900 ACRE MASTER PLANNED BUSINESS PARK LOCATED AT THE …€¦ · Broadmoor N 25 INTERS TATE Academy...
Transcript of 900 ACRE MASTER PLANNED BUSINESS PARK LOCATED AT THE …€¦ · Broadmoor N 25 INTERS TATE Academy...
900 ACRE MASTER PLANNED BUSINESS PARK LOCATED AT THE ENTRANCE TO THE COLORADO SPRINGS AIRPORT
CUSTOMIZED SITES AVAILABLE FOR SALE, LEASE OR BUILD-TO-SUITOFFICE | INDUSTRIAL | RETAIL | ENTERTAINMENT | RECREATION | HOSPITALITY
Air Cargo Rd.
Downtown Colorado Springs
Colorado Springs Airport
Northrop Grumman
The Aerospace Corporation
The Broadmoor
N
25INTERSTATE
Milton E. Proby Pkwy.
Academy Blvd.
S. P
ower
s Bl
vd.
S. Powers Blvd.
Why Colorado Springs?
A THRIVING COMMUNITY*• “Second Most Desirable Place to Live” (U.S. News & World Report, 2017)• Second largest city in Colorado – MSA population over 670,000• Only 70 miles (one hour drive) from Denver• Low cost of living and operating• Highly educated workforce – more than 37% of adults have a bachelor’s
degree or higher• Extraordinary quality of life and outdoor lifestyle
A HUB FOR INDUSTRY*• Key industries: Aerospace and Defense, Information Technology, Cyber-
security, Manufacturing, Healthcare & Medical Technologies, and Sports• Diverse manufacturing presence with more than 400 manufacturers in
the region• 30+ Fortune 500 companies including HP, Progressive Insurance,
Lockheed Martin Corporation, Oracle Corporation, Ford Motor Credit, and Northrop Grumman
• Five military installations with key command units such as Air Force Space Command, Army Strategic Command, and North American Aerospace Defense Command
• Olympic City USA - Headquarters of the U.S. Olympic Committee, U.S. Olympic Training Center, and the U.S. Olympic Museum and Hall of Fame (opening 2019)
• National Cybersecurity Center providing collaborative cybersecurity research, education, and training
EDUCATED WORKFORCE*• Top rated higher education institutions including four NSA certified
Centers of Academic Excellence in Information Assurance » U.S. Air Force Academy
» University of Colorado Colorado Springs
» Pikes Peak Community College
» Colorado Technical University
» Colorado College
• More than 41,000 university and college students• Steady stream of veterans entering the workforce
ACCESSIBILITY**• Centrally located in Mountain Time Zone• Approximately 8 miles to downtown Colorado Springs and 4 miles to
Interstate 25• Colorado Springs Airport
» 7,200 Acres of air field
» 400+ Acres of land for aviation related development
» Four Business Centers: General & Corporate Aviation, Commercial Aviation, Military Aviation, Business Park
COLORADO SPRINGS, COLORADO
* Source: Colorado Springs Chamber & EDC, 2017 ** Source: www.flycos.com
EXCLUSIVE INCENTIVES• Pikes Peak Enterprise Zone• Commercial Aeronautical Zone• Aviation Development Zone• Foreign Trade Zone• State and regional incentives
available to support business development projects
PRIME LOCATION• Directly south of the Colorado
Springs Airport• Quick access to I-25 from
Academy Boulevard• Visible to over 20,000 vehicles
per day on Powers Boulevard
Why Peak Innovation Park?
PRIME LOCATION DIRECTLY SOUTH OF THE COLORADO SPRINGS AIRPORT
Peak Innovation Park Master PlanCOLORADO SPRINGS, CO A U G U S T 1 , 2 0 1 7
TRAVEL & HOSPITALITY MIXED USE Conference CenterConference Hotel(s)Travel Convenience High-tech Business/Office Transitions to Corporate and Government Aviation Retail, Restaurants, and Fitness
INNOVATION & ENTERTAINMENT MIXED USE Think Tank/Innovation Central Green High-tech Business/Office/Incubator SpacesEducation Entertainment Retail, Restaurants, and FitnessResidential over Retail and Office
TRAVEL & HOSPITALITY MIXED USE
CORPORATE AVIATION
GOVERNMENT AVIATION
MILTON E PROBY PKWY
S POWERS BLVD.
