 SAP ECC 6.0 Business Blueprint for GGPL Controlling Module  Hewlett - Packard -  confidential - Page 8 of 86 T he body of this document describes the organizational s tru cture, enterprise area, and S AP E CC 6.0 functional process flows to be implem ent ed at GGP L . Gene rally, requirem ents that can be me t us ing s tandard S AP E CC 6. 0 functionality through routine configuration tasks are not explicitly documented. However, certain key requirements are explicitly identified and summarized to highlight their importance to GGPL and to document the approach proposed to mee t the requirement.  One s ection of th e report su m marizes identified gaps . T he proj ect team sh ould d iscu s s this li s t with agreem ent on the approach going forward. Acceptable approaches may require:  Additional programming or technical effort R ecognition and acceptance of procedural changes ( "Workaroun ds" ) us ing s tandard S AP E CC 6.0 Additional resource commitment  The deferral of a feature to a later phase  Simply the recognition and acc eptance of a limitation. T he Blu eprint reiterates the S AP E CC 6.0 organiz ational s tru ctu res t hat have been identified and wi ll s erve as th e basis for the initial configuration activities. T he HP team believes th at SAP E CC 6.0 can accurate ly model GGPL's organizational requirements. N o signifi cant configuration choices have been ident ifi ed that will prevent the fut ur e implem ent ation of additional capabiliti es within the SAP EC C 6.0  environment. The information gathered and documented in the Blueprint is sufficient for the team to go forward into the R ealization p has e. However , it is critical th at b oth th e HP and GG P L te am agree on th e scope of th e project as presented in this document. Acceptance -  by both teams -  is required to move the project into the next phase.  

description

gj

Transcript of 8

7/17/2019 8

http://slidepdf.com/reader/full/8563db918550346aa9a99f760 1/1

SAP ECC 6.0 Business Blueprint forGGPL Controlling Module 

Hewlett-Packard -  confidential -

Page 8 of 86 

The body of this document describes the organizational structure, enterprise area, and SAP ECC 6.0 functional

process flows to be implemented at GGPL. Generally, requirements that can be met using standard SAP ECC6.0  functionality through routine configuration tasks are not explicitly documented. However, certain key

requirements are explicitly identified and summarized to highlight their importance to GGPL and to document the

approach proposed to mee t the requirement. 

One section of the report summarizes identified gaps. The project team should discuss this list with agreement on

the approach going forward. Acceptable approaches may require: 

Additional programming or technical effort 

Recognition and acceptance of procedural changes ("Workarounds") using standard SAP ECC 6.0

Additional resource commitment 

The deferral of a feature to a later phase 

Simply the recognition and acceptance of a limitation. 

The Blueprint reiterates the SAP ECC 6.0 organizational structures that have been identified and will serve as the

basis for the initial configuration activities. The HP team believes that SAP ECC 6.0 can accurately model

GGPL's organizational requirements.

No significant configuration choices have been identified that will prevent the future implementation of additional

capabilities within the SAP EC C 6.0 environment.

The information gathered and documented in the Blueprint is sufficient for the team to go forward into the

Realization phase. However, it is critical that both the HP and GGPL team agree on the scope of the project as

presented in this document. Acceptance - by both teams - is required to move the project into the next phase.