Design & Control Design and Commissioning of a New Thruster Assisted Mooring System (TAMS) for Global Producer III Richard I. Stephens Allan Meahan Converteam, Ltd. October 9-10, 2007 Return to Session Directory Return to Session Directory

Transcript of A new thruster assisted mooring system, Design and...

Design & Control

Design and Commissioning of a New Thruster Assisted Mooring System (TAMS)

for Global Producer III

Richard I. StephensAllan Meahan

Converteam, Ltd.

October 9-10, 2007

Return to Session DirectoryReturn to Session Directory

Design and commissioning of a new thruster assisted mooring system (TAMS) for Global Producer III

Richard Stephens and Allan Meahan

Return to Session Directory

| CUSTOMISED TECHNOLOGY FOR CUSTOMER SUCCESS | | 2New TAMS for GP3

SUMMARYGP3 re-fitTAMS/APS user interfaceControl philosophyTuningConclusions

Return to Session Directory

| CUSTOMISED TECHNOLOGY FOR CUSTOMER SUCCESS | | 3New TAMS for GP3

⎢ Entering dry-dock

Return to Session Directory

| CUSTOMISED TECHNOLOGY FOR CUSTOMER SUCCESS | | 4New TAMS for GP3

⎢ After the re-fit

Return to Session Directory

| CUSTOMISED TECHNOLOGY FOR CUSTOMER SUCCESS | | 5New TAMS for GP3

⎢ New network layout

Outstation 6

Port Aft Engine Room

MTC Console

Bridge

Outstation 1

Fwd Sw’bdRoom

Outstation 2

Fwd Engine Room

Outstation 3

Stbd Aft LV Sw’bd Room

Outstation 4

Port Aft LV Sw’bd Room

Outstation 5

Stbd Aft Engine Room

Remote I/O 1

CCR

Remote I/O 2

Turret HPU Room

T1 Speed f/bT1 Speed Ref T1 Drive Status

T1 Azimuth f/bT1 Azimuth Ref T1 Azimuth Status

T5 Stbd Stern Speed f/bT5 Stbd Stern Speed Ref

T3 Port Stern Speed f/bT3 Port Stern Speed Ref

T3 Port Stern Drive Status

T5 Stbd Stern Azimuth Status

T5 Stbd Stern Azimuth f/bT5 Stbd Stern Azimuth Ref

T3 Stbd Stern Azimuth RefT3 Stbd Stern Azimuth Status

T3 Stbd Stern Azimuth f/b

T5 Stbd Stern Drive Status

DUAL FIP

DUAL Ethernet

DP/TAMS Console A

DP/TAMS Console B

Advisory/ Prediction Simulator Console

Maintenance PC

Outstation 6

Port Aft Engine Room

MTC Console

Bridge

Outstation 1

Fwd Sw’bdRoom

Outstation 2

Fwd Engine Room

Outstation 3

Stbd Aft LV Sw’bd Room

Outstation 4

Port Aft LV Sw’bd Room

Outstation 5

Stbd Aft Engine Room

Remote I/O 1

CCR

Remote I/O 2

Turret HPU Room

T1 Speed f/bT1 Speed Ref T1 Drive Status

T1 Azimuth f/bT1 Azimuth Ref T1 Azimuth Status

T5 Stbd Stern Speed f/bT5 Stbd Stern Speed Ref

T3 Port Stern Speed f/bT3 Port Stern Speed Ref

T3 Port Stern Drive Status

T5 Stbd Stern Azimuth Status

T5 Stbd Stern Azimuth f/bT5 Stbd Stern Azimuth Ref

T3 Stbd Stern Azimuth RefT3 Stbd Stern Azimuth Status

T3 Stbd Stern Azimuth f/b

T5 Stbd Stern Drive Status

DUAL FIP

DUAL Ethernet

DP/TAMS Console A

DP/TAMS Console B

Advisory/ Prediction Simulator Console

Maintenance PC

Return to Session Directory

| CUSTOMISED TECHNOLOGY FOR CUSTOMER SUCCESS | | 6New TAMS for GP3

⎢ Old consoles

Return to Session Directory

| CUSTOMISED TECHNOLOGY FOR CUSTOMER SUCCESS | | 7New TAMS for GP3

⎢ Old consoles showing old hardware

Return to Session Directory

| CUSTOMISED TECHNOLOGY FOR CUSTOMER SUCCESS | | 8New TAMS for GP3

⎢ New consoles

Return to Session Directory

| CUSTOMISED TECHNOLOGY FOR CUSTOMER SUCCESS | | 9New TAMS for GP3

⎢ New hardware within existing cabinet

Return to Session Directory