PKWY
Community Amenity/
Event Space
AIRPORT FACILITIES
INNOVATION & ENTERTAINMENT
MIXED USE
UTILITY
AIRPORT FACILITIES
OPENSPACE
CRESTERA
Future connection to Bradley Road and S. Powers Blvd.
DESIGN GOALS:• Create a vibrant environment for travelers,
companies, employees and residents• Strongly integrate airport and business park
systems• Support connectivity with strong regional, local,
neighborhood and pedestrian circulation patterns that re-enforce western views
• Create two distinct Mixed-Use Zones connected through amenity streets and green-way patterns and focus amenities on the unique users groups
S POWERS BLVD.
Northrop Grumman(EXISITNG OFFICE)
Aerospace Corporation
(EXISITNG OFFICE)
A/DACGARRIVAL/DEPARTURE
AIRFIELD CONTROL GROUP
Future Detention
Future Detention
GR
INN
ELL
ST
To Terminal
From Terminal
PA 1 EMPLOYMENT
Sky View Sports Complex
PA 2 EMPLOYMENT
(
PA 3RETAIL
PA 4RETAIL
PA 5RETAIL
PA 6MIXED USE
PA 7MIXED USE
PA 8MIXED USE
PA 9MIXED USE
PA 10MIXED USE
PA 11MIXED USE
PA 12MIXED USE
PA 17MIXED USE
PA 19RETAIL
PA 20RETAIL
PA 21RETAIL
PA 22RETAIL
PA 23RETAIL
PA 44EMPLOYMENT
PA 24MIXED USE
PA 25MIXED USE
PA 26MIXED USE
PA 29MIXED USE
PA 30MIXED USE
PA 31MIXED USE
PA 15 EMPLOYMENT
PA 14MIXED USE
PA 16MIXED USE
PA 13MIXED USE
PA 27 EMPLOYMENT
PA 28 EMPLOYMENT
PA 40EMPLOYMENT
PA 41EMPLOYMENT
PA 43EMPLOYMENT
PA 42EMPLOYMENT
PA 36EMPLOYMENTPA 35
EMPLOYMENT
PA 32RETAIL
PA 33RETAIL
PA 34RETAIL
PA 37RETAIL
PA 38RETAIL
PA 39 EMPLOYMENT
CONCEPTUAL PREFERRED LAND USE PLAN
PA 18MIXED USE
OPENSPACE
OPENSPACE
OPENSPACE
DRENNAN RD
Future Detention
Future Detention
Future Detention
Future Detention
Future Detention
Future Connection to
Marksheffel Road OPEN SPACE
AMENITY PARK SPACE
EMPLOYMENT
AVIATION USES
MIXED USE
RETAIL 126 AC +/- 5
OFFICE, RESEARCH AND DEVELOPMENT, LIGHT INDUSTRIAL AND MANUFACTURING
LEGEND
AMENITY STREET CONNECTION
BLUESTEM PRAIRIE GRASS
PREFERRED HOTEL LOCATIONS
RP
Z
RP
Z
RP
Z
AP
Z1
RP
Z
AP
Z2
0 250 500 1000
AP
Z1
Option Property(OFFICE)
AP
Z1
Future Development
Future Development
Future Development
Future Development
AP
Z2
AP
Z1
LAN
GLE
Y S
T.
MIL
TON
E P
RO
BY
PK
WY
Milton Proby AirPort return
CAR
GO
R
D.
AIR
.
