A1
GLOBALink
VHF Digital Link Mode 2 Progress Report
toICAO AMCP WG-M/2
Prepared by:Dan Pendergast
Presented by:Bassam Farroha
![Page 2: A 1 GLOBALink VHF Digital Link Mode 2 Progress Report to ICAO AMCP WG-M/2 Prepared by: Dan Pendergast dpenderg@arinc.com 410-266-2267 Presented by: Bassam.](https://reader035.fdocuments.in/reader035/viewer/2022062511/55154936550346c77d8b6293/html5/thumbnails/2.jpg)
A2
Overview
VDL Mode 2 Accomplishments to Date
VDL Mode 2 Development Activities
VDL Mode 2 Deployment Activities
![Page 3: A 1 GLOBALink VHF Digital Link Mode 2 Progress Report to ICAO AMCP WG-M/2 Prepared by: Dan Pendergast dpenderg@arinc.com 410-266-2267 Presented by: Bassam.](https://reader035.fdocuments.in/reader035/viewer/2022062511/55154936550346c77d8b6293/html5/thumbnails/3.jpg)
A3
GLOBALink
VDL Mode 2 Progress Summary
![Page 4: A 1 GLOBALink VHF Digital Link Mode 2 Progress Report to ICAO AMCP WG-M/2 Prepared by: Dan Pendergast dpenderg@arinc.com 410-266-2267 Presented by: Bassam.](https://reader035.fdocuments.in/reader035/viewer/2022062511/55154936550346c77d8b6293/html5/thumbnails/4.jpg)
A4
ARINC’s Overall VDL Mode 2 Progress Summary
Initial VDL AOA Operational Capability Deployed and Operational
VDL AOA AQP Capability Established
First Flight Successfully Accomplished
Boeing Black Label Certification Underway
Deployment Activities for VDL Coverage Expansion Underway
ATN Development Meeting Milestones
![Page 5: A 1 GLOBALink VHF Digital Link Mode 2 Progress Report to ICAO AMCP WG-M/2 Prepared by: Dan Pendergast dpenderg@arinc.com 410-266-2267 Presented by: Bassam.](https://reader035.fdocuments.in/reader035/viewer/2022062511/55154936550346c77d8b6293/html5/thumbnails/5.jpg)
A5
GLOBALink
ARINC VDL Mode 2 Development Activities
for 2001
![Page 6: A 1 GLOBALink VHF Digital Link Mode 2 Progress Report to ICAO AMCP WG-M/2 Prepared by: Dan Pendergast dpenderg@arinc.com 410-266-2267 Presented by: Bassam.](https://reader035.fdocuments.in/reader035/viewer/2022062511/55154936550346c77d8b6293/html5/thumbnails/6.jpg)
A6
VDL Mode 2 Program 2001 Development Activities
AOA• Develop and deploy first maintenance release in June• Enhance AQP capability• Deployment RF test/analysis accomplished
Avionics Interoperability Testing for AOA and ATN• Collins underway (AOA and ATN)• Airbus/Aerospatiale underway for AOA• Boeing type certification underway• FAA interoperability tests underway (ATN)• EuroControl PETAL tests underway (ATN ground/ground)• Honeywell imminent (AOA)• Teledyne imminent (AOA)
![Page 7: A 1 GLOBALink VHF Digital Link Mode 2 Progress Report to ICAO AMCP WG-M/2 Prepared by: Dan Pendergast dpenderg@arinc.com 410-266-2267 Presented by: Bassam.](https://reader035.fdocuments.in/reader035/viewer/2022062511/55154936550346c77d8b6293/html5/thumbnails/7.jpg)
A7
VDL Mode 2 Program 2001 Development Activities
ATN• PETAL
Software test near completion and fielded within the next 30 days
– end-to-end CPDLC message delivery proven over the RF– AA 767 w/Collins CMU/ARINC ATN network/Maastricht
5 of 6 Ground stations deployed in Europe 2 AGRMs deployed in Europe ATN routers deployed Engineering network operations center established PETAL aircraft certification
– Two AGTS’s deployed and operational at Dallas-Fort Worth and Tulsa
– Aircraft certification underway
PETAL operational from May through October ‘01
![Page 8: A 1 GLOBALink VHF Digital Link Mode 2 Progress Report to ICAO AMCP WG-M/2 Prepared by: Dan Pendergast dpenderg@arinc.com 410-266-2267 Presented by: Bassam.](https://reader035.fdocuments.in/reader035/viewer/2022062511/55154936550346c77d8b6293/html5/thumbnails/8.jpg)
