ParameterPlan007C(shownoverleaf)setsmaximumbuildingandfrontageheightsrelativetothefinishedgroundfloorlevels.Maximumheightsareinclusiveofplantlevels.
Asdiscussedabove(section8.3),ParameterPlan002(transportinfrastructure)showsthelocationofprimary,secondaryandtertiaryroutesthroughthemasterplanarea.Theseroutesbenefitfromlimitsofdeviation.AsdescribedintheRDSF,ifthelocationoftheroutesvarieswithinthepermittedlimitsofdeviationidentifiedonParameterPlan002and003,theconfigurationofthebuildingzoneswillchange.TheadjacentimageshowstheparameterenvelopewiththeadjustedHighStreetalignment.
Themaximumheightparameterissetat45mforthenorthsideofPlot12,anddropsto33mtothesouth.TheHighStreetandClaremontParkRoadarekeyfrontages.
ThemaximumfrontageheightontheHighStreetis33m(takenfromfinishedfloorlevel(FFL)ofthegroundfloor).
ThemaximumfrontageheightonClaremontParkRoadis27m(takenfromFFLofthegroundfloor).
TheS73Permissionallows30%ofthekeyfrontagesofaplottoexceedthemaximumfrontageheight,aslongastheydonotexceedthemaximumbuildingzoneheights(seesection8.5,extractedfromtheRDAS(sectionA2.4.3,HeightandMassingParameters)).
TheproposedschemeforPlot12showsthetallestwingofthenorthbuildinglocallyexceedingthemaximumfrontageheightbylessthan30%,butwithinthemaximumbuildingzoneheight,inaccordancewiththeS73Permission.
TheClaremontParkRoadelevationsitswithinthemaximumfrontageheight.
Theproposalsarethereforeincompliancewiththeparameterplanenvelope(savefortheflue,asdiscussedinthefollowingsection).
Fig.145 DiagramtoshowtherelationshipbetweentheproposedmassingandthemaximumparameterenvelopeasdefinedbyParameterPlan007
buildingzone
45m33m
33m27m
maximumfrontageheight
maximumbuildingzone
Maccreanor Lavington86
3300
0
1600
0
1200
0
2700
0
3300
0
4500
0
92025 AOD
47500 AOD48000 AOD
75050 AOD
72500 AOD
Original printed at A1
© Maccreanor Lavington Ltd.
Do not scale from this drawing. Verify alldimensions on site. Drawing should be read inconjunction with information from all other designconsultants and contractors. All drawings in digitalformat are for reference only, paper copies areavailable on request.
Title:
Scale:
Client
Project
Rev Details Drwn DateChkd
te
77 Bastwick Street,London, EC1V 3PZ
+44 (0)20 7336 [email protected]
RMA SUBMISSION
MLUK-549-A-L-XX-3103
Brent Cross South Limited Partnership
549 Brent Cross - Plot 12
Proposed West Elevation
1 : 200 @ A1 / 1 : 400 @ A3
- RMA Submission OJ GW 25/10/17
0 10m5
SURROUNDING CONTEXTSHOWN INDICATIVELY
Fig.146 LongsectionsE-WandN-S.
Thesectionbelow showshowthebuildingandfrontageheightsoftheproposalssitwithintheS73parameterenvelope.ThetallerelementofthenorthbuildingexceedsthefrontageheightinaccordancewiththeprovisionsoftheS73Permission(seesection8.6 fordetails).
