A. Nasir CV(1)

6
Muscat 096896504067 Abdul Nasir Personal Profession : Civil Engineer Nationality : Pakistani C.N.I.C No : 36104-7359934-9 Religion : Islam Home District : Khanewal Date of Birth : 15-03-1974 Education DAE in Civil Engineering (1612 Marks) in 1993 Metric (571/850 Marks) in 1989 Language Capable English, Urdu, Punjabi Professional Record Position Project Manager Name of Organization Arabian Supplies & Contracting LLC (Muscat). Name of Project Construction of Road at Oman Munition production Company (Lizugh) Period January 2015 to till date . Responsibility To manage & execute all infrastructure works. Including 7 Meters Roads, 125 ducts, 15 box culverts & 6 Meters channels ( 40000 Sqm Rip Rap work). Construction of schools (18 class rooms,20class rooms,20class rooms &10class rooms) in different cities of Oman. Position Acting Project Manager Name of Organization Desert Line Projects LLC (Muscat). 1 |3

Transcript of A. Nasir CV(1)

Page 1: A. Nasir CV(1)

Muscat 096896504067

Abdul NasirPersonal Profession : Civil Engineer

Nationality : Pakistani C.N.I.C No : 36104-7359934-9

Religion : IslamHome District : KhanewalDate of Birth : 15-03-1974

Education DAE in Civil Engineering (1612 Marks) in 1993Metric (571/850 Marks) in 1989

Language Capable English, Urdu, Punjabi

Professional Record Position Project Manager

Name of Organization Arabian Supplies & Contracting LLC (Muscat).Name of Project Construction of Road at Oman Munition

production Company (Lizugh)Period January 2015 to till date

.Responsibility To manage & execute all infrastructure works.

Including 7 Meters Roads, 125 ducts, 15 box culverts & 6 Meters channels ( 40000 Sqm Rip Rap work). Construction of schools (18 class rooms,20class rooms,20class rooms &10class rooms) in different cities of Oman.

Position Acting Project Manager Name of Organization Desert Line Projects LLC (Muscat).Name of Project Construction of Ring Road at Madinat Al IlamPeriod March 2011 to till date

.Responsibility To manage all structure works including

1 No Bridge of 3Spans, 8 No ,s Box culverts Construction of Dual Carriageway of Ring Road & 3 Million cubic meter cutting, 3.5 million Cubic meter cutting Support in Preparation of IPC’s Escalation of work done, Correspondence with Consultant NESPAK and Client Royaaal office.

Position Deputy Manager

1 |3

Page 2: A. Nasir CV(1)

Name of Organization Habib Construction Services (Pvt) Ltd.Name of Project Improvement/Rehabilitation of Existing Multan

Road, LahorePeriod March 2010 to till date

Name of Project Construction of Lahore Ring Road Package-10 Period May 2009 to Feb 2010.Responsibility To manage all structure works including

2 No.s Flyovers of 2 Spans, Underpasses, Subway and Construction of Main Carriageway of Ring Road & G.T Road & ApproachesSupport in Preparation of IPC’s Escalation of work done, Correspondence with Consultant NESPAK and Client P.M.U.

Position Senior Engineer StructureName of Organization Qavi Engineers (pvt) Ltd.Name of Project Construction of Nishat Power Plant 220 MW

(Combined Cycle) Pattoki.Period July 2008 to May 2009.Responsibility To manage all structure works including

Engine hall workshop, cooling tanks (Engine foundations, Flooring of engine halls, Tank foundations & switch yard), Correspondence with ConsultantWartsila and Client Nishat Power Plant Pattoki.

Position Construction ManagerName of Organization Sh. Abdur Razzaq & Co. (Pvt) Ltd. LahoreName of Project Construction of Flyover for G. Magnolia

Park Housing Scheme at Gujranwala,Period February, 2006 to June 2008.Responsibility To manage all structure works including

Flyover of 20 Span, Retaining Walls, Main Boulevard and approach roads.Preparation of IPC’s Escalation of work done, Correspondence with Consultant NESPAK and Client Ghosia Builders Construction of Main Boulevard & Approaches.

Position Sr. Structure EngineerName of Organization Izhar (Pvt) Ltd.Name of Project Construction of Bulleha Shah Paper Mill at

kasurPeriod September, 2005 to February, 2006Responsibility Preparation and checking of

Structure Concreting of Heavy Raft Foundation, Columns, Shells and Roof Slab

2 |3

Page 3: A. Nasir CV(1)

Position Project EngineerName of Organization SKB Engineering & Construction (Pvt) Ltd.Name of Project 1. Construction of Mall Road Underpass

2. Construction of F.C. College Underpass.3. Construction of Doctor’s Hospital Underpass.4. Construction of Dharam Pura Underpass.

Period October, 2003 to August, 2005Responsibility To manage the work schedule

o Quantity Analysis of structure.o Preparing of Bar-Bending Schedule for all

RCC.Structure including 314 Nos Piles, and 12 NosCC Bridges, Retaining Walls & Approach Roads

o Confirmatory boring and drilling of Piles.o Pile load test.

Position Govt. ContractorName of Organization Tehsil Municipal Administration Mian ChanuName of Project Various Projects like Construction of Approach

Road T.M.A. Office Mian Chanu, Construction of Metalloid Road & Laying of Sewerage Line in Officers Colony Mian Chanu, Construction of Metalloid Hanif Manna Road in Faisal Town Mian Chanu, Construction of Sludge Carrier T. Chowk Mian Chanu, Providing & Laying of 01 feet Sewerage Pipe Line Liaqat Road Mian Chanu

Period January, 2001 to September, 2003. Position Site Engineer (Structure)

Name of Organization M. Fahim haider (Pvt) Ltd.Name of Project Provision & Laying of Ducts & Piped Services

at Jinnah Naval Base Ormara (Baluchistan)Period July, 1995 to December, 2000Responsibility Being a Site Engineer, having been involved in

the activities i.e.o Excavation for ducts & piped lines.o Laying of High & Medium Voltage Cables,

Laying of Fresh Water, Compressed Air, Fire Water, JP4 & Fuel Pipe Lines. Construction of Joint Pits, Values & Service Chambers

o Preparation of IPC’s.Name of Project Construction of Baba Fareed Ghee Industries

(Pvt) Ltd. OkaraName of Project Construction of Feroze Pur Road Underpass

Lahore.Responsibilities To manage the work schedule

Quantity Analysis of structurePreparing of Bar-Bending Schedule for all RCCStructure including Piles, Deck Slab &Retaining

3 |3

Page 4: A. Nasir CV(1)

Walls & also supervised all the work.

Position Site Supervisor / SurveyorName of Organization Deep Well Corp (Pvt) Ltd.Name of Project Lahore – Islamabad Motorway (M2)Period March, 1993 to June, 1995Responsibility Layout of Piles, Supervise the drilling &

Concreting of PilesName of Project Piling of Bridges Raheem Yar Khan – Ubbaro

Dual Carriageway

4 |3