1 Session IV – Designing Attractive Engineering Curricula UWIG/NREL INDUSTRY-UNIVERSITY WORKSHOP POWER ENGINEERING NEEDS FOR THE WIND INDUSTRY May 7-8, 2008, Broomfield, CO By: Ned Mohan University of Minnesota ([email protected]) A Forward-Looking Electric Energy Systems Curriculum SOLDOTNA -40/+70 Mvar 115kV DAVES CREEK -10/+25 Mvar 115kV WAPA FARGO -45/+22 Mvar 14kV MAINE EL. POWER CHESTER -140/+425 Mvar 345kV NIAGARA MOHAWK LEEDS -300/+270 Mvar 345kV JERSEY CENTRAL ATLANTIC CITY -130/+260 Mvar 230kV CONECTIV CARDIFF -100/+150 Mvar 230kV CONECTIV INDIAN RIVER -100/+200 Mvar 230kV CONECTIV NELSON -100/+150 Mvar 138kV AM. EL. POWER BEAVER CREEK -125/+125 Mvar 138kV VIRGINIA POWER COLINGTON -30/+78 Mvar 115kV VELCO Essex STATCOM Georgia Power North Dublin GORDON EVANS 0/+300 Mvar 138kV KANSAS GAS & EL. MURRAY GILL 25/+200 Mvar 138kV LANL LOS ALAMOS -50/+100 Mvar 115kV LADWP Adelanto BONNEVILLE POWER MAPLE VALLEY -300/+300 Mvar 230kV SDG&E Talega STATCOM BONNEVILLE POWER KEELER -300/+300 Mvar 230kV AEP West Eagle Pass STATCOM Back-to-Back 2 x +/-36 MVA Austin Energy Holly STATCOM +/-95 MVAr PG&E Potrero -100/+240 230 kV NYSEG Fraser -300/+325 (Upgrade) 345kV PG&E Newark -100/+240 Mvar 230kV NSP FORBES -110/+150 Mvar (Cont.) -615/+460 MVAr (10 Sec.) 500kV LADWP Marketplace Tri-State G&T Clapham Retrofit Northeast Utilities Glenbrook STATCOM XCEL Lake Yankton Solar Flywheels for Storage Fuel Cells Hybrid Hybrid Wind CFL SOLDOTNA -40/+70 Mvar 115kV DAVES CREEK -10/+25 Mvar 115kV WAPA FARGO -45/+22 Mvar 14kV MAINE EL. POWER CHESTER -140/+425 Mvar 345kV NIAGARA MOHAWK LEEDS -300/+270 Mvar 345kV JERSEY CENTRAL ATLANTIC CITY -130/+260 Mvar 230kV CONECTIV CARDIFF -100/+150 Mvar 230kV CONECTIV INDIAN RIVER -100/+200 Mvar 230kV CONECTIV NELSON -100/+150 Mvar 138kV AM. EL. POWER BEAVER CREEK -125/+125 Mvar 138kV VIRGINIA POWER COLINGTON -30/+78 Mvar 115kV VELCO Essex STATCOM Georgia Power North Dublin GORDON EVANS 0/+300 Mvar 138kV KANSAS GAS & EL. MURRAY GILL 25/+200 Mvar 138kV LANL LOS ALAMOS -50/+100 Mvar 115kV LADWP Adelanto BONNEVILLE POWER MAPLE VALLEY -300/+300 Mvar 230kV SDG&E Talega STATCOM BONNEVILLE POWER KEELER -300/+300 Mvar 230kV AEP West Eagle Pass STATCOM Back-to-Back 2 x +/-36 MVA Austin Energy Holly STATCOM +/-95 MVAr PG&E Potrero -100/+240 230 kV NYSEG Fraser -300/+325 (Upgrade) 345kV PG&E Newark -100/+240 Mvar 230kV NSP FORBES -110/+150 Mvar (Cont.) -615/+460 MVAr (10 Sec.) 500kV LADWP Marketplace Tri-State G&T Clapham Retrofit Northeast Utilities Glenbrook STATCOM XCEL Lake Yankton Solar Flywheels for Storage Fuel Cells Role of Power Electronics Hybrid Hybrid Wind CFL

Transcript of A Forward-Looking Electric Energy Systems Curriculum Siemens, Hamilton Sundstrand, ... ALASKA ENERGY...

