The proven, fast slab formwork made of high-strength aluminium
prod
uct
rang
e 8.
10
SKYDECK
2064495_PERI_Skydeck_U1_11.qxd 22.12.2006 11:08 Uhr Seite a1
Important notes:
Our products are to be used in accordance with therelevant national and european safety regulations.
The illustrations in this brochure are photographs ofreal site situations. Safety or formwork anchor detailsare therefore not to be taken as a definitive guide tothe way the equipment is to be used.
Safety precautions and allowable loads are to bestrictly observed. Separate structural calculations arerequired for any deviations from the standard designdata.
The information contained herein is subject to technical change in the interests of progress.
Edition 01/2007
PERI GmbHP. O. Box 12 6489259 WeissenhornTel.: 0 73 09 / 9 50-0Fax: 0 73 09 / 9 [email protected]
2064495_PERI_Skydeck_U1_11.qxd 22.12.2006 11:08 Uhr Seite a2
1
PageContents
The proven aluminiumslab formwork system 2 - 3
The cost-effective slab formworkwith many advantages for the user 4 - 5
Forming with drophead 6 - 7
SKYDECK infills 8 - 9
Detailed solutions with system components 10
Even the logistics have been rationalised 11
Design tables 12-19
Range 20-33
PERI International 36-37
2064495_PERI_Skydeck_U1_11.qxd 22.12.2006 11:08 Uhr Seite 1
2
60 m
m
PERI SKYDECKThe proven aluminium slab formwork systemfor sensationally fast formwork erection
SKYDECK’s main beam reducesthe number of props
You only need 0.29 props per squaremeter of slab. This corresponds to agrid rectangle of 2.30 x 1.50 m (3.45 m2) supported by just oneprop.
Fewer props save time and leavemore space.
Formwork materials can be trans-ported across the site, or building materials such as bricks easily storedbetween these widely spaced propsready for subsequent use.
SKYDECK has a drophead
that allows you to strike after only 1 day (depending on the depth ofthe slab and concrete strength).This allows you to reduce formworkstock levels on site, since the beams and panels are than availablefor the next concreting cycle.Striking after a short time meansstriking and cleaning is also mucheasier, since the panels separatefrom the concrete effortlessly. Thedrophead principle enables you towork more flexibly, for instance bystriking early during poor weather, or when you have labour free.
The large prop spacing of 1.50 x 2.30 mmeans time saving and more space formoving materials.
The panels and coverstrips form the soffitof the concrete.
The cover strips anddropheads remain while the panels and beamsare struck.
Erected
Drophead lowered
2064495_PERI_Skydeck_U1_11.qxd 22.12.2006 11:08 Uhr Seite 2
3
PERI ECCPERI ECC
Die
besondere Pulverbeschichtungvon
PE
RI
Easy Clean Coating
sc
hn
el l e r s a uber
The main beam lies protected under the panels. This reduces cleaning.
The ECC powdercoating preventsconcrete adhering to SKYDECK.
SKYDECK minimises cleaningcosts
The SKYDECK panels and main beams have self-draining edges,and the edges of the panels are undercut. This keeps the side surfaces cleanand reduces cleaning to a minimum.
SKYDECK components are madeof aluminium to make them verylight.
No part weighs more than 15 kg.Thanks to the low individual weightsPERI SKYDECK enables easy and tireless erection and striking.
The SKYDECK main beam with
powder coating and plastic rack is designed to minimise cleaning, andis therefore an important factor inthe speed achieved with this system.
SKYDECK has manageable parts.
The largest part measuresonly 1500 x 750 x 120 mm.
This allows optimumtransport between
the rows of props and through door and
window openings.
Working with SKYDECKmeans easy and tirelesserection and striking thewhole day.
2064495_PERI_Skydeck_U1_11.qxd 22.12.2006 11:08 Uhr Seite 3
4
1,50
m
2,30 m
The outward projecting teeth "catch"the panels. The panels clip in and liesecurely in the rack. The SKYDECKsystem provides working safety during erection.
SKYDECK systematization means you– no longer have to set out props– don't have to determine primary and
secondary beam spacings– do not have to take account of the load capacity
of the formlining
The panels are secured automatically by the lugs onthe main beam.
The main beam is mounted rigidly on the drophead orprophead and cannot tilt.
3.45 m2 are erected with one standard field.Using main beam SLT 225 means only 0.29 props per m2.
The cost-effective slab formworkwith many advantages for the user
SKYDECK forms slab thicknessesof up to 950 mm.
See design tables.
SKYDECK offers a systematic erection sequence and safety features that rule out erection errors.Handling is quickly mastered, evenby personnel unfamiliar with thissystem.
SKYDECK panels positioned from above.
2064495_PERI_Skydeck_U1_11.qxd 22.12.2006 11:08 Uhr Seite 4
5
SKYDECK provides: Benefit to you:
Mounting SKYDECK head
The SKYDECK drophead and prop-head are fitted with the new type ofself-locking coupling. This allowsyou to mount the head without laborious bolting or pinning andwedging. Simply place it and allowit to engage – that’s all there is to it!The head is now securely mounted.
SKYDECK speeds up formwork to reduce your costs.
Removal is simply a matter of releasing the coupling and taking the head off.
Self-locking coupling = time saving.
Works with all standardprops. Diameter of holeø 40 mm.
Main beams that save on props Fewer props
Drophead principle Earlier, easier striking
ECC powder coating Less cleaningself-draining edges, plastic profiles
Individual components made of Easy erection and strikingalum. and weighing less than 15 kg without fatigue
Straight formwork line Simple perimeter adjustment
Structurally optimised system Very accurate surfaces
Systematic erection sequence Operating errors ruled out
New type of self-locking coupling Quick mounting on the propwithout screws or bolts.
2064495_PERI_Skydeck_U1_11.qxd 22.12.2006 11:08 Uhr Seite 5
6
AA
B
B
Typical application with wall return,angled wall junction and column tobe formed.
SKYDECK standard gridpanel with drophead system
Formwork with drophead
Gives you the advantage of rapidconcreting cycles with small stockof equipment.
The drophead principle allows striking after 1 day, depending onslab depth and concrete strength.
Striking is easier, since the panelsrelease from the concrete more readily after a shorter time.
The possibility of striking after ashorter time allows you to work more flexibly (eg during bad weatheror when personnel have free capacity).
The main beam cuts the number ofprops. You only need 1 prop for a2.30 x 1.50 = 3.45 m2 bay. This corresponds to 0.29 props persquare meter of slab.
2064495_PERI_Skydeck_U1_11.qxd 22.12.2006 11:08 Uhr Seite 6
7
0,41
0,41
prophead dropheaddrophead
Only the props withdrophead and cover strip remain after striking.
Cross section A-A
The design principle with the panelslying on top of the main beam makes the wall junction possible asthe main beam can be set back,along the panel.
Longitudinal section B-B
Wall junction with prophead setback. The prophead is held on thebeam automatically.
