A Leading Zinc Junior in Established Canadian Mining Districts · 3 CALLINEX corporate PRESENTATION...
Transcript of A Leading Zinc Junior in Established Canadian Mining Districts · 3 CALLINEX corporate PRESENTATION...
A L e a d i n g Z i n c J u n i o r i n E s t a b l i s h e d C a n a d i a n M i n i n g D i s t r i c t s
TSX-V: CNX I OTCQX: CLLXF
This presentation contains certain forward-looking information and statements. Such forward-looking information and statements are based on
the current, estimates and projections of the Company or assumptions based on information currently available to the Company. Such forward-
looking information and statements reflect current views with respect to future events and are subject to risks, uncertainties and assumptions. The
Company cannot give assurance to the correctness of such information and statements. These forward-looking information and statements can
generally be identified by the fact that they do not relate only to historical or current facts. Forward-looking statements sometimes use terminology
such as “targets”, “believes”, “expects”, “aims”, “assumes”, “intends”, “plans”, “seeks”, “will”, “may”, “anticipates”, “would”, “could”, “continues”,
“estimate”, “milestone” or other words of similar meaning and similar expressions or the negatives thereof. By their nature, forward-looking
information and statements involve known and unknown risks, uncertainties and other important factors that could cause the actual results,
performance or achievements of the Company to differ materially from any future results, performance or achievements that may be expressed or
implied by the forward-looking information and statements in this presentation. Should one or more of these risks or uncertainties materialize, or
should any underlying assumptions prove to be incorrect, the Company’s actual financial condition or results of operations could differ materially
from that or those described herein as anticipated, believed, estimated or expected. Any forward-looking information or statements in this
presentation speak only as at the date of this presentation. Except under the applicable securities laws, the Company does not intend, and
expressly disclaims any obligation or undertaking, to publicly update, correct or revise any of the information included in this presentation, including
forward looking information and statements, whether to reflect changes in the Company’s expectations with regard thereto or as a result of new
information, future events, changes in conditions or circumstances or otherwise on which any statement in this presentation is based. Given the
aforementioned uncertainties, prospective investors are cautioned not to place undue reliance on any of these forward-looking statements.
The technical content of this presentation has been reviewed and approved by James Pickell, P.Geo, a consultant to the Company, and a Qualified
Person as defined by National Instrument 43-101.
F O R W A R D L O O K I N G I N F O R M A T I O N
Callinan Mines, founded by Jack Callinan in 1927, has had a major presence in the Flin Flon mining district in Manitoba, Canada
777 VMS Mine, discovered on Callinan claims, commences production and royalty payments begin
Callinan Mines splits into two entities: Callinan Royalties and Callinex, which holds the exploration portfolio today
Callinex renews exploration focus on massive sulphide deposits
Callinex announces new zinc and gold discovery and acquires zinc deposits in Eastern Canada
1927
2011
O U R H I S T O R Y
2014
2016
2004 To discover and develop
base and precious metal
rich deposits within
established Canadian
mining districts
O U R M I S S I O N
33 T S X - V : C N X | O T C Q X : C L L X F C A L L I N E X c o r p o r a t e P R E S E N T A T I O N
SHARE PERFORMANCE
C O R P O R A T E O V E R V I E W
Closing Price
(08/31/2017)
$0.36
52-Week Range
$0.28 - $0.69
Average Daily
Volume (3 - mo)
178,443
RECENT TRADING
Shares
Outstanding
77.5M
Options
Outstanding
6.2M($0.35 VWAP)
Warrants
Outstanding
4.0M($0.75 VWAP)
CAPITAL STRUCTURE
Market Cap
$27.9M
Debt
$0
Cash
$7.2MAs of 06/30/2017
ENTERPRISE VALUE
TSX-V: CNX I OTCQX: CLLXF
4T S X - V : C N X | O T C Q X : C L L X F C A L L I N E X c o r p o r a t e P R E S E N T A T I O N
