An Innovative Approach to Big Ticket Infrastructure Decision-Making:Sewer Collection PlanningNational APWA 2014 Congress
Toronto, Ontario
Presenters:
Tom Hickmann P.E.Director of the Engineering and Infrastructure Planning Department, City of Bend
David Stangel P.E. Principal Engineer, Murray, Smith & Associates
Jeff FreyCo-founder & VP Client Services, Optimatics, LLC.
Libby Barg Vice President, Barney & Worth, Inc.
OrientationImmediate Capacity Optimization
Solution Recommendation
Model Building
Sewer Infrastructure Advisory Group (SIAG)
SIAG
Project phases = Presentation format
![Page 2: 8991 An Innovative Approach for Big Ticket Infrastructure ... · 8/25/2014 3 The City of Bend’s wastewater collection system 430 miles of sewer mains 90 sewer pumping stations 246](https://reader034.fdocuments.in/reader034/viewer/2022050121/5f51a66f5851dc4f5a18a496/html5/thumbnails/2.jpg)
8/25/2014
2
Where is Bend?
City of Bend
Oregon
What is Bend?
Project phases = Presentation format
OrientationImmediate Capacity Optimization
Solution Recommendation
Model Building
SIAG
SIAG
![Page 3: 8991 An Innovative Approach for Big Ticket Infrastructure ... · 8/25/2014 3 The City of Bend’s wastewater collection system 430 miles of sewer mains 90 sewer pumping stations 246](https://reader034.fdocuments.in/reader034/viewer/2022050121/5f51a66f5851dc4f5a18a496/html5/thumbnails/3.jpg)
8/25/2014
3
The City of Bend’s wastewater collection system
430 miles of sewer mains
90 sewer pumping stations
246 home pumping stations
System contains 4 different types of collection infrastructure
Collects 6.0 million gallons per day
The system is
cobbled together
and near capacity.
What’s the problem?
Bend is growing rapidly
36% increase since 2000
![Page 4: 8991 An Innovative Approach for Big Ticket Infrastructure ... · 8/25/2014 3 The City of Bend’s wastewater collection system 430 miles of sewer mains 90 sewer pumping stations 246](https://reader034.fdocuments.in/reader034/viewer/2022050121/5f51a66f5851dc4f5a18a496/html5/thumbnails/4.jpg)
8/25/2014
4
Same 8” gravity line that River Rim &
Poplar Park feed to.
11
Flow profile of critical manhole
![Page 5: 8991 An Innovative Approach for Big Ticket Infrastructure ... · 8/25/2014 3 The City of Bend’s wastewater collection system 430 miles of sewer mains 90 sewer pumping stations 246](https://reader034.fdocuments.in/reader034/viewer/2022050121/5f51a66f5851dc4f5a18a496/html5/thumbnails/5.jpg)
8/25/2014
5
Master planning - take 1
Recommendation: shift to gravity conveyance
Major interceptors to reduce demand on city core
Focus was on alleviating problem areas
Capacity issues addressed
Improved access for unsewered areas
2007 Proposed CIP
City of Bend
Citizens unhappy with the City…
Key Findings: No shared understanding of Bend’s infrastructure challenges No shared vision for solutions A strong perception among stakeholders: the City “doesn’t
listen” No single source for credible
information on infrastructure projects
The general public is thought to be unaware and apathetic
Stakeholder interviews conducted in 2012
![Page 6: 8991 An Innovative Approach for Big Ticket Infrastructure ... · 8/25/2014 3 The City of Bend’s wastewater collection system 430 miles of sewer mains 90 sewer pumping stations 246](https://reader034.fdocuments.in/reader034/viewer/2022050121/5f51a66f5851dc4f5a18a496/html5/thumbnails/6.jpg)
8/25/2014
6
What happened next?
2875
OrientationImmediate Capacity Optimization
Solution Recommendation
Model Building
SIAG
SIAG
Project phases = Presentation format
Community helps solve the problems
Sewer Infrastructure Advisory Group (SIAG): 16-member citizen committee
Appointed by Bend City Council in 2012
Advises master planning
Goal: Develop affordablecollection systemimprovements for Bend —within the current Urban Growth Boundary.