Themaximumbuildingheightforthenorthernpartoftheplot,withinwhichBuilding12Nislocated,is45m.ThemainmassofBuilding12Nhasamaximumheightof44.525mwhichsitsbelowthemaximumparameterheightforthispartoftheplot.However,thismaximumbuildingheightisexceededbyaminoramount(2.525m)inordertoaccommodateaflue(*).Theflueisassociatedwiththeprovisionofboilersandplantwithin
8.7. Key Building heights
*
maximum frontage height 33m
maximum frontage height 27m
maximum building zone 45m
maximum building zone 33m
minimum frontage height 16m
minimum frontage height 12m
theproposedbasement.Theparameterexceedancepresentsaminordeviationfroms73Permissionmaxima.Paragraph1.8oftheRDSFallowsfortheconsiderationofproposeddeparturesfromtheparametersandprinciplesofthes73Permission.Proposeddeparturescanbeconsideredunlesstheyarelikelytohavesignificantadverseenvironmentalimpactsbeyondthosealreadyassessed.TheproposedfluehasbeentakenintoaccountaspartofanEIAscreeningrequest,whichconfirmsthattheproposedfluedoesnotresultinanynewordifferentsignificantenvironmentaleffects.Itisthereforeconsideredthattheminordeparturefromthes73permissionparametersassociatedwiththeproposedflueisacceptable.
AlsorefertotheaccompanyingVisualAssessmentStudy,whichconcludesthattheimpactoftheflueisnegligible.
Brent Cross South Plot 12 - Design Statement Maccreanor Lavington 87
maximum frontage height 27m
maximum building zone 33m
minimum frontage height 12m
3300
0
1600
0
4500
0
92025 AOD
47500 AOD
75050 AOD
Original printed at A1
© Maccreanor Lavington Ltd.
Do not scale from this drawing. Verify alldimensions on site. Drawing should be read inconjunction with information from all other designconsultants and contractors. All drawings in digitalformat are for reference only, paper copies areavailable on request.
Title:
Scale:
Client
Project
Rev Details Drwn DateChkd
-
-
te
77 Bastwick Street,London, EC1V 3PZ
+44 (0)20 7336 [email protected]
R0E
DRAFT PLANNING
MLUK-549-A-L-3100
Brent Cross South Limited Partnership
549 Brent Cross - Plot 12
Proposed North Elevation
1 : 200 @ A1
A North Block Issue OJ GW 08/08/17B 12S and Basement Revisions OJ GW 14/08/17C Draft Planning Set OJ GW 22/09/17D Elevation Updates OJ OJ 04/10/17E Draft Planning Set OJ GW 13/10/17
Fig.147 SectionN-S-Core12B.
TheadjacentsectionshowstherelationshipbetweenthetallerwingofthenorthbuildingandtheS73Permissionparameterheights.Whilstitsheightlocallyexceedsthemaximumfrontageheight,itswidthiswithinthe30%frontageallowableanditstotalheight, doesnotexceedthemaximumdevelopmentzone.
8.8. High Street frontage
maximum frontage height 33m
maximum building zone 45m
minimum frontage height 16m
*
Maccreanor Lavington88
Plots12’sproposalsfollowthegroundfloorusestofrontage as set out in the S73 Permission: namely, predominantly retail use on the High Street frontage andresidentialontheParkFrontage.
A café is proposed to be located on the south-east corneroftheplottohelpactivateboththeparkedgeandthetemporarygreenspace.
ThelocationofthiscaféontheClaremontParkfrontagegivesrisetoasmalldeviationfromParameterPlan004.AsexplainedinmoredetailwithintheaccompanyingExplanatoryReport,Section2.4oftheRDSFmakesspecificreferencetosuchdeviationsfrom the parameters and principles referred to in the s73 Permission: in the event that the proposals have noadverseenvironmentalimpacts,suchdeviationsmaybeacceptable.Theproposeddeviationissmallandneitherthelandusenordevelopmentquantumproposedasaresultbreachthemaximafloorspaceallowedforunderthetermsofthes73Permission.Thecaféwillprovideamenityforresidentsandvisitorsalikeandwillservetoenliventhisfrontage.
Fig.148 ConsentedParameterPlan(extract) Fig.149 Parameter overlay Fig.150 Plot 12 proposals
8.9. Parameter compliance matrixGround level uses to frontage: Parameter plan 004
Predominantly Retail or Leisure or Hotel
Residential
Plot12’sproposalsfollowtheupperlevelusestofrontagesetwithintheS73Permission.