1

Session IV – Designing Attractive Engineering CurriculaUWIG/NREL INDUSTRY-UNIVERSITY WORKSHOP

POWER ENGINEERING NEEDS FOR THE WIND INDUSTRYMay 7-8, 2008, Broomfield, CO

By:Ned Mohan

University of Minnesota([email protected])

A Forward-LookingElectric Energy Systems

CurriculumAL AS KA ENE RG Y AU TH.S O LDO TN A-40/+70 M var115kV

AL AS KA ENERG Y AU TH.DAVES CRE EK-10/+25 M var11 5kV

W AP A

W AP AFARG O -45/+22 M var14kV

M AINE E L. P OW E RCHE S TE R -140/+425 M var345kV

NIAG AR A M OHAW KLE EDS -300/+270 M var345kV

JER SEY CEN TRALATL AN TIC C ITY -130/+26 0 M va r230kV

CO NECTIVCARDIFF -100/+150 M var230kV

C ONECTIVINDIAN R IV E R -1 00/+20 0 M var2 30kV

C ONECTIVN ELSON -1 00/+15 0 M var1 38kV

AM . E L. POW E RBE AVER CREE K -125/+125 M var138kV

V IRGIN IA PO W E R COLINGTO N -30 /+78 M var11 5kV

VE LCO E ssex S TATCO M

G eorgia P ow erNorth Dub lin

K ANSAS GAS & EL. G OR DO N EV ANS 0 /+300 M var1 38kV

KANSAS G AS & EL. MU RRAY G ILL 25 /+200 M var138kV

L ANL LO S ALAM O S -50 /+100 Mvar115kV

LADW PAdelanto

BO NNEV ILLE P O WE R M AP LE V ALL EY -300/+300 M var230kV

SDG &ETale ga STATCO M

BO NNEV ILLE P O WE R KEELE R -300/+300 M var230kV

AE P W estEagle Pass S TATC OMBack-to-Back2 x +/-36 M VA

Austin E nergyHolly S TAT COM+/-95 M VAr

P G&EP otrero-100/+240230 kV

NY S EGFraser-300/+325 (Upgrade)34 5kV

PG &E New ark-100/+240 Mvar230kV

NS PFORBES -110 /+150 M var (Cont.)-615 /+460 M V Ar (10 S ec.) 500kV

LADW PMarketplace

Tri-State G&TClapham Retrofit

Northeast U tilitiesGlenbrookS TATCOM

XC ELLake Y ankton

RO LE O F FA CT S Ro le of FAC TS – SVC & STATC O M

Solar

F lyw heels for S torageFuel C ells

R ole of Pow er E lectronics

H ybridH ybrid

W ind

CFL

AL AS KA ENE RG Y AU TH.S O LDO TN A-40/+70 M var115kV

AL AS KA ENERG Y AU TH.DAVES CRE EK-10/+25 M var11 5kV

W AP A

W AP AFARG O -45/+22 M var14kV

M AINE E L. P OW E RCHE S TE R -140/+425 M var345kV

NIAG AR A M OHAW KLE EDS -300/+270 M var345kV

JER SEY CEN TRALATL AN TIC C ITY -130/+26 0 M va r230kV

CO NECTIVCARDIFF -100/+150 M var230kV

C ONECTIVINDIAN R IV E R -1 00/+20 0 M var2 30kV

C ONECTIVN ELSON -1 00/+15 0 M var1 38kV

AM . E L. POW E RBE AVER CREE K -125/+125 M var138kV

V IRGIN IA PO W E R COLINGTO N -30 /+78 M var11 5kV

VE LCO E ssex S TATCO M

G eorgia P ow erNorth Dub lin

K ANSAS GAS & EL. G OR DO N EV ANS 0 /+300 M var1 38kV

KANSAS G AS & EL. MU RRAY G ILL 25 /+200 M var138kV

L ANL LO S ALAM O S -50 /+100 Mvar115kV

LADW PAdelanto

BO NNEV ILLE P O WE R M AP LE V ALL EY -300/+300 M var230kV

SDG &ETale ga STATCO M

BO NNEV ILLE P O WE R KEELE R -300/+300 M var230kV

AE P W estEagle Pass S TATC OMBack-to-Back2 x +/-36 M VA

Austin E nergyHolly S TAT COM+/-95 M VAr

P G&EP otrero-100/+240230 kV

NY S EGFraser-300/+325 (Upgrade)34 5kV

PG &E New ark-100/+240 Mvar230kV

NS PFORBES -110 /+150 M var (Cont.)-615 /+460 M V Ar (10 S ec.) 500kV

LADW PMarketplace

Tri-State G&TClapham Retrofit

Northeast U tilitiesGlenbrookS TATCOM

XC ELLake Y ankton

RO LE O F FA CT S Ro le of FAC TS – SVC & STATC O M

Solar

F lyw heels for S torageFuel C ells

R ole of Pow er E lectronics

H ybridH ybrid

W ind

CFL

2

• NSF (~1M$)• NASA• ONR• Center for Electric Energy (since 1981)

Past Sponsors:

Present Support:• ONR (1.23 M$ over 5 years)• EPRI• AEP• Consortium of Utilities/Industry/Government

AEP, Siemens, Hamilton Sundstrand, Air Force, ISO - New England, Midwest ISO so far

