A MAPS based Inner Tracking System of the Multi-Purpose Detector at the … · 2019. 11. 4. ·...
Transcript of A MAPS based Inner Tracking System of the Multi-Purpose Detector at the … · 2019. 11. 4. ·...
![Page 1: A MAPS based Inner Tracking System of the Multi-Purpose Detector at the … · 2019. 11. 4. · MPD-ITS (OB) is now recognized at Stage I Stage I: overall commissioning starts in](https://reader035.fdocuments.in/reader035/viewer/2022071401/60eae149436bc6674e1d7c62/html5/thumbnails/1.jpg)
NICA
Volga
river
Yuri Murin, VBLHEP JINR for the MPD ITS team
Yangtze
Volga
NICA
A MAPS based Inner Tracking System of the Multi-Purpose Detector at the NICA collider
![Page 2: A MAPS based Inner Tracking System of the Multi-Purpose Detector at the … · 2019. 11. 4. · MPD-ITS (OB) is now recognized at Stage I Stage I: overall commissioning starts in](https://reader035.fdocuments.in/reader035/viewer/2022071401/60eae149436bc6674e1d7c62/html5/thumbnails/2.jpg)
The physics case – an attempt to deconfine quarks through
density fluctuations of the fireball under critical
conditions
A role of the rare probes (heavy hyperons and charmed
mesons) in search of hints of critical point
Transition from strips to pixels and the MAPS “invasion”
The new ALICE ITS2 saves NICA a generation period
the MPD ITS project and plans for its implimentation
The outline
2
Yu. Murin for the MPD ITS TeamOctober, 2019, Warsaw, NICA Days-2019
![Page 3: A MAPS based Inner Tracking System of the Multi-Purpose Detector at the … · 2019. 11. 4. · MPD-ITS (OB) is now recognized at Stage I Stage I: overall commissioning starts in](https://reader035.fdocuments.in/reader035/viewer/2022071401/60eae149436bc6674e1d7c62/html5/thumbnails/3.jpg)
3
Look for a needle in a “hay” of tracks for rare events
The Inner Tracking System or Vertex tracker is a multilayer telescope which measures the position of particle hits positions to
restore the track trajectory. It’s special task to be located as close as possible to the interaction point and to be as precise as possible to identify specific decays of particles carrying strangeness, charm or
beauty i.e. S, C, or B - quarksYu. Murin for the MPD ITS TeamOctober, 2019, Warsaw, NICA Days-2019
![Page 4: A MAPS based Inner Tracking System of the Multi-Purpose Detector at the … · 2019. 11. 4. · MPD-ITS (OB) is now recognized at Stage I Stage I: overall commissioning starts in](https://reader035.fdocuments.in/reader035/viewer/2022071401/60eae149436bc6674e1d7c62/html5/thumbnails/4.jpg)
STAR F.T.
HADES
CBM
Inte
racti
on
ra
te [
Hz]
Collision energy √S [GeV]NN
NICA/BM@N II
To deconfine quarks: to heat or to enhance density fluctuations
NA-61/SHINE
2022 – 2025: SIS-100 FAIR
energy region of max.
baryonic density
NICA/MPD
STAR BES II
4Yu. Murin for the MPD ITS TeamOctober, 2019, Warsaw, NICA Days-2019
![Page 5: A MAPS based Inner Tracking System of the Multi-Purpose Detector at the … · 2019. 11. 4. · MPD-ITS (OB) is now recognized at Stage I Stage I: overall commissioning starts in](https://reader035.fdocuments.in/reader035/viewer/2022071401/60eae149436bc6674e1d7c62/html5/thumbnails/5.jpg)
5
The basic task for the Inner Tracking System
Identification of particles through inspection of Inverse Massdistributions M2=sum(Ei)
2-sum(Pi)2 (c=1)
Λ → p + π –
Ξ¯ → Λ + π –
└→ p + π –
Ω¯ → Λ + K¯
└→ p + π –
Λc→ p + K‒ + π +
D0 → K¯ + π +
D+→ K‒ + π + + π +
Yu. Murin for the MPD ITS TeamOctober, 2019, Warsaw, NICA Days-2019
![Page 6: A MAPS based Inner Tracking System of the Multi-Purpose Detector at the … · 2019. 11. 4. · MPD-ITS (OB) is now recognized at Stage I Stage I: overall commissioning starts in](https://reader035.fdocuments.in/reader035/viewer/2022071401/60eae149436bc6674e1d7c62/html5/thumbnails/6.jpg)
6
Yu. Murin for the MPD ITS TeamOctober, 2019, Warsaw, NICA Days-2019
The MAPS “Invasion”