INSTITUTIONS 31%
INSIDERS & CLOSE ASSOCIATES
29%
RETAIL INVESTORS
40%
OWNERSHIP BREAKDOWN
- Resource Capital Funds- Sprott Group- Plethora Precious Metals Fund - Fieldhouse Capital Management
C A L L I N E X c o r p o r a t e P R E S E N T A T I O N 4T S X - V : C N X | O T C Q X : C L L X F
Mike Muzylowski Chairman
Max PorterfieldCEO, President and Director
Jordan Butler VP Corporate development
Matthew Anderson Chief financial officer
A renowned geologist and member of the Canadian Mining Hall of Fame with over 50 years of experience which has included the discovery and development of 16 mineral deposits through to production
Over ten years of experience in natural resources and financial markets, previously with GoldMining Inc., Uranium Energy Corp. and US Global Investors
Over six years of experience in the resource sector specializing in identifying and evaluating mineral properties. Previously, Financial Analyst with Americas Bullion Royalty Corp. and Till Capital
A Certified Professional Accountant with significant experience in financial and accounting related functions for natural resource issuers
M A N A G E M E N T T E A M
5 T S X - V : C N X | O T C Q X : C L L X F C A L L I N E X c o r p o r a t e P R E S E N T A T I O N 5 T S X - V : C N X | O T C Q X : C L L X F C A L L I N E X c o r p o r a t e P R E S E N T A T I O N
d i r e c t o r s A n d a d v i s o r y b o a r d
D I R E C T O R S A D V I S O R Y B O A R D
Keith Minty
An experienced mining engineer currently serving as the Senior VP of Business Development at Stope Capital Advisors and a Director of Auryn Resources Inc., previously the Chief Operating Officer of Thani Emirates Resource Holdings Ltd.
Carlo Civelli, Chairman
Since founding Clarion Finanz AG in 1980, Mr. Civelli has been instrumental in funding early stage investments, nearly a dozen of which have developed into billion dollar market cap companies
Michael Louie
A Principal in D+H Group LLP with 25 years of accounting experience, specifically working on behalf of First Nations organizations and specializing within the Canadian mining sector
Jason Dunning
Over 20 years experience in base and precious metal exploration, currently serving as the Manager of Nystar’s Mining Group, one of the world’s largest zinc producers, and previously a Project Geologist with Hudbay focused on the Flin Flon area
Nico Civelli
An independent financial advisor specializing in natural resources, and the VP of Finance for Pacific LNG which recently sold to Oil Search Ltd. for USD $900 million
Steve Swatton
Over 28 years of experience in both technical and senior managerial experience, previously the Global Head of Business Development for BHP Billiton’s Exploration Division
Jayant Bhandari
A Senior Analyst of Anarcho Capital, distinguished speaker and published author, Mr. Bhandari advises institutional investors about opportunities in the natural resources sector on a global scale
C A L L I N E X c o r p o r a t e P R E S E N T A T I O N 6T S X - V : C N X | O T C Q X : C L L X F
T e c h n i c a l T e a m
Canadian Mining Hall of Fame Inductee and PDAC Developer of the Year award PDAC Bill Dennis Prospector of the Year award
Mike MuzylowskiChairman of the Board
Involved in the discovery of 12 VMS mines in the Flin Flon district of Manitoba, Canada. His discoveries include the Trout Lake mine, which operated from 1982-2012. Mr. Muzylowski received the 1988 PDAC Developer of the Year award and is a 2011 inductee into the Canadian Mining Hall of Fame.
Jim Pickellchief Geologist
Over 40 years of VMS exploration experience globally. Notable discoveries include the Callinan North, Konuto Lake and 777 ore bodies within the Flin Flon district of Manitoba, Canada. Mr. Pickell is a recipient of the PDAC Bill Dennis Prospector of the Year Award for his role in the discovery of the 777 Mine.
Alan Vowles chief Geophysicist
Over 35 years of VMS exploration experience within the North America and an integral member of the HudBay team that discovered the Lalor deposit within the Flin Flon district of Manitoba, Canada. Mr. Vowles is a recipient of the PDAC Bill Dennis Prospector of the Year Award for his role in the discovery of the Lalor Mine.
