    Communication Form Site Management

    (Compile date )2012/10/26 (Refrence No.): 330BCFSM024(PROJECT NAME) MADHUCON PHASE II(TYPE OF BOILER) 330B-MX1(UG-487/13.7-M)

    PART NAME

    (BRICKS LAYING DWG)

    (DRAWING NO.) 330B-5

    Problemdescribe

    3#

    Regarding to the problem of 3# castable on site construction,

    introduction will be made step by step as the photo during

    construction.

    Soultion

    . The serious waste of materialsduring site construction

    1 pic11

  • 7/30/2019 9 11 12 Refractory Problems

    2/9

    2 / 9

    During site construction, materials are wasted seriously,Pic. 1 was

    taken during right separator import construction;

    . Improper storage of the materials

    2 pic2 3 pic3

    23

    Pic.2 and Pic.3 showed the storage situation of refractory brick and

    insulating brick on site, all bricks on site were air storage, not

    meet the castable storage requirements.

    . Castable junction surface

    4 pic4

    4

    Must ensure the smoothness of the position pic.4 showed after

    construction every time.

    here should be

    smooth, or castable

    will be leakiness

    and easily dropped.

    correctly

    construction,

    smoothness satisfied

    the requirements

  • 7/30/2019 9 11 12 Refractory Problems

    3/9

    3 / 9

    .Pouring on header

    5 pic5

    300mmWhen separator band header castable construction,300mm transition

    region should be ensured.

    . During construction of plastic material

    6 pic6

    7 pic7

    300mm

    There should be

    no binding gap 300mm

    above the header, castable

    should be completion

    entirely in this area.

    Wrong

    construction ,

    water enters

    Right

    construction,color after

    construction

  • 7/30/2019 9 11 12 Refractory Problems

    4/9

    4 / 9

    6

    7

    Water entered part locaion of plastic material, lead to the

    construction quality can not meet the requirements(as the comparison

    in pic. 6), workers can use the agglutinant(pic.7) for washing hands

    during site construction, no water for washing.

    . Part of wall surface

    8 pic8 9 pic9

    898

    Comparision between Pic.8&pic.9, part of wall surface is not smooth,

    maybe theres no firmly hammer after construction.

    . Asphalt brushed uneven

    10 pic10 11 pic11

    1011

    Asphalt brushed uneven,as pic.10(upper part of furnace side

    wall),pic.11(underpart of furnace)

    . Reserved combination spaceof two different parts does not meet the requirements

  • 7/30/2019 9 11 12 Refractory Problems

    5/9

    5 / 9

    12 pic12

    The reserved space at center cylinder of seperator,castable here will

    be easily dropped during boiler operating.

    . Nail construction in water-cooled plenum

    13 pic13

    The

    space here is

    too narrow,

    bigger space is

    needed to

    ensure the

    strength.

  • 7/30/2019 9 11 12 Refractory Problems

    6/9

    6 / 9

    14 pic14

    15 pic15 16 pic16

    131414

    1516

    Pic.13 and pic.14(in pic.14,nails blocked the air inlet of cowl),nailswelding does not in according with the drawing,site construction

    should be as pic.15&16)

    . Sealing should be donebefore the water-cooled plenum castable construction

  • 7/30/2019 9 11 12 Refractory Problems

    7/9

    7 / 9

    17 pic17

    18 pic18

    19 pic19

    Unfinished

    sealing here.

    Unfinished

    sealing here,

    coal will

    easily

    leaking.

    Sealed

    here.

  • 7/30/2019 9 11 12 Refractory Problems

    8/9

    8 / 9

    17181918

    In pic.17&18, different parts of water-cooled plenum had not

    sealed yet; pic.19 showed the completed sealing style, the same part

    as pic.18.

    . Return device construction

    20 pic20 21 pic21

    2021330B-5

    Pic.20&21 should open the venthole during

    ovening according to 330B-5 technical requirements when welding the

    nails.(venthole can be made by welding gun directly.

    22 pic22

    2#222#

    3#4#

    2# Boiler (pic.22), template and vibrator are unused during return

  • 7/30/2019 9 11 12 Refractory Problems

    9/9

    9 / 9

    apparatus construction, result in large area castable damaged during

    2# boiler operating. Second stage( 3# and 4# boiler) are required to

    use template and vibrator, or re-construction should be apply.

    .

    23 pic23

    23The reserved space

    from furnace exit to expansion joint of separator (pic.23) is too

    small.

    4#Note: regarding to above problems, re-construction should be appliedif seriously affected the construction quality; if not seriously,should pay attention during construction of 4# boiler.

    (CONSTRUCTION COMPANY)(REPRESENTITIVE):(SIGN DATE) Annex

    the

    space here is

    too smallcan not meet

    the

    requirement

    the

    space here

    can meet the

    requirement