8339MA-Delivery Data of SHP-06
description
Transcript of 8339MA-Delivery Data of SHP-06
BYPASS EXHAUST SYSTEM [2
Document NameDocument
0
Rev.
No
ABN
BYPASS EXHAUST SYSTEM [2
OWNER
CLIENT
CONTRACTOR
Document Name
Document No.
08/09/2012
Date
IES PTY LTD
ABN 71 124 484 108
KDL 120MW
BYPASS EXHAUST SYSTEM [2
8339MA
OWNER
CLIENT
EPCM
CONTRACTOR
: Workshop Loading: 8339MA
Data of Workshop loading for
71 124 484 108
KDL 120MW CCPP
BYPASS EXHAUST SYSTEM [2-OFF] for FRAME 6B [PG6581B] GAS TURBINE
8339MA
KDL
Workshop Loading8339MA-950-413
Data of Workshop loading for SHP-06
Description
CCPP
CILEGON, BANTEN, INDONESIA
OFF] for FRAME 6B [PG6581B] GAS TURBINE
POWER STATION, INDONESIA
Workshop Loading
Reports
Data of Workshop loading for
Prepared
2/35 Gilbert Park Drive, Knoxfield, Victoria, 3180 AustraliaTelephone : +61 3 9763 6711 Fax : +61 3 9763 6799
CILEGON, BANTEN, INDONESIA
OFF] for FRAME 6B [PG6581B] GAS TURBINE
POWER STATION, INDONESIA
WS
Prepared by
Checked
2/35 Gilbert Park Drive, Knoxfield, Victoria, 3180 AustraliaTelephone : +61 3 9763 6711 Fax : +61 3 9763 6799
CILEGON, BANTEN, INDONESIA
OFF] for FRAME 6B [PG6581B] GAS TURBINE
POWER STATION, INDONESIA
WS
Checked by
Reviewed
2/35 Gilbert Park Drive, Knoxfield, Victoria, 3180 AustraliaTelephone : +61 3 9763 6711 Fax : +61 3 9763 6799
CILEGON, BANTEN, INDONESIA
OFF] for FRAME 6B [PG6581B] GAS TURBINE
POWER STATION, INDONESIA
QL
Reviewed by
Approved
2/35 Gilbert Park Drive, Knoxfield, Victoria, 3180 AustraliaTelephone : +61 3 9763 6711 Fax : +61 3 9763 6799
www.baltecies.com.au
OFF] for FRAME 6B [PG6581B] GAS TURBINE
QL
Approved by
2/35 Gilbert Park Drive, Knoxfield, Victoria, 3180 Australia
Telephone : +61 3 9763 6711 Fax : +61 3 9763 6799www.baltecies.com.au
2/35 Gilbert Park Drive, Knoxfield, Victoria, 3180 Australia
Telephone : +61 3 9763 6711 Fax : +61 3 9763 6799
www.baltecies.com.au
Table Contents
1.
Workshop loading report for SHP-06
2.
Partial Packing Report
3.
Partial Packing List for SHP-06
Project NameProject Code Unit Name
W
solutions for the power industry
A.
Reference of PL
Shipment Number
Loading Date
Location of Loading
Shippment Map
B.
NO.
1.
C.
1
2
3
E.
D.
Project Name
Project Code Unit Name
WORKSHOP LOADING
solutions for the power industry
A.
WORKSHOP LOADING REFERENCE
Reference of PL/ Rev.
Shipment Number
Loading Date
Location of Loading
Shippment Map
B.
INSPECTION SUBJECT
NO.
Packing Number
.
8339MA-1
C.
LOADING INSPECTION DESCRIPTION
Lifting equipment
1
Forklift
1 Overhead Crane
Containers Used
Container Dimension
Container Number
Seal Number
Additional Description
E.
END OF REPORT
D.
FIGURES DURING WORKSHOP LOADING
1.
Double tires truck
:
Project Code
:
:
RKSHOP LOADING
solutions for the power industry
ORKSHOP LOADING REFERENCE
/ Rev.
:
005/PPD
Shipment Number
:
SHP-0
:
Saturday
Location of Loading
:
Workshop
:
maps.htm
INSPECTION SUBJECT
Number
10-081
D
LOADING INSPECTION DESCRIPTION
ifting equipments
Capacity 5 tons
1 Overhead Crane Capacity
Containers Used
Container Dimension
Container Number
Seal Number
Additional Description
END OF REPORT
FIGURES DURING WORKSHOP LOADING
Double tires truck
, with police number
KDL-Cilegon
8339MA
#1 and #2
REPORT
ORKSHOP LOADING REFERENCE
PPD-SWG/8339/0
06
Saturday, 08
September
Workshop-
PT. Swadaya Graha, Gresik
maps.htm from: RA kartini, gresik to: Krakatau Daya Listrik PT, Cilegon, Banten
Model
Double tires truck
LOADING INSPECTION DESCRIPTION
Capacity 5 tons
Capacity 10 tons
:
N/A
:
N/A
:
N/A
:
-
-
FIGURES DURING WORKSHOP LOADING
, with police number
PT. BALTEC KIG Blok AWebsite:
09.2012 /rev. 03
September, 2012
PT. Swadaya Graha, Gresik
from: RA kartini, gresik to: Krakatau Daya Listrik PT, Cilegon, Banten
Vehicle
Police Number
ouble tires truck
W 9491
Total 1
package
All cargos have been lashing by properly before leaving SWG facility
, with police number
W 9491 UA
CostumeContractor NameReport Number
BALTEC Exhaust Dan Inlet Systems IndonesiaKIG Blok A-16, Jl. Tridarma No. 3Website: www.baltecies.com.au
Forwarder by
Surveyor by
Assurance Company
PT. Swadaya Graha, Gresik
Insurance Type
from: RA kartini, gresik to: Krakatau Daya Listrik PT, Cilegon, Banten
ETA of Shipment
Inspector Name
Loaded Onto
Loose CargoPolice Number
491
UA
package
have been loaded on
All cargos have been lashing by properly before leaving SWG facility
Costumer
Contractor Name
Report Number
Systems Indonesia
16, Jl. Tridarma No. 3
www.baltecies.com.au
Forwarder by
Surveyor by
Assurance Company
Insurance Type
ETA of Shipment
Inspector Name
Loose Cargo
(Yes/ No)
Crate
have been loaded on Saturday, September 0
All cargos have been lashing by properly before leaving SWG facility
:
Arrange by
:
N/A
:
N/A
:
N/A
:
2
days
:
Wawan Setyo
Into Container
N/A
, September 08, 2012
All cargos have been lashing by properly before leaving SWG facility
:
PT. PP
:
PT. Swadaya Graha
:
8339-WLR
Certificate No. : JKT6011937
Arrange by PT. Swadaya Graha
days
Wawan Setyo
Remarks
Support structure faste
Turnbackle for EJ 21
Various fastener for Diverter 13
, 2012
All cargos have been lashing by properly before leaving SWG facility
Form No. 1000MI-
PT. Swadaya Graha
WLR-06
Page 1
of 1
Certificate No. : JKT6011937
wadaya Graha
Remarks
Support structure fastener U1 &U2
backle for EJ 21-U1 and U2
Various fastener for Diverter 13
U1 & U2
-950-413
Certificate No. : JKT6011937
U1 & U2