![Page 7: 8991 An Innovative Approach for Big Ticket Infrastructure ... · 8/25/2014 3 The City of Bend’s wastewater collection system 430 miles of sewer mains 90 sewer pumping stations 246](https://reader034.fdocuments.in/reader034/viewer/2022050121/5f51a66f5851dc4f5a18a496/html5/thumbnails/7.jpg)
8/25/2014
7
SIAG members' expertise:
Chamber of Commerce
Land use
Large sewer users
Attorneys
Schools
Community leaders
Economics / CPA
Environmental
Utilities
Architect
Developers
Medical
SIAG participated in entire process
Identified community priorities
Reviewed & evaluated short- and long-term collection system needs
Identified a community-supported financial strategy
Considered the financial, engineering, economic development, growth management, and political implications of various alternatives
Provided updates and a final recommendation to City Council
In-depth involvement:
SIAG met 21 times (Jul. 2012 – Aug. 2014),
totaling more than 1,100 hours of volunteering
![Page 8: 8991 An Innovative Approach for Big Ticket Infrastructure ... · 8/25/2014 3 The City of Bend’s wastewater collection system 430 miles of sewer mains 90 sewer pumping stations 246](https://reader034.fdocuments.in/reader034/viewer/2022050121/5f51a66f5851dc4f5a18a496/html5/thumbnails/8.jpg)
8/25/2014
8
OrientationImmediate Capacity Optimization
Solution Recommendation
Model Building
SIAG
SIAG
Project phases = Presentation format
Project and PM challenges:
Some projects from original master plan already underway
No hydraulic model to identify immediate solutions
Lack of clarity concerning wet weather response in system
High level of community involvement / public interest / scrutiny
Master planning with everyone involved
Traditional Master Plan Bend’s Master Plan
Focus on engineeringsolutions
Focus on community values, then engineering solutions
Planning assumptions taken at face-value
Every assumption scrutinized
Solution set limited
No special modeling tools
Focus on capital costs
Day-to-day approvers: City staff
Solution set expanded
Optimization modeling
Full life-cycle costs analyzed
Approvers: community members / City staff / City Council
![Page 9: 8991 An Innovative Approach for Big Ticket Infrastructure ... · 8/25/2014 3 The City of Bend’s wastewater collection system 430 miles of sewer mains 90 sewer pumping stations 246](https://reader034.fdocuments.in/reader034/viewer/2022050121/5f51a66f5851dc4f5a18a496/html5/thumbnails/9.jpg)
8/25/2014
9
Project schedule
OrientationImmediate Capacity Optimization
Solution Recommendation
Model Building
SIAG
SIAG
Project phases = Presentation format
City of Bend
Existing sewer challenges
![Page 10: 8991 An Innovative Approach for Big Ticket Infrastructure ... · 8/25/2014 3 The City of Bend’s wastewater collection system 430 miles of sewer mains 90 sewer pumping stations 246](https://reader034.fdocuments.in/reader034/viewer/2022050121/5f51a66f5851dc4f5a18a496/html5/thumbnails/10.jpg)
8/25/2014
10
Areas 3 & 5 Option Combo:
28
New Colorado Lift Station & Force Main to 2nd Street$3,890,000
Immediate term improvement options
Area 3Solution 1
Westside PS Pumps
$701,000
Area 3Solution 2
Westside PS Pumps & Storage
$1,509,000
Combo:Areas 3 & 5
New Colorado Lift Station
$3,890,000
Area 5Solution 1
Gravity Sewer
$256,000
Area 5Solution 2
Reconstruct Shevlin PS
$897,000
Area3
Area5
+ OR
OR
OR
Which solution is best? Why?
OrientationImmediate Capacity Optimization
Solution Recommendation
Model Building
SIAG
SIAG
Project phases = Presentation format
![Page 11: 8991 An Innovative Approach for Big Ticket Infrastructure ... · 8/25/2014 3 The City of Bend’s wastewater collection system 430 miles of sewer mains 90 sewer pumping stations 246](https://reader034.fdocuments.in/reader034/viewer/2022050121/5f51a66f5851dc4f5a18a496/html5/thumbnails/11.jpg)
8/25/2014
11
Build comprehensive model & prepare optimization inputs
Create pipe network from updated GIS
Load model with existing and future sewer flows
Collect sewer flow monitoring
Calibrate model
Set design criteria
Evaluate system under existing and future conditions
Develop unit costs
Identify potential alternatives
Existing loading development
Capacity for special areas
Areas such as: Central area plan (yellow)
OSU cascades campus (orange)
Transit corridors (red)
Hospital (blue)
Additional areas?