An important advantage in application:
The extended length of the prop remains the same, irrespective ofwhether you are working with drophead or the prophead drawnback at the wall junction.
Striking with drophead
The drophead is released with ahammer blow, causing all of theformwork to drop 60 mm. Panelsand main beams can then be takenoff. The drophead props with coverstrips remain in the grid rectangle.Props in the edge or infill areas canbe removed. You will therefore onlyneed about 70% extra dropheadprops for your new cycle.
Prophead set backat the wall junction
Drophead
2064495_PERI_Skydeck_U1_11.qxd 22.12.2006 11:08 Uhr Seite 7
8
SLT 225 SLT 225
Infill length L
edgebeam
Transition from standard grid rectangle toinfilling with the end support
SKYDECK infills
Longitudinal infilling
For infilling up to 1.50 m, formworkis simply continued with panels andprophead until the gap left can beclosed with filler timbers.
Infilling lengths:≤ 2.25 m with main beam SLT 150 and appropriate infill≤ 1.50 m with 1 panel 750 mm wide and appropriate infill≤ 750 mm panel with appropriate infillor with infill panel 375 mm wide and appropriate infill(see SKYDECK Poster for detailed infilling)
drophead SFK drophead SFK
end support SSL
2064495_PERI_Skydeck_U1_11.qxd 22.12.2006 11:08 Uhr Seite 8
9
Transverse infilling with 150 x 75 panel, SPH fillertimber and filler plate.
max. 1.50 m
dropheadfillertimber
pri-mary beam
Formwork is taken around columns with a maximum edge length of 1.38 m in this way.When the edge beam SRT-2 75 is being usedthe maximum edge length is 630 mm.
Transverse infilling
Transverse infilling or adaptation forangled walls is carried out in the same way as longitudinal infilling,using panels and prophead until thegap left can be closed with a fillerplate. The panels can be turned inthe other direction to achieve this.
Formwork around a column
With the secondary or edge beam in one direction.
Edge beams turned sidewayscan be used for formworkaround columns.
Transverse infilling with dropheadsystem with 150 x 75 panel, edgebeam and filler
2064495_PERI_Skydeck_U1_11.qxd 22.12.2006 11:08 Uhr Seite 9
10
Detailed solutions with system componentsThe SKYDECK Platform on the edge of the building saves a safety scaffold
Edge of slab with safety handrailsystem
Slab edges are formed with the cantilevered SLT 375 slab edge beam and the SKYDECK Platform.
The SKYDECK platform saves construction time.
Even 1 day after concreting it servesas a safety scaffold for work on thecolumns and breast walls (parapets).
After the simple positioning the platform is immediately fixed againsttipping or moving.
No safetyscaffold necessary
Safety scaffold at the cycle joint
Plan
SKYDECKplatform
SLT 375main beam
SAO tension sleeve
anchor chain andM 12 anchor coupler
Side elevation
handrail posthandrail holder
2064495_PERI_Skydeck_U1_11.qxd 22.12.2006 11:08 Uhr Seite 10
11
Even the logistics have been rationalised
Formwork erection will be even faster if there is order on site andas few crane lifts as possible.
The SKYDECK pallet can be shiftedwith the crane or moved with a pallettruck. The pallet is equally suitablefor forklift trucks when dispatching,or in the builder's yard.
All SKYDECK pallets are hot-dip galvanised and can be stacked.
Pallet lifting truckItem no.: 061510
RP 80 x 120 filled with 25 MULTIPROP Propscorresponding to 86 m2 of formwork surface.
Large SKYDECK pallet with48 panels 150 x 75 = 54 m2
of formwork surface
SKYDECK Pallet SD filled with14 panels 150 x 75 = 15.75 m2 offormwork surface.
2064495_PERI_Skydeck_U1_11.qxd 22.12.2006 11:08 Uhr Seite 11
12
0.14
0.16
0.18
0.20
0.22
0.24
0.26
0.28
0.30
0.35
0.40
0.45
0.48
0.50
0.55
0.60
0.65
0.70
0.75
0.80
0.85
0.90
0.95
5.19
5.71
6.23
6.75
7.27
7.79
8.31
8.83
9.40
10.94
12.47
14.01
14.93
15.54
17.07
18.61
20.14
21.68
23.21
24.74
26.28
27.81
29.35
17.9
19.7
21.5
23.3
25.1
26.9
28.7
30.5
32.4
37.7
43.0
Panel span c1,50 m
withSSk
centresupport
Prop load[kN]
Deflectionline**
Sla
b th
ickn
ess
d [m
]
Load
q* [k
N/m
2 ]
17.8
20.8
23.7
26.6
28.3
withSSk
centresupport
7
7
7
7
7
7
7
7
7
6
6
7
7
6
6
6
withSSk
centresupport
Prop load[kN]
9.0
9.8
10.7
11.6
12.5
13.4
14.3
15.2
16.2
18.9
21.5
24.2
25.7
26.8
29.5
32.1
34.7
37.4
40.0
42.7
19.3
20.8
22.4
24.0
25.6
27.2
28.8
30.4
Deflectionline**
withSSk
centresupport
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
6
6
6
6
7
7
7
7
7
7
7
6
Main beam SLT 225
Panel span c0,75 m
12.1
13.3
14.5
15.7
16.9
18.1
19.3
20.5
21.9
25.4
29.0
32.6
34.7
Panel span c1,50 m
withSSk
centresupport
Prop load[kN]
Deflectionline**
withSSk
centresupport
7
7
7
7
7
7
7
7
7
7
6
6
6
withSSk
centresupport
Prop load[kN]
18.1
19.8
21.6
23.4
25.2
27.0
28.8
30.5
32.3
34.1
Deflectionline**
withSSk
centresupport
7
7
7
7
7
7
7
6
6
6
Main beam SLT 150
Panel span c0,75 m
SKYDECKWith prophead SFK,Main beam SLT 225, SLT 150
When calculating the prop load, the actual extension length may be used.The exact extension length of the prop when using theSKYDECK drophead: clear height minus 0.41 m.From a prop load of over 33.3 kN bolting on the Drophead (2 boltsM12x40 mm Mu DIN 601) can only be omitted when using MULTIPROP props.