JJ O’DonnellConsulting Geologist
Over 25 years of VMS exploration experience within Canada while holding senior positions with Callinex, HudBay, Selwyn Chihong Mining and Granges. Mr. O’Donnell has been instrumental in the exploration and development of the world-class Howard’s Pass Zinc Project located in the Yukon, Canada.
TROUT MINE +22 MT
LALOR MINE +25 MT
777 MINE +21 MT
7 T S X - V : C N X | O T C Q X : C L L X F C A L L I N E X c o r p o r a t e P R E S E N T A T I O N
magma
mass of sulphide deposits
sedimentation
seawater seepage
sea �oor
heat
Ag
Au
Cu
Zn
HIGH GRADE
Polymetallic deposits often containing zinc, copper, lead, gold and silver
FORMATION
Deposits occur where mineral rich, superheated water is brought to the surface by volcanic activity
DISTRICT SCALE
Most deposits occur in clusters that define major mining districts, such as Flin Flon and Bathurst
PREVALENCE
350 deposits and major VMS occurrences in Canada; Flin Flon and Bathurst Camps are the top two jurisdictions in the nation1
Source: 1 Mineral Deposits of Canada, Volcanogenic Massive Sulphide Deposits
VOLCANOGENIC MASSIVE SULPHIDE DEPOSITS
C A L L I N E X c o r p o r a t e P R E S E N T A T I O N 8T S X - V : C N X | O T C Q X : C L L X F
Zinc Supply: Stalling Production Growth
Uncommitted Projects Increasingly Delayed
Existing and Fully Committed Mines
Zinc Mine Production has Peaked
201010,000
11,000
12,000
13,000
14,000
Thou
sand
Ton
nes
Mine Production Secondary Demand
15,000
16,000
17,000
2013 2016 2019 2022
Thou
sand
Ton
nes
0
500
1,000
2018Last Year
2020Last Year
2022FLast Year
2018Today
2020Today
2022Today
1,500
2,000
2,500
3,000
Base Highly Probable
Source: Wood Mackenzie, CRU, Teck
9 T S X - V : C N X | O T C Q X : C L L X F C A L L I N E X c o r p o r a t e P R E S E N T A T I O N
Dwindling Global Zinc Inventories
Source: Bloomberg
May
-12
May
-13
May
-14
May
-15
May
-17
May
-16
Jul-1
2
Jul-1
3
Jul-1
4
Jul-1
5
Jul-1
6
Sep-
12
Sep-
13
Sep-
14
Sep-
15
Sep-
16
Nov
-12
Nov
-13
Nov
-14
Nov
-15
Nov
-16
Jan-
13
Jan-
14
Jan-
15
Jan-
16
Jan-
17
Mar
-13
Mar
-14
Mar
-15
Mar
-16
Mar
-17
0.60
0.70
0.80
0.90
LME SHFE LME Cash Price
1.00
US$
/lb kt
1.10
1.20
1.30
1.40 1800.0
1600.0
1400.0
1200.0
1000.0
800.0
600.0
400.0
200.0
0.0
C A L L I N E X c o r p o r a t e P R E S E N T A T I O N 10T S X - V : C N X | O T C Q X : C L L X F
Years of Potential Mine Supply at Current Production Rates
Uranium
172
7.5%
154
1.2%
Nickel
135
1.5%
Copper
90
Silver
65
2.8%
Gold
55
1.4%
Zinc
54
N/A
Lead
Source: SNL
N/A
Years of Potential Supply % Revenue Reinvested in Exploration
11 T S X - V : C N X | O T C Q X : C L L X F C A L L I N E X c o r p o r a t e P R E S E N T A T I O N
portfolio of zinc assets
• Portfolio of advanced stage zinc rich VMS deposits located in established Canadian mining jurisdictions
• All mineral resources start at or near surface
• Deposits located near processing facilities and essential mining infrastructure
• Provides exposure to rising metal prices with deposits containing sizeable zinc, gold and silver resources
Buchans District
Bathurst District
Flin Flon District
C A L L I N E X c o r p o r a t e P R E S E N T A T I O N 12T S X - V : C N X | O T C Q X : C L L X F
