Established in 1931 Phoenix is based in central London.
We specialise in the complete installation of Mechanical & Electrical to all work sectors including quality office developments, commercial and public buildings, data centers, retail, health, education, leisure,
hotels, residential and pharmaceuticals.
The company has an extensive client base including financial institutions, insurance companies, the legal and accountancy sectors and major pharmaceutical companies. Our clients include prominent
main and management contractors.
Our experience ranges from projects with a value in excess of £50M to £1M. Our special works division undertakes projects up to the
value of £1M.
Phoenix Mechanical was introduced in 2008 to form a stronger team and provide a fully coordinated and integrated service solution. We offer an M&E design & build management facility along with
design and development, installation of MV / LV distribution systems, shell & core, CAT A & B fit-out, HV cabling and switchgear, lighting control, BMS, Public Health, water treatment and commissioning,
At Phoenix we believe that the way to promote our business is
through the development of good working relationships with our clients. We aim to provide a high quality installation in an efficient,
friendly manner on time and to budget.
Phoenix ME
A better way to do business
New Year New Phoenix
After 83 years of successful trading as Phoenix Electrical Company Limited we have decided to rename the company to reflect that we
now undertake the full range of engineering services within the Construction sector. Our Mechanical capability has been developed to enable us to offer a competitive and proficient Mechanical and
Electrical combined service offer to meet our customers requirements. We feel that this requires us to market and identify
our services differently and to clearly communicate what our business does and where we see our future. We are therefore
pleased to announce a change of company name to
Phoenix ME Limited
Phoenix ME
A better way to do business
Management Staff
phoenix me
a better way to do business
Managing Director Lee Compton
Director Dave Cunningham
Director Stewart Crane
Operations Director Terry Perkins
Operations Director Adam Cecil
Operations Director Mike Viney
Project Director Sean O’Connor
Health, Safety & QA John King
Company Secretary Nigel Swanson
Director Colin Mint
Brett Cowlbeck Contracts Services
Manager Special Works
Project Director Simon Collingbourne
Claire Walker Procurement
Manager
Rita Gobin Estimating Manager
Tony Deacon CAD Manager
Danielle Browne Customer Relations
Turnover
Phoenix ME
A better way to do business
2011 - £44M
Mechanical £8M Electrical £36M
2012 - £52M
Mechanical £14.2M Electrical £31M
Construction £6.8M
2013 - £62M
Mechanical £16M Electrical £45M
Construction £1M
Phoenix have been appointed to carry out the services fit out for Arcadia’s
head office at Oxford Street. Works consist of Electrical , Mechanical and
Public Health services which includes ownership of BMS, Fire Alarm and
Sprinkler installations. The building is located above a live shopping centre
which occupies Levels grd – 1st with Arcadia’s demise consist of Part
basement level, grd floor receptions, levels 2-6 and roof. Arcadia currently
have staff occupying levels 3-5 whilst the fit out of the basement, core 1 (
grd – 6th floor), 2nd floor, 6th floor and roof are fitted out with new services
and Plant which consist of the following :
Generator works, LV Distribution, Lighting, LV Power, Uninterruptable
Power Supply, Earthing/bonding, Fire Alarm including disabled facilities,
Lighting Protection, Leak detection & Trac Heating, BMS, Rainwater,
Drainage, Gas, Domestic Services, General office supply & extract
ventilation, Fire rated Smoke extract ventilation from the shopping centre,
Toilet Extract, Kitchen Ventilation, Natural gas, LTHW, VRF System, DX
Split systems, AHU’s, Packaged Plant rooms, Sprinklers and Dry Risers.
Phoenix are the lead co-ordinator on the project and are responsible for
producing fully working coordinated drawings for all the above services ,
including new riser works which pass both through the shopping centre and
occupied Arcadia floors. As well as co-ordinating old plant with new in both
the roof and basement areas.