* Load to DIN 4421 :
Dead load g = 0.20 kN/m2
Concrete load b = 26 kN/m3 x d (m)Live load p = 0.20 x b
1.5 ≤ p ≤ 5.0 kN/m2
Total load q = g + b + 0.9 x p
**Deflection to DIN 18202 assumingperfect levelling.
13
SKYDECKWith prophead SSK,Main beam SLT 225, SLT 150
0.14
0.16
0.18
0.20
0.22
0.24
0.26
0.28
0.30
0.35
0.40
0.45
0.50
0.51
0.55
0.60
0.65
0.70
0.75
0.80
0.85
0.90
0.95
5.19
5.71
6.23
6.75
7.27
7.79
8.31
8.83
9.40
10.94
12.47
14.01
15.54
15.85
17.07
18.61
20.14
21.68
23.21
24.74
26.28
27.81
29.35
17.5
19.3
21.0
22.8
24.5
26.3
28.0
29.8
31.7
36.9
42.1
Panel span c1.50 m
withSSk
centresupportS
lab
thic
knes
sd
[m]
Load
q* [k
N/m
2 ]
17.8
20.7
23.6
26.5
29.4
30.0
withSSk
centresupport
7
7
7
7
7
7
7
7
7
6
6
7
7
6
6
6
6
withSSk
centresupport
8.8
9.6
10.5
11.4
12.3
13.1
14.0
14.9
15.9
18.5
21.0
23.6
26.2
26.7
28.8
31.4
34.0
36.6
39.2
41.8
19.2
20.7
22.3
23.9
25.5
27.0
28.6
30.2
withSSk
centresupport
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
6
6
6
6
7
7
7
7
7
7
7
6
Main beam SLT 225
Panel span c0.75 m
11.7
12.8
14.0
15.2
16.4
17.5
18.7
19.9
21.2
24.6
28.1
31.5
35.0
35.7
Panel span c1.50 m
withSSk
centresupport
withSSk
centresupport
7
7
7
7
7
7
7
7
7
7
6
6
6
6
withSSk
centresupport
19.2
20.9
22.7
24.4
26.1
27.8
29.6
31.3
33.0
withSSk
centresupport
7
7
7
7
7
7
6
6
6
Main beam SLT 150
Panel span c0.75 m
When calculating the prop load, the actual extension length may be used.The exact extension length of the prop when using theSKYDECK Prophead: clear height minus 0.33 m.
* Load to DIN 4421 :
Dead load g = 0.20 kN/m2
Concrete load b = 26 kN/m3 x d (m)Live load p = 0.20 x b
1.5 ≤ p ≤ 5.0 kN/m2
Total load q = g + b + 0.9 x p
**Deflection to DIN 18202 assumingperfect levelling.
Prop load[kN]
Deflectionline**
Prop load[kN]
Deflectionline**
Prop load[kN]
Deflectionline**
Prop load[kN]
Deflectionline**
14
SKYDECKPanel system
Panel system
0.75 m
1.50
mSla
b th
ickn
.d
[m]
UD
Lq*
[kN
/m2 ]
Pro
p lo
ad[k
N]
**D
efle
ctio
nto
DIN
182
02 li
ne
0.14 5.19 5.8 7
0.16 5.71 6.4 7
0.18 6.23 7.0 7
0.20 6.75 7.6 7
0.22 7.27 8.2 7
0.24 7.79 8.8 7
0.26 8.31 9.3 7
0.28 8.83 9.9 7
0.30 9.40 10.6 7
0.35 10.94 12.3 7
0.40 12.47 14.0 6
0.45 14.01 15.8 6
0.48 14.93 16.8 6
0.50 15.54 17.5 6
0.51 15.85 17.8 6
* Load to DIN 4421 :
Dead load g = 0.20 kN/m2
Concrete load b = 26 kN/m3 x d (m)Live load p = 0.20 x b
1.5 ≤ p ≤ 5.0 kN/m2
Total load q = g + b + 0.9 x p
**Deflection to DIN 18202 assumingperfect levelling.
15
B
L L
B
SKYDECKFiller timbers, striking time guidelines
Slab depth [m]
GT 24
VT 20 K
KH 10/16
2. Permissible span L [m] of the edge main girders
Girdersused
Width of load carried by plywood 400 mm
0.20 0.30 0.40 0.50 0.60 0.70 0.80
3.51 3.15 2.88 2.68 2.52 2.40 2.29
2.85 2.56 2.34 2.18 2.05 1.91 1.67
2.64 2.37 2.17 2.02 1.90 1.81 1.73
0.20 0.30 0.40 0.50 0.60 0.70 0.80
0.24 0.21 0.19 0.18 0.17 0.16 0.15
0.67 0.58 0.54 0.49 0.47 0.43 0.40
0.47 0.44 0.42 0.41 0.40 0.39 0.38
0.90 0.81 0.76 0.72 0.69 0.67 0.64
1. Permissible width B [m] of the plywood filler
Slap depth [m]
3-ply transversely
Spruce, Finply,3-ply longitudinally
Plywoodused
3-ply transversely
Spruce, Finply,3-ply longitudinally
Ca
se
1C
ase
2
Filler timber SPH orEdge beam SRT-2
Case 1 Case 2
Minimum concrete strength and guide values* for striking with drophead system
*Guide values for the strikingtime [days] for panels and beamsat average curing temperature
[°C] of
0.140.160.180.200.220.250.300.35
0.40-0.95
The necessary concrete strength at the time of strikingis important. This can be calculated by suitablemethods.Account must also be taken of DIN 1045, e.g. curing.At least 1.31 cm2/m(Q 131) is necessary as lowerreinforcement. For systems without centre support ofthe main girders.A live load of 100 kg/m2 is to be taken into account forthe early struck slab.*Guide values after Leonhard for Z 35 cement,CEM I 32,5 R.
Sla
b th
ickn
ess
d [m
]
Con
cret
est
reng
thre
quire
df c
k [N
/mm
2 ]
151311987655
5°1086544332
10°654332221
20°543222211
max. 100 mm
CombiheadSCK
Filler timber SPH orEdge beam SRT-2
16
All PEP 20 props conform with DIN EN 1065 class D.The perm. load for the entire extension range is min. 20 kN.
All PEP 20 props clamped in the table swivel head or UNIPORTAL head fittedto PERI tableforms have a permissible load of 30 kN over the entire extensionrange.
*Application Inner Tube at bottom only possible with PERI Slab Tables orSKYDECK (Head bolted).
PropsPEP 20
Permissible prop load [kN] according to type inspection
1.60 35.0 35.01.70 35.0 35.01.80 35.0 35.0 35.0 35.01.90 35.0 35.0 35.0 35.02.00 33.5 35.0 35.0 35.0 35.0 35.02.10 31.9 35.0 32.2 35.0 35.0 35.02.20 30.9 35.0 30.5 35.0 35.0 35.02.30 29.8 35.0 29.0 35.0 35.0 35.0 35.0 35.02.40 28.6 35.0 27.8 35.0 35.0 35.0 35.0 35.02.50 27.1 32.9 26.9 35.0 35.0 35.0 35.0 35.02.60 24.8 29.4 26.1 35.0 33.8 35.0 35.0 35.02.70 24.9 31.7 32.4 35.0 35.0 35.02.80 23.3 28.5 31.2 35.0 35.0 35.0 35.0 35.02.90 21.6 25.7 30.2 35.0 35.0 35.0 35.0 35.03.00 20.0 23.2 29.2 35.0 35.0 35.0 35.0 35.03.10 27.5 34.6 33.6 35.0 35.0 35.03.20 25.7 31.5 32.5 35.0 35.0 35.03.30 24.1 28.8 31.2 35.0 35.0 35.03.40 22.4 26.4 29.6 35.0 35.0 35.03.50 20.7 24.1 27.8 33.9 35.0 35.03.60 26.1 31.2 35.0 35.03.70 24.5 28.9 35.0 35.03.80 23.0 26.8 35.0 35.03.90 21.6 24.8 35.0 35.04.00 20.1 22.8 34.2 35.04.10 32.3 35.04.20 30.6 35.04.30 28.9 34.04.40 27.4 31.94.50 26.0 29.94.60 24.6 28.14.70 23.4 26.44.80 22.1 24.94.90 20.9 23.45.00 20.0 21.8
Extend. L = 1.51 - 2.60 m L = 1.71 - 3.00 m L = 1.96 - 3.50 m L = 2.21 - 4.00 m L = 2.71 - 5.00 mlength Outer tube Inner tube Outer tube Inner tube Outer tube Inner tube Outer tube Inner tube Outer tube Inner tube
[m] bottom bottom bottom bottom bottom bottom bottom bottom bottom bottom
PEP 20-300 PEP 20-350 PEP 20-400 PEP 20-500
PEP 20 N 260* PEP 20 N 300* PEP 20 N 350* PEP 20 G 410*
17
All PEP 30 props conform with DIN EN 1065 class E.The perm. load for the entire extension range is min. 30 kN.