Fig.151 ConsentedParameterPlan(extract) Fig.152 Parameter overlay Fig.153 Plot 12 proposals
Upper level uses to frontage: Parameter plan 005
Residential
Brent Cross South Plot 12 - Design Statement Maccreanor Lavington 89
TheproposedfinishedsitelevelsforPlot12arewithintheLimitsofDeviationsetoutinParameterPlan006.
Proposed finished site levels: Parameter plan 006
Proposed Ground Level along the High Street, with L.o.D. of +2.00m/-1.00m
Proposed Ground Level, with L.o.D. of +/-1.00m
Existing Site Level
Fig.157 ConsentedParameterPlan(extract) Fig.158 Parameter overlay Fig.159 Plot 12 proposals
TheproposalsforPlot12arecompliantwiththemaximumfrontageandbuildingheightsassetoutintheParameterPlan007.Pleaserefertosection8.7fordetails
Fig.154 ConsentedParameterPlan(extract) Fig.155 Parameter overlay Fig.156 Plot 12 proposals
Maximum frontage and building heights: Parameter plan 007C
27m Maximum Frontage Height (L.o.D. +/-2.00m)
33m Maximum Frontage Height (L.o.D. +/-2.00m)
Building zones
Maccreanor Lavington90
TheproposalsforPlot12arecompliantwiththeminimum frontage heights as set out in the Parameter Plan008.Pleaserefertosection8.7fordetails
Minimum frontage heights: Parameter plan 008
12m Minimum Frontage Height
16m Minimum Frontage Height
There are no basement or service access points located onthekeyfrontagestocomplywithParameterPlan009
Fig.160 ConsentedParameterPlan(extract) Fig.161 Parameter overlay Fig.162 Plot 12 proposals
Basement and service access: Parameter plan 009
Areas within which new basements may be constructed
Car park entrance
Frontages which would not include any direct carpark or service yard entrances, or direct service access
Fig.163 ConsentedParameterPlan(extract) Fig.164 Parameter overlay Fig.165 Plot 12 proposals
Brent Cross South Plot 12 - Design Statement Maccreanor Lavington 91
Table5ofAppendix10oftheRSDFsetsoutkeybuildingdimensionswithinMQ2.
Fig157oppositeandthetablebelowsetsoutthekeydimensions.Both12Nand12SshouldbereviewedundertheheadingResidential(Courtyard).
As12Nisanopencourtyard,itswidthisreadasthedimensionfromthenorthfaceof12Ntothenorthfaceof12S.Permittedminimumtomaximumrangeshowninbrackets.
8.10. Building dimensions
Key Dimensions Height /m Length/m Width/m
12NResidential(Courtyard) 44.6(12-45) 78.9(50-100) 47.8(46-73)
12S Residential(Courtyard) 28.6(12-45) 60.6(50-100) 55.0(46-73)
Table13 Key dimensions (permittedmin.-max.rangeshowninbrackets)
Fig.166 Key Building dimensions
Maccreanor Lavington92
9.0. Planning Summary and Compliance
The s73 Permission includes several parameters and principles that aretobetakenintoaccountintheformulationofreservedmatterproposals.ThesearesetoutintheapprovedRevisedDesignGuidelines(RDG),RevisedDesignandAccessStatement(RDAS)andtheRevisedDevelopmentSpecificationandFramework(RDSF).Thesedocumentshavebeencarefullyconsidered,inadditiontowider,moregeneral,planningpolicyandguidance.
The main over-arching principles contained in the RDAS and RDSF are set outbelow,followedbymoredetailedprinciplescontainedintheRDG.
DAS and DSFFromareviewofthesedocuments,theprinciplestobefollowedinrelationtoPlot12are,asfollows:
• “Anintegrated,diverse,newtowncentre”with“mixeduseplots”.
• “Highdensitytowncentre”anda“clearurbanstructure.”
• “ReplacementofhousingontheWhitefieldResidentialEstate”and“reclaimingalostpieceofBarnet”.
• Suitablescaleandshape.
• “Legibleandseamlesstransitionbetweensuburbanandurban”.
• Considering“the‘courtyardblock’”asan“exemplaryurbanform”.