3

Courses have not kept pace with Industrial Practices

ALASKA ENERGY AUTH.SOLDOTNA-40/+70 M var115kV

ALASKA ENERGY AUTH.DAVES CREEK-10/+25 M var115kV

W APA

W APAFARGO -45/+22 Mvar14kV

MAINE EL. POW ERCHESTER -140/+425 M var345kV

NIAGARA M OHAW KLEEDS -300/+270 M var345kV

JERSEY CENTRALATLANTIC CITY -130/+260 M var230kV

CONECTIVCARDIFF -100/+150 M var230kV

CONECTIVINDIAN R IVER -100/+200 M var230kV

CONECTIVNELSO N -100/+150 M var138kV

AM . EL. POW ERBEAVER CREEK -125/+125 Mvar138kV

VIRGINIA POW ER COLINGTON -30 /+78 M var115kV

VELCO Essex STATCO M

Georgia Pow erNorth Dublin

KANSAS GAS & EL. GORDON EVANS 0/+300 M var138kV

KANSAS G AS & EL. MURRAY GILL 25/+200 M var138kV

LANL LOS ALAM OS -50/+100 M var115kV

LADW PAdelanto

BONNEVILLE POW ER M APLE VALLEY -300/+300 M var230kV

SDG&ETalega STATCOM

BONNEVILLE POW ER KEELER -300/+300 M var230kV

AEP W estEagle Pass STATCOMBack-to-Back2 x +/-36 MVA

Austin EnergyHolly STATCOM+/-95 M VAr

PG&EPotrero-100/+240230 kV

NYSEGFraser-300/+325 (Upgrade)345kV

PG&E Newark-100/+240 M var230kV

NSPFORBES -110/+150 M var (Cont.)-615/+460 M VAr (10 Sec.) 500kV

LADW PM arketplace

Tri-State G&TClapham Retrofit

Northeast UtilitiesGlenbrookSTATCOM

XCELLake Yankton

ROLE OF FACTS Role of FACTS – SVC & STATCOM

Guangdong

Fujian

Taiw an

Sichuan & Chongqing

Hubei

Hunan

Jiangxi

Heilongjiang

Inner Mongolia

Hebei

Henan Jiangsu

Shandong

Anhui

Guangxi Guizhou

Beijing Tianjin

Shanghai

J ilin

G ansu

Shaanxi

Shanxi

Qinghai

Xinjiang

Xizang

Ningxia

Liaoning

Zhejiang

Yunnan

Hainan Xiaow an/Yunnan-Guangdong3000 M W , 2009

Bangkok

Northw est-Sichuan Interconnection ( Baoji – Deyang )3000 M W , 2009

BtB Shandong-East1000 MW , 2012

BtB North - Central1200 MW , 2009

Future HVDC Projects in ChinaTrans Asia Transm ission

2000 MW , 2018BtB Northeast-North600-1000MW , 2011

G oupitan - Guangdong3000 MW , 2011

Russia

Jinghong-Thailand3000M W , 2013

Northw est-North Interconnection(YinNan - TianJing)3000 M W , 2010

NW PG

NCPG

NEPG

C CPG ECPG

North Shaanxi-Shandong3000 M W , 2011

Guizhou-G uangdong II3000 MW , 2007

SCPG

Three Gorges-Beijing(North) 3000 MW , 2009

Xiangjiaba - Jiangsu3500 M W , 2012

Xiangjiaba - Jiangxi2700 M W , 2013

Xiluodu - Hubei2700 MW , 2015

Xiluodu - Shanghai3500 M W , 2014

Nuochadu - Guangdong3000 M W , 2016

Xiluodu - Zhejiang3500 MW , 2016

Xiluodu - Hunan2700 MW , 2016

Jingping – East China3500 M W , 2015

(The year m eans project in operation)