![Page 12: 8991 An Innovative Approach for Big Ticket Infrastructure ... · 8/25/2014 3 The City of Bend’s wastewater collection system 430 miles of sewer mains 90 sewer pumping stations 246](https://reader034.fdocuments.in/reader034/viewer/2022050121/5f51a66f5851dc4f5a18a496/html5/thumbnails/12.jpg)
8/25/2014
12
Flow monitoring
Flow monitoring
2013 47 locations plus water
reclamation facility
No rain
2011 33 locations plus water
reclamation facility
No rain
2007 15 locations
Two rain events
Calibration
![Page 13: 8991 An Innovative Approach for Big Ticket Infrastructure ... · 8/25/2014 3 The City of Bend’s wastewater collection system 430 miles of sewer mains 90 sewer pumping stations 246](https://reader034.fdocuments.in/reader034/viewer/2022050121/5f51a66f5851dc4f5a18a496/html5/thumbnails/13.jpg)
8/25/2014
13
Define design criteria
Define the hydraulic and basic facility parameters used in the optimization analysis:• Sewage level in pipes/manholes• Flow velocity• Pump operation under dry and wet weather• Emergency power at lift stations• Standard pipe sizes• Pipe slope• Others
Used to identify existing deficiencies and set requirements for proposed improvements
Bend geology poses challenges for traditional excavation methods
Rock excavation assumed in all cases
Pipe cost development
Saw trenching Rock sawing
![Page 14: 8991 An Innovative Approach for Big Ticket Infrastructure ... · 8/25/2014 3 The City of Bend’s wastewater collection system 430 miles of sewer mains 90 sewer pumping stations 246](https://reader034.fdocuments.in/reader034/viewer/2022050121/5f51a66f5851dc4f5a18a496/html5/thumbnails/14.jpg)
8/25/2014
14
Pipe installation methods: special crossings
Unique costs assigned in optimization
Directional drilling
Bore and jack
Unique costs assigned in optimization Different methods identified for unique locations
Pipe rehabilitation - alternatives
Cured-in-place pipe Sliplining
Sliplining
In-line storage alternatives
Used for wet weather peaks only
Usually a big pipe or box culvert
Probably best deployed ‘higher’ in the system
Important to capture the ‘real’ initial price for the cost basis
Important to capture the ‘real’ O&M price for the cost basis
![Page 15: 8991 An Innovative Approach for Big Ticket Infrastructure ... · 8/25/2014 3 The City of Bend’s wastewater collection system 430 miles of sewer mains 90 sewer pumping stations 246](https://reader034.fdocuments.in/reader034/viewer/2022050121/5f51a66f5851dc4f5a18a496/html5/thumbnails/15.jpg)
8/25/2014
15
Offline storage alternatives
Used for wet weather peaks only
Tank, basin, or vault
More applicable ‘lower’ in the system
Important to capture the ‘real’ initial and O&M prices for the cost basis
Wastewater treatment process
Optimization role
Satellite treatment must operate year-round to offset collection system capacity needs
Collection system deficiencies and available land determine satellite treatment sites
Satellite Treatment
Facility
Disposal Site (Liquid & Solids)
![Page 16: 8991 An Innovative Approach for Big Ticket Infrastructure ... · 8/25/2014 3 The City of Bend’s wastewater collection system 430 miles of sewer mains 90 sewer pumping stations 246](https://reader034.fdocuments.in/reader034/viewer/2022050121/5f51a66f5851dc4f5a18a496/html5/thumbnails/16.jpg)
8/25/2014
16
Develop unit costs
Alternatives need to demonstrate:
Life Cycle Costs can be “independently” verified• Land area, initial cost, energy use, O&M, chemicals, etc.