• A“strongurbancontextthatformsthepublicrealmandclearlydelineatesbetweenpublicandprivatespace”
• Buildingsthatare“durable,attractiveandvisuallyharmonious”.
• “Amasonryarchitectureshouldprevail”(inlowandmediumrise),whichis“solid,ratherthanlightweight”.
Design Guidelines The main principles from the RDG that have informed the Plot 12 design aresetoutbelow.
• Atlowerlevelsbuilding’swillhave“frontdoorstolowerfloormaisonettesaswellasresidentialcoresforflatsabove”.
• “Play,socialisingandpedestrianmovement”istheprioritywithin“clustersofresidentialbuildings”.
• Elevationtypologyguidelinespromote“adialoguebetweenbuildingandpublicrealm”:relatestothehierarchyofstreetsandspaces.
Incompliancewiththekeyprinciplessummarisedabove,theproposalsforPlot12areforprimarilyresidentialbuildingsatanurbandensity,withmixedusesatgroundlevel,tocreatethebeginningsofanintegrated,vibrantanddiversetowncentre.Plot12willprovidereplacementhomesforresidentsoftheWhitefieldEstateandaspartofBXSwillstarttoreclaim a ‘lost’ piece of Barnet, currently rather isolated by surrounding strategicinfrastructure.Theproposalsseektomediatebetweentheexistinglowrisehousingtothesouthandtheconsentedhighdensitytowncentre.
Theproposalsincludecourtyardtypologiestogivestrongdefinitiontothestreetsandcreatebothpublicandprivatespaces.ScaleandmassingisassessedinSection8.0,whichdemonstratescompliancewithparameters.Theproposalsareforprincipallybrickbuildings,withstreetsactivatedbyfrontdoors.Thesurroundingtertiarystreetsprioritisepedestriansandgreenspacesprioritiseplayandsocialising.
InsectionB4-K2,theDesignGuidelinescallforasetbackofaminimumof1.5mabove6floorsfortheHighStreet,ClaremontParkRoadandtheAccessRoadsinMarketQuarter.Whilstwehaveintroducedsetbackstotheseelevations,theyvaryinheighttoreflectthehierarchyofstreets(seesection3.1.2).Thesesetbacksoccuronthe7thand8thfloorsandcomplywiththefrontageheightsdefinedintheParameterPlans.
InsectionB4-K4,theDesignGuidelinessetoutthatthegroundfloorlevelforhousingshouldbeaminimumof0.8maboveexternalground.OnPlot12N,thereareonlytworesidentialunitsatgroundfloor,helpingtoactivatethefrontagealongthepocketpark.Althoughtheseunitsarenotelevatedabovegroundlevel,theybenefitfromgenerousplantingsettingthembackfromthepublicspace,andaresplitovertwolevels,allowingallbedroomstobeonthefirstfloor.
On Plot 12S, the ground level is raised above the car park by an average of1m.However,asthegroundlevelsurroundingthebuildingvaries,thegroundfloorlevelvariesfrom1.2mto0.7atitslowestpoint.
InsectionB4-M3,theDesignGuidelinesprescribetheuseofrecessedloggiasalongtheHighStreetfrontage.Asthenorth-westorientationofthiselevationisnotfavourableforgooddaylighting,theseloggiaswherereplacedbysemi-recessedbalconiesthatwillallowmorelightintothedwellingsandhavealimitedprojection.
SectionB4-N2statesthatallplantventilationshouldbeatrooflevel.TheproposalsforPlot12generallyachievethis,however,thesubstationlocated along the access route to the east of Plot 12N has a limited numberofventstothestreettocomplywithUKPNrequirements.Additionally,theairintakeforthecarparkventilationmustoccuratlowlevel.Allventsareoflimitedsizeanddesignedtointegratediscreetlywithinthecompositionofthefacades.
SectionB4-QoftheDesignGuidelinessetsoutthecharacterofthedifferentelevationtypologies.Inthissection,theHighStreetisexpectedtohaveaminimumofonefrontdoorperverticalarticulation.However,itwasfeltthatacontinuouslengthofretailfrontagewouldprovidesufficientanimationtothestreet,whilsttheresidentialentranceswouldhelpactivatethepocketparktotherearofthebuilding.ThisstrategyalsohelpstoincreasetheresidentialfeeloftheheartofPlot12.