All PEP 30 props clamped in the table swivel head or UNIPORTAL head fittedto PERI tableforms have a permissible load of 40 kN over the entire extensionrange.
*Application Inner Tube at bottom only possible with PERI Slab Tables orSKYDECK (Head bolted).
PropsPEP 30
Permissible prop load [kN] according to type inspection
1.00 35.0 35.01.10 35.0 35.01.20 35.0 35.01.30 34.9 35.01.40 34.2 35.01.50 33.5 35.0 40.0 40.01.60 40.0 40.01.70 40.0 40.01.80 40.0 40.0 40.0 40.01.90 38.5 40.0 40.0 40.02.00 36.8 40.0 40.0 40.0 40.0 40.02.10 35.3 40.0 40.0 40.0 40.0 40.02.20 34.4 40.0 40.0 40.0 40.0 40.02.30 33.3 40.0 40.0 40.0 40.0 40.0 40.0 40.02.40 32.1 37.6 40.0 40.0 40.0 40.0 40.0 40.02.50 30.1 34.8 39.9 40.0 40.0 40.0 40.0 40.02.60 38.8 40.0 40.0 40.0 40.0 40.02.70 37.4 40.0 40.0 40.0 40.0 40.02.80 35.8 40.0 40.0 40.0 40.0 40.02.90 33.2 37.2 40.0 40.0 40.0 40.03.00 30.4 33.8 40.0 40.0 40.0 40.03.10 40.0 40.0 40.0 40.03.20 37.6 40.0 40.0 40.03.30 35.0 37.6 40.0 40.03.40 32.3 34.6 40.0 40.03.50 30.0 31.6 40.0 40.03.60 40.0 40.03.70 40.0 40.03.80 37.4 40.03.90 34.8 37.04.00 32.2 33.9
PEP 30-150 PEP 30-250 PEP 30-300 PEP 30-350 PEP 30-400
PEP 30 G 300* PEP 30 G 350*Extend. L = 0.96 - 1.50 m L = 1.46 - 2.50 m L = 1.71 - 3.00 m L = 1.96 - 3.50 m L = 2.21 - 4.00 mlength Outer tube Inner tube Outer tube Inner tube Outer tube Inner tube Outer tube Inner tube Outer tube Inner tube
[m] bottom bottom bottom bottom bottom bottom bottom bottom bottom bottom
18
1.45 73.3 76.21.50 73.3 76.21.60 73.3 76.21.70 73.3 76.21.80 71.7 76.21.90 68.6 76.21.95 67.0 76.2 88.3 87.42.00 65.4 76.2 88.3 87.42.10 63.8 74.6 83.0 87.42.20 62.2 73.0 77.7 87.42.30 61.1 70.5 72.9 86.62.40 60.6 67.0 68.6 85.12.50 60.0 63.6 64.4 83.52.60 61.9 80.7 85.9 71.42.70 59.3 77.8 81.2 71.12.80 57.5 74.9 76.5 70.82.90 55.7 71.9 71.8 70.43.00 54.3 68.3 67.1 70.13.10 52.9 64.6 63.0 69.43.20 51.4 60.0 58.9 68.63.30 49.8 55.4 54.8 67.93.40 46.4 50.3 52.5 66.23.50 42.9 45.1 50.2 64.53.60 47.9 62.83.70 46.0 58.63.80 44.2 54.43.90 42.3 50.24.00 40.4 46.94.10 38.5 43.74.20 36.6 40.44.30 34.8 38.2 56.2 44.64.40 32.9 36.0 54.7 44.64.50 31.1 33.7 53.1 44.64.60 29.3 31.5 50.9 43.84.70 27.4 29.3 48.8 43.04.80 25.6 27.1 46.4 42.14.90 43.8 41.25.00 41.2 40.35.10 38.6 38.85.20 36.1 37.35.30 33.8 35.95.40 31.9 34.55.50 29.9 33.15.60 28.4 31.65.70 26.9 30.15.80 25.5 28.65.90 24.3 27.06.00 23.1 25.46.10 22.0 24.16.20 20.9 22.86.25 20.4 22.1
MP 250 MP 350 MP 480 MP 625l = 1.45 - 2.50 m l = 1.95 - 3.50 m l = 2.60 - 4.80 m l = 4.30 - 6.25 m Extend.
length Outer tube Inner tube Outer tube Inner tube Outer tube Inner tube Outer tube Inner tube[m] at bottom at bottom at bottom at bottom at bottom at bottom at bottom at bottom
MULTIPROPs are classified according to official approval as follows:MP 250 = T 25 MP 480 = D 45MP 350 = R 35 MP 625 = D 60
NB:We recommend using the HD spanner, Item no 022027,to release loads > 60 kN.
All MULTIPROPs clamped in the table swivel head or UNIPORTAL headfitted to PERI tableforms have a permissible load of MP 350 min. 56 kN,MP 480 min. 36 kN over the entire extension range.
Permissible prop load [kN] according to type inspection
PropsMULTIPROP 250, 350, 480, 625
19
375
82
1500
750
300 275 175
78
22
300 275 350 400 175
375750
750
375
750
1500
120
9921
27*
5 00
500
500
300200
20
Panel SDP, AluPowder-coated.Formlining: 9mm Finply(100% Fin. birch)SDP 150x75 = 1,13m2 15,50 061000Filler panels:SDP 150x50 = 0,75m2 11,70 061011SDP 150x37,5 = 0,56m2 10,60 061020SDP 75x75 = 0,56m2 8,60 061010SDP 75x50 = 0,37m2 6,37 061013SDP 75x37,5 = 0,28m2 5,04 061030
Cover Strip SALPlastic. For use with drophead.Plywood thickness 21mm.SAL 150 1,55 061026SAL 75 0,77 061027SAL 50 0,55 061024SAL 37,5 0,38 061038
*Plywood thickness 27mmSAL 150/27 1,65 061028SAL 75/27 0,84 061029SAL 37,5/27 0,45 061039
SKYDECK and Accessories
Weight kg Item no.