A pipeline of zinc projects spanning various phases of development
Exploration portfolio
MINE DEVELOPMENT
SUPERJACK
PT LEAMINGTON
NASH CREEK
PINE BAY
10+ PROPERTIES
DISCOVERY EXPLORATION
RESOURCE EXPANSIONBIG ISLAND
13 T S X - V : C N X | O T C Q X : C L L X F C A L L I N E X c o r p o r a t e P R E S E N T A T I O N
bathurst MINING District
Modified from Goodfellow, 2003Clusters of deposits make up the Bathurst Mining District
CLUSTER EFFECT VMS DEPOSITS
PRODUCTION HISTORY
One of the largest massive sulphide belts in the world with more than 130Mt of ore produced, commonly Zn-Pb-Cu-Ag-Au
GEOLOGICAL ENDOWMENT
Over 45 volcanic-hosted massive sulphide deposits including the 230Mt Brunswick No. 12, 70 Mt Caribou Mine and 69 Mt Heath Steel Mines
MINING INFRASTRUCTURE
Great access to power, water, roads and processing facilities in a major mining district
30
20
10
5
3
10.1 1 10 100 1000
Pb +
Zn
(wt.
%)
Million Tonnes
Caribou
BMS #12
SuperjackNash Creek
C A L L I N E X c o r p o r a t e P R E S E N T A T I O N 14T S X - V : C N X | O T C Q X : C L L X F
Quebec
N
• Near-surface Indicated resource of 9.0Mt grading 3.6% Zn Eq. containing 712 million pounds of Zn Eq. and an Inferred resource of 1.1Mt grading 3.6% Zn Eq. containing 88 million pounds of Zn Eq.
• Located within 25km of to a seaport and a smelter and 100 km to an operating processing facility
• The deposit is open for expansion along strike with recent drilling having intersected near-surface mineralization 350m north of the deposit
• Preliminary Economic Assessment (PEA) to investigate stand-alone and toll-milling options for development
n a s h c r e e k p r o j e c t
SUPERJACK
NASH CREEK
Caribou Mine
Brunswick Mine #12
Brunswick Mine #6
Heath Steele Mine
Bathurst90 KM
N
LEGEND Processing Facility Lead Smelter Mine
Road Power Rail Port
City
15 T S X - V : C N X | O T C Q X : C L L X F C A L L I N E X c o r p o r a t e P R E S E N T A T I O N
Near-surface Zinc-Lead-Silver Deposit
GRADE
Potential for an average head grade to 5-7% Zn Eq. with dense media separation
RECOVERY
Metallurgical tests indicate recoveries of 91% Zn, 82% Pb and 31% Ag with ability to produce a zinc concentrate grading up to 64% Zn and 126 g/t Ag
SIMPLE MINING
Open pit potential with a forecasted strip ratio of <4 to 1
Open
Open
Callinex is advancing the Nash Creek Project towards completion of a Preliminary Economic Assessment in Q1, 2018
C A L L I N E X c o r p o r a t e P R E S E N T A T I O N 16T S X - V : C N X | O T C Q X : C L L X F
Nash Creek Drilling Campaign
• A total of 13 drill holes confirm the expansion of the Nash Creek Deposit 500m to the north, an increased strike length of approximately 35%
• Highlights from the northern extension of the Nash Creek Deposit includes*:
• Hole 229 intersected 11.7m of 4.0% Zn Eq. within a larger intersection over 18.1m grading 3.0% Zn Eq. at a starting depth of 18.1m;
• Hole 233 that intersected 9.5m of 6.5% Zn Eq. within a larger intersection over 43.9m grading 3.1% Zn Eq. at a starting depth of 30.1m; and
• Hole 241 that intersected 10.6m of 4.3% Zn Eq. with a larger intersection over 20.0m of 3.0% Zn Eq. at a starting depth of 64.5m.
