1) Introduction of COPHC.
2) Port Development
3) Free Zone Development
4) CSR
5) Schedule and Plan
6) Challenges and difficulties
G A T E W A Y T O T H E
G L O B A L O P P O R T U N I T I E S
China Overseas Ports Holding Company Ltd. (Pakistan)
Gwadar International Terminals Ltd.
(GITL)
Gwadar Marine Services Ltd.
(GMSL)
Gwadar Free Zone Company Ltd.
(GFZL)
• The Concession Agreement (CA) for Gwadar Port & Free Zone was signed in 2007 on BOT basis
with PSA (Port Singapore Authority).
• This CA was transferred to COPHC in May 2013 without any single modification.
• To Develop and Operate Gwadar Port & Free zone, three (3) operating companies were formed.
01
02
Port Development
Port Facilities
• Since the concession were handed over to COPHC , we have been working
on improving port facilities, surrounding environment and port business ;
• By 2018, COPHC had invested $50 million for port facilities upgrading.
Port Environment Port Business
5 STS Systems
65000m2 stockyard
1000 tons/day
desalination system
Bulk-cargo load
system
10000 m2 Green
area
Port renovation
including tugboats,
warehouses &
roads
Container shipping-
line(Weekly)
Sign agreements with
the Gwadar Seafood
Exporters Association,
All Pakistan Customs
Bonded Carrier
Association and FPCCI.
Main Quay Length = 602 m
Depth Alongside = -14.5 m
3 multi-purpose &1 RORO Facility
Channel depth =-14.2m / -13.8 m
Permissible Vessel draught -12.5 m
CURRENT FACILITIES AND INFRASTRUCTURE
2 Tug-boats
2 Pilot boats
1 Mooring boat
Power-house (4.5 MW)
Water desalination plant
Fueling facility
Warehouse (3800 sqm)
Storage area (100 ha )
400 Reefer Points
Operations buildings
Workshops
03 Ship to Shore Gantry Cranes
5 Portal cranes with Grabs / spreaders
2 RTG Cranes
2 Mobile Cranes
2 Empty Stackers
8 Hoppers
8 Bagging Plants
10 Terminal Tractors
12 Fork-lift Trucks
2 Bull-dozers
2 Fire-fighting trucks
1 Oil tanker
2 Weighbridges
CCTV Fuel Station
Desalination Plant Container Storage Area
Maintenance of two Port Cranes (40tons) and two RTGs (40tons)
Gwadar Port has achieved its full operational capability. It can
accommodate two 50,000-ton vessels simultaneously and handle bulk-cargo,
general cargo, containers and RORO efficiently.
Port Cranes Port Cranes
2.1 Port Operation
2.1 Port Operation
After five (05) new STS cranes are currently in operation, The terminal
handling efficiency has greatly improved.
NEW ADDITIONS AT GWADAR INTERNATIONAL TERMINAL Ltd. (GITL)
Desalination plant
With the success rehabilitation of the existing 500 T/D desalination plant,
upgrading has been done and the capacity has been increased up to 1000T/D.
2.2 Port Operation
Consistent vessel calls of General cargo from various shipping lines, catering
import cargo mostly for Freezone, Port & CPEC project construction.
13th Nov ’16, the first container export from Gwadar Port of CPEC
make its mark on the trade routes.
Pilot project end point of CPEC i.e. GWADAR port, where it was loaded on 02 vessels on 12th Nov, namely COSCO Wellington and Al-Hussein which are heading to Colombo and
Jebel Ali respectively.
The cargo was loaded on the ships by using port cranes in day and night
operations.
Operationalization of CPEC via Trade Convoy
• Various seminars, activities have been organized to promote Gwadar Port. COPHC signed the
agreements of importing & exporting Bulk cargo and containerized volumes, LPG & RORO
trade with cargo owners. Invitation to utilize Gwadar Port for Afghan transit trade, whereas
coal import have been forwarded to the Authorities for consideration.
2.3 Port Business
2.4 Port Operation
On 07th Mar 2018, the container liner service at Gwadar Port was formally launched.