150049
2250
161
13
300
82 266
450 750 375 375 750 450 300
610
98
660
745
595
68
43
49
14
1360
1410
1495
1345
43
68
35
300
187 1120 187
161
300 450 375 375 300450
275
70
240
72
120
225
190
240
1 313
24
93*
9893*
1042 1042
21
Main Beam SLTAlu, powder-coated. With rack made ofhighly impact-resistant plastic.SLT 225 Standard beam 15,40 061100SLT 150 For filler areas 10,30 061110SLT 375 For tables and overhangs 25,50 061160
Edge Beam SRT-2, AluPowder-coated. For longitudinal andtransverse filling, for shuttering aroundcolumns. Plywood thickness 21mmSRT-2 75 2,86 061046SRT-2 150 6,16 061045
*Plywood thickness 27mm (yellow)SRT-2 75/27 2,86 061048SRT-2 150/27 6,16 061047
Filler Timber SPHFor longitudinal and transverse filling,individually adaptable.Plywood thickness 21mmSPH 150 4,00 061049SPH 225 6,00 061036
*Plywood thickness 27mmSPH 150/27 3,38 061050SPH 225/27 5,07 061040
3744
Bracket axis 3750
Detail x
Detail x
Detail x
2244
Bracket axis 2250
Detail x
1494
Bracket axis 1500
Weight kg Item no.
1 00
250
390
550
80
80
258
40
259
8016
050
250
8 0
184
72
62
750
100
720
62
1500
1470
253*
9893*
9 89 3*
22
Grid Beam SRO, Alu* SRO 150 5,96 061041Powder-coated. SRO 75 3,03 061042For use in the grid beam system.Plywood thickness 21mm
* is no longer produced
*Plywood thickness 27mm (yellow)SRO 150/27 6,18 061043SRO 75/27 3,14 061044
Prophead SSK 3,92 061200Powder-coated.With self-locking coupling.Supports panels, main beams, secondarybeams, edge beams and filler timber.
Drophead SFK 6,08 061210Powder-coated.With self-locking coupling.Supports main beams as well ascover strip or formlining. Lowers 60mm.
*Drophead SFK/27 6,07 061035Plywood thickness 27mm (yellow)
Weight kg Item no.
60 L
ower
ing
149
6370
165
102
8516
0
F
2 70
30
100
DW 15
37
140
245
275
100
1490
202
23
Tension Sleeve SAO 1,00 061310Powder-coated.Locking device to prevent grid beams fromlifting off. For anchoring cantilevers.
Permissible Load (F): 3kN
End Support SSL 2,10 061023Powder-coated.For the transition from beam to panelwithout beam, or edge beam or secondarybeam when filling gap.
Wall Holder SWH-2, Alu 5,56 061051Powder-coated.For anchoring the formwork to thewall horizontally.Attach to every second beam or panel.
Weight kg Item no.
adju
stm
ent
r an g
e 1 0
5 0
1605
70300
35
120
425
65
1750
1416
112
44
15
425
ø 5
1500
ø 10
305
245 36
8
1 612 5
93 0
5
5 0
250
24
Combi-Head SCK 5,33 061180Powder coated.With self-locking coupling.Supports main beams, panels,edge beams and Filler Timber.
Handrail Holder SGH, Alu 5,03 061250Powder-coated.With quick locking devicefor mounting on the main beam.
Accessorie:Handrail Post SGP 5,82 061260
Handrail Post SGP 5,82 061260Powder-coated.For use with SGH Handrail Holder.Height of handrail above top of panel = 1,40m
Weight kg Item no.
50
121
43
78
115
80
116
1500
750
98
750
98 750
93*
93*
125
25
Panel Clip SPK, galv. 0,13 061290Fixes panels on main beam.
Panel Wedge Clip SPKK 0,75 061280Powder-coated.
Applications1. Panel joint in middle of 2. Projecting panel Panel/Panel main beam Panel/Panel connection with main beam connection with main beam
Triangular Frame SDR, AluPowder-coated.For non-right angled filler applications.
Plywood thickness 21mmSDR 150x75 8,79 061021SDR 75x75 5,45 061022
*Plywood thickness 27mm (yellow)SDR 150x75/27 7,54 061015SDR 75x75/27 4,68 061016
Shuttering Aid SSH, Alu 2,32 061300Powder-coated.Adjustable in 75mmincrements.
Weight kg Item no.
Side view
min. 2325-max. 3750
16
2500
14
3900
1224
1040
8 0
1 43 4
3 24 0
2 80 0
90
ø 21ø 13ø 21
40 55 30 25
60
150
65
80
60
40 10
20
130
26
Transportation Fork SKYDECK SUG, galv. 403,00 061520For moving SKYDECK tables with a crane.Comply with the instructions for usegiven on the type plate.
Lifting device to BGR 500 Permissible load: 1000kg
Anchor Chain 3,0kN L = 2,5m 1,37 065073Galvanized.
Permissible Tension Load: 3kN.
Turnbuckle 3,0kN, M12 0,45 065074Galvanized.
Permissible Tension Load: 3kN.
Base Plate for RS 1,86 028100Complete with:Pin ø 16x65/86 and Cotter Pin 4/1 (1x).
Anchor Bolt PERI MMS 20x130 0,33 103606For erecting push-pull props without plugs,tension cables etc.Use drill ø 18mm to DIN 8035
type plate
Weight kg Item no.
SW 30
drill
ing
dept
hm
in 1
40
min. 220
max. 300
Platform SDBSDB 300 185,00 061062SDB 225 153,00 061061SDB 150 108,00 061060
For work and protective access toDIN 4420. Scaffold width 1,30m.With continuous 39mm thick stagingand folding handrail frame for easytransporting. Platform SDB 225 cantileversby 750mm to the left or right.
Spare Parts:Handrail Frame SDB, galv.Foldable.
SDB 300 33,30 061065SDB 225 25,90 061064SDB 150 18,50 061063
Plywood Planking SDBWith continuous 39mm thick staging.
SDB 300 73,10 061068SDB 225 54,50 061067SDB 150 35,90 061066
Weight kg Item no.
1288
1220
1448
1000
2990
2 24 0
1 49 0
1 00 0
1300
750
1500
225 0
1 50 0
1 50 0
1 50 0
3 00 0
SDB 300
SDB 225
SDB 150
1 50 0
7 50
SDB 225 2 25 0
2250
27
1630
640
580
760
120
60 60
1720
1970
330
70
85
74
140
23
28
Hex. Bolt M12x140 DIN 6914-10.9 0,14 061230
Accessories:Hex. Nut ISO 4032 M12-8, galv. 0,017 710330Washer ISO 7089-12-200HV, galv. 0,006 780702
Table Connector STV 2,56 061052For connecting SKYDECK tables.Also used for setting props at anylocation at the Main Beams.Complete with:Ring screw M12 DIN 582
Pallet SD 150x75, galv. 77,80 061500For stacking and transportation of14 SKYDECK Panels 150x75.