![Page 7: A MAPS based Inner Tracking System of the Multi-Purpose Detector at the … · 2019. 11. 4. · MPD-ITS (OB) is now recognized at Stage I Stage I: overall commissioning starts in](https://reader035.fdocuments.in/reader035/viewer/2022071401/60eae149436bc6674e1d7c62/html5/thumbnails/7.jpg)
7
Yu. Murin for the MPD ITS TeamOctober, 2019, Warsaw, NICA Days-2019
New ALICE ITS#2: sharing of technology
![Page 8: A MAPS based Inner Tracking System of the Multi-Purpose Detector at the … · 2019. 11. 4. · MPD-ITS (OB) is now recognized at Stage I Stage I: overall commissioning starts in](https://reader035.fdocuments.in/reader035/viewer/2022071401/60eae149436bc6674e1d7c62/html5/thumbnails/8.jpg)
8
Yu. Murin for the MPD ITS TeamOctober, 2019, Warsaw, NICA Days-2019
The ALPIDE sensor
![Page 9: A MAPS based Inner Tracking System of the Multi-Purpose Detector at the … · 2019. 11. 4. · MPD-ITS (OB) is now recognized at Stage I Stage I: overall commissioning starts in](https://reader035.fdocuments.in/reader035/viewer/2022071401/60eae149436bc6674e1d7c62/html5/thumbnails/9.jpg)
9
Yu. Murin for the MPD ITS TeamOctober, 2019, Warsaw, NICA Days-2019
The ALPIDE Readout
![Page 10: A MAPS based Inner Tracking System of the Multi-Purpose Detector at the … · 2019. 11. 4. · MPD-ITS (OB) is now recognized at Stage I Stage I: overall commissioning starts in](https://reader035.fdocuments.in/reader035/viewer/2022071401/60eae149436bc6674e1d7c62/html5/thumbnails/10.jpg)
10
Yu. Murin for the MPD ITS TeamOctober, 2019, Warsaw, NICA Days-2019
New ALICE ITS#2 beats records on material budget
![Page 11: A MAPS based Inner Tracking System of the Multi-Purpose Detector at the … · 2019. 11. 4. · MPD-ITS (OB) is now recognized at Stage I Stage I: overall commissioning starts in](https://reader035.fdocuments.in/reader035/viewer/2022071401/60eae149436bc6674e1d7c62/html5/thumbnails/11.jpg)
11
Yu. Murin for the MPD ITS TeamOctober, 2019, Warsaw, NICA Days-2019
New ALICE ITS#2: …….and number of pixels
![Page 12: A MAPS based Inner Tracking System of the Multi-Purpose Detector at the … · 2019. 11. 4. · MPD-ITS (OB) is now recognized at Stage I Stage I: overall commissioning starts in](https://reader035.fdocuments.in/reader035/viewer/2022071401/60eae149436bc6674e1d7c62/html5/thumbnails/12.jpg)
12
Yu. Murin for the MPD ITS TeamOctober, 2019, Warsaw, NICA Days-2019
Plans for ALICE ITS#3: exchange of the IB
![Page 13: A MAPS based Inner Tracking System of the Multi-Purpose Detector at the … · 2019. 11. 4. · MPD-ITS (OB) is now recognized at Stage I Stage I: overall commissioning starts in](https://reader035.fdocuments.in/reader035/viewer/2022071401/60eae149436bc6674e1d7c62/html5/thumbnails/13.jpg)
Stage I: TPC, TOF, ECAL, ZDC, FFD + ITS(OB)
MPD-ITS (OB) is now recognized at Stage I
Stage I: overall commissioning
starts in 2022 (t.b.c.)13
Stage II : ITS(IB) + EndCap (CPC, Straw, TOF, ECAL)
FHCal
FFD
Transfer of High Tech Instrumentation Know-How from CERN to NICA-MPD
Yu. Murin for the MPD ITS TeamOctober, 2019, Warsaw, NICA Days-2019
![Page 14: A MAPS based Inner Tracking System of the Multi-Purpose Detector at the … · 2019. 11. 4. · MPD-ITS (OB) is now recognized at Stage I Stage I: overall commissioning starts in](https://reader035.fdocuments.in/reader035/viewer/2022071401/60eae149436bc6674e1d7c62/html5/thumbnails/14.jpg)
CERN will procure, test and deliver to NICA
19’000 ALPIDE Monolithic Active Pixel Sensors for the MPD ITS
4’500 SAMPA electronic circuits for the TPC readout
5’000 FEAST DC/DC converters for the ECAL MPD
Jigs and fixtures for module and supermodule assembly for the MPD ITS
Training of personal for assembly and QA certification modules and supermodules of the MPD ITS
Provision of complete technical and commercial information on parts of the
new ALICE Inner Tracking System, including drawings, internal technical reports, quotes, etc.