• Additional drilling planned in 2017 to further expand the Nash Creek Deposit and deliver an updated resource estimate in Q4
*See News Release dated September 5500m
LEGEND Previous Drill Holes
Reported Drill Holes
Expanded Zone
Mineral Resources
Provincial Highway 11
Major Transmission Line
N
Plan Map of Nash Creek Deposit
25 km to Smelter, Deep Sea Port &
Railway
1.5 K
M T
O HW
Y
17 T S X - V : C N X | O T C Q X : C L L X F C A L L I N E X c o r p o r a t e P R E S E N T A T I O N
Dense Media Separation: A Proven Technology
Previously utilized in some of the world’s largest zinc mines including the Sullivan and Mount Isa operations
A simple three step process:
1. Primary crushing of mineralization often ranging from 1-6mm
2. Screen mineralization to sort coarse material
3. Mineralization is suspended in water with use of ferrosilicon and a cyclone turns at high and low speeds to separate heavier minerals from lighter materials
C A L L I N E X c o r p o r a t e P R E S E N T A T I O N 18T S X - V : C N X | O T C Q X : C L L X F
District scale POTENTIAL
Potential to identify additional zinc-lead deposits along a 20 km long trend with only ~2.5 km having been drill tested
VMS deposits almost always occur in clusters; however, Nash Creek is the only known VMS deposit in the area
Limited exploration previously conducted by Falconbridge, Noranda , Novagold and BHP, which indicated potential for base metal discoveries
Highlight of mineral occurrences over the southern portion of the property include:
• 5.5% Cu and 3.4% Cu
• 3.5% Zn, 2.5% Pb and 1,500 g/t Ag
• 9.1% Zn and 2.1% Pb
• 8.1% Zn and 10.9%
Nash Creek Deposit
8.1% Zn and 10.9% Pb
9.1% Zn and 2.1% Pb
3.5% Zn, 2.5% Pb and 1,500 g/t Ag
5.5% Cu and 3.4% Cu
N
LEGEND Base Metal Occurances
Claim Boundary
4km
19 T S X - V : C N X | O T C Q X : C L L X F C A L L I N E X c o r p o r a t e P R E S E N T A T I O N
• Near-surface Inferred resource of 3.2Mt grading 4.6% Zn Eq. containing 328 million pounds of Zn Eq.
• Located 15km from the ‘supergiant’ Brunswick #12 Mine, recently one of the largest underground zinc mines in the world
• The two deepest holes drilled at the A Zone intersected 6.4m of 10.4% Zn Eq. and 11.2m of 7.5% Zn Eq. including 2.6m of 17.5% Zn Eq. at a depth of ~440m
s u p e r j a c k p r o j e c t
Quebec
N
SUPERJACK
NASH CREEK
Caribou Mine
Brunswick Mine #12
Brunswick Mine #6
Heath Steele Mine
Bathurst
50 KM
LEGEND Processing Facility Lead Smelter Mine
Road Power Rail Port
City
C A L L I N E X c o r p o r a t e P R E S E N T A T I O N 20T S X - V : C N X | O T C Q X : C L L X F
“A” Zone: Open at depth with increasing grade
Open For Expansion
Longitudinal Section of the “A” Zone
NP 11-54 with 6.4m of 10.4% Zn Eq. including 1.7m of 16.5% Zn Eq.
SJ15-86 with 2.4 of 5.2% Zn Eq. including 0.7m of 11% Zn
Eq. (no Au assays)
• Existing “A” zone is open along strike and at depth
• The zone has been defined down to a depth of 440m with all three holes drilled along a 225m strike length interesting high-grade mineralization
• NP11-39 with 11.2m of 7.5% Zn Eq. including 2.6m of 17.5% Zn Eq.
• NP 11-54 with 6.4m of 10.4% Zn Eq. including 1.7m of 16.5% Zn Eq.
• SJ15-86 with 2.4 of 5.2% Zn Eq. including 0.7m of 11% Zn Eq. (no Au assays)
• 2016 borehole surveys on NP11-54 and SJ15-86 indicates mineralization continues at depth along plunge line
Project covers the Caribou and Brunswick horizons which hosts on average 15-20 Mt geologic deposits
NP11-39 with 11.2m of 7.5% Zn Eq. including 2.6m of 17.5% Zn Eq.
