A crude (lower limit) estimation of resolution and event rate Development and Construction of an...

26
A crude (lower limit) estimation of resolution and event rate Development and Construction of an Extensive Air Shower Array in HOU Antonis Leisos, Hellenic Open University Erlangen 11-13 April 2006 Calibration of a km 3 ν- Telescope Using Extensive Air Showers project is co-funded by the European Social Fund & National Resources EPEAEK-II (PYTHAG

Transcript of A crude (lower limit) estimation of resolution and event rate Development and Construction of an...

Page 1: A crude (lower limit) estimation of resolution and event rate Development and Construction of an Extensive Air Shower Array in HOU Antonis Leisos, Hellenic.

• A crude (lower limit) estimation of resolution and event rate

• Development and Construction of an Extensive Air Shower Array in HOU

Antonis Leisos, Hellenic Open UniversityErlangen 11-13 April 2006

Calibration of a km3 ν-Telescope Using Extensive Air Showers

The project is co-funded by the European Social Fund & National Resources EPEAEK-II (PYTHAGORAS)

Page 2: A crude (lower limit) estimation of resolution and event rate Development and Construction of an Extensive Air Shower Array in HOU Antonis Leisos, Hellenic.

Cosmic Ray Energy Spectrum

Page 3: A crude (lower limit) estimation of resolution and event rate Development and Construction of an Extensive Air Shower Array in HOU Antonis Leisos, Hellenic.

The General Idea…

•Angular offset

•Efficiency

•Resolution

•Position

Page 4: A crude (lower limit) estimation of resolution and event rate Development and Construction of an Extensive Air Shower Array in HOU Antonis Leisos, Hellenic.

The Example of Amanda-Spase

30 stations (4 scint. 0.2 m2 in a triangular grid, 30m spacing)

B10 resolution 3.8 degrees

Page 5: A crude (lower limit) estimation of resolution and event rate Development and Construction of an Extensive Air Shower Array in HOU Antonis Leisos, Hellenic.

~4km

~20km

Very High Energy

Very High Zenith AngleExtreme low rate

Page 6: A crude (lower limit) estimation of resolution and event rate Development and Construction of an Extensive Air Shower Array in HOU Antonis Leisos, Hellenic.

Floating stations

(Sea Technology?)

The Concept

We propose a minimum of 3 stations with at least 3 m2 scintillator

detectors each

Page 7: A crude (lower limit) estimation of resolution and event rate Development and Construction of an Extensive Air Shower Array in HOU Antonis Leisos, Hellenic.

Single Station

GPSScintillator-PMTScintillator-PMT

Scintillator-PMT

DAQ

~20 m

1 m2

Single Station Set-Up

Triangulation

Shower Direction

Page 8: A crude (lower limit) estimation of resolution and event rate Development and Construction of an Extensive Air Shower Array in HOU Antonis Leisos, Hellenic.

Multi Station Set upMulti Station Set-Up

Page 9: A crude (lower limit) estimation of resolution and event rate Development and Construction of an Extensive Air Shower Array in HOU Antonis Leisos, Hellenic.

The HELYCON Scintillation Module

Scintillator 2

Scintillator 3

GPS timestamp

Station Server

Page 10: A crude (lower limit) estimation of resolution and event rate Development and Construction of an Extensive Air Shower Array in HOU Antonis Leisos, Hellenic.

Prototype Construction

10 x 12 cm tiles

80 tiles ~ 0.96 m2

12 WLS fibers per row

Single PMT read out

Page 11: A crude (lower limit) estimation of resolution and event rate Development and Construction of an Extensive Air Shower Array in HOU Antonis Leisos, Hellenic.

Scintillators & WLS fibers

WLS fibers: Bicron (BCF-91A)

Light attenuation length: 330cm

Scintillators :

Protvino (Russia) Emission spectrum:420 nm Decay time 2 ns

Page 12: A crude (lower limit) estimation of resolution and event rate Development and Construction of an Extensive Air Shower Array in HOU Antonis Leisos, Hellenic.

PMT Testing

Photonis XP-1912Standard, 10-stage, 19 mm (3/4") round tube

Page 13: A crude (lower limit) estimation of resolution and event rate Development and Construction of an Extensive Air Shower Array in HOU Antonis Leisos, Hellenic.

Detector Testing

Page 14: A crude (lower limit) estimation of resolution and event rate Development and Construction of an Extensive Air Shower Array in HOU Antonis Leisos, Hellenic.

DAQ

GPS Input

USB PortTrigger Ouput4 PMT Signal Inputs

25ps accuracy TDC

Page 15: A crude (lower limit) estimation of resolution and event rate Development and Construction of an Extensive Air Shower Array in HOU Antonis Leisos, Hellenic.