Items to be shipped from CERN formulated in Addendums to the Protocol
Yu. Murin for the MPD ITS TeamOctober, 2019, Warsaw, NICA Days-2019
![Page 15: A MAPS based Inner Tracking System of the Multi-Purpose Detector at the … · 2019. 11. 4. · MPD-ITS (OB) is now recognized at Stage I Stage I: overall commissioning starts in](https://reader035.fdocuments.in/reader035/viewer/2022071401/60eae149436bc6674e1d7c62/html5/thumbnails/15.jpg)
15
MPD ITS based on the ALPIDE MAPS CERN technology
Beam pipe Ø = 40 mm
Yu. Murin for the MPD ITS TeamOctober, 2019, Warsaw, NICA Days-2019
![Page 16: A MAPS based Inner Tracking System of the Multi-Purpose Detector at the … · 2019. 11. 4. · MPD-ITS (OB) is now recognized at Stage I Stage I: overall commissioning starts in](https://reader035.fdocuments.in/reader035/viewer/2022071401/60eae149436bc6674e1d7c62/html5/thumbnails/16.jpg)
ITS pointing resolution within STAR-ALICE toy model
16
ALICE MPD
New ITS
Old ITS
Ø = 40 mm
Ø = 50 mm
Ø = 60 mm
Pions Pions
Yu. Murin for the MPD ITS TeamOctober, 2019, Warsaw, NICA Days-2019
![Page 17: A MAPS based Inner Tracking System of the Multi-Purpose Detector at the … · 2019. 11. 4. · MPD-ITS (OB) is now recognized at Stage I Stage I: overall commissioning starts in](https://reader035.fdocuments.in/reader035/viewer/2022071401/60eae149436bc6674e1d7c62/html5/thumbnails/17.jpg)
Selection criteria
17
D0 selection parameters:
• distances of closest approach to the
collision vertex DCAπ,K ,
• two-track separation DCAD ,
• decay path λD,
• pointing angle θD.
Selection criteria:
DCAπ > С1 && DCAK > С2 && DCAD < С3 && λD > С4 && θD < С5
The parameters of the corresponding selections are optimized by maximizing
the signal significance :
where S and B are the estimated numbers of the
signal and background events.
Do → K- + π+
daBS
S)а(Sg
a
0
Yu. Murin for the MPD ITS TeamOctober, 2019, Warsaw, NICA Days-2019
![Page 18: A MAPS based Inner Tracking System of the Multi-Purpose Detector at the … · 2019. 11. 4. · MPD-ITS (OB) is now recognized at Stage I Stage I: overall commissioning starts in](https://reader035.fdocuments.in/reader035/viewer/2022071401/60eae149436bc6674e1d7c62/html5/thumbnails/18.jpg)
18
Example : cuts selections for D0
dcaK>0.01 сm &
dcaPi>0.01 сm & distPiK
< 0.02 cm & path(D0) >
0.025 сm & angle(D0) <
0.2 rad
Yu. Murin for the MPD ITS TeamOctober, 2019, Warsaw, NICA Days-2019
![Page 19: A MAPS based Inner Tracking System of the Multi-Purpose Detector at the … · 2019. 11. 4. · MPD-ITS (OB) is now recognized at Stage I Stage I: overall commissioning starts in](https://reader035.fdocuments.in/reader035/viewer/2022071401/60eae149436bc6674e1d7c62/html5/thumbnails/19.jpg)
19
D+ and D0 reconstruction
DCA(π, K,D0), path(D0), angle(D0) cuts
t1=t2=t3=50μ (IB ITS3) t4=t5=700μ (ОВ ITS2)
Yu. Murin for the MPD ITS TeamOctober, 2019, Warsaw, NICA Days-2019
![Page 20: A MAPS based Inner Tracking System of the Multi-Purpose Detector at the … · 2019. 11. 4. · MPD-ITS (OB) is now recognized at Stage I Stage I: overall commissioning starts in](https://reader035.fdocuments.in/reader035/viewer/2022071401/60eae149436bc6674e1d7c62/html5/thumbnails/20.jpg)
20
Strange particle reconstruction results
Yu. Murin for the MPD ITS TeamOctober, 2019, Warsaw, NICA Days-2019
![Page 21: A MAPS based Inner Tracking System of the Multi-Purpose Detector at the … · 2019. 11. 4. · MPD-ITS (OB) is now recognized at Stage I Stage I: overall commissioning starts in](https://reader035.fdocuments.in/reader035/viewer/2022071401/60eae149436bc6674e1d7c62/html5/thumbnails/21.jpg)