APPLICATION

ALASKA ENERGY AUTH.SOLDOTNA-40/+70 M var115kV

ALASKA ENERGY AUTH.DAVES CREEK-10/+25 M var115kV

W APA

W APAFARGO -45/+22 Mvar14kV

MAINE EL. POW ERCHESTER -140/+425 M var345kV

NIAGARA M OHAW KLEEDS -300/+270 M var345kV

JERSEY CENTRALATLANTIC CITY -130/+260 M var230kV

CONECTIVCARDIFF -100/+150 M var230kV

CONECTIVINDIAN R IVER -100/+200 M var230kV

CONECTIVNELSO N -100/+150 M var138kV

AM . EL. POW ERBEAVER CREEK -125/+125 Mvar138kV

VIRGINIA POW ER COLINGTON -30 /+78 M var115kV

VELCO Essex STATCO M

Georgia Pow erNorth Dublin

KANSAS GAS & EL. GORDON EVANS 0/+300 M var138kV

KANSAS G AS & EL. MURRAY GILL 25/+200 M var138kV

LANL LOS ALAM OS -50/+100 M var115kV

LADW PAdelanto

BONNEVILLE POW ER M APLE VALLEY -300/+300 M var230kV

SDG&ETalega STATCOM

BONNEVILLE POW ER KEELER -300/+300 M var230kV

AEP W estEagle Pass STATCOMBack-to-Back2 x +/-36 MVA

Austin EnergyHolly STATCOM+/-95 M VAr

PG&EPotrero-100/+240230 kV

NYSEGFraser-300/+325 (Upgrade)345kV

PG&E Newark-100/+240 M var230kV

NSPFORBES -110/+150 M var (Cont.)-615/+460 M VAr (10 Sec.) 500kV

LADW PM arketplace

Tri-State G&TClapham Retrofit

Northeast UtilitiesGlenbrookSTATCOM

XCELLake Yankton

RO LE O F FACTS Role of FACTS – SVC & STATCOM

Guangdong

Fujian

Taiw an

Sichuan & Chongqing

Hubei

Hunan

Jiangxi

Heilongjiang

Inner Mongolia

Hebei

Henan Jiangsu

Shandong

Anhui

Guangxi Guizhou

Beijing Tianjin

Shanghai

J ilin

G ansu

Shaanxi

Shanxi

Qinghai

Xinjiang

Xizang

Ningxia

Liaoning

Zhejiang

Yunnan

Hainan Xiaow an/Yunnan-Guangdong3000 M W , 2009

Bangkok

Northw est-Sichuan Interconnection ( Baoji – Deyang )3000 M W , 2009

BtB Shandong-East1000 MW , 2012

BtB North - Central1200 MW , 2009

Future HVDC Projects in ChinaTrans Asia Transm ission

2000 MW , 2018BtB Northeast-North600-1000MW , 2011

G oupitan - Guangdong3000 MW , 2011

Russia

Jinghong-Thailand3000M W , 2013

Northw est-North Interconnection(YinNan - TianJing)3000 M W , 2010

NW PG

NCPG

NEPG

C CPG ECPG

North Shaanxi-Shandong3000 M W , 2011

Guizhou-G uangdong II3000 MW , 2007

SCPG

Three Gorges-Beijing(North) 3000 MW , 2009

Xiangjiaba - Jiangsu3500 M W , 2012

Xiangjiaba - Jiangxi2700 M W , 2013

Xiluodu - Hubei2700 MW , 2015

Xiluodu - Shanghai3500 M W , 2014

Nuochadu - Guangdong3000 M W , 2016

Xiluodu - Zhejiang3500 MW , 2016

Xiluodu - Hunan2700 MW , 2016

Jingping – East China3500 M W , 2015

(The year m eans project in operation)

APPLICATION

Power Programs are Stagnating

Urgency:Serious workforce shortfalls predicted

Crisis in Undergraduate Education

4

Wind Generation: Example of an Integrated System

0 69010 60

VHz

−−

34.5kV

161kV

Power ElectronicsConverters

V

Time0

60 Hz

Low-VoltageRide-Through

Generator

690V