CENTRAL GREEN
CE
NTR
AL
GR
EE
N
MU
LTI-M
OD
ULE
CO
RR
IDO
R
Sky View Sports Complex
** NOTE: THIS CURRENT “CONCEPTUAL MASTER PLAN,” DATED JULY 31, 2017 IS “CONCEPTUAL ONLY” TO ILLUSTRATE ONE POSSIBLE SCENARIO AND DOES NOT REPRESENT ANY FINAL PROPOSED COMMITMENT OR CONDITIONS. THIS INITIAL CONCEPTUAL MASTER PLAN IS INTENDED TO HELP ENVISION THE POTENTIAL OF THE PROJECT AND IS SUBJECT TO CHANGES AND REFINEMENTS WITHOUT NOTIFICATION, PER MARKET CONDITIONS AND AS THE DETAILS OF THE ACTUAL APPROVED DEVELOPMENT UNFOLDS.
SITE AVAILABILITY• Over 900 acres, with
customized land sites from one acre
• Build-to-suits available for all product types starting at 10,000 RSF
• Sites are available for sale, lease, or build-to-suit
• Zoned for multiple uses including office, industrial, retail, entertainment, recreation and hospitality
Peak Innovation Park Master PlanCOLORADO SPRINGS, CO A U G U S T 1 , 2 0 1 7
TRAVEL & HOSPITALITY MIXED USE Conference CenterConference Hotel(s)Travel Convenience High-tech Business/Office Transitions to Corporate and Government Aviation Retail, Restaurants, and Fitness
INNOVATION & ENTERTAINMENT MIXED USE Think Tank/Innovation Central Green High-tech Business/Office/Incubator SpacesEducation Entertainment Retail, Restaurants, and FitnessResidential over Retail and Office
TRAVEL & HOSPITALITY MIXED USE
CORPORATE AVIATION
GOVERNMENT AVIATION
MILTON E PROBY PKWY
S POWERS BLVD.
PKWY
Community Amenity/
Event Space
AIRPORT FACILITIES
INNOVATION & ENTERTAINMENT
MIXED USE
UTILITY
AIRPORT FACILITIES
OPENSPACE
CRESTERA
Future connection to Bradley Road and S. Powers Blvd.
DESIGN GOALS:• Create a vibrant environment for travelers,
companies, employees and residents• Strongly integrate airport and business park
systems• Support connectivity with strong regional, local,
neighborhood and pedestrian circulation patterns that re-enforce western views
• Create two distinct Mixed-Use Zones connected through amenity streets and green-way patterns and focus amenities on the unique users groups
S POWERS BLVD.
Northrop Grumman(EXISITNG OFFICE)
Aerospace Corporation
(EXISITNG OFFICE)
A/DACGARRIVAL/DEPARTURE
AIRFIELD CONTROL GROUP
Future Detention
Future Detention
GR
INN
ELL
ST
To Terminal
From Terminal
PA 1 EMPLOYMENT
Sky View Sports Complex
PA 2 EMPLOYMENT
(
PA 3RETAIL
PA 4RETAIL
PA 5RETAIL
PA 6MIXED USE
PA 7MIXED USE
PA 8MIXED USE
PA 9MIXED USE
PA 10MIXED USE
PA 11MIXED USE
PA 12MIXED USE
PA 17MIXED USE
PA 19RETAIL
PA 20RETAIL
PA 21RETAIL
PA 22RETAIL
PA 23RETAIL
PA 44EMPLOYMENT
PA 24MIXED USE
PA 25MIXED USE
PA 26MIXED USE
PA 29MIXED USE
PA 30MIXED USE
PA 31MIXED USE
PA 15 EMPLOYMENT
PA 14MIXED USE
PA 16MIXED USE
PA 13MIXED USE
PA 27 EMPLOYMENT
PA 28 EMPLOYMENT
PA 40EMPLOYMENT
PA 41EMPLOYMENT
PA 43EMPLOYMENT
PA 42EMPLOYMENT
PA 36EMPLOYMENTPA 35
EMPLOYMENT
PA 32RETAIL
PA 33RETAIL
PA 34RETAIL
PA 37RETAIL
PA 38RETAIL
PA 39 EMPLOYMENT
CONCEPTUAL PREFERRED LAND USE PLAN
PA 18MIXED USE
OPENSPACE
OPENSPACE
OPENSPACE
DRENNAN RD
Future Detention
Future Detention
Future Detention
Future Detention
Future Detention
Future Connection to
Marksheffel Road OPEN SPACE
AMENITY PARK SPACE
EMPLOYMENT
AVIATION USES
MIXED USE
RETAIL 126 AC +/- 5
OFFICE, RESEARCH AND DEVELOPMENT, LIGHT INDUSTRIAL AND MANUFACTURING
LEGEND
AMENITY STREET CONNECTION
BLUESTEM PRAIRIE GRASS
PREFERRED HOTEL LOCATIONS
RP
Z
RP
Z
RP
Z
AP
Z1
RP
Z
AP
Z2
0 250 500 1000
AP
Z1
Option Property(OFFICE)
AP
Z1
Future Development
Future Development
Future Development
Future Development
AP
Z2
AP
Z1
LAN
GLE
Y S
T.