Overall,weconsiderthatthedesignofPlot12hasbeeninformedbyandisconsistentwiththeprinciplesandparameterssetoutinthes73Permission.Thedesignishighqualityandin-keepingwiththeapproachtoarticulation,materials,elevations,amenity,etcasprescribedinthevariouscontroldocuments(theRDAS,RDG,RDSF).
Brent Cross South Plot 12 - Design Statement Maccreanor Lavington 93
Maccreanor Lavington94
10.0. Sustainability
Energy and Sustainability StatementThis page summarises the key elements of the Energy and Sustainability StatementpreparedbySWECO.Pleaserefertothefullreport(whichformspartofthisReservedMatterssubmission)forfurtherdetail.
The Energy and Sustainability Statement for Plot 12 provides an assessment of the proposals for Plot 12 against the energy and sustainabilityrequirementsoftheS73Permission,assummarisedbelow:
• AlldwellingstoachieveminimumLevel4underCodeforSustainableHomes;
• AllcommercialspacestoachieveatleastVeryGoodratingunderBREEAM;
• 40%reductiononcarbonemissionsoverBuildingRegulationsPartL2010forresidentialbuildings;
• 25%reductiononcarbonemissionsoverBuildingRegulationsPartL2010fornon-domesticbuildings;
• AllelementstocomplywithrelevantversionofPartLasappropriateatthepointofdesignconstruction(e.g.PartL2013)
• Allprincipalresidentialbuildingsconnecttothedistrictheatnetwork,wherefeasibletodoso.
Additionally,Plot12willmeettherequirementsfortheWaterUsePrinciplescontainedinParagraph2.71fromtheRDSF:
• Residentialdevelopmentswillbedesignedtoachieveawaterusageof105litres/person/day(38.3cubicmetres/person/year;equivalenttotherequirementfora4-starratingusingtheCodeforSustainableHomes),withanaspirationofmeetingthetargetof80litres/person/day(29.2cubicmetres/person/year,equivalenttotheminimumrequirementfora5-starratingusingCodeforSustainableHomes);
• Rainwaterharvestingwillbedesignedtocapture10%ofrainfallingonthesiteforirrigationandcleansinguse,and‘grey’waterwillberecycled from commercial buildings, if that proves necessary to meet demand;
• Watermeteringwillbeinstalledinallbuildingsandleakdetectionsystems in commercial buildings;
• Lowwaterusefittings/appliancesand‘A’ratedwhitegoodswillbearequirementinallresidentialdevelopment;and
• Waterbuttswillbeprovidedinresidentialbuildingswithindividualgardensorsuitablebalconies.
Plot12willcomplywithConditions33.2,35.1and35.2.Additionally,thesustainabilityfeaturesoutlinedinTable9oftheRDSFwillbeimplementedwhereapplicablewithinthedevelopment.
10.1. Sustainability strategy 10.2. Energy and Sustainability StatementFollowingtheenergyandcarbonevaluationitisproposedthatextensiveenergyefficiencymeasuresalongwithlowandzerocarbon(LZC)applicationswillbeincorporatedintothedesignsforthedevelopment.EnergyandcarboncalculationshaveconfirmedthattheproposedenergyefficiencydesignandLZCapplicationwillachieve:
• Regulatedcarbondioxidesavingsof48%relativetoaNew-BuildPartL1A2010,fortheresidentialareas;
• Regulatedcarbondioxidesavingsof7.1%relativetoaNew-BuildPartL1A2013,fortheresidentialareas;
• Regulatedcarbondioxidesavingsof31.2%relativetoaNew-BuildPartL2A2010,forthenon-residentialareas;
• Regulatedcarbondioxidesavingsof17.9%relativetoaNew-BuildPartL2A2013,forthenon-residentialareas.
Fabric efficiency:The proposals for Plot 12 have been designed to ensure a high level of fabricefficiency.Thelayoutofthebuildingsminimisesthewalltofloorratio.