Lifting device to BGR 500 Permissible load: 1000kg
Max. stacking height: 2Min. length of rope: 3,0m
Weight kg Item no.
SW 22
Important safety note!When stacking light, large surfaceitems outdoors the maximumstacking height must be reduced.
!
2110
1550
250
2310
12012
019
0
29
Pallet SD 150x225, galv. 83,60 061530For stacking and transportation of48 SKYDECK Panels 150x75.Complete with:5 tension straps
Lifting device to BGR 500 Permissible load: 750kg
Pallet Lifting Trolley 110,00 061510Length of Forks: 1550mmSupport Width of Forks: 520mmLifting Range: 85 to 195mm
Lifting appliance to BGV D8 Permissible load: 2000kg
Weight kg Item no.
ø 48
1800 750
250
3035
115 0
2360 1100
2
1
9
8
7
6
5
1110
34
30
Stripping Cart ASW 465 363,00 102031Complete with:1 Steel traverse 140/220 ASW (1x) 32,60 102033
consisting of 3 parts2 Folding base unit 160/190 ASW (1x) 18,60 1020253 Vertical frames 70/90 ASW (6x) 4,40 1020354 Vertical frames 70/120 ASW (6x) 4,90 1020345 Entry platforms 190 ASW (2x) 14,80 1020266 Toe-board set 70/190 ASW (1x) 8,00 1020307 Double handrails 190 ASW (4x) 5,30 1020278 Diagonal braces 210 ASW (3x) 2,40 1020289 Horizontal braces 190 ASW (2x) 2,30 10202910 Wind security clip 60 ASW (8x) 0,06 10203711 Ballast 10kg ASW (12x) 10,00 102807
Packed in:Ring pallet USP 104, galvanized 65,60 100678Complete with:Lashing strap 25x5750mm (1x) 0,50 100707Scaffold Tube steel ø 48.3x3.2, L = 1,0m 3,55 026411as Ring extensions (6x)Max. platform height = 4,65mMax. working height = 6,65mPlatform height alterations∆ = 300mm
Ring pallet USP 104, galv.Observe operating instructions!
Lifting device to BGR 500 Permissible load: 1200kg
Stripping Cart, Alu 77,00 035500Platform height: up to 2,00mPermissible load: 100kg/m2
Weight kg Item no.
hand
rail
h eig
h t 9
8 0
p la t
f orm
he i
g ht
2 00 0
31
PERI Bio CleanRelease Agent for all types of formwork.- Rapidly biologically degradeable.- Based on mineral oils.- Class 1 on German water pollutant scale. (WGK 1)
Release Agent Bio Clean 20L 0,91/L 031440 Release Agent Bio Clean 208L 0,91/L 031455
For further information see product information PERI Bio Clean.
Consumption:1 litre covers 50 to 90m2 of formwork(depending on formwork surface)
PERI CleanRelease Agent for all types of formwork.Based on mineral oils.Cleans and protects.Can be used down to -15C degree.Class 1 on German water pollutant scale.
Release Agent PERI Clean 20L 0,92/L 031420Release Agent PERI Clean 208L 0,92/L 031435
For further information see product information PERI Clean.
Consumption:1 litre covers 50 to 90m2 of formwork(depending on formwork surface)
Pressure Sprayer 4,44 031520For spraying formwork surfaces evenlywith PERI BIO Clean or PERI Clean.Capacity: 5 litre
Spare Part:Spray Nozzle (0,1F 110) 0,064 031530
Weight kg Item no.
PERI BIO Clean, PERI Clean
87
15012080
64
150
120
80
10 7564
BA
75
10
64
ø 40
ø 14
100
150
ø12,5
ø42
80 200
500
ø 89
ø 17
ø 17
32
MULTIPROP and Accessories
MULTIPROP MP, AluCan be used individually, as well as incombination with MULTIPROP MRK Framestableforms or shoring towers.
MULTIPROP MP 120 10,40 027288(0,80-1,20m)MULTIPROP MP 250 15,00 027289(1,45-2,50m)MULTIPROP MP 350 18,80 027290(1,95-3,50m)MULTIPROP MP 480 23,80 027291(2,60-4,80m)MULTIPROP MP 625 33,60 027305(4,30–6,25m)
Base MP 50 8,81 027310With quick action clamp coupling.
For mounting propswith 6 to 10mm thickend plates.
Weight kg Item no.
L min. L max. A B
MP 120 800 1200 715 421
MP 250 1450 2500 1365 1071
MP 350 1950 3500 1865 1571
MP 480 2600 4800 2515 2221
MP 625 4300 6250 4211 1975
Section
End Plate
L m
in –
L m
ax
33
B
100
8B
AD1
6
8410
0
D2
L
ø 14
ø 9
40
100
80
120
A
L
D2
D1
ø 14
ø 9
40
100
80
120
82
Weight kg Item no.
Props PEP 20, galv.
PEP 20-300 L = 1,71-3,00m 15,70 103058PEP 20-350 L = 1,96-3,50m 19,20 103059PEP 20-400 L = 2,21-4,00m 22,70 103060PEP 20-500 L = 2,71-5,00m 30,50 103061
For load capacity refer toPERI Formwork Design Tables.
Props PEP 30, galv.
PEP 30-150 L = 0,96-1,50m 10,40 103066PEP 30-250 L = 1,46-2,50m 15,00 103067PEP 30-300 L = 1,71-3,00m 18,70 103062PEP 30-350 L = 1,96-3,50m 22,70 103063PEP 30-400 L = 2,21-4,00m 27,20 103065
For load capacity refer toPERI Formwork Design Tables.