Past performance in municipal installations
Past performance in similar applications• Regulatory, climate, geology
Record of multiple years of O&M, energy data
Support from a U.S. based “supplier” of equipment and parts
COST
CONFIDENCE
Unit costs – WWTP Example
Construction costs decrease with size
Decentralized
Satellite
Individual and Cluster
Optimization alternatives
![Page 17: 8991 An Innovative Approach for Big Ticket Infrastructure ... · 8/25/2014 3 The City of Bend’s wastewater collection system 430 miles of sewer mains 90 sewer pumping stations 246](https://reader034.fdocuments.in/reader034/viewer/2022050121/5f51a66f5851dc4f5a18a496/html5/thumbnails/17.jpg)
8/25/2014
17
Economic evaluation of alternatives
EUAC – Equivalent Uniform Annual Cost
Used to ensure assets with differing life spans and capital, operating and maintenance costs are compared on an equal basis
Calculates the cost per year of owning and operating an asset over its entire life span
Removes the need to separately quantify the value of an asset at the end of the cost analysis period
For the purpose of presenting results, the total EUAC was converted to a 40-year life-cycle cost by multiplying the EUAC by 40
The 40-year analysis period is arbitrary and does not affect the optimization
Equivalent uniform annual costexample comparison
Gravity Pipe Life Cycle Cost $(80-Y Life) Annual Capital Cost (1/80)
Annual O&M Cost
Annual Electricity Cost
= Total EUAC Gravity Pipe
Lift Station Life Cycle Cost $(35-Y Life) Annual Capital Cost (1/35)
Annual O&M Cost
Annual Electricity Cost
= Total EUAC Lift Station
Equivalent uniform annual costexample comparison
+
++
+
Overall sewer cost components
![Page 18: 8991 An Innovative Approach for Big Ticket Infrastructure ... · 8/25/2014 3 The City of Bend’s wastewater collection system 430 miles of sewer mains 90 sewer pumping stations 246](https://reader034.fdocuments.in/reader034/viewer/2022050121/5f51a66f5851dc4f5a18a496/html5/thumbnails/18.jpg)
8/25/2014
18
Sewer monitoring & flow triggers
Flow Triggers (aka don’t build it until you need it)
Flow trigger location1500 gpm (peak dry)
2+ miles of 30” gravity main$8m+
Flow triggers (don’t build it until you need it)
OrientationImmediate Capacity Optimization
Solution Recommendation
Model Building
SIAG
SIAG
Project phases = Presentation format
![Page 19: 8991 An Innovative Approach for Big Ticket Infrastructure ... · 8/25/2014 3 The City of Bend’s wastewater collection system 430 miles of sewer mains 90 sewer pumping stations 246](https://reader034.fdocuments.in/reader034/viewer/2022050121/5f51a66f5851dc4f5a18a496/html5/thumbnails/19.jpg)
8/25/2014
19
Optimization addresses Bend’s key issues
Sewer system upgrades estimated at more than $130
million
Aging and under-sized infrastructure requires quick
attention
Limits on funding necessitate staging of improvements
Active citizenry wants to participate in the planning
process
Simplify operations by eliminating dozens of pump stations challenge
Optimization goals
Reduce or defer CIP costs by >20% and improve
performance
Investigate a wide range of scenarios to provide confidence
in the selected solution
Permit SIAG to provide input based on public preferences
Create staged plans to minimize overall life-cycle cost
Traditional modeling
Planner interacts with simulation model using iterative, trial and error process.
Planner inputs simulation data, but is unable to consider both the life-cycle costs and the hydraulic performance of alternative designs necessary to identify the best solutions.
![Page 20: 8991 An Innovative Approach for Big Ticket Infrastructure ... · 8/25/2014 3 The City of Bend’s wastewater collection system 430 miles of sewer mains 90 sewer pumping stations 246](https://reader034.fdocuments.in/reader034/viewer/2022050121/5f51a66f5851dc4f5a18a496/html5/thumbnails/20.jpg)
8/25/2014
20
Optimization modeling
Planner inputs all allowable improvement options, as well as the required performance standards to be met.
Optimization model automates the iterative process by creating thousands of solutions and simulating each one to evaluate its cost and performance while converging on lowest cost approach.