Green roofs:InlinewiththerequirementssetoutintheRDSF,10%ofavailableroofareawillbeoccupiedbygreenroofs.
SUDs and rainwater attenuation:RainwaterattenuationisprovidedbytwoattenuationtanksinPlot12Saswellasa“blueroof”attenuationlayerinthebuildupofthepocketpark.Inaddition,SUDsareintegratedintothelandscapeofthesurroundingstreetstoprovideattenuationforthepublicrealm.
Rainwater Harvesting:Rainwaterharvestingwillbedesignedtocapture10%ofrainfallingonthesiteforirrigationandcleansinguse
Flood risk:Condition45.2oftheS73Permissionstatesthatallfinishedfloorlevelsmustbenolowerthan300mmabovethe1in100yearfloodlevel.
Plot12issituatedoutsideofthefloodplaneoftheriverBrentandallfinishedfloorlevelsexceedtherequiredlevel.MoreinformationcanbefoundintheDrainagestatementpreparedbyARUP.
Brent Cross South Plot 12 - Design Statement Maccreanor Lavington 95
11.0. Daylight and Sunlight
Overshadowing Assessment - Sun Hours On Ground
Figure 34: View from above
Area which sees 2+ hours of direct sunlight
on 21st of March
56.3 %
59.5%
Sources of information:IR_16-17/25,27-30_11598
Rel_10_11598_DSD
Issue No: IS13-11598Page No: 36
Date: 20 September 2017
Amenity Within The Site
11598 - Brent Cross South - Plot 12 (Plot 11 Revised)
GIA, The Whitehouse, Belvedere Road, London SE1 8GA t 020 7202 1400 f 020 7202 1401 e [email protected] w www.gia.uk.com
The proposals have been tested throughout the design process to maximisethedaylightandsunlighttoboththeproposedresidentialunitsandtotheaccompanyingamenityspaces.This page provides a summary of the assessments, for full details see Daylight and Sunlight report producedbyGIA,whichisincludedaspartofthisRMAsubmission.
11.2.1. OvershadowingThesunlightperformanceinbothopenspaceswithinPlot12hasbeenexplored,andportionsofthemassinghavebeenrelocatedtoimprovethesunlightavailabilityasmuchaspossible.Themassingalterationshaveallowedforgoodlevelsofsunlightonthetestedopenspaces,currentlybothexceedingtheBRErecommendationon21stMarch.
TheBREsuggestedminimumrequirementforamenityspacesisthat50%oftheareareceives2hoursofdirectsunlighton21stMarch.
Theproposals,testedbyGIA,producethefollowingresults:
• 12NPocketPark:56.3%
• 12Scourtyard:59.5%
11.2.2. Daylight PotentialThe internal layouts have also evolved to get the best out of the available daylightoutdoors:thishasresultedinwindowsbeingmaximisedwherepossible,balcony’sshapereducedandmovedtowardsthebedrooms,theuseoflighterfinishesfortheinternalfloorsandtheenclosureofthekitchenareawithphysicalseparationssuchashighlevelcabinetsandabreakfastbar.Thedaylighthasbeenprioritisedinlivingareas,wherepeoplespendmostoftheirtimeathome,andsignificantimprovementwasachievedwithinbothplots12Nand12S.
ThedaylightandsunlighttestsbyGIAshowthat80%ofallhabitableroomswithinPlot12seegoodlevelsofdaylight,withthebreakdownasfollows:
• Plot12N79%
• Plot12S81%
Overall,GIAconcludethattheproposalshaveoptimiseddaylightandsunlightconditionsandthatfutureoccupantswillhavegoodaccesstodaylightandsunlight.
Maccreanor Lavington96
12.0. Noise Mitigation
PleaserefertotheaccompanyingAcousticDesignReport.
Residential block layout designCourtyardbuildingsareproposedtomaximisethenumberofunitsthathaveaccesstonon-noisyfacades.
