viewer/2022062619/55182c775503469d318b4e69/html5/thumbnails/87.jpg)
Schematic Representation of STP
![Page 88: A PRESENTION ON THE DESIGN OF AN OFFICE BUILDING By Kalpesh P.](https://reader035.fdocuments.in/reader035/viewer/2022062619/55182c775503469d318b4e69/html5/thumbnails/88.jpg)
Paint Using low voltaic organic components paint is beneficial.Lighting Using T5 Lamps, low mercury lamps helps in reduction in
energy consumptionWaterproofing Aquafin-IC is used a penetrating, inorganic, cementitious
material used to permanently waterproof
Other Green Engineering Component
![Page 89: A PRESENTION ON THE DESIGN OF AN OFFICE BUILDING By Kalpesh P.](https://reader035.fdocuments.in/reader035/viewer/2022062619/55182c775503469d318b4e69/html5/thumbnails/89.jpg)
Components Quantity in (ft3)
Slabs 75000
Beams 6973
Columns 5488
Staircase 1750
Shear Wall with Staircase 5667
Shear Wall with Elevator(2) 11861.54
Footing for Shear Wall with Staircase 1200
Footing for Shear Wall with Elevator (2) 2434.86
Footing Under Column 7232
Retaining wall 15688.52
Total 133294.9 cft
Concrete Estimation
![Page 90: A PRESENTION ON THE DESIGN OF AN OFFICE BUILDING By Kalpesh P.](https://reader035.fdocuments.in/reader035/viewer/2022062619/55182c775503469d318b4e69/html5/thumbnails/90.jpg)
Thank You