Optimizer’s intelligent search example
Optimizer options analysis process
Formulate
Run
Review
Refine Scenarios /Sensitivity Analyses
Optimizer WCSTM
![Page 21: 8991 An Innovative Approach for Big Ticket Infrastructure ... · 8/25/2014 3 The City of Bend’s wastewater collection system 430 miles of sewer mains 90 sewer pumping stations 246](https://reader034.fdocuments.in/reader034/viewer/2022050121/5f51a66f5851dc4f5a18a496/html5/thumbnails/21.jpg)
8/25/2014
21
Bend 2033 Optimization Options
Animation of Bend optimization run
Pipe and pump options shown in blue
Storage options shown in purple
Animation of Bend optimization run
Cost ItemTotal Cost ($ Arb) (Including O&M)
Pipes
Pumps
Storage
Total Project Cost
![Page 22: 8991 An Innovative Approach for Big Ticket Infrastructure ... · 8/25/2014 3 The City of Bend’s wastewater collection system 430 miles of sewer mains 90 sewer pumping stations 246](https://reader034.fdocuments.in/reader034/viewer/2022050121/5f51a66f5851dc4f5a18a496/html5/thumbnails/22.jpg)
8/25/2014
22
Actual processing time: 0.15 hours
(cloud computing using 104 cores in parallel)
Complete hydraulic analysis of each trial solution
Detailed life-cycle cost analysis of each trial sol.
All costs divided by arbitrary value for purpose of demonstration
Cost ItemTotal Cost ($ Arb) (Including O&M)
Pipes 58.3
Pumps 5.4
Storage 8.3
Total Project Cost 72.0
Generation 1 (200 Trial Solutions) Best Solution in 1st Generation
Generation 2 (400 Trial Solutions) Best Solution in 2nd Generation
Cost ItemTotal Cost ($ Arb) (Including O&M)
Pipes 51.3
Pumps 4.3
Storage 8.7
Total Project Cost 64.3
Actual processing time: 0.3 hours
(cloud computing using 104 cores in parallel)
Complete hydraulic analysis of each trial solution
Detailed life-cycle cost analysis of each trial sol.
All costs divided by arbitrary value for purpose of demonstration
Generation 5 (1,000 Trial Solutions) Best Solution in 5th Generation
Cost ItemTotal Cost ($ Arb) (Including O&M)
Pipes 49.4
Pumps 5.9
Storage 6.1
Total Project Cost 61.4
Actual processing time: 0.75 hours
(cloud computing using 104 cores in parallel)
Complete hydraulic analysis of each trial solution
Detailed life-cycle cost analysis of each trial sol.
All costs divided by arbitrary value for purpose of demonstration
![Page 23: 8991 An Innovative Approach for Big Ticket Infrastructure ... · 8/25/2014 3 The City of Bend’s wastewater collection system 430 miles of sewer mains 90 sewer pumping stations 246](https://reader034.fdocuments.in/reader034/viewer/2022050121/5f51a66f5851dc4f5a18a496/html5/thumbnails/23.jpg)
8/25/2014
23
Generation 10 (2,000 Trial Solutions) Best Solution in 10th Generation
Cost ItemTotal Cost ($ Arb) (Including O&M)
Pipes 42.0
Pumps 4.3
Storage 9.3
Total Project Cost 55.6
Actual processing time: 1.50 hours
(cloud computing using 104 cores in parallel)
Complete hydraulic analysis of each trial solution
Detailed life-cycle cost analysis of each trial sol.
All costs divided by arbitrary value for purpose of demonstration
Generation 25 (50,000 trial solutions) Best Solution in 25th Generation
Cost ItemTotal Cost ($ Arb) (Including O&M)
Pipes 31.2
Pumps 5.4
Storage 6.1
Total Project Cost 42.7
Actual processing time: 3.75 hours
(cloud computing using 104 cores in parallel)
Complete hydraulic analysis of each trial solution
Detailed life-cycle cost analysis of each trial sol.
All costs divided by arbitrary value for purpose of demonstration
Generation 50 (100,000 Trial Solutions) Best Solution in 50th Generation
Cost ItemTotal Cost ($ Arb) (Including O&M)
Pipes 21.7
Pumps 3.5
Storage 10.1
Total Project Cost 35.3
Actual processing time: 7.50 hours
(cloud computing using 104 cores in parallel)
Complete hydraulic analysis of each trial solution
Detailed life-cycle cost analysis of each trial sol.