21
Particle D0 D+
Decay channel D0→ K- + π + D+→ K- + π + + π +
Multiplicity (HSD 10-2 10-2
BR,% 3.9 9.1
IB option ITS3(50μ) ITS2(200μ) ITS3(50μ) ITS2(200μ)
S/B(2σ) 0.43 0.10 0.65 0.27
Significance 15.1 2.2 28.5 7.6
Efficiency,% 1.9 0.13 2.3 0.3
D-meson parameters in 100М central Au+Au collisions at = 9 ГэВNNS
Yu. Murin for the MPD ITS TeamOctober, 2019, Warsaw, NICA Days-2019
Impact of Beam pipe diameter on efficiency
![Page 22: A MAPS based Inner Tracking System of the Multi-Purpose Detector at the … · 2019. 11. 4. · MPD-ITS (OB) is now recognized at Stage I Stage I: overall commissioning starts in](https://reader035.fdocuments.in/reader035/viewer/2022071401/60eae149436bc6674e1d7c62/html5/thumbnails/22.jpg)
22
Current limitations of eхperimental data on D meson
Abdel Nasser TAWFIK† and Ehab ABBAS
Thermal Description of Particle Production in Au-Au Collisions at STAR Energies
Physics of Particles and Nuclei Letters. November 2013
Identificaion achieved
Thermal generator: D meson’s pt - spectrum
Yu. Murin for the MPD ITS Team
![Page 23: A MAPS based Inner Tracking System of the Multi-Purpose Detector at the … · 2019. 11. 4. · MPD-ITS (OB) is now recognized at Stage I Stage I: overall commissioning starts in](https://reader035.fdocuments.in/reader035/viewer/2022071401/60eae149436bc6674e1d7c62/html5/thumbnails/23.jpg)
23
MC and reconstructed pt-spectra of D0-mesons and their decay products
D0 mesons
Pions
Kaons
Yu. Murin for the MPD ITS TeamOctober, 2019, Warsaw, NICA Days-2019
![Page 24: A MAPS based Inner Tracking System of the Multi-Purpose Detector at the … · 2019. 11. 4. · MPD-ITS (OB) is now recognized at Stage I Stage I: overall commissioning starts in](https://reader035.fdocuments.in/reader035/viewer/2022071401/60eae149436bc6674e1d7c62/html5/thumbnails/24.jpg)
Stage I: Installation of OB (2022-
23)
~ 9 500
ALPIDE MAPS
in 5 cylinders of 2 barrels
D+ K-
π+
π+
tentative assembly
layout
ITS realization in two Steps (OB first) due to BP sequence
4,9۰109 pixels, active area 3,9 m2.
24
MPD beam pipe
Stage I: 64 mm in diameterStage II:
38 mm in diameter
Stage II: OB+IB (2022+25) ?
October, 2019, Warsaw, NICA Days-2019
![Page 25: A MAPS based Inner Tracking System of the Multi-Purpose Detector at the … · 2019. 11. 4. · MPD-ITS (OB) is now recognized at Stage I Stage I: overall commissioning starts in](https://reader035.fdocuments.in/reader035/viewer/2022071401/60eae149436bc6674e1d7c62/html5/thumbnails/25.jpg)
Yu. Murin for the MPD ITS TeamOctober, 2019, Warsaw, NICA Days-2019
Current Activities1.Mechanics for integration of ITS with Beam Pipe and TPC - JINR
![Page 26: A MAPS based Inner Tracking System of the Multi-Purpose Detector at the … · 2019. 11. 4. · MPD-ITS (OB) is now recognized at Stage I Stage I: overall commissioning starts in](https://reader035.fdocuments.in/reader035/viewer/2022071401/60eae149436bc6674e1d7c62/html5/thumbnails/26.jpg)
Yu. Murin for the MPD ITS TeamOctober, 2019, Warsaw, NICA Days-2019
Current Activities2. Start production of ultralight CF mechanics in SPbSU and VBLHEP
![Page 27: A MAPS based Inner Tracking System of the Multi-Purpose Detector at the … · 2019. 11. 4. · MPD-ITS (OB) is now recognized at Stage I Stage I: overall commissioning starts in](https://reader035.fdocuments.in/reader035/viewer/2022071401/60eae149436bc6674e1d7c62/html5/thumbnails/27.jpg)
Truss length is 1540 mm. Modules (HICs)
are are located on two cooling plates .
