A French group OF CONSTRUCTION AND CIVIL€¦ · A French group OF CONSTRUCTION AND CIVIL...

40
A French group OF CONSTRUCTION AND CIVIL ENGINEERING COMPANIES January 2017

Transcript of A French group OF CONSTRUCTION AND CIVIL€¦ · A French group OF CONSTRUCTION AND CIVIL...

A French group OF CONSTRUCTION AND CIVIL ENGINEERING COMPANIES

January 2017

IMAGE DE FOND Pour remplacer l'image de fond : - clic droit en marge de la diapo

- "Mise en forme de l'arrière-plan" - cliquez sur [Fichier] dans le volet à

droite de l'écran - sélectionnez la nouvelle image.

MULTIMETIERS = TURNKEY/LLAVE EN MANO

2

An expanding group of Construction & Civil Engineering companies

66% INCREASE IN ANNUAL

REVENUE OVER 5 YEARS

9,000 FULLY TRAINED,

INDEPENDENT &

RESPONSIBLE

EMPLOYEES

€1.5 billion IN ANNUAL REVENUE

AN IN-HOUSE TRAINING

COLLEGE

4 DEDICATED CENTERS

INVESTMENT of

€62m IN PLANT & EQUIPMENT

70% YEAR-ON-YEAR INCREASE

IN INTERNATIONAL REVENUE

an average of

1000 PEOPLE HIRED PER

YEAR OVER THE LAST

3 YEARS

A

DYNAMIC

HIRING

POLICY WITH

NGE - January 2017

3

A huge diversity of infrastructures

A

B

C

D

E

F

G

H

I

I

I

F

A. Roads and freeways B. Engineered structures C. Optical fiber networks D. Railways E. Urban development F. Water & environment G. Subsurface H. Airports I. Buildings

NGE - January 2017

4

The values that unite us

NGE - January 2017

Unity

the value of teamwork

Ambition

the daily commitment to enterprise

Transparency

the belief in delegation and

independence

5

Innovation: it's a state of mind

At NGE, the benefits of innovation and

R&D are clear: technical, organizational,

financial and social

The customer is central to everything we

do at all 3 sequential stages of the

innovation process

identifying ideas, expectations and innovation pathways

collaborative experimentation with concepts and prototypes using the Lean Startup model

monitoring customer satisfaction and making the necessary improvements and/or corrections

Before

During

After

NGE - January 2017

6

Training at NGE

4 DEDICATED

CENTERS

75 TRAINERS

A CONSTANT

COMMITMENT WITH

130 TRAINING

PROGRAMS

our in-house training college

MORE THAN

85,000 HOURS OF

TRAINING PER

YEAR

3,700 TRAINEES PER YEAR

NGE - January 2017

7

Our own plant & equipment fleet

Availability, responsiveness,

local presence and total

management of machinery

35 workshops, including 7 technical centers

Structured by business sector: rail, multi-expertise and specialties

An in-house mechanical engineering design office serving every area of

the business

Investment totaling €62m

~ 1500 items of heavy

machinery

NGE - January 2017

8

Wagons

track-laying machines, switches and crossings: ballast cleaning machine, self-discharging wagons,

conveyor belts on wagons

tamping machines, turnouts tamping machines,

ballast regulators, ballast recovering train, stabilizers

flash butt welding machine, aluminothermic equipment sets,

welding train for high speed lines

civil works machines

switchers, locomotive, low speed tractor

Equipment fleet

9

Machinery Resources

1 High output track renewal train (ballast/sleepers/rail)

1 High output rail renewal train for High speed lines

NGE - Janvier 2017

10

An international footprint

NGE - January 2017

11

Working together: multi-expertise for the benefit of customers and their structures

Taking a global overview of project

work sites via a single point of

contact

NGE - January 2017

Teams that work together alongside

customers

12

Our construction specialties

NGE - January 2017

URBAN INFRASTRUCTURES & EARTHWORKS

PIPELINES & OTHER UNDERGROUND NETWORKS

CIVIL ENGINEERING

ROADBUILDING & ROAD EQUIPMENT

GEOTECHNICAL & SAFETY CONTRACTING

RAIL INFRASTRUCTURES

BUILDING CONSTRUCTION

13

Urban Infrastructures & Earthworks

General earthworks

Soil treatment

Road bases

Development & servicing

Urban development

Pyrotechnic decontamination

Blasting

Asbestos removal

THE 'RUINES DE LA SECHILIENNE' DIVERSION

NGE - January 2017

14

Pipelines & Other Underground Networks

WATER INFRASTRUCTURES

Water industry contracting (abstraction-

wastewater-stormwater)