Phoenix are also working very closely with ISG, Arcadia and the Plaza
Shopping Centre teams to ensure the existing occupants are not affected
by any installation works, Major Plant shutdowns and the migration of old
services to new.
On completion of the above the Arcadia occupants on Level 5 will move to
Levels 2 & 6 to allow the strip out and fit out works to commence on level 5
with the process repeating for the remaining floors, this is a live project and
runs until July 2015.
phoenix me
a better way to do business
Arcadia
Client – Arcadia Group Main Contractor - ISG
Architect – Sheppard Robson Consultant – TB&A
Programme Duration – Sept 13 – Present Value – £10.6M Area – 12,542M2
phoenix me
a better way to do business
Phoenix were appointed by Double Negative (Europe’s largest visual effects company) to carry out the Mechanical & Electrical
fit out for there new London offices over five floors.
This project was CatB, providing Double Negative with new design studios, two bespoke purpose build cinemas, ten black out
screening rooms complete with remote on air indication, general offices, refreshment hubs and reception area complete with café
and seating, along with an illuminated pictorial work history.
At the heart of the business is a basement level main machine room (MCR). Cooling to the MCR is provided by the means of 48 chilled
water racks, supplied by three new chillers at roof level.
Many areas required a high end finish, such as specialised lighting to the Oscar award cabinet. Reception and cinemas required in-depth interfacing from mechanical plant, lighting and ceiling to
provide the desired finish. Throughout the fit-out there is a proportion of exposed
services.
Double Negative
Client – Double Negative Main Contractor – BW Interiors
Architect – MCM Consultant – Medland Metropolis
Quantity Surveyor – CBRE Programme Duration - 24 Weeks
(June 2012 – November 2012)
Value – £3.2M Area – 8000M²
phoenix me
a better way to do business
Phoenix have been appointed to carry out the Cat B Fit-Out
for Amazon’s new London head office. Works consisted of the
electrical, mechanical and public health services over 11 floors,
with additional plant space on the roof and basement levels.
All co-ordination drawings were produced on site and approval
given via workshops with the professional team.
Services consisted of extension to the LV system, new dedicated
UPS system and CRAC units serving MDF & IDF rooms, high and
low level power track installation serving fan coils with LTHW heater
batteries, fully addressable Simmtronic lighting control system and
specialist feature lighting.
Installation of new Advanced Air fan coil units served by new chilled
water installation, and the relocation of existing FCU’s, new supply
air and extract air system. Installation of public health tea points on
all levels west and east sides.
Flushing and commissioning was via a temporary floor mounted
pumps. All electrical testing and commissioning was
undertaken by Phoenix JIB approved operatives.
Tribble
Client – Amazon Main Contractor – BW Interiors
Architect – AI Architects Consultant – YES Engineering
Quantity Surveyor – Cushman & Wakefield Programme Duration –
2013 – Present Value – £7M
Area – 3700M²
60 Holborn Viaduct, EC1
phoenix me
a better way to do business
Phoenix have been appointed to carry out the Cat A&B Fit-Out
for Jardine Lloyd Thompson’s new London head office. Works
consisted of the electrical, mechanical and public health
services over 10 floors, with additional plant space on the roof
and basement levels.
All co-ordination drawings were produced on site and approval
given via workshops with the professional team.
Services consisted of extension to the LV system, new
dedicated UPS systems serving SER & MER rooms, high and
low level power track installation serving fan coils with electric
heater batteries, fully addressable DALI lighting control system
and specialist feature lighting.
Installation of 602 ability Matrix fan coil units served by new
chilled water installation, new supply and extract system.
Installation of public health showers, tea points and a fully
workable kitchens on various levels
Flushing and commissioning was via a temporary floor. Mounted
pumps over seen by Chesterfield prior to installation. All
electrical testing and commissioning was undertaken by
Phoenix JIB approved operatives.