All costs divided by arbitrary value for purpose of demonstration
![Page 24: 8991 An Innovative Approach for Big Ticket Infrastructure ... · 8/25/2014 3 The City of Bend’s wastewater collection system 430 miles of sewer mains 90 sewer pumping stations 246](https://reader034.fdocuments.in/reader034/viewer/2022050121/5f51a66f5851dc4f5a18a496/html5/thumbnails/24.jpg)
8/25/2014
24
Generation 75 (150,000 Trial Solutions) Best Solution in 75th Generation
Cost ItemTotal Cost ($ Arb) (Including O&M)
Pipes 21.7
Pumps 3.5
Storage 10.1
Total Project Cost 35.3
Actual processing time: 11.25 hours
(cloud computing using 104 cores in parallel)
Complete hydraulic analysis of each trial solution
Detailed life-cycle cost analysis of each trial sol.
All costs divided by arbitrary value for purpose of demonstration
Generation 100 (200,000 trial solutions) Best Solution in 100th Generation
Cost ItemTotal Cost ($ Arb) (Including O&M)
Pipes 10.4
Pumps 2.7
Storage 10.7
Total Project Cost 23.8
Actual processing time: 15.00 hours
(cloud computing using 104 cores in parallel)
Complete hydraulic analysis of each trial solution
Detailed life-cycle cost analysis of each trial sol.
All costs divided by arbitrary value for purpose of demonstration
Generation 125 (250,000 Trial Solutions) Best Solution in 125th Generation
Cost ItemTotal Cost ($ Arb) (Including O&M)
Pipes 7.6
Pumps 5.9
Storage 9.1
Total Project Cost 22.6
Actual processing time: 18.75 hours
(cloud computing using 104 cores in parallel) Complete hydraulic analysis of each trial solution
Detailed life-cycle cost analysis of each trial sol.
All costs divided by arbitrary value for purpose of demonstration
![Page 25: 8991 An Innovative Approach for Big Ticket Infrastructure ... · 8/25/2014 3 The City of Bend’s wastewater collection system 430 miles of sewer mains 90 sewer pumping stations 246](https://reader034.fdocuments.in/reader034/viewer/2022050121/5f51a66f5851dc4f5a18a496/html5/thumbnails/25.jpg)
8/25/2014
25
Additional sensitivity analyses
Conducted prior to final optimization per SIAG request:• Continued Mid Rainfall and High Rainfall response evaluations
• Growth Node Evaluation
• Water Conservation (10% reduction in dry loading)
• Micro Optimization of specific basins
Not completed due to SIAG input:• University Growth Area (believed to be adequately covered in
development of future planning data)
Bend 2033 Selected Options
City of Bend
NOTE: Cost summary does not include condition-based and local area improvements.
DRAFT FINAL RESULTS – SUBJECTTO CHANGE
Optimized solution: 20-year phasing
PhasePresent Value
Capital Cost ($M)
Phase 1 – 1 to 5 years 39.72
Phase 2 – 6 to 10 years 18.00
Phase 3 – 11 to 20 years 25.46
TOTAL 83.18
![Page 26: 8991 An Innovative Approach for Big Ticket Infrastructure ... · 8/25/2014 3 The City of Bend’s wastewater collection system 430 miles of sewer mains 90 sewer pumping stations 246](https://reader034.fdocuments.in/reader034/viewer/2022050121/5f51a66f5851dc4f5a18a496/html5/thumbnails/26.jpg)
8/25/2014
26
2007 Proposed CIP
City of Bend
Benefit of optimized decisions
Stretch budgets: reduce capital improvement, main replacement, system operating, and LID/GI costs
Increased confidence: client input on options, analysis of key scenarios, and sensitivity runs performed
Balanced solutions: capital vs. operating costs, best mix of supplies, grey vs. green, triple bottom line (TBL)
Intelligently add redundancy: know what it costs
Support from utility and elected officials: unbiased, comprehensive analysis leads to defensible results
Avoided costs delivered by optimization
Water / wastewater utility
Original cost manual method (million)
Optimized solution cost
(million)
Projected savings (million)
% Savings
Fort Collins-Loveland Water, CO $5.9 $3.0 $2.9 49%
Las Vegas Valley Water, NV $9.1 $7.4 $1.7 19%
Sierra Pacific, Reno-Sparks, NV $26.0 $17.0 $9.0 35%
San Diego Water, Alvarado, CA $55.0 $35.3 $19.7 36%
Augusta Utilities, GA $32.4 $18.3 $14.1 44%
North Penn Water Authority, PA $33.3 $25.0 $8.3 25%
Fort Worth Water Department, TX $260.0 $187.0 $73.0 28%SA Water NSISP Desal. Integration, Aus.