A8
VDL Mode 2 Program 2001 Development Activities
ATN
• Deployment Activities for Miami Airspace Coverage requirements defined with FAA and
American Airlines Ground Stations fielded as part of AOA deployment in
2001 and early 2002– additional Florida and Caribbean sites required
• ATN Service Operational in December ‘01 Will support CPDLC Build I and AOC needs ATN initially cut-over to limited geographical area Expansion to operational service cloud in Florida in
early ‘02
![Page 9: A 1 GLOBALink VHF Digital Link Mode 2 Progress Report to ICAO AMCP WG-M/2 Prepared by: Dan Pendergast dpenderg@arinc.com 410-266-2267 Presented by: Bassam.](https://reader035.fdocuments.in/reader035/viewer/2022062511/55154936550346c77d8b6293/html5/thumbnails/9.jpg)
A9
GLOBALink
ARINC VDL Mode 2 2001 Deployment Activities
![Page 10: A 1 GLOBALink VHF Digital Link Mode 2 Progress Report to ICAO AMCP WG-M/2 Prepared by: Dan Pendergast dpenderg@arinc.com 410-266-2267 Presented by: Bassam.](https://reader035.fdocuments.in/reader035/viewer/2022062511/55154936550346c77d8b6293/html5/thumbnails/10.jpg)
A10
VDL Mode 2 Service and Ground Station Roll-Out
Initial Operational Capability Established
2001 Deployment Activities Encompasses:• Installing over 80 VDL retrofit kits for currently deployed VDL-
capable ground stations• Beginning deployment of over 90 new ACARS/VDL operational
ground stations Over 20 retrofit kits fabricated to date
• Deploying Air/Ground Routers/Regional Managers (AGRMs)• Establishing VDL Mode 2 ATN IOC capability
2001 Deployment Coverage• Continental US focus is en-route cloud and CPDLC coverage• Europe focus is cloud to support Airbus VDL production
certification
![Page 11: A 1 GLOBALink VHF Digital Link Mode 2 Progress Report to ICAO AMCP WG-M/2 Prepared by: Dan Pendergast dpenderg@arinc.com 410-266-2267 Presented by: Bassam.](https://reader035.fdocuments.in/reader035/viewer/2022062511/55154936550346c77d8b6293/html5/thumbnails/11.jpg)
A11
VDL Mode 2Service and Ground Station Roll-Out
VDL Ground Station Deployment Approach• Long lead parts ordered and fabrication underway• Operational testing underway to ensure smooth
implementation (especially at high volume “critical” airports)
• Begin deployment at @ 20 ground stations per month in 2Q01 with the following focus:
VDL kits for already deployed VDL-upgradeable ground stations
New VDL ground stations for Miami airspace and to fill in holes in en-route VDL coverage
![Page 12: A 1 GLOBALink VHF Digital Link Mode 2 Progress Report to ICAO AMCP WG-M/2 Prepared by: Dan Pendergast dpenderg@arinc.com 410-266-2267 Presented by: Bassam.](https://reader035.fdocuments.in/reader035/viewer/2022062511/55154936550346c77d8b6293/html5/thumbnails/12.jpg)
A12
Representative Planned Operational CoverageCurrently Deployed VDL-Capable Ground Stations
![Page 13: A 1 GLOBALink VHF Digital Link Mode 2 Progress Report to ICAO AMCP WG-M/2 Prepared by: Dan Pendergast dpenderg@arinc.com 410-266-2267 Presented by: Bassam.](https://reader035.fdocuments.in/reader035/viewer/2022062511/55154936550346c77d8b6293/html5/thumbnails/13.jpg)
A13
Summary
One Big Milestone Accomplished and Several To Go in 2001• VDL Mode 2 Is Reality Now
The Focus of 2001 is:• PETAL• Deploying VDL Mode 2 ATN capability for AOC and
CPDLC• Expanding VDL Mode 2 Coverage• Continuing to Work with Industry for VDL Mode 2
Air/Ground Interoperability