Electrical contracting

Installation of other underground pipelines

Drainage

Household waste transportation

Environmental engineering

NGE - January 2017

15

Civil Engineering

THE ACHERES WASTEWATER TREATMENT PLANT

Standard and bespoke engineered structures

Civil Engineering and industrial buildings

Civil Engineering for the water industry

Civil Engineering for the energy industry (wind

power generators, photovoltaic installations and micro-plants)

Prefabrication

Subsurface contracting

NGE - January 2017

16

Roads

Pavements:

Asphalts

Dressings

Cement-bound aggregate

Untreated aggregate

Bitumen sealing

Industries: Asphalt plants

Cement-bound aggregate plants

Binder plants

Quarries

RN2 AT MAUBEUGE

NGE - January 2017

17

Road Equipment

Concrete pavements

Slip forms

Crash barriers

Noise barriers

Traffic guidance systems

High-quality development

Surface markings

CONCRETE PAVEMENT - CDG

NGE - January 2017

18

Geotechnical & Safety Contracting

Soil improvement

Reinforcement and retention

Deep foundations

Injection

Difficult access contracting

Civil Engineering for specific applications

River, sea and subsea contracting

TOURMALET

NGE - January 2017

19

Rail Contracting

METRO DE ST DOMINGUE

Track construction, upgrading and maintenance

Electrification and catenary upgrades

Rail safety - Signaling

Topography and rail software development

Locomotive maintenance and rebuilding

Design, installation and remedial maintenance of rail line,

tramway and trolleybus electrical systems

PANAMA METRO

NGE - January 2017

20

Breakdown of revenue by specialty

2015

NGE - January 2017

RAIL INFRASTRUCTURES

€398m

CIVIL ENGINEERING

€186m

ROADBUILDING & ROAD EQUIPMENT

€164m

PIPELINES & OTHER UNDERGROUND NETWORKS

€168m

URBAN INFRASTRUCTURES & EARTHWORKS

€478m 32%

27%

11%

11%

12%

7%

Total Revenue

€1,497m

GEOTECHNICAL & SAFETY CONTRACTING

€103m

21

A concessions department for projects requiring private finance

NGE - January 2017

Freeway and road networks

Harbors, Urban developments, Urban

infrastructures and hydroelectric dams

Drinking water supply networks Fiber Optic infrastructure installation

22

Our successes

MAJOR PROJECTS

LEADING THE MARKET IN EARTHWORKS

THE GRAND PARIS EXPRESS

INFRASTRUCTURE UPGRADES

URBAN DEVELOPMENT

THE FRENCH THD SUPERFAST BROADBAND PLAN

NGE - January 2017

4

22

23

Leading the way with major projects...

Civil Engineering

SOUTHERN EUROPE-ATLANTIC HS RAIL LINK

Rail Contracting

NGE - January 2017

24

Leading the market as experts in earthworks...

NGE - January 2017

A9 Montpellier Bypass

25

Forging ahead in underground civil engineering...

Underground tunnel tapering for the Eole RER extension project

(Haussmann St Lazare to the La Défense tunnel)

NGE - January 2017

GRAND PARIS EXPRESS

7

2

1 6

3

4 5

26

Forging ahead in rail contracting...

Crossrail, London

NGE - January 2017

GLOBAL URBANIZATION

Santo Domingo

27

FAST TRACK TO EXCELLENCE

28

Over 85 years of experience

Over 1.000 Employees in France and

1.500 abroad

Over 250 millions euros of turnover

(30% from overseas

projects)

Linked-up with

NGE group since 2011

(Largest public Works

independent company in

France with a turnover of

1,4 billion euros & over

8.000 employees)

The specialist for tracks and catenaries works,

TSO provides its high knowledge for :

• Construction of railway lines (high speed, heavy load

lines…) and all kinds of urban rails and power systems

• Renewal and maintenance of existing tracks

• Modernization and electrification of overhead catenary’s

system

• surveying works as well as software development

dedicated to railway

• Maintenance and overhauling of locomotives and wagons.

World Speed Record — 319 mph

(513 km/h) in May 1990 & 357 mph

(574,8 km/h) in April 2007 on

ballasted track laid by TSO in

France

357 mph April 2007

Your partner for railway solutions

29

Currently, our teams are mobilized to start the ”South European

Atlantic“ high speed line, the biggest railway project ever

done in Europe.