N
21 T S X - V : C N X | O T C Q X : C L L X F C A L L I N E X c o r p o r a t e P R E S E N T A T I O N
SUCCESS RATE
Over 50% of deposits have been advanced to production, totaling 32 mines which have led to 86 consecutive years of mining
INFRASTRUCTURE
Over $1.6 billion invested towards mine development with road, rail, power and water infrastructure to facilitate quick development of new discoveries
TIMELINES AND CAPEX
Typically less than six years from discovery to development with reduced capital expenditures
FLIN FLON MINING DISTRICT
Flin Flon (100 Mt) Snow Lake (60 Mt)
Clusters of VMS deposits make up the Flin Flon/Snow Lake mining districts in the Flin Flon Greenstone Belt
CLUSTER EFFECT
Recent discoveries have typically been larger in size and deeper than previously discovered
DEPTH OF MINES Initial Production
Average Depth Deposit Size
-1500
-1200
-900
-600
-300
0
20+
16
12
8
4
01916 1930 1948 1955 1955 1982 1990 2004 2013 2014
Ave
rag
e D
ep
th (
m)
De
po
sit S
ize
(M
illio
n To
nn
es)
19751969
777Trout Lake Lalor
ReedNorth Star
Flin Flon
Cuprus
MandyDon Jon
Centennial
Callinan
Pine Bay
C A L L I N E X c o r p o r a t e P R E S E N T A T I O N 22T S X - V : C N X | O T C Q X : C L L X F
• Operates a 6,000 TPD Mill in Flin Flon, MB, primarily sourcing ore from the 777 Mine, which has less than four years of mine life
• 777 discovery hole was discovered at 1,278 meters down-hole depth with current mining operations down to a vertical depth of ~1,500m with $51/t OPEX
• Reserves average 6.3 Mt grading 11% Zn Eq. (1.6% Cu, 4.8% Zn, 1.88 g/t and 27.22 g/t Ag) over 8 meters
• The +20 Mt 777 deposit has yielded nearly $2 billion in net profit
HudBay’s Flin Flon Operations
23 T S X - V : C N X | O T C Q X : C L L X F C A L L I N E X c o r p o r a t e P R E S E N T A T I O N
N
Flin Flon Project
Big Island Project
Flin Flon
Pine Bay Project
777 Mine Processing Facility
LEGEND Deposit
Historic Mine
Pine Bay Shaft
Emerging Callinex Discovery
Callinex Claims
Callinex Mining Lease
HudBay Claims
Paved Road
Power
Rail
Strategic Properties Near Hudbay’s Flin Flon Operations
• Strategic property totaling 6,300 sq. ha located 16 km to Flin Flon, MB
• Advanced permitting status that includes the right to conduct mining activities
• Power, water and road access at site to service historic shaft and underground workings
• Property covers 10 km long trend consisting of at least four stacked VMS horizons
p i n e b ay p r o j e c tN
Pine Bay Project
N
KILOMETERS
Deposit Mine
Mine Shaft
Emerging Callinex Discovery
Callinex Claims Callinex Mining Lease HudBay Claims Road Power Rail
LEGEND
25 T S X - V : C N X | O T C Q X : C L L X F C A L L I N E X c o r p o r a t e P R E S E N T A T I O N
• Explored by Placer Dome during the 1990s, where they had a mandate to discover a 30 Mt VMS deposit
• Covers one of the largest felsic rock packages within the belt, the primary host rock for VMS deposits
• Large alteration zone spanning 1,100m long and up to 700m wide has been overturned and is facing to the west, adjacent to three VMS horizons
• Three stacked horizons host five mineralized zones including the Pine Bay Copper deposit
PINE BAY area
POTENTIAL FOR A LARGE VMS DEPOSIT + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +
+ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +
+ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +
+ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +
+ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +
+ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +
+ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +
+ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +
+ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +
+ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +
+ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +
+ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +
+ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +
+ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +
+ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +
+ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +
+ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +
+ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +
+ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +
+ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +
+ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +
+ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +
+ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +
+ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +
+ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +
+ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +
+ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +
+ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +
+ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +
+ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +
+ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +
+ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +
+ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +
KILOMETERS
0 2
N
Deposit
Historic Mine
Mine Shaft
Emerging Callinex Discovery
Callinex Claims
Callinex Mining Lease
HudBay Claims
Alteration Zone
KILOMETERS
0 2
N
+ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +
+ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +
+ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +
+ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +
+ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +
+ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +
+ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +
+ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +
+ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +
+ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +
+ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +
+ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +
+ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +
+ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +
+ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +
+ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +
+ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +
+ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +
+ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +
+ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +
+ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +
+ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +
+ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +
+ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +
+ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +
+ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +
+ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +
+ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +
+ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +
+ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +
+ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +
+ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +
+ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +
Baker Patton Felsic Complex
Road
Power
LEGEND
N
C A L L I N E X c o r p o r a t e P R E S E N T A T I O N 26T S X - V : C N X | O T C Q X : C L L X F
• Callinex discovered 10.3m of 13.1% Zn Eq. (6.0% Zn, 1.8 g/t Au, 60.4 g/t Ag, 0.7% Cu and 0.4% Pb) by extending a previous Placer Dome drill hole by 38m
• Hole intersected most significant gold and silver results from 625 holes drilled from over 80 years of exploration at the project
• Nature of mineralization indicates the VMS system is long-lived and the intersection occurs at the edge of the system
Proof of Concept with New Discovery
Hole From (m) To (m) Interval (m) Zn Eq (%) Zn (%) Au (g/t) Ag (g/t) Cu (%) Pb (%)284-3-93-DPN 998.80 1010.26 11.46 12.23 5.61 1.65 56.38 0.68 0.35Including 999.26 1009.59 10.33 13.06 6.00 1.78 60.39 0.71 0.35
Including 999.80 1004.00 4.20 20.77 11.82 2.43 73.77 0.70 0.73Including 999.80 1002.50 2.70 26.35 16.37 2.57 79.21 0.86 0.98
Cabin VMS Horizon Baker Patton VMS HorizonPine Bay VMS Horizon
New Discovery – 10.3m of 13.1 Zn Eq.
27 T S X - V : C N X | O T C Q X : C L L X F C A L L I N E X c o r p o r a t e P R E S E N T A T I O N
PBM-008 “3.3m of 3.2% Cu”
PBM-014 (Cabin FW Zone)“2.3m of 9.3% Zn Eq. (6.65% Zn, 0.83 g/t Au, 28.0 g/t Ag and 0.1% Cu)”
Cabin VMS DepositNW
Hashimoto Alteration Index
Exploration CorridorPBM-017
PBM-024
284-393-DPN
PBM-014
95-02-DPN
95-100 Extreme
90-95 Strong
85-90 High
60-85 Moderate
0-60 Low
LEGEND
Longitudinal Section of the Cabin VMS Horizon
400m
284-393-DPN“10.3m of 13.1% Zn Eq. (0.7% Cu, 6.0% Zn, 1.8 g/t Au, and 0.4% Pb)”
PBM-024“2.6m of 3.0% Cu Eq. (1.64% Cu, 0.53% Zn, 0.92 g/t Au, 34.6 g/t Ag)”
Cabin VMS Horizon
Zinc Mineralization
Copper Mineralization
C A L L I N E X c o r p o r a t e P R E S E N T A T I O N 28T S X - V : C N X | O T C Q X : C L L X F
N
• Strategic property located 10km east from Flin Flon, MB
• The area may contain a similar rock package that host the Flin Flon, Callinan and 777 Mines that have collectively produced over 100 million tonnes of ore.
• Project contains the Tara Lake Deposit which is highlighted by previous drill results including 7.4m of 35% Zn Eq, 12.4m of 34% Zn Eq. and 19.6m of 24% Zn Eq.
• The deposit was discovered in 1987 but it has not been drilled since 1991.