5

- Design an Integrated Curriculum thatBenefits StudentsIndependent of the Severity of the Workforce ShortagesEmphasizes Renewables/Storage, Reliable Delivery, Efficient End-Use

• Increase Quality and QuantityOur Response:

6

Complementary Courses:

- Analog/Digital Control

- DSPs, FPGAs- Programming

Languages- Heat Transfer- Thermo

Our Integrated Curriculum –Only 3 Courses

Core Courses

Power Electronics

Electric Drives

Power Systems

Core Courses

Power Electronics

Electric Drives

Power Systems

Students are Broadly Trained; They can work in any field of EE.

7

Designing these courses:What should students learn?Top-DownUseful to all students – even those not interested in Power & Energy

8

Advantages of Our Approach: • Broader range of topics with more in-

depth coverage in each course (!)

• Students broadly trained

• Springboard to Graduate Education & PhD Research

• Domestic Graduate Students (?)

9

0

20

40

60

80

100

120

140

160

1999 2000 2001 2002 2003 2004 2005 2006 2007

Year

Enr

ollm

ent

Power Systems Power Electronics Electric Drives

Increasing Student Enrollments –Fall 2007 Enrollments at the University

of Minnesota• Power Systems: 78• Power Electronics: 81• Electric Drives: 103

10

Textbooks:UNDERGRADUATE:

GRADUATE:

11

Power Systems Lab:

MATLAB/SimulinkPowerWorldPSC

Softwar

AD-E

e:

MTDC

Power Electronics Lab:Power Electronics Lab:

Electric Drives Lab:

12

2008 Annual WorkshopNapa, CA Feb 7-9, 2008

(Nearly 150 participants; 35 ECE Dept Heads)

2009 Annual WorkshopNapa, CA Feb 12-15, 2009

New: Discuss Entry-Level Graduate Courses

13

Next Weeklong Summer Training Workshop: (sponsored by ONR-EPRI-AEP)• Northern Arizona

University (NAU)

• July 6-11, 2008

• In collaboration with Prof. Allison Kipple of NAU

• At 7,000 feet in Flagstaff, AZ

14

Goal of ONR Grant Supported by EPRI & AEP:Affect Curricular Change in at least 175 Schools Nationwide

– Adapted so far in various combinations at >50 schools

Parallel International Effort

15

Good Education Leads to Research Ideas:1. Open-Ended AC Drives with Matrix Converters

U of M Innovation Grant Award: $50,000ONR Award No: N000140710463 $527,262

2. Matrix Converters Based Power Electronics Transformers with Advanced FeaturesONR Award No: N000140710968, $395,578

3. Multi-port Bi-Directional DC-DC ConvertersIREE Grant: $111,000

4. NaS Battery Storage to Further Integration of WindCo-PI with Xcel Energy: 5M$ (total project)

5. Flywheel-based Energy StorageProposal Prepared: $497,858

16

Developing Online Courses For Practicing Engineers:Unique Characteristics

Brief (Otherwise, Headache in A Hurry!); ModularTightly-Coupled to our TextbooksOnline-Assessments based (CEUs)

Cost: $69.95/Module