MIL
TON
E P
RO
BY
PK
WY
Milton Proby AirPort return
CAR
GO
R
D.
AIR
.
CENTRAL GREEN
CE
NTR
AL
GR
EE
N
MU
LTI-M
OD
ULE
CO
RR
IDO
R
Sky View Sports Complex
** NOTE: THIS CURRENT “CONCEPTUAL MASTER PLAN,” DATED JULY 31, 2017 IS “CONCEPTUAL ONLY” TO ILLUSTRATE ONE POSSIBLE SCENARIO AND DOES NOT REPRESENT ANY FINAL PROPOSED COMMITMENT OR CONDITIONS. THIS INITIAL CONCEPTUAL MASTER PLAN IS INTENDED TO HELP ENVISION THE POTENTIAL OF THE PROJECT AND IS SUBJECT TO CHANGES AND REFINEMENTS WITHOUT NOTIFICATION, PER MARKET CONDITIONS AND AS THE DETAILS OF THE ACTUAL APPROVED DEVELOPMENT UNFOLDS.
INFRASTRUCTURE• The Peak Innovation Park
property is currently served with adequate capacities of utilities for development of all anticipated land uses. The project has an extensive network of water, wastewater, electric, natural gas and telecommunication systems in place.
• Existing trunk lines in Milton E. Proby Pkwy.
Milton E. Proby Pkwy.
S. Academy Blvd.
I-25 ACCESS
For more information, please contact:
ALEC RHODES, sior
Managing Director+1 303 312 [email protected]
AARON VALDEZDirectorCertified Supply Chain Professional+1 303 312 [email protected]
PETER SCOVILLE Managing Director+1 719 418 [email protected]
DAVE JOHNSON, ccim
Executive Director+1 303 312 [email protected]
AARON HORNManaging Director+1 719 418 [email protected]
900 ACRE MASTER PLANNED BUSINESS PARK LOCATED AT THE ENTRANCE TO THE COLORADO SPRINGS AIRPORT
1401 Lawrence Street, Suite 1100 / Denver, Colorado 80202 / phone +1 303 292 3700 / fax +1 303 534 8270 / cushmanwakefield.com
© 2018 Cushman & Wakefield. All rights reserved. The information contained in this communication is strictly confidential. This information has been obtained from sources believed to be reliable but has not been verified. NO WARRANTY OR REPRESENTATION, EXPRESS OR IMPLIED, IS MADE AS TO THE CONDITION OF THE PROPERTY (OR PROPERTIES) REFERENCED HEREIN OR AS TO THE ACCURACY OR COMPLETENESS OF THE INFORMATION CONTAINED HEREIN, AND SAME IS SUBMITTED SUBJECT TO ERRORS, OMISSIONS, CHANGE OF PRICE, RENTAL OR OTHER CONDITIONS, WITHDRAWAL WITHOUT NOTICE, AND TO ANY SPECIAL LISTING CONDITIONS IMPOSED BY THE PROPERTY OWNER(S). ANY PROJECTIONS, OPINIONS OR ESTIMATES ARE SUBJECT TO UNCERTAINTY AND DO NOT SIGNIFY CURRENT OR FUTURE PROPERTY PERFORMANCE.