October 16, 2019 Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Attention: Ms. Kimberly D. Bose, Secretary Re: El Paso Natural Gas Company, L.L.C.; Docket No. CP19-28-000 Northern Delaware Basin Expansion Project Weekly Environmental Inspector Report No. 33 Commissioners: El Paso Natural Gas Company, L.L.C. ("EPNG") is hereby filing with the Federal Energy Regulatory Commission ("Commission") in Docket No. CP19-28-000, its weekly status report related to the Northern Delaware Basin Expansion Project (“Project”). Description of Proceeding On December 19, 2018, EPNG filed a prior notice application pursuant to sections 157.205, 157.208(b), and 157.210 of the Commission’s regulations under the Natural Gas Act and EPNG’s blanket certificate issued in Docket No. CP82-435-000 for authorization to construct an approximate 14-mile twenty-four-inch (24”) outside diameter (“O.D.”) loop line of its existing 20-inch (20”) O.D. Line No. 3162 in Winkler County, Texas, as well as make minor appurtenant facility modifications at existing compressor station and other facility locations in Winkler, Crane, and Upton Counties, Texas. Additionally, EPNG is hydrotesting approximately 51 miles of its existing 24-inch (24”) O.D. Line No. 1105 that traverses Winkler, Ector, and Crane Counties, Texas. On December 27, 2018, the Commission issued a Notice of Request Under Blanket Authorization initiating the 60 day comment period to allow for any person or Commission’s staff to file motions or notice to intervene and protests. Since no protests were filed within the comment period, the Project was deemed to be authorized on February 26, 2019. Submittal of Status Report In compliance with Section 157.208(c)(10) of the Natural Gas Act, EPNG is providing Environmental Inspector Report No. 33 for the period of October 6, 2019 through October 12, 2019.
-
Federal Energy Regulatory Commission -2- October 16, 2019 Filing Information EPNG is e-Filing this letter and report with the Commission's Secretary in accordance with the Commission's Order No. 703, Filing Via the Internet, guidelines issued on November 15, 2007 in Docket No. RM07-16-000.
Respectfully submitted,
EL PASO NATURAL GAS COMPANY, L.L.C.
By__________/s/_______________ Francisco Tarin Director, Regulatory
Enclosures
-
EPNG WeDocket NProject N
County/S
ReportinEnvironm 1. Summ
Line NDurin
MainpipinStatio2000 StatioNo. 2
Line NHogglocatthe liand Mthen replaMetesegmsuccethen
2. Relev
DurinsevenDelaw
All eq All opNo an
3. Envir
No en
eekly EnviroNo. CP19‐28‐Name:
State:
ng Period: mental Inspe
mary of Con
No. 31111 Long this repor
nline Valve ag at Line Noon was painMLV 1. In
on bypass lin2000 pig laun
No. 1105 Hyg Meter Statied at the Mine. After dMLV 4 were installed, aced. Wateer Station inment of pipeessfully testetested on Sa
vant Environng this repon‐hundred tware Basin E
quipment wa
pen ditch wnimals were
ronmental Pnvironmenta
onmental Ins‐000
NorWinCouOct
ector: Dav
nstruction Ac
oop Line: rting period,
and Pig Lauo. 1105 MLVnted. The rn addition, tne were comncher/receiv
ydrostatic Teion and MLV
MLV 5 tempodewatering, jremoved anand the tesr was then n preparatiobetween th
ed. The nexaturday, Oct
nmental Actorting periodtwo (702) pExpansion Pr
as checked f
as walked o noted in the
Problems/Issal problems/
spector Rep
rthern Delawnkler, Ector,unties, Texastober 6, 2019vid McCullou
ctivity for In
piping at W
uncher/ReceV 12 and MLemainder othe forms fompleted andver barrel at
esting: DuriV 5 was pushorary workspjumpers at nd test headt headers wpumped ba
on for hydrohe Line No. xt segment btober 12, 20
ivities: d, two (2) people have roject.
for noxious w
on a daily bae ditch durin
sues and Co/issues were
port No. 33
ware Basin E, Crane ands 9 to Octobeugh
nspection Pe
Wink Compre
eiver ModifiLV 5, Line Nof the graveor concrete d a concreteWink Comp
ng this repohed out of thpace locatiothe Line Noers at each owere weldeack into Linostatic testi3103 takeo
between the19.