Provision of quiet facadesThemostsensitivefacadesarethosefacingtheHighStreetandClaremontParkRoad.Intheselocations,semiorfullyrecessedbalconiesareprovidescreeningtothelivingspacesandsomebedrooms.
Inlinewiththerecommendationsinsection4.4oftheAcoustcDesignReport,wholehouseventilationisalsoproposedthroughouttheschemetoallowresidentstoventilatetheirhomeswithouttheneedtoopenwindows.Doubleglazingisalsoproposedthroughout.
Brent Cross South Plot 12 - Design Statement Maccreanor Lavington 97
13.0. Secured by Design
TofulfiltheobligationsofCodeforSustainableHomes,theschemeisrequiredtomeettherequirementssetoutinSection2(PhysicalSecurity)oftheSecuredByDesign(SBD)guidance.ThiswillbeachievedinconsultationwiththelocalDesigningoutCrimeOfficer.
During the development of the proposals for Plot 12, the design teammetwiththeDesigningOutCrimeOfficer(DOCO)whomadethefollowingrecommendations,whichhaveeitherbeenincludedontheapplicationdrawingsorwillbeaddressedinthefuturedetailedspecificationofthebuildings:
Compartmentalization and Access:• Duetothenumberofapartments,itisnecessarytocompartmentalize
the buildings to make sure that, if someone can get in at ground level, theywon’thavefullaccesstothebuilding.
• Alldoorsoutofstaircoresontoresidencefloorsshouldbeaccesscontrolledona‘fobout’,‘pushbuttonin’basis.I.e.Accesscontrolreadertogofromthestaircoretotheresidencefloorpushbuttontogofromthefloorintothestaircore.
• Frontdoorsshouldbeaccesscontrolledbyafobin,pushbuttonout.Doorsintothestaircoreatgroundlevelshouldbefobin,pushbuttonout.I.e.accesscontrolfobrequiredtogetintothestaircore,andpushbuttonreleasetogetoutofthestaircore.
• Allliftsshouldbeaccesscontrolledwithdestinationcontrolincluded.Thedecisionwhethertoallowallresidentstohaveaccesstoallfloorswasuptotheprojectteam,butaccessforvisitorsshouldbelimited.Ifliftswerenottobeaccesscontrolled,aseconddooroneachfloorbetweentheliftlobbiesandtheresidencefloorsshouldbeprovided.
Physical Security:• All apartment doors should be physical security rated products,
certifiedtoPAS24:2016.
• AllexternaldoorsintocommunalareasshouldbeaphysicalsecurityratedproductcertifiedtoLPS1172SecurityRating2(SR2).
• AllinternaldoorsintocommunalareastobePAS24:2016rateddoors.
• DoorsintoPostboxroomsshouldbeLPS1172SR2.
• ExternaldoorstobinstoresshouldbeLPS1172SR2.InternaldoorstobinstorestobePAS24:2016.
• Allretailunitsshouldincorporateaphysicalsecurityratedproduct.Exactspecificationwasnotdiscussed.
• Alldoorsshouldbeself-closingandself-locking.
• AnydoorsthataresecuredwithMaglocksshouldincorporatetwomaglocks;oneat1/3heightandoneat2/3height.Ifanelectronic
strike,shootbolt,lockwerespecifiedasinglelockwouldbeacceptable.
• AllexternalwindowsatgroundlevelshouldbePAS24:2016certifiedsecurityproducts.GlazingshouldincorporateP2Alaminatedglass.DOCOnotedthatonlyproductscertifiedtoPAS24:2016wouldbeaccepted(andnotpreviousversionsofPAS24)duetotheupdatestotheglazingspecification.Itwasagreedthat,ifadoorwasratedtoapreviousversionofPAS24,anddidnotincludeaglazedpanel,theywouldreviewonacasebycasebasis.
• Allpostboxesshouldbespecifiedtoincludeanti-fishingmechanisms.2.3ElectronicSecurity
• Allexternalintercomsforvisitoraccessshouldbeaudioandvideointercoms.Internalintercoms(atsecondary/tertiaryaccesscontrolleddoors,andinthelifts)canbeaudioonly.
