A
GLOBALink
ARINC VDL Mode 2 AOA and ATN
Program Status&
Deployment Activities
November, 2000
AMCPWGM1
WP23
A
VDL Mode 2 Program Status• AOA– Initial Operational Capability Established on
November 17th over Iowa and Washington State
– Four Ground Stations in Service as of November 17th
– En-route Coverage Roll-out and Service Offering Begins in Early 2001
• Interoperability Testing– Collins Underway– FAA Underway– Honeywell imminent– Airbus/Aerospatiale (AMA) plans in
progress
A
VDL Mode 2 Program Status
• ATN– “Early” ATN Release for PETAL IIe
Completed and Tested by 1Q01– PETAL IIe Ground Infrastructure will be
Deployed and Operational in April 2001• evaluations from May through October 2001• Eurocontrol, American Airlines, ARINC,
Collins,
– ATN Service will be Deployed and Operational in December 2001• FAA CPDLC Build 1 operational evaluation
begins in June 2002• ATN service offered in 2002
A
ARINC VDL/ATN Development andContinuing Maintenance
ARINC VDL Mode 2 Service(Including Demonstrations & Operational Evaluations)
PETAL II5-10/017 Stns
ARINCFAAEurocontrol
AOAIOC
1/01 1/02 1/03 1/04 1/05 2011+
CPDLC Build 14 Services, MIA, Enroute
CPDLC Build 1AAdditional Services; National
Deployment, Enroute
1/97-00
ARINC VDL/ATN Development toSupport PETAL II and CPDLC
ATNIOC ARINC VDL/ATN Service Expansion
A
ARINC VDLM2 Industry Partnership
• Interoperability Team Meetings Occuring Since Early ‘98– Most Recent Meeting at Boeing in August
• Air/Ground Test Station (AGTS) Developed and Delivered to Industry– Allows Avionics Suppliers to Test with ARINC
Production VDLM2 Software• Collins AGTS delivered in March• Honeywell AGTS fabricated - delivery by early
November• Three additional AGTS’s will support American
Airlines 767 VDLM2 certification in 2002
A
VDLM2 Industry PartnershipRecent Accomplishments
• On-going Testing Between ARINC and Collins since March– Proven that ARINC and Collins Implementations are
Compatible
• First VDLM2 Flight on October 20th was accomplished against ARINC VDLM2 Implementation
• First VDLM2/AOA Flight Against “Live” Network Occurred on November 20, 2000– Collins Test Aircraft Exchanged VDLM2/AOA
Messages
• FAA Tech Center VDLM2 “Test Stack”– Tested VDL link establishment, data delivery, and
disconnects
A
AOA Service and Ground Station Roll-Out Approach
• Initial Operational Capability – Limited Coverage Area Currently Established – Anticipate Very Few Aircraft Equipped
• avionics certification activities• AQP activities
• Operational Service Evolves & Expands– En-route Service Coverage Deployed– System Enhancements are Implemented – VDLM2 AOA Equipped Aircraft in Revenue Service
• AOA Service will Remain
– No “Sunset” Date
A
AOA Initial Coverage and Expansion
• Initial Coverage to Support Avionics Certification over two geographic areas– Three Ground Stations Deployed in Washington
• Boeing and Honeywell certification activities
– Deployment complete in early November
– Three Ground Stations Deployed in Iowa• Rockwell Collins certification activities
– Deployment complete
• Coverage Expansion– Driven by the Following Factors
• Alleviate ACARS RF Congestion
• Airline Coverage Needs
– Aircraft equipage rates
A
Summary
• Roll-out of VDL Mode 2 Has Begun• Program is On Schedule to Deliver VDL
Mode 2 as Planned• Industry Interoperability Testing has been
Very Successful• VDL Mode 2 ATN Capability to Deliver ATS
Messages will be Demonstrated in 2001• Aggressive Service Coverage Expansion
throughout the US will Occur Beginning in 2001