people receivreceived e
weeds and fo
asis to ensurng this repor
rrective Acte identified d
Expansion Prd Upton D
r 12, 2019
eriod:
essor Station
ications: Do. 2000 MLVl was delivesupports fo
e pad was popressor Statio
orting periodhe pipe and n in order to. 3103 takeof these sited back intoe No. 1105ng. On Frioff site and e MP 41.0 te
ved environnvironment
ound to be c
re that no arting period.
ions Taken:during this re
roject Date: 10/16/
n was painte
uring this rV 1 and at Wered and spor the Keystoured at theon.
d, water in tinto the aboto remove aoff site, MPes were cut oo the line a5 between Mday, OctobeMP 41.0 tesest break site
nmental traial training o
clean.
nimals had .
eporting per
/2019
d.
reporting peWink Comprread at Linetone Compre end of the
he pipe betwove ground tir pockets wP 41.0 test boff. Fill pigs and the jumMLV 5 and er 11, 2019st break sitee and MLV 4
ining. A toton the Nort
been entrap
riod.
eriod, essor e No. essor e Line
ween tanks within break, were
mpers Hogg 9, the e was 4 was
tal of thern
pped.
-
4. Envir
No en 5. Issue
No la 6. Work
Ta
Ittere
TfoC
ronmental Cnvironmenta
es and Concendowner iss
k Planned fohe tie‐in of Lnd the ditcht is anticipatested. Testeporting perhe chain linkorms for theompressor S
Compliance Ial complianc
erns Identifisues or conc
or the FollowLine No. 311 backfilled. ed that the t results of riod. k fence at the concrete pStation bypa
Issues/Resoce issues we
ed by Landocerns were id
wing Reporti111 and Line
third sectiothe second
he Line No. 2pad at Line ass line will b
lutions: re identified
owners: dentified du
ing Period:e No. 3162 a
on (between d segment
2000 MLV 1No. 1105 Mbe poured w
d during this
ring this rep
t Wink Com
MLV 4 and will also be
1 site will be MLV 12, and with concrete
s reporting p
porting perio
mpressor Stat
Hogg Metee reported
completed.the forms f
e.
period.
od.
tion will be m
er Station) wduring the
. In additionfor the Keys
made
will be next
n, the stone
-
Report NPhotos Location31111 atCompresDirectionNorthweDescriptipig launcpiping.
Location31111 atCompresDirectionSouthweDescriptiditch prioNo. 3111No. 3162tie‐in.
No. 33
: Line No. t Wink ssor Station n of Photo: est ion: Paintedcher/receive
: Line No. t Wink ssor Station n of Photo: est ion: Open or to the Lin11 and Line 2 crossover
r
e
-
Photos Location31111 at418+00 DirectionSouthweDescriptialong theline ROW
Location31111 at251+00 DirectionNortheasDescriptialong theline ROW
: Line No. t Station No.
n of Photo: est ion: View e new loop W.
: Line No. t Station No.
n of Photo: st ion: View e new loop W.
-
Photos Location31111 at68+00 DirectionSouthweDescriptialong theline ROW
Location31111 at42+00 DirectionNorth Descriptialong theline ROW
: Line No. t Station No.
n of Photo: est ion: View e new loop W.
: Line No. t Station No.
n of Photo:
ion: View e new loop W.
-
Photos Location1105 at MDirectionNorth DescriptiInstallinginto one headers.
Location1105 at MDirectionNorth Descriptia test heLine No.
: Line No. MLV 4 n of Photo:
ion: g the fill pig of the test
: Line No. MLV 4 n of Photo:
ion: Weldingader into 1105.
g
-
Photos Location1105 at ttake‐off sDirectionNorthweDescriptiHydrostathe first s
Location2000 at MDirectionSouthweDescriptiSpreadinthe MLV
: Line No. the Line 310site n of Photo: est ion: atic testing segment.
: Line No. MLV 1 n of Photo: est ion: g gravel at 1 site.
3
-
Photos Location2000 at MDirectionNorth Descriptiinstalled for the chfence.
LocationCompresDirectionEast Descripticoncreteend of th2000 pig launcher
: Line No. MLV 1 n of Photo:
ion: Newly fence postshain link
: Wink ssor Station n of Photo:
ion: New pad at the he Line No.
r/receiver.
-
Certificate of Service I hereby certify that I have this day caused a copy of the foregoing documents to be served upon each person designated on the official service list compiled by the Commission's Secretary in this proceeding in accordance with the requirements of Section 385.2010 of the Federal Energy Regulatory Commission's Rules of Practice and Procedure. Dated at Colorado Springs, Colorado as of this 16th day of October 2019.