Big Island Project N
Big Island Project
LEGEND Deposit
Historic Mine
Callinex Claims
Callinex Mining Lease
HudBay Claims
Paved Road
Power
Rail
TARA LAKE DEPOSIT
N
29 T S X - V : C N X | O T C Q X : C L L X F C A L L I N E X c o r p o r a t e P R E S E N T A T I O N
• Advanced stage VMS project located in Newfoundland, Canada
• 14.1Mt Inferred resource grading 6.2% Zn Eq. containing 1.9 billion pounds of Zn Eq. (including 484,000 oz Au at 1.1 g/t Au)
• Resource starts at surface and extends to a vertical depth of 350m
• Advanced permitting stage with resource contained within current Mining Lease
• High-grade mineralization open at depth with assays including 4.67m of 15.1% Zn, 4.4 g/t Au, 57.9 g/t Ag and 0.36% Cu down-plunge from resource*
*See News Release dated May 16, 2016
P o i n t l e a m i n g t o n p r o j e c t
Duck Pond
Buchans
PT. LEAMINGTON PROJECT
Bishop’s Falls
Grand Falls WindsorBadger
South Brook
LEGEND Processing Facility Mine
Road Power Trail Port
City
N
C A L L I N E X c o r p o r a t e P R E S E N T A T I O N 30T S X - V : C N X | O T C Q X : C L L X F
Inferred Mineral Resources*
Indicated Mineral Resources*
Project Cut-off (Zn Eq) Tonnes Zn Eq. (%) Zn (%) Pb (%) Ag (g/t) Au (g/t) Cu (%) Zn Eq.
(M Lbs)Nash Creek 2.0 9,033,000 3.58 2.79 0.57 18.16 n/a n/a 712Total 9,033,000 3.58 2.79 0.57 18.16 n/a n/a 712
Project Cut-off (Zn. Eq) Tonnes Zn Eq. Zn (%) Pb (%) Ag (g/t) Au (g/t) Cu (%) Zn Eq.
(M Lbs)
Point Leamington 4.0 14,093,000 6.15 1.88 0.02 17.12 1.07 0.42 1,910Superjack 1.5 3,211,015 4.63 3.01 0.78 29.45 n/a 0.27 328
Nash Creek 2.0 1,113,000 3.58 2.83 0.57 15.51 n/a n/a 88
Total 18,417,015 5.73 2.13 0.19 19.17 0.82 0.37 2,326
Total mineral resources• Large inventory of zinc resources within established Canadian mining jurisdictions totaling 712 million pounds of Zn Eq.
in the Indicated category and 2.3 billion pounds of Zn Eq. in the Inferred category.
See News Release dated November 9, 2017
31 T S X - V : C N X | O T C Q X : C L L X F C A L L I N E X c o r p o r a t e P R E S E N T A T I O N
Upcoming Catalysts for 2017
Superjacknash creek
• Drill campaign to extend deposit along strike in advance of PEA
• Update resource estimate and complete Preliminary Economic Assessment
Pine Bay
• Summer drilling campaign to test strike extension of zinc-gold discovery
• Drill test targets at Big Island and Flin Flon Projects
• Drill campaign to test top targets including large untested coincident magnetic-gravity anomaly below soil anomaly
• Provide samples for dense media separation testing as part of toll milling investigations
C A L L I N E X c o r p o r a t e P R E S E N T A T I O N 32T S X - V : C N X | O T C Q X : C L L X F
I N V E S T M E N T S U M M A R Y
PROJECT PORTFOLIOSTRONG TEAM TIGHT CAPITAL STRUCTURE
Strong portfolio of zinc-rich assets in Canadian mining jurisdictions
Technical team involved in three of the four largest VMS discoveries within the prolific Flin Flon Greenstone Belt
Funded for upcoming drilling campaigns with $7M in cash
33 T S X - V : C N X | O T C Q X : C L L X F C A L L I N E X c o r p o r a t e P R E S E N T A T I O N
T S X - V : C N X | O T C Q X : C L L X F
604.605.0885 [email protected] www.callinex.ca
Corporate Head Office 1555 - 555 West Hastings Street Vancouver, BC Canada V6B 4N4
President and CEO: Max Porterfield
Corporate Counsel: Northwest Law Group
Auditors: PwC