85 000 tons of rails,

3 000 000 tons of ballast,

1 100 000 sleepers,

110 turnouts,

13 000 overhead poles,

1700 tons of copper wire

+ de 400 employees

HIGH SPEED LINES

Construction

Conventional lines, high speed lines, metros, light rails, ...

TSO can deploy all the required expertise, from development to implementation.

30

TSO Activities

NGE - Janvier 2017

Metros Ballast track Light rails Overhead lines

Maintenan

ce

workshops

Topography Track, ballast, sleepers,

rails Overhead

lines

Metros Ballast track Light rails Overhead lines

Maintenance workshops

Topography Track, ballast, sleepers, rails Overhead lines

31

HIGH SPEED LINES

Channel Tunnel, High Speed One in Great Britain, High Speed Line in Belgium, “Atlantic”,

“Mediterranean”, “North”, East European,“Rhin Rhône in France

TSO took an active part in the track installation of more than

2500 km of high speed lines, on the French and European territories.

Construction

Conventional lines, high speed lines, metros, light rails, ...

TSO can deploy all the required expertise, from development to implementation.

32

Panama > 2010-2014: Panama Metro - Construction of Line 1 - Track - Overhead lines - Depot equipment

Dominican Republic > 2011-2012: Santo Domingo metro - Construction of line 2 Dominican Republic > 2007-2008: Santo Domingo metro - Construction of line 1 - Supply and installation of the first metro line

of St Domingo, 14.2 km of double track from el Centro de los Heros to Villa Mella. Supply and installation of workshop equipment, ventilation and fire protection systems

Algeria > 2006-2008: Algiers Metro line 1

METROS

SLAB TRACK,

THIRD RAIL,

RIGID CATENARY,

CONDUCTOR RAIL...

Construction

Conventional lines, high speed lines, metros, light rails, ...

TSO can deploy all the required expertise, from development to implementation.

URBAN LINES TSO adapts its offer to all the urban areas issues:

trolleybus, metros, light rails

33

Construction

Conventional lines, high speed lines, metros, light rails, ...

TSO can deploy all the required expertise, from development to implementation.

RAILWAYS In France and abroad, TSO many references.

Construction of 100 km of new dual-gauge track in Bangladesh (Jamuna Bridge Project)

MULTI-CHANNEL SPACING, TYPE

METRIC, HEAVY LOAD, ETC..

Construction of 450 km of new track in Saudi Arabia (Heavy load train - NSR Project - CTW 100 Section)

Saudi Arabia > 2007-2011: Construction of 450 km of new track (Heavy load train - NSR Project - Section CTW 100)

Algeria > 2004-2012: Construction of the Standard gauge track Mecheria-Bechar (360 km) France > Western circular route operation > 2003-2004: Noisy-le-Roi to St Germain-en-Laye - Track and switch gears laying and

ballast implementation Bangladesh > 1997-2003: Jamuna Bridge Railway Project - Construction of 95 km of new dual gauge track

Nigeria > 1992-2004: Warri Line - Installation of 250 km of track and switch gears on concrete sleepers

34

URBAN LINES

Algeria > 2010-2012: Light rail line in Oran - Line 1 from Sidi-Maarouf to Es-Senia - Laying of tracks and switch gears

France - Light rail line in Montpellier > 2009-2011: The town’s 3rd line. France – “Maréchaux” South tramway > 2004-2006: Railway works of platform and sprinklers covering.

France - Light rail line in Grenoble > 2004-2005: The town’s 3rd line. Supply and laying of tracks and switch gears France - Light rail line in Nantes > 2004-2004: Line 3, north extension.

Romania > 2001-2002: Light rail line in Bucarest - Rehabilitation of the section 3 of the Line 41 France - Light rail line in Orléans > 1998-2000: Track laying for sections 1 and 2. Reconditioning of the workshop.

TSO adapts its offer to all the urban areas issues:

trolleybus, metros, light rails

SLAB TRACK,

THIRD RAIL,

RIGID CATENARY,

CONDUCTOR RAIL...

LIGHT RAIL

Construction

Conventional lines, high speed lines, metros, light rails, ...

TSO can deploy all the required expertise, from development to implementation.

35

Our own equipment and machineries with high standards

= an highly technical expertise and strong competitiveness

Technical innovation focused

= Priority to quality, efficiency and safety improvements

= Take part in the technical progress for the railway maintenance costs.