• Accesscontrolsystemshouldprovideadatalogofalluses.Standard30daystoragewouldbesufficient.
• Allfireexitoverrides(greenbreakglassunits)shouldbeautomaticallyresettingunitstoavoidmisusebyresidents,leavingthebuildinginsecure.
• TherearenosignificantCCTVrequirements,thoughcoverageisexpectedinthefollowinglocations:Mainentrancelobbies,Mailboxes,CarParkandBikeStores.
Landscaping• Defensiveplantingaroundgroundfloorresidencesshouldprovidea
1.5mbufferandtheplantingshouldbesufficientlymatureatthetimeofoccupationoftheresidences.I.e.Lowlevelplantingthatwillgrowoveranumberofyearsisnotacceptable.
• Alowlevelfenceorshinguardaroundplantingshouldbeconsideredtodissuadepeoplefromcuttingacrosstheplanting.
• AnySheffieldBikestandsforvisitorsshouldbelocatedclosetothebusier areas of the development, such as adjacent to retail units and cafes.
• Anyexternalseating/furniture,shouldbelocatedasfarawayfromtheentrancesdoorsaspossibletoreducetheriskoftailgating.
• Theparkshouldbewelllit.Lowheightpedestal/bollardlightingisnotpreferred.Lightingshouldbedesignedtoensuregooduniformitytoavoiddarkspots.HighLuxlevelsarenotnecessary.
• Traditionallightingcolumnswouldbepreferredinthepark.Orbuildingmountedlighting.
• AllexternallightingcolumnsshouldbepreppedtoallowfortheMetropolitanpolicetoinstalltemporaryCCTVifrequired.Power/dataoutletsforsuchaccommodationsshouldbeabove3m.
• Lowlevelplantingshouldbekeptbelow1mandtreecanopiesshouldbeabove2m.
• Anyseatingforretailunits/cafesshouldbekeptawayfromanygroundfloorresidencesfrontdoors,ortheentrancestothelobbiesgivingaccesstoupperresidences.
• Fencesforgroundlevelresidencesprivatepatioareasshouldbe1.5mhigh(nothigher).
• Solidfencesarenotpreferred.
• Gatesintoindividualgarden/patiosshouldbelockablegates.
• LightingoverdoorsshouldbedawnuntilduskratherthanPIRbased.
• The level change into the southern block central courtyard should providea1.8mhighbarrier.Thiscanbeacombinationofsteeplandscapingandfencing.Thegateintothecentralcourtyardshouldbeaccesscontrolledonafobinfoboutbasis.
Visitor Access• Visitorstothebuildingshouldberequiredtogothroughanumberof
controlpoints.Thereshouldbeanexternalaudioandvideointercomtogaininitialaccess.Thentheywillberequiredtousetheaudiointercomatindividualaccesscontrolleddoors.
• Anaudiointercomshouldbeprovidedinalllifts.Whenaccessisgranted,theliftshouldonlyallowaccesstotheparticularresidencesfloor.
• Theliftsshouldreturnallliftstogroundlevelonlywhereafobauthorizationisnotprovided.
Basements• Allocatedparkinginthebasementwouldbepreferredtoprevent
misuse.
• The entry to the basement carpark should include either a gate or a slidingshutter.
• GateshuttershouldbeanLPS1175:SR2ratedproduct.IffreeairrequirementsforbuildingventilationprecludetheuseofanSR2ratedaproduct,anSR1ratedproductwouldbeconsidered.Ifasuitablegatecannotbeidentified,DOCOwillreviewabespokesolutionandadviseonspecification.
• Thegate/shuttershouldbefullheight.
• Accessshouldbeonafobin/foboutaccess.
• Thereshouldbenoinductionloops(otherthanforsafety)thatautomaticallyopenthegate/shutter.
• No intercom facility should be provided at the vehicle entrance to provideaccess.
Brent Cross South Limited Partnership 4 Stable StreetLondonN1C 4ABT: +44(0)20 3664 0200
www.brentcrosssouth.co.uk www.argentrelated.co.uk @argentrelated