Page 2 A Grieg Group Company
ECDIS PAST, PRESENT & Future
Past Present
Future
2000- 2010
2015...
2010-2015
Page 3 A Grieg Group Company
History
Page 4 A Grieg Group Company
I am Checking now Sir
What is going on there?????
DEEPLy - Past
Page 5 A Grieg Group Company
ECDis – History
• ECDIS has taken a long time to mature to the point when mandatory carriage can be agreed.
• IMO Performance Standards for ECDIS were formally adopted by the International Maritime Organization (IMO) on November 23, 1995 and issued as IMO Resolution A19/Res.817.
• Back-up arrangements for ECDIS were adopted by IMO in November 1996 and became Appendix 6 to the Performance Standards.
Page 6 A Grieg Group Company
• Though IMO's first performance standards for ECDIS were completed in 1995, type approved equipment appeared only in 1999.
• Principal Obstacles
• Cost
• Reliability
• User Familiarity
ECDis – History
Page 7 A Grieg Group Company
Drivers for acceptability
• FSA
• Safety
• Cost Saving
ECDis – History
Page 9 A Grieg Group Company
ECDIS Mandatory per time table on the Screen
May 30, 2012
Company Presentation
9
The timetable for new builds is based on the date the vessel’s keel is laid. Existing vessels will be required to fit ECDIS in advance of the first survey after the implementation date. There are no requirements for existing cargo vessels of less than 10,000 gross tons. Flag States may exempt vessels that will be taken permanently out of service within two years of the implementation date.
Page 10 A Grieg Group Company
CurrEnt issuEs witH rEsPECt ECDis arE:
-IMO Regulations
-IHO Rules
-Port State Control and Vetting Inspectors
-Training
-Support
Page 11 A Grieg Group Company
iMo rEguLations
The relevant regulations are:
• Regulation 2
• Regulation 19
• Regulation 27
Page 12 A Grieg Group Company
iHo ruLEs
IHO Data Presentation and Performance Checks for Ships
the display of navigation areas recently recognised by IMO ESSA (Especially Sensitive Sea Area), PSSA (Particularly Sensitive Sea Area), ASL (Archipelagic Sea Lanes)
the display of lights with complex characteristics
the display of underwater features and isolated dangers
detection of objects by “route checking” in voyage planning mode
Page 13 A Grieg Group Company
Port statE ControL anD VEtting insPECtors
• Lot of Gray Areas
• SIRE, VIQ, TMSA
• T &P Notices
• Updates
• ENC’s/AVCS
• Back Up arrangements
• Paperless Navigation
Page 14 A Grieg Group Company
training anD suPPort
• Generic vs. Type Specific
• Different Nationalities, different Standards
• Flag State Regulations
• Costs
• Lack of Standard Interface across different Equipment
• Different Time Zones
• Redundancy
Page 15 A Grieg Group Company
PAST – Present
FroM PrEsEnt to FuturE
Page 18 A Grieg Group Company
VDs
Voyage Decision Support System – A Productivity Tool with many applications from several sources like MARPOL, SOLAS, Anti-Piracy , War Zones, WEATHER etc. Interactive tools with all information in real time as required by the Management through Plug-in Apps
Cloud ECDIS – ECDIS @ cloud M, is a concept , where the ECDIS information available to Navigator on board is available through MARIS Cloud – Cloud M, on various Platforms to relevant persons,
Page 19 A Grieg Group Company
tHE VDs-ConCEPt
VDS Voyage Decision Support
An electronic information tool for multiple sea & shore stakeholders
based on Maris ECDIS, designed to
• PLAN and EXECUTE the voyage
and
• DOCUMENT and ANALYSE the result
developed with the objective to: Assist ship owners / operators and navigators plan safe and economically efficient voyages, to relevant environmental standards Realise fuel saving potential of up to 5% of annual fuel costs Implement regulatory requirements (MARPOL, Ballast Water Management, etc.) Minimise heavy weather navigation risks and insurance claims Analyse vessel or fleet performance using selected information
Page 21 A Grieg Group Company
ONBOARD VOYAGE DECISION SUPPORT
PLANNING SPECIFIC VOYAGE ON ACTUAL UP-TO-DATE INFORMATION
VOYAGE PROGRESS MONITORING AND EVALUATION
VOYAGE DATA RECORDING AND STORAGE
SHORT-TERM / SINGLE VOYAGE PERSPECTIVE
DOCUMENTING BEST PRACTICE
SHORE-BASED FLEET MANAGEMENT SYSTEM
ANALYSIS OF FLEET PERFORMANCE
COST CONTROL
LONG-TERM PERSPECTIVE
HISTORICAL REFERENCE
COMMERCIAL CONSIDERATIONS
PROGRESS MONITORING
DOCUMENTING BEST PRACTICE
VDs FunCtionaLity
Page 22 A Grieg Group Company
wHat Can you oPtiMisE in suCH a wEatHEr .. ...
THE FUTURE OF NAVIGATION, OSLO
Page 23 A Grieg Group Company
unLEss you Know wHat is going on BEnEatH
Page 24 A Grieg Group Company
oCEan CurrEnts: BEttEr to FoLLow tHan to FigHt
Page 25 A Grieg Group Company
IN COOPERATION WITH AMARCON B.V., MARIS IS DEVELOPING AN ADVISORY TOOL TO DEAL WITH: HULL RESISTANCE AND TRIM OPTIMISATION
HEAVY WEATHER NAVIGATION
SQUAT AND SHALLOW WATER EFFECTS
WIND AND DRIFT
FUEL DISTRIBUTION
BALLAST WATER MANAGEMENT
ADVICE IS GENERATED BY USING MEASURED VESSEL’S RESPONSES AS OPERATIONAL WARNINGS: REAL-TIME MONITORING AND RECORDING
FORECASTING CONDITIONS AND RESPONSES FOR ALL HEADINGS AND SPEEDS
USER-DEFINED CRITERIA
CLEAR PRESENTATION ON VDS COMPUTER
VDs MoDuLE 2. aCtiVE sEa-KEEPing anD HEaVy wEatHEr naVigation
•ACTIVE SEA-KEEPING AND HEAVY WEATHER NAVIGATION
Page 26 A Grieg Group Company
HEAVY WEATHER PUT LARGE STRESSES ON THE HULL, CARGO, EQUIPMENT AND CREW
ADDED HULL RESISTANCE IN HEAVY WEATHER !
HEaVy wEatHEr naVigation
Page 28 A Grieg Group Company
FuturE – ECDis @ CLouD m Concept –All sensor information gathered at the ship is
streamed live through the MARIS Cloud
Cloud
m
Page 29 A Grieg Group Company
From Cloud to various devises on different Platforms with value add fectures such as real time, alarms, antigrounding, anticollision
Page 30 A Grieg Group Company
How Far is tHE FuturE …….
FUTURE COMES – MUCH BEFORE YOU EXPECT!
Page 31 A Grieg Group Company
Thank you Very Much for your kind Attention