Taylor Made equipment

= a concrete train: 250 lm/day of track, concrete capacity 250 m3

= Multi-Purpose Gantry: unloading of long welded rails and sleepers, transferring of

equipment (jigs & props, shutters…), positioning of reinforcement cages, concreting

Flexibility and experience

= quickly and efficiently adaptation to its local Partners and Customers.

A reliable partner for railway solutions…

OUR forces

36

Renewal Maintenance works cover all the activities of heavy maintenance on main lines, switches

and

crossings.

TRACK AND BALLAST

HIGH SPEED SEQUENCES

OF OPERATION France > 2013-2015: Renewal of ballasted tracks - Continuous program

France > 2009-2012: Renewal of ballasted tracks - Continuous program France > 2009-2014: Track lifting - Atlantic high speed line

Nigeria > 2010-2012: Warri Line - Rehabilitation of 250 km of tracks, construction of 20 km of tracks and maintenance tamping over 300 km

France > 2010: Ballast renewal in Thionville - Agen - Villeneuve St Georges France > 2009: Renewal of all the track components - “Chartreux” Tunnel in Marseille

France > 2009-2010: track and ballast renewal Lyon-Marseille line Greece > 2005-2007: 50 km of track renovation between Evros and Alexandropouli

France > Renewal of ballasted tracks > 1997-2001: Continuous program, a 55 months contract. Annual basis of 210 km France > Regeneration of the South East High Speed Line > 1996-2000: line Paris-Lyon, 350 km of tracks and 65 switch gears

37

SLEEPERS BALLAST

France > 2013-2015: Renewal of ballasted tracks - Continuous program

France > 2009-2012: Renewal of ballasted tracks - Continuous program France > 2009-2014: Track lifting - Atlantic high speed line

Nigeria > 2010-2012: Warri Line - Rehabilitation of 250 km of tracks, construction of 20 km of tracks and maintenance tamping over 300 km

France > 2010: Ballast renewal in Thionville - Agen - Villeneuve St Georges France > 2009: Renewal of all the track components - “Chartreux” Tunnel in Marseille

France > 2009-2010: track and ballast renewal Lyon-Marseille line Greece > 2005-2007: 50 km of track renovation between Evros and Alexandropouli

France > Renewal of ballasted tracks > 1997-2001: Continuous program, a 55 months contract. Annual basis of 210 km France > Regeneration of the South East High Speed Line > 1996-2000: line Paris-Lyon, 350 km of tracks and 65 switch gears

Renewal Maintenance works cover all the activities of heavy maintenance on main lines, switches

and

crossings.

38

RAILS

France > 2009-2014: Rail renewal - LGV A to LGV PSE

Gabon > 2011-2011: Libreville - Transgabonese - Realisation of 2000 flash butt welds in situ

Republic of Congo > 2004-2005: Rail welding and technical assistance for the track renovation

France > 2009: Rail renewal - East Paris-Esbly

Renewal Maintenance works cover all the activities of heavy maintenance on main lines, switches

and

crossings.

HIGHLY MECHANIZED PATENTED DEVICE,

FLASH-BUTT WELDING OF RAILS

39

Electrification of Railway Infrastructure Design, Procurement, Construction, Testing and Commissioning, Maintenance:

the mastering of railway know-how to provide appropriate answers to complex

requirements.

Rhin-Rhône high-speed line, Electrification, Bourges-Saincaise,

Electrification, Bourg-Bellegarde, Electrification, Nantes-Les Sables,

Remodelling in all parts of France, Overhead contact rail, RER C high-speed

metro line, Le Mans tramway, Lyon tramway, Tours tramway

Intercity lines

•Electrification of new lines (National

Network and High Speed Lines)

•Electrification of operating

•Railway Lines

•Remodelling and Maintenance

Urban Lines

•Overhead Contact System

•Rigid Overhead Conductor

For Tramways, Trolleys

and Metros

Engineering

•Project planning

•Conception design

•Principle and basic design

•Detailed design

•RAMS studies

40 technicians

in our design office

THANK YOU FOR

YOUR TIME NGE

SAINT-ÉTIENNE-DU-GRÈS

PARC D’ACTIVITÉS DE LAURADE

BP 22 - 13156 TARASCON CEDEX

TEL.: +33 (0)4 90 91 60 00

www.nge.fr

Join us on social media