The route was named as “Pakistan Gwadar Middle East Express”. It is operated by
COSCO Shipping. It will use Jebel Ali, Karachi and Abu Dhabi as transit ports, and
connect almost all the important international ports of the word. This milestone has
created many opportunities for cargo owners to trade directly from Gwadar port.
COPHC heavily subsidizing this service on each vessel call since its commencement.
In respect of the concerns of cargo owner and potential customer A more
aggressive marketing strategy established:
1, Competitive handling charges
2, Assurance of NO demurrage charge
3, Assurance of security and safety of cargo
4, Speedy custom clearance
5, Free storage up to 3 months by pre-arrangement
6, Land transport security
2.5 Port Operation
May. 30th 2018
May.30th ,2016
03Free Zone Development
With the investment of over
$250 million, COPHC has
successfully completed the
infrastructure of Gwadar Free
zone (phase-1) in the most
remarkable time (end of 2017).
In these infrastructure, the
investors are assured to avail the
24 hours of power supply,
treated water consumption, road
network, tele-communication,
waste treatment, drainage
system, high security and
pleasant environment.
3.1 Construction
Infrastructure mainly includes:
• One window service facility
• Water supply and drainage
• Uninterrupted Power supply
• Telecommunication with WIFI
• Road network
• HVAC engineering
• Sanitation and garbage collection
• Parking yard
• Fire fighting facilities
• Security management and control
• Customs clearance facility
• Green environment
3.2 Free Zone Inaugration
On 29th Jan 2018, the Gwadar Free Zone was formally inaugurated officially
indicating that the first industrial park of CPEC came into the era of
industrialization.
•Investment promotion work in the Initial Area is
completed.
•More than 20 enterprises, involving banks,
insurance, financial, warehouses, fishery products
processing, edible oil processing, pipe, furniture
manufacturing, electric bicycle assembly, trade and
logistics, have already registered in GFZ.
•The total investment exceeds 3 billion RMB.
3.3 Business Insight
Gwadar Free Zone also attract
many Pakistan enterprises:
At present,
HBL bank, UBL bank, Askari Bank
EFU insurance company,
PAK Delight food company,
Jolta technology company ,
Pak-Afghan Cargo services Co,
have registered in Free Zone.
3.4 Business Insight
3.4 Business Insight
Registered Enterprises under Gwadar Free Zone Phase#1:
Company ProjectConstruction area
(sqm)
CCCC Business Center 25000
Linyi Overseas Mall Products display and storage 22500
Yufei Marine Services & Technology Cold storage and fishery processing 32600
Pakistan Delight Food Co. Edible oil pressing 10000
Pakistan JOLTA Tech Co. Electric bicycles and motorcycles 5000
Zhejiang Litchi Stainless Steel Tube Factory
Steel Pipe factory 10000
Tianjin Cereal & Oil Trade Co. Palm oil, canola oil, soybean oil 22000
Ningbo Huilong RecyclingResources Tech Co. Metal recycling 22000
Harmony Logistics (tianjin)Co.,Ltd Furniture 2000
3.5 Gwadar Expo 2018
COPHC and GPA have initiated series of events by organizing ‘GWADAR EXPO 2018’ on
January 29th and Mineral Expo on 29th of Sep. in Gwadar Free Zone. Through this expo,
Gwadar has achieved rapid growth and development under the strong leadership from
China and Pakistan. Gwadar Expo has attracted various Local and International investors.
More than 30,000 people visited the event and more 200 companies have participated as
exhibitor.
Besides providing infrastructure and property management services for
investor, we also offer a full range of services, such as visa application,
travel arrangements, security, business registration, legal consultation,
project financing, and market research.
3.6 Business Promotion
May.2nd 2016
Jan.29th 2018
04
Security and C.S.R
4.1 Integrate With The Local Community
4.2 C.S.R.—Local Employment
Young Baloch(s) are key players in developing Gwadar, more than 1, 000
Baluchi, From senior officers to general laborers, from fresh out of college to
old and experienced, men and women-all directly employed in Gwadar port
and Free Zone. These are not people outsourced, contracted. But a part of a
family that is growing each day.