End Plate
20-300 20-350 20-400 20-500
A 1602 1852 2102 2602
B 143 93 143 143
D1 ø 66.0 ø 71.5 ø 75.5 ø 84.0
D2 ø 54.0 ø 59.5 ø 63.5 ø 72.0
End Plate
30-150 30-250 30-300 30-350 30-400
A 852 1352 1602 1852 2102
B 93 93 143 93 143
D1 ø 66.0 ø 66.0 ø 71.5 ø 75.5 ø 84.0
D2 ø 54.0 ø 54.0 ø 59.5 ø 63.5 ø 72.0
PEP 20, PEP 30 Props
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
PERI S.A.S.Zone Industrielle Nord34-36 rue des Frères Lumière77109 Meaux Cedex
Tel.: +33 /1/ 64 35 24 40Fax: +33 /1/ 64 35 24 [email protected]
PERI AGAspstraße 178472 Ohringen
Tel.: +41 /52/ 3 20 03 03Fax: +41 /52/ 3 35 37 [email protected]
PERI S.A. Sociedad UnipersonalCtra. Paracuellos - Fuente el Saz km. 18,9Camino de Malatones, km. 0,528110 Algete / Madrid
Tel.: + 34 / 91 / 6 20 48 00Fax: + 34 / 91 / 6 20 48 [email protected]
N.V. PERI S.A.IndustrieparkNijverheidsstraat 6 PB 541840 Londerzeel
Tel.: +32 /52/ 31 99 31Fax: +32 /52/ 30 08 [email protected]
PERI B.V.v. Leeuwenhoekweg 23Postbus 3045480 AH-Schijndel
Tel.: +31 /73/ 5 47 91 00Fax: +31 /73/ 5 49 36 [email protected]
PERI Formwork Systems, Inc.7135 Dorsey Run RoadElkridge, MD 21075
Tel.: +1 /4 10/ 7 12-72 25Fax: +1 /4 10/ 7 12-70 [email protected]
PT Beton Perkasa WijaksanaP.O. Box 3737Jakarta 10210
Tel.: +62 /21/ 5 71 26 44Fax: +62 /21/ 5 73 85 [email protected]
PERI S.p.A.Via G. Pascoli, 420060 Basiano (MI)
Tel.: +39 /02/ 9 50 78-1>Fax: +39 /02/ 95 76 19 [email protected]
PERI Japan K.K.7F 314 Hakozaki Building,31-4 Hakozaki-cho,Nihonbashi Chuo-kuTokyo 103-0015
Tel.: +81 / 3 / 56 42 / 61 00Fax: +81 / 3 / 56 42 / [email protected]
PERI Ltd.Market Harborough RoadClifton upon DunsmoreRugby, CV23 0AN
Tel.: +44 /17 88/ 86 16 00Fax: +44 /17 88/ 86 16 [email protected]
PERI Kalıp ve İskeleleriSan. Tic. Ltd. Sti.Çakmaklı Köyü KarşısıSanbir Bl. 4.Bölge 9.Cadde No: 133Büyükçekmece / IstanbulTel.: +90 /2 12/ 8 86 74 01(02)-(09)Fax: +90 /2 12/ 8 86 74 [email protected]
PERI Kft.Zádor u. 4.1181 Budapest
Tel.: +36 /1/ 2 960 960Fax: +36 /1/ 2 960 [email protected]
PERI Formwork MalaysiaSdn. Bhd.Unit 19-04-7, Level 7PNB Damansara19 Lorong DungunDamansara Heights50490 Kuala Lumpur
Tel.: + 60 / 3 / 20 93 68 23Fax: + 60 / 3 / 20 92 58 [email protected]
PERI-HORY ASIAFormwork Pte. Ltd.No. 1 Sims Lane # 06-10Singapore 387355
Tel.: +65 / 67 44 29 89Fax: +65 / 67 44 36 [email protected]
PERI Ges.mbHIndustriegelände 152Postfach 13131 Getzersdorf
Tel.: +43 /27 83/ 41 19Fax: +43 /27 83/ 41 [email protected]
PERI spol. s r.o.P.O. Box 3252 42 Jesenice / Prahy
Tel.: +420 /241 090 311Fax: +420 /241 090 [email protected]
PERI DANMARK A/Sforskalling og stilladsGreve Main 262670 Greve
Tel.: +45 /43/ 45 36 27Fax: +45 /43/ 45 36 [email protected]
PERI Suomi Ltd OyHakakalliontie 505460 HYVINKÄÄ
Tel.: +358 /19/ 26 64 600Fax: +358 /19/ 26 64 666www.perisuomi.fi
PERI NORGE ASIndustrigata 113400 Lier
Tel.: +47 /32/ 24 17 00Fax: +47 /32/ 24 17 [email protected]
PERI Polska Sp. z o.o.ul. Stołeczna 6205-860 Płochocin
Tel.: +48 /22/ 72 17 400Fax: +48 /22/ 72 17 [email protected]
PERIform SVERIGE ABMontörgatan 4-6Box 907330013 Halmstad
Tel.: +46 /35/ 17 46 60Fax: +46 /35/ 17 46 [email protected]
PERI (Korea) Ltd.9thFl., Yuseong Bldg.830-67 Yeoksam-dong,Kangnam-ku,Seoul 135-080
Tel.: +82 /2/ 5 50 22 00Fax: +82 /2/ 5 57 53 [email protected]
PERIcofragens Lda.Rua Cesário Verde, nº 5 - 3º Esq.Linda-a-Pastora2790-326 QUEIJAS
Tel.: +3 51 /21/ 4 25 38 90Fax: +3 51 /21/ 4 25 39 [email protected]
PERI S.A.Ruta Nacional No. 9, km 47,5(Panamericana Ramal Escobar)(1625) Escobar / Prov. Bs. As.
Tel.: +54 /34 88/ 42 81 00Fax: +54 /34 88/ 42 30 [email protected]
36
1
11
1
2
9
4
21
12
18
20
24
16
3
44
17
13
30
6
28
29
33
32
34
38
46
41
22 19
11
5
48
52
42
53
France
Switzerland
Spain
Belgium/Luxemburg
Netherlands
USA
Indonesia
Italy
Japan
United Kingdom/Ireland
Turkey
Hungary
Malaysia
Singapore
Austria
Czech Republic
Denmark
Finland
Norway
Poland
Sweden
Korea
Portugal
Argentina
PERI GmbH
Rudolf-Diesel-Strasse89264 WeissenhornPhone 07309/950-0Telefax 07309/[email protected]
PERI International
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
37
PERI Formas eEscoramentos Ltda.Rodovia Raposo Tavares, km 41Colinas Bandeirante
CEP 067300-000
Vargem Grande PaulistaSão PauloTel.: +55 / 11 / 41 58 81 88Fax: +55 / 11 / 41 58 81 [email protected]
PERI Chile Ltda.C /José de San Martin 104Parque Industrial Los LibertadoresColina, Santiago de Chile
Tel.: +56 /2/ 4 44 60 00Fax: +56 /2/ 4 44 60 [email protected]
PERI România SRLCalea Bucureşti nr. 2B077015 Baloteşti - ILFOV
Tel.: +40 /21/ 3 51 19 73 (75)Fax: +40 /21/ 3 51 19 [email protected]
Goran Opaliã s. p.technologije in storitveObrežna 1372000 Maribor
Tel.: +386 /2/ 4 21 52 40Fax: +386 /2/ 4 21 52 41
PERI spol. s r.o.Pribylinská 10831 04 Bratislava
Tel.: +421 /2/ 4 92 09-1 11Fax: +421 /2/ 4 92 09-1 [email protected]
TOW PERI Ukraina23, M. Raskowoj Str.02002 Kiev
Tel.: +380 /44/ 5 68 53 57Fax: +380 /44/ 5 68 51 [email protected]