DAQ•Handles 4-channels

•Adjustable PMT Thresholds

•Relative Arrival times < 1ns

•Estimates Pulse sizes (TOT) and Shapes

•Synchronization with GPS ~ 25ns

•Digital Interface to PC

•Slow Controls & Environmental Monitoring

HPTDC

• 32 channels (LR) – 8 Channels (HR)

•25ps (HR) to 800 ps (LR) accuracy

•Self Calibrating

GPS

(Motorola M12+Timing Oncore)

• 25 ns UTC accuracy can be better (up to 5ns)

Page 16: A crude (lower limit) estimation of resolution and event rate Development and Construction of an Extensive Air Shower Array in HOU Antonis Leisos, Hellenic.

Software Tools

CORSIKA(Extensive Air Shower

Simulation)

GEANT4(Scintillation, WLS & PMT response)

Page 17: A crude (lower limit) estimation of resolution and event rate Development and Construction of an Extensive Air Shower Array in HOU Antonis Leisos, Hellenic.

Software Tools

DAQSIM(DAQ Simulation)

HOUANA(Analysis &

Track Reconstruction)

Time (ns)

Height (mV)

Zentih (degrees)

Page 18: A crude (lower limit) estimation of resolution and event rate Development and Construction of an Extensive Air Shower Array in HOU Antonis Leisos, Hellenic.

Monte Carlo Studies• Reconstruction of Shower Direction

• Reconstruction of the Shower Core

Properties

Charge (p.e.s)

Distance from core (m)

Vertical Proton Showers (106-107 GeV)

Distance from core (m)

Particles/m2

Page 19: A crude (lower limit) estimation of resolution and event rate Development and Construction of an Extensive Air Shower Array in HOU Antonis Leisos, Hellenic.

Monte Carlo StudiesNeeded corrections

curvature

thickness

ns after 1st particle

Core distance>500m

Page 20: A crude (lower limit) estimation of resolution and event rate Development and Construction of an Extensive Air Shower Array in HOU Antonis Leisos, Hellenic.

Monte Carlo Studies

Time Delay (ns)

Pes

Time Spread (ns)

Pes

Some Corrections (thickness)

Vertical Proton Showers (106-107 GeV)

Page 21: A crude (lower limit) estimation of resolution and event rate Development and Construction of an Extensive Air Shower Array in HOU Antonis Leisos, Hellenic.

Monte Carlo Studies

Θrec-Θtrue Pull

Single Station Performance

Vertical Proton Showers (106-107 GeV) QC: charge(p.e.s)>75.

Page 22: A crude (lower limit) estimation of resolution and event rate Development and Construction of an Extensive Air Shower Array in HOU Antonis Leisos, Hellenic.

Monte Carlo Studies

Distance from core (m) Distance from core (m)

Reconstruction efficiency Resolution (degrees)

Single Station Performance

Vertical Proton Showers (106-107 GeV) QC: charge(p.e.s)>75.

Page 23: A crude (lower limit) estimation of resolution and event rate Development and Construction of an Extensive Air Shower Array in HOU Antonis Leisos, Hellenic.

Monte Carlo StudiesExamples of a 3-Station

Performance

(Crude Analysis)

Vertical Proton Showers (106-107 GeV)

Threshold Charge (pes) Threshold Charge (pes)

Resolution per reconstructed track (degrees) Resolution in determining a possible Angular Offset (degrees)-10 day operation

Page 24: A crude (lower limit) estimation of resolution and event rate Development and Construction of an Extensive Air Shower Array in HOU Antonis Leisos, Hellenic.

HELYCON Online Control & Data Analysis Package

control

real time monitor

shower reconstruction

data analysis

real data & data summary storage

graphics & presenter

Page 25: A crude (lower limit) estimation of resolution and event rate Development and Construction of an Extensive Air Shower Array in HOU Antonis Leisos, Hellenic.

Time SchedulePrototype detector full test

(PMT and Scintillator)

May 2006

Production & test of 15 detectors

July 2006 (2 detectors per week)

Electronics Testing May-June 2006 (the prototype is currently tested)

DAQ Test + Detectors July-September 2006

Online Software-Analysis Tools-Reconstruction Strategy Development

-September 2006

3 station Run Autumn 2006

Page 26: A crude (lower limit) estimation of resolution and event rate Development and Construction of an Extensive Air Shower Array in HOU Antonis Leisos, Hellenic.

Another use of the detectorsHELYCON

1019 eV

1017 eV

1015 eV

2 km