| CUSTOMISED TECHNOLOGY FOR CUSTOMER SUCCESS | | 10New TAMS for GP3

⎢ New consoles in the existing suite

Return to Session Directory

| CUSTOMISED TECHNOLOGY FOR CUSTOMER SUCCESS | | 11New TAMS for GP3

⎢ Controller screens

Return to Session Directory

| CUSTOMISED TECHNOLOGY FOR CUSTOMER SUCCESS | | 12New TAMS for GP3

⎢ Controller monitoring screens

Return to Session Directory

| CUSTOMISED TECHNOLOGY FOR CUSTOMER SUCCESS | | 13New TAMS for GP3

⎢ Consequence analysis screens

Return to Session Directory

| CUSTOMISED TECHNOLOGY FOR CUSTOMER SUCCESS | | 14New TAMS for GP3

⎢ Consequence analysis (2)

Return to Session Directory

| CUSTOMISED TECHNOLOGY FOR CUSTOMER SUCCESS | | 15New TAMS for GP3

⎢ Consequence analysis (3)

Return to Session Directory

| CUSTOMISED TECHNOLOGY FOR CUSTOMER SUCCESS | | 16New TAMS for GP3

⎢ Prediction simulator screens

Return to Session Directory

| CUSTOMISED TECHNOLOGY FOR CUSTOMER SUCCESS | | 17New TAMS for GP3

⎢ Advisory screens

Return to Session Directory

| CUSTOMISED TECHNOLOGY FOR CUSTOMER SUCCESS | | 18New TAMS for GP3

⎢ Vessel thruster layout

Return to Session Directory

| CUSTOMISED TECHNOLOGY FOR CUSTOMER SUCCESS | | 19New TAMS for GP3

⎢ Control philosophy

Minimise points of failureTension measurements unreliable and noisyTension model requires operator input

Assist (complement) anchor system

Minimise thruster usageEconomyNoise

Return to Session Directory

| CUSTOMISED TECHNOLOGY FOR CUSTOMER SUCCESS | | 20New TAMS for GP3

⎢ Control modes

Anchor monitor

Manual bias

Auto heading

Anchor assist

Anchor economy

‘Matrix’ mode

Return to Session Directory

| CUSTOMISED TECHNOLOGY FOR CUSTOMER SUCCESS | | 21New TAMS for GP3

⎢ Comparison of mooring forces

2000 2200 2400 2600 2800 3000 3200-600

-500

-400

-300

-200

-100

0

100

200

300

400

Time

GP3 logged data 30-Jan-07 13:00

Thruster force [kN]Estimated anchor force [kN]Measured anchor force [kN]

Return to Session Directory

| CUSTOMISED TECHNOLOGY FOR CUSTOMER SUCCESS | | 22New TAMS for GP3

⎢ Comparison of anchor tensions

18:10 18:20 18:301.05

1.1

1.15

1.2

1.25

1.3

1.35x 106

Time

Tens

ions

[N]

GP3 anchor 3 tension at 02-Feb-2007 18:00:01

MEAS_TENSION3APS_MODEL_TENSION3

Return to Session Directory

| CUSTOMISED TECHNOLOGY FOR CUSTOMER SUCCESS | | 23New TAMS for GP3

⎢ Heading step change

23:35 23:40-5

-4

-3

-2

-1

0

1

Time

Hea

ding

erro

r (de

g)

GP3 started logging at 31-Jan-2007 23:00:01

Return to Session Directory

| CUSTOMISED TECHNOLOGY FOR CUSTOMER SUCCESS | | 24New TAMS for GP3

⎢ TAMStool user interface

Return to Session Directory

| CUSTOMISED TECHNOLOGY FOR CUSTOMER SUCCESS | | 25New TAMS for GP3

⎢ Conclusions

New HMI

No tension measurements

Minimised points of failure

Preparation via initial simulation

Commissioned with no interruption to production

Return to Session Directory

Thank you for your attention

Adipiscing editLorem ipsum dolor sit amet, conseceteur adipiscing elit, sed diam nonummy nibh euismod tincidunt ut laoreet dolore magna aliquam eratvolutpat. Ut wisi enim ad minim veniam, quis nostrud exerci tation ullamcorper suscipit lobortis nisl ut aliquip ex ea commodo consequat.

Duis autem vel eum iriure dolor in hendrerit in vulputate velit esse molestie consequat, vel illum dolore eu feugiat nulla facilisis at vero eros et accumsan.

www.converteam.com

Return to Session Directory