PERI GmbHEgypt Branch Office24 A, Obour Gardens,4th floor, apt. #1Salah Salem Street11361 Heliopolis / Kairo
Tel.: +20 /2/ 4 04 85 24/26Fax: +20 /2/ 4 04 57 [email protected]
PERI - Oplate d.o.o.Jurija Gagarina 8111070 Novi Beograd
Tel.: +3 81/ 11/ 2 15 31-48 /-49Fax: +3 81/ 11 / 3 18 59 [email protected]
PERI Cimbras y Andamios,S.A. de C.V.Cerrada de Tejocotes,Lote 4, Bodega AFracc. San Martin Obispo
C.P.54763 Cuautitlán IzcalliEstado de MéxicoTel.: + 52 / 55 / 58 87 72 30Fax: + 52 / 55 / 58 87 71 [email protected]
PERI BAKUBaku Branch OfficeMehdi Hüseyn 71/9Baku / AserbaidschanTel : + 994 12 97 64 24Fax : + 994 12 92 45 [email protected]
PERI Kal�p ve İskeleleriAşgabat Branch OfficeOguzhan Köçesi No: 112 Kat:3AşgabatTel : +993 12 45 66-83/84Fax : +993 12 45 23 [email protected]
PERI GmbHGikalostr. 3Büro 413220000 Minsk / Belarus
Tel : +3 75 / 1 72 / 84 72 38Fax: +3 75 / 1 72 / 84 72 [email protected]
PERI Oplate i Skele d.o.o.Dolenica 2010 250 Zagreb/Donji Stupnik
Tel : +3 85 /1/ 6 55 36 36 Fax: +3 85 /1/ 6 55 36 [email protected]
PERI GmbHIran Branch OfficeValiasr Ave., No. 1075Flat 904,Tehran / Iran
P.O. Box 15 11 73 49 11Tel : + 98 / 21 / 88 71 27 10Fax: + 98 / 21 / 88 71 27 09
PERI Formwork Systems, Inc.45 Nixon RoadBolton, Ontario
L7E 1K1
Tel.: +1 /9 05/ 9 51 54 00Fax: +1 /9 05/ 9 51 54 [email protected]
PERI GmbHLebanon Representative OfficeAYA Commercial Center, 7th Fl,Dora HighwayP.O box: 90 416-JdeidehBeirut - Lebanon
Tel: + 961 / 1 24 33 65Fax: + 961 / 1 24 33 67Mob: + 961 / 3 73 73 [email protected]@peri.de
PERI UABTitnago st. 192053 Vilnius
Tel.: +370 /5/ 2 31 14 54Fax: +370 /5/ 2 32 19 [email protected]
PERI S.A.Route de Rabat, km. 5Piste de Beni TouzineTanger
Tel.: +212 /39 31 75 48Fax: +212 /39 31 75 [email protected]
PERI FormworkEngineering Ltd.16 Moshe Dayan st.P.O. Box 10202Kiriat AriePetach Tikva 49002
Tel.: +972 /3/ 9 24 93 32Fax: +972 /3/ 9 24 93 [email protected]
PERI BULGARIA EOODKv. Vragdebnam. Nova machala Nr. 461839 – Sofia, Bulgarien
Tel.: +3 59 /2/ 8 14 40 40Fax: +3 59 /2/ 8 14 40 [email protected]
MEST ltd.,Malarhofdi 10110 Reykjavik
Tel.: +354 / 44 00-4 00Fax: +354 / 44 00-4 [email protected]
PERI KazakhstanRubenstein Street 10(corner Dostyk Str.)050010 Almaty
Tel.: +7 /32 72/ 93 00 66Fax: +7 /32 72/ 91 77 [email protected]
OOO PERIUl. Krasnaja Presnja, 24Business-Center“Krasnaja Presnja”, 8. Etage123022 Moskwa
Tel.: +7 / 4 95/ 2 23 88 44Fax: +7/ 4 95/ 2 23 88 [email protected]
PERI Wiehahn (Pty.) Ltd.P.O. Box 2668Bellville 7535
Tel.: +27 /21/ 9 05 18 15Fax: +27 /21/ 9 05 47 [email protected]
PERI Australia Pty. Ltd.116 Glendenning RoadGlendenning NSW 2761
Tel.: +61 /2/ 88 05 23 00Fax: +61 /2/ 96 75 72 [email protected]
PERI ASValdmäe 8Tänassilma Tehnopark76401 Saku vald
HarjumaaTel.: + 3 72 / 6 / 77 11 00Fax: + 3 72 / 6 / 77 11 [email protected]
PERI Hellas Ltd.Sokratous Str.5th kil. Koropi-Varis Ave.P. O. Box 407194 00 Koropi
Tel.: +30 /210/ 66 20 895-8Fax: +30 /210/ 66 28 [email protected]
PERI SIAGranita 261057 Riga
Tel.: +371 / 7 13 41 11Fax: +371 / 7 13 41 [email protected]
PERI (L.L.C.)Brashy Building, Office No. 212Shk. Zayed RoadP.O. Box 27933Dubai
Tel.: +971 /4/ 3 39 44 94Fax: +971 /4/ 3 39 44 [email protected]
35
44
3740
7
26
2527
14
15
23
8
10
31
47
36
39
45
43
49
50 51
52
54
Australia
Estonia
Greece
Latvia
United Arab Emirates
Brazil
Chile
Romania
Slovenia
Slovakia
Ukraine
Egypt
Serbia
Mexico
Azerbaijan
Turkmenistan
Belarus
Croatia
Iran
Canada
Lebanon
Lithuania
Morocco
Israel
Bulgaria
Iceland
Kazakhstan
Russian Federation
South Africa
PERI GmbHP.O. Box 12 6489259 WeissenhornTel.: 0 73 09 / 9 50 -0Fax: 0 73 09 / 9 51 [email protected]
The PERI RangePanel Formwork
TRIO, TRIO-L, TRIO 330Versatile panel systemTRIO HOUSING
TRIO REPLIABLE
DOMINOLight weight panel systemHANDSETThe "one man" panel system
Girder Wall Formwork
VARIO GT 24Wall, column formwork
RUNDFLEX and GRVCircular formwork
FTFFacade formwork
Shoring Systems
ST 100Stacking towerHD 200Heavy duty propPERI MULTIPROPThe Alu propPERI PEP PropPEP = PERI EURO-PROP
Climbing Formwork
KG and CBClimbing systems
ACSSelf climbing formwork
SKS and SSCSingle sided climbing form-work
Scaffolding
UP T 70 / T 100Frame scaffolding
UP RosettModular scaffolding
UP RosettShoring
Column Formwork
RAPIDAlu column formworkTRIOColumn formworkQUATTROThe fast column formworkPERI SRSCircular column formwork
Girder Slab Formwork
MULTIFLEXGirder slab formwork
UNIPORTAL / Table ModulesTable form
PD 81 system for 3 applications
Platform Systems
Folding Platform FB 180Universal working and protective scaffold to DIN 4420
ASG 160The light platform system for building trades
Alu-Slab Formwork
PERI SKYDECKAlu slab formwork system
Further Systems
Software for formwork and scaffolding planning
PlywoodSite equipmentBrace framesFormwork accessoriesCustom forms
D
pr
8.10
e 0
1/20
07 1
0ho
Art
. Nr.:
790
937
© C
opyr
ight
by
PE
RI G
mbH