4.3 CSR – Education (scholarship)
By closing cooperation with CPDF and Chinese Embassy,COPHC has constructed one school (with 500 students) inGwadar, offered 56 scholarships to local graduated studentsstudying in china.
COPHC Scholarship
4.3 C.S.R. —Education
【PAK CHINA FAQUEER COLONY SCHOOL】
For Medical Center operation,
COPHC cooperate with China
Medical Team and Red Crescent PAK.
providing Medical treatment and
medicine to local people for free.
4.4 C.S.R. —Public Health
During Gwadar Expo 2018, COPHC has signed the agreement with District
Council of Gwadar on local poverty relief Area. (including 14 poor family)
4.5 C.S.R. —Poverty Relief
China Overseas Ports Holding
Company initiated a poverty relief
program in Gwadar city by carrying
out some Local Employment
Oriented Projects. The initial projects
are:-
• Plantation of 1 million trees
• Construction of fresh water tank
• Fresh water pipeline
• Chicken/Goat farms
These projects will be funded
exclusively by COPHC.
4.5 C.S.R. —Poverty Relief Program
On 6th May 2018, COPHC signed the agreement with the Balochistan
government to provide 300,000 gallons freshwater to local people every day.
On 15th May 2018, Senate Chairman Sadiq Sanjrani attended and witnessed
the launch of the freshwater supply ceremony.
4.6 C.S.R. —Freshwater Supply
05 Schedule and Plan
5.1 Port Expansion PlanPhase I: The storage yard will be rebuilt and expanded with an area of 38.3ha;
Phase II: One 100,000 general-purpose berths of 352m, of which the 322m structure on
the west side is 100,000 tons, and the 30m structure on the east side is 200,000
tons; A 150,000-ton coal berth of 355m, with structure set aside at 200,000
tons; land area 51.3ha;
Free zone
Long Term Planning
Phase IIPhase I
NORTH FREE ZONE
NORTH FREE ZONE
自由区北区规划图 NORTH FREE ZONE
06Challenges and difficulties
6.1 Infrastructure (water, travel, communication, power)
Water and Power
Road, rail and air
connections
Fiber-optic cable
Shortage of
qualified staff
High Operation Cost
First and foremost, we would like to express our sincere gratitude
for the continuous support & cooperation provided by the
Pakistani Government for the operationalization of Gwadar Port.
COPHC is making all-out efforts to equip the port with modern system. The Port is fully
operational with required infrastructure and ready to handle all types of vessel like
Containerize, Break-Bulk cargo, General cargo, RORO, tanker, liquid bulk etc.
Following comprehensive points are associated with the concern authorities matters
involved in non-operation of Gwadar Port for commercial purpose. In the light of following
mentioned points, we humbly request the concerned authorities for the consideration and
issuance of necessary approvals/ Notifications in this regard. We assure that this shall prove a
stepping stone for the prompt operationalization of Gwadar Port and shall help in making the
Gwadar port fully utilized which brings economic activities in Pakistan, particularly in the
province of Balochistan.
6.2 Applicable Incentives, Summary
Prompt Issuance of Gwadar Free Zone Rules & Policy for Customs Procedures:
Free Zone businesses are directly linked with the development of Gwadar Port. In order to establish businesses at Gwadar Free Zone, the Customs procedures should be clearly defined so that the investors can establish import and export activities for their respective businesses which includes import of machineries, equipment, raw-materials, export of finished goods etc. In spite of the fact that the draft rules were sent to FBR by the concerned collectorate during Feb/ Mar 2017 and were expected to be issued in July/August 2017. So far, twelve (12) licenses have been issued to the potential Free Zone Investors whose businesses are yet to be established due to the absence of FZ Rules.
Permission to import all commercial consignments acceptable under rules.
On 01st June 2018, FBR approved limited import of selected 20 items at Gwadar port. Since we are at the stage of developing the trade and economy, we feel that it should be more flexible instead of limitation.
6.3 Applicable Incentives, Summary
中国海外港口控股有限公司CHINA OVERSEAS PORTS HOLDING COMPANY PAKISTAN(PVT).LTD.