OB stave carriers 196 sensors.
The MPD ITS need is 42 OB staves.
Yu. Murin for the MPD ITS TeamOctober, 2019, Warsaw, NICA Days-2019
Current Activities3. Start Assembly of HICs in Dubna and China (2020 Q1) and Staves(2021 Q1)
![Page 28: A MAPS based Inner Tracking System of the Multi-Purpose Detector at the … · 2019. 11. 4. · MPD-ITS (OB) is now recognized at Stage I Stage I: overall commissioning starts in](https://reader035.fdocuments.in/reader035/viewer/2022071401/60eae149436bc6674e1d7c62/html5/thumbnails/28.jpg)
Yu. Murin for the MPD ITS TeamOctober, 2019, Warsaw, NICA Days-2019
Planned Activities4. Development of ITS3 together with ALICE ITS3 team
![Page 29: A MAPS based Inner Tracking System of the Multi-Purpose Detector at the … · 2019. 11. 4. · MPD-ITS (OB) is now recognized at Stage I Stage I: overall commissioning starts in](https://reader035.fdocuments.in/reader035/viewer/2022071401/60eae149436bc6674e1d7c62/html5/thumbnails/29.jpg)
Yu. Murin for the MPD ITS TeamOctober, 2019, Warsaw, NICA Days-2019
Planned Activities5. Preparing the Technical Design Report and Organization of the MPD ITS Consortium
![Page 30: A MAPS based Inner Tracking System of the Multi-Purpose Detector at the … · 2019. 11. 4. · MPD-ITS (OB) is now recognized at Stage I Stage I: overall commissioning starts in](https://reader035.fdocuments.in/reader035/viewer/2022071401/60eae149436bc6674e1d7c62/html5/thumbnails/30.jpg)
Conclusions
and summary
30
Yu. Murin for the MPD ITS Team
![Page 31: A MAPS based Inner Tracking System of the Multi-Purpose Detector at the … · 2019. 11. 4. · MPD-ITS (OB) is now recognized at Stage I Stage I: overall commissioning starts in](https://reader035.fdocuments.in/reader035/viewer/2022071401/60eae149436bc6674e1d7c62/html5/thumbnails/31.jpg)
major milestones of the
MPD ITS project
(tentavily!)
• 2018 –2019 – simulations and start of delivery of parts from CERN
• 2019 – organization of the Russian-Chinese Consortium
• 2019 – Writing TDR ( Draft)
• 2019-2020 – Production of first HICs at VBLHEP and CCNU
• 2020 –2021 – Mechanics including parts for integration
• 2020 –2021 – updating the readout chain (with China and ?)
• 2020 –2023 – R@D effort on IB together with ALICE
• 2021 –2023 – Production HICs, assembly of OB staves (with
China )
• 2023 (?) – ITS-OB assembly, bench testing, commissioning
• 2025( ?) – ITS-OB+IB commissioning (Stage II)
31October, 2019, Warsaw, NICA Days-2019 Yu. Murin for the MPD ITS Team
![Page 32: A MAPS based Inner Tracking System of the Multi-Purpose Detector at the … · 2019. 11. 4. · MPD-ITS (OB) is now recognized at Stage I Stage I: overall commissioning starts in](https://reader035.fdocuments.in/reader035/viewer/2022071401/60eae149436bc6674e1d7c62/html5/thumbnails/32.jpg)
summary The MPD-ITS project is both scientific- and time-wise well justified
The project has a solid reason to be accomplished in two stages
The MPD-ITS(OB) (stage 1) one is now recognized and approved
for financing at JINR
The MPD-ITS(IB) (stage 2) contains R@D proposed to be
performed under the supervision of ALICE Collaboration (ITS-3)
The project effort due to its technical complexity cannot be
undertaken by JINR alone and calls for organization of a
Consortium of Institutes from Russia and China (and elsewhere!)
functioning at least till 2025
32October, 2019, Warsaw, NICA Days-2019 Yu. Murin for the MPD ITS Team
![Page 33: A MAPS based Inner Tracking System of the Multi-Purpose Detector at the … · 2019. 11. 4. · MPD-ITS (OB) is now recognized at Stage I Stage I: overall commissioning starts in](https://reader035.fdocuments.in/reader035/viewer/2022071401/60eae149436bc6674e1d7c62/html5/thumbnails/33.jpg)
33Thank you for attention and RFBR for GRANT # 18-02-401119!