JLT St Botolphs
Client – JLT Main Contractor – ISG
Architect – M Moser Associates Consultant – Grontmij
Quantity Surveyor – Capita Symonds Programme Duration - 36 Weeks
(November 2012 – July 2013)
Value – £10M Area – 27,000M2
Phoenix were appointed by ISG to carry out the Mechanical,
Electrical and Public Health Cat ‘A’ installation on levels Grd, 1,
2, 3, 5, 7, 8 & 9 and Cat ‘B’ fit out works on levels Grd, 1, 7, 9
and basement levels within the Walbrook.
The Cat ‘A’ works comprised off fully co-ordinated services
installation comprising off approx. 200 Diffusion FCUs a floor
with associated BMS controls and power supplying conditioned
air to the office space. FCUs were fed via a dedicated CHW
system that was integrated to the landlord system. Installation of
new DBs and associated tap off, h/l modular wiring power and
Simmtronic lighting control system
The Cat ‘B’ works comprised off installation off a dedicated AC
system to the on floor SERs, post room , and executive shower
room. Modifications to the Cat ‘A’ service to accommodate the
new meeting rooms, executive meeting rooms, executive offices,
tea points, WCs and pantry. A new kitchen ventilation system
providing conditioned air to the kitchen located on level 7 via an
AHU located within the ceiling void and extract fan at roof level.
Electrical installation comprising of fully co-ordinated under
power track installation, power supplies to SERs, desk top fit out,
specialist lighting to all executive areas and main receptions
New WCs, tea points, pantry and kitchen were provided
throughout consisting of all new DWS & PH and dedicated
extract ventilation system
phoenix me
a better way to do business
Walbrook
Fit-Out
Client Minerva & AJG Gallagher's
Main Contractor - ISG Architect
Fosters & partners Scott Brownrigg
Morey Smith Consultant
Cat A Gronmij Cat B HPF
Programme Duration Oct 2012 - Present
Value – £4.2M
phoenix me
a better way to do business
Phoenix were appointed as the principal contractor,
responsible for the full Design and Build and the Construction
of a 7 storey building which was located between two existing
buildings. The new building housed new Generators, MV and
LV switch panels and associated services. New Chillers were
added to the roof on one of the existing buildings which
required full structural strengthening.
Two floors in the existing building were stripped out and fully
fitted out as Data Halls.
The other ten floors in the building were occupied and all
existing services were maintained throughout the project. A
new incoming MV supply substation
was built under the DLR and new bulk fuel tanks were
housed in an external compound.
Within the data halls we installed new PDU’s, Cooling
CRACs, fire protection, water mist, new UPS system
were installed in new rooms and ventilation and
humidification systems were added in addition to the new
power and lighting systems. A full BMS/PMS and EMS
were installed to control the Generators and Power
management.
Harbour Exchange Data Centre
Client – Telecity Main Contractor – Phoenix
Architect – NWA Consultant – Houseman Henderson Quantity Surveyor – Davis Langdon Programme Duration - 44 Weeks
(January 2012 – November 2012)
Value – £18M Area – 8000M²
Phoenix ME
A better way to do business
Endorsements
Quadrant 3 Project
Technical Services Manager Sir Robert McAlpine
“100% well lead from the Project Director, Project
Manager and all site staff”
“Attitude excellent from the project manager through to all the team”
“Project completed early and within
budget / costs allocated”
The Walbrook Project
Technical Services Manager ISG
“Your complete team including your
subcontractors showed full commitment from start to finish, I was very pleased”
Double Negative Project
Project Director BW Interiors
“Bought competitively & quick.
Final account good”
“Director always keen to come to site and assist. Honest approach from the Project
Manager and all the Phoenix team”
Project Skype
Construction Director
ISG
“Phoenix consistently delivered an excellent product on time /on budget and to the highest
quality”
Project Salford
Project Manager Mace
“Pro-active attitude throughout”
“Good overall performance from the Phoenix Team and I look forward to
working with Phoenix again”