$1,100.0 $403.0 $697.0 63%
Bend, OR Summer Operations/Energy $1,895/day $1,460/day $435/day 23%
South Bend, IN CSO LTCP Optimization $412.0 $299.6 $112.5 27%
Major Texas City SSO Optimization Pilot $270.1 $168.0 $102.1 38%
![Page 27: 8991 An Innovative Approach for Big Ticket Infrastructure ... · 8/25/2014 3 The City of Bend’s wastewater collection system 430 miles of sewer mains 90 sewer pumping stations 246](https://reader034.fdocuments.in/reader034/viewer/2022050121/5f51a66f5851dc4f5a18a496/html5/thumbnails/27.jpg)
8/25/2014
27
OrientationImmediate Capacity Optimization
Solution Recommendation
Model Building
SIAG
SIAG
Project phases = Presentation format
How are things going?
Good news!
Projects can be phased and scaled to meet demands
2007 CSMP 5-year project list: $80 million
Optimized and phased list: $40 million (first 5-years)
Sewer flow data (flow triggers) will signal need/timing for future projects and adjustments to the plan
![Page 28: 8991 An Innovative Approach for Big Ticket Infrastructure ... · 8/25/2014 3 The City of Bend’s wastewater collection system 430 miles of sewer mains 90 sewer pumping stations 246](https://reader034.fdocuments.in/reader034/viewer/2022050121/5f51a66f5851dc4f5a18a496/html5/thumbnails/28.jpg)
8/25/2014
28
Three critical projects confirmed for first five years:
Southeast interceptor:Linchpin for solving Bend’s sewer problems (Under construction)
Colorado Lift Station: Relieves Westside capacity issues (In design)
North area capacity improvements:Adds capacity to serve NE employment land (In design)
Southeast Interceptor
SIAG financial strategy
Start building reserves now to replace aging/failing pipes in the future
Put aside money now to start solving the problem of Bend’s unsewered neighborhoods
Borrow money to pay for projects, paid back through revenues from sewer rates, system development charges and other fees
Start with a higher rate increase now to catch up, then smaller increases / rate stability
Overall sewer cost components
Draft results – subject to change
![Page 29: 8991 An Innovative Approach for Big Ticket Infrastructure ... · 8/25/2014 3 The City of Bend’s wastewater collection system 430 miles of sewer mains 90 sewer pumping stations 246](https://reader034.fdocuments.in/reader034/viewer/2022050121/5f51a66f5851dc4f5a18a496/html5/thumbnails/29.jpg)
8/25/2014
29
Final results: additional costs included
Hydraulic-based capital
costs
Hydraulic-based life-cycle costs
Pump and pipe condition improvements
Ongoing repair & replacement
budget
Local-area costs
Previous plan
Initial optimization
Intermediate optimization
Final optimization
Final CIP
Rate calculation
Rate dashboard
Council approved 9% rate increase
FY FY FY FY FY FY FY FY FY FY2015 2016 2017 2018 2019 2020 2021 2022 2023 2024
Bill Difference $3.99 $1.23 $1.26 $1.30 $1.33 $1.36 $1.40 $1.43 $1.47 $1.51
Residential Monthly Bill $48.36 $49.60 $50.86 $52.16 $53.49 $54.85 $56.25 $57.69 $59.16 $60.66
Proposed Rate Increase 9.00% 2.55% 2.55% 2.55% 2.55% 2.55% 2.55% 2.55% 2.55% 2.55%
Existing monthly rate $44.37
![Page 30: 8991 An Innovative Approach for Big Ticket Infrastructure ... · 8/25/2014 3 The City of Bend’s wastewater collection system 430 miles of sewer mains 90 sewer pumping stations 246](https://reader034.fdocuments.in/reader034/viewer/2022050121/5f51a66f5851dc4f5a18a496/html5/thumbnails/30.jpg)
8/25/2014
30
Questions
“The meetings were well organized and presented clear information and decision points. The time spent preparing for the meetings was critical to the success.” Sharon Smith, SIAG Steering Committee Member
“This was overall a good process with a positive outcome for the City and the community.” Mike Riley, SIAG Steering Committee Member