B Documen Documen 0 Rev. No AB BYPASS EX O C CONTRA nt Name nt No. 08/09/2012 Date IES PTY LTD BN 71 124 484 108 KDL 120 XHAUST SY 8339M OWNER CLIENT EPCM ACTOR : Works : 8339M Data of W 8 0MW CCPP YSTEM [2-O MA KDL shop Loading MA-950-413 Workshop loa SHP-06 Description P CILEGON OFF] for F POWER S g Reports ading for P 2/35 G Te N, BANTEN FRAME 6B STATION, I WS Prepared by C Gilbert Park D elephone : +6 N, INDONE [PG6581B INDONESI WS Checked by Re Drive, Knoxfi 61 3 9763 67 ESIA B] GAS TUR IA QL eviewed by Ap ield, Victoria, 711 Fax : +6 www.ba RBINE QL pproved by , 3180 Austra 61 3 9763 67 altecies.com alia 799 m.au

description

packing list

Transcript of 8339MA-Delivery Data of SHP-06

Page 1: 8339MA-Delivery Data of SHP-06

BYPASS EXHAUST SYSTEM [2

Document NameDocument

0

Rev.

No

ABN

BYPASS EXHAUST SYSTEM [2

OWNER

CLIENT

CONTRACTOR

Document Name

Document No.

08/09/2012

Date

IES PTY LTD

ABN 71 124 484 108

KDL 120MW

BYPASS EXHAUST SYSTEM [2

8339MA

OWNER

CLIENT

EPCM

CONTRACTOR

: Workshop Loading: 8339MA

Data of Workshop loading for

71 124 484 108

KDL 120MW CCPP

BYPASS EXHAUST SYSTEM [2-OFF] for FRAME 6B [PG6581B] GAS TURBINE

8339MA

KDL

Workshop Loading8339MA-950-413

Data of Workshop loading for SHP-06

Description

CCPP

CILEGON, BANTEN, INDONESIA

OFF] for FRAME 6B [PG6581B] GAS TURBINE

POWER STATION, INDONESIA

Workshop Loading

Reports

Data of Workshop loading for

Prepared

2/35 Gilbert Park Drive, Knoxfield, Victoria, 3180 AustraliaTelephone : +61 3 9763 6711 Fax : +61 3 9763 6799

CILEGON, BANTEN, INDONESIA

OFF] for FRAME 6B [PG6581B] GAS TURBINE

POWER STATION, INDONESIA

WS

Prepared by

Checked

2/35 Gilbert Park Drive, Knoxfield, Victoria, 3180 AustraliaTelephone : +61 3 9763 6711 Fax : +61 3 9763 6799

CILEGON, BANTEN, INDONESIA

OFF] for FRAME 6B [PG6581B] GAS TURBINE

POWER STATION, INDONESIA

WS

Checked by

Reviewed

2/35 Gilbert Park Drive, Knoxfield, Victoria, 3180 AustraliaTelephone : +61 3 9763 6711 Fax : +61 3 9763 6799

CILEGON, BANTEN, INDONESIA

OFF] for FRAME 6B [PG6581B] GAS TURBINE

POWER STATION, INDONESIA

QL

Reviewed by

Approved

2/35 Gilbert Park Drive, Knoxfield, Victoria, 3180 AustraliaTelephone : +61 3 9763 6711 Fax : +61 3 9763 6799

www.baltecies.com.au

OFF] for FRAME 6B [PG6581B] GAS TURBINE

QL

Approved by

2/35 Gilbert Park Drive, Knoxfield, Victoria, 3180 Australia

Telephone : +61 3 9763 6711 Fax : +61 3 9763 6799www.baltecies.com.au

2/35 Gilbert Park Drive, Knoxfield, Victoria, 3180 Australia

Telephone : +61 3 9763 6711 Fax : +61 3 9763 6799

www.baltecies.com.au

Page 2: 8339MA-Delivery Data of SHP-06

Table Contents

1.

Workshop loading report for SHP-06

2.

Partial Packing Report

3.

Partial Packing List for SHP-06

Page 3: 8339MA-Delivery Data of SHP-06

Project NameProject Code Unit Name

W

solutions for the power industry

A.

Reference of PL

Shipment Number

Loading Date

Location of Loading

Shippment Map

B.

NO.

1.

C.

1

2

3

E.

D.

Project Name

Project Code Unit Name

WORKSHOP LOADING

solutions for the power industry

A.

WORKSHOP LOADING REFERENCE

Reference of PL/ Rev.

Shipment Number

Loading Date

Location of Loading

Shippment Map

B.

INSPECTION SUBJECT

NO.

Packing Number

.

8339MA-1

C.

LOADING INSPECTION DESCRIPTION

Lifting equipment

1

Forklift

1 Overhead Crane

Containers Used

Container Dimension

Container Number

Seal Number

Additional Description

E.

END OF REPORT

D.

FIGURES DURING WORKSHOP LOADING

1.

Double tires truck

:

Project Code

:

:

RKSHOP LOADING

solutions for the power industry

ORKSHOP LOADING REFERENCE

/ Rev.

:

005/PPD

Shipment Number

:

SHP-0

:

Saturday

Location of Loading

:

Workshop

:

maps.htm

INSPECTION SUBJECT

Number

10-081

D

LOADING INSPECTION DESCRIPTION

ifting equipments

Capacity 5 tons

1 Overhead Crane Capacity

Containers Used

Container Dimension

Container Number

Seal Number

Additional Description

END OF REPORT

FIGURES DURING WORKSHOP LOADING

Double tires truck

, with police number

KDL-Cilegon

8339MA

#1 and #2

REPORT

ORKSHOP LOADING REFERENCE

PPD-SWG/8339/0

06

Saturday, 08

September

Workshop-

PT. Swadaya Graha, Gresik

maps.htm from: RA kartini, gresik to: Krakatau Daya Listrik PT, Cilegon, Banten

Model

Double tires truck

LOADING INSPECTION DESCRIPTION

Capacity 5 tons

Capacity 10 tons

:

N/A

:

N/A

:

N/A

:

-

-

FIGURES DURING WORKSHOP LOADING

, with police number

PT. BALTEC KIG Blok AWebsite:

09.2012 /rev. 03

September, 2012

PT. Swadaya Graha, Gresik

from: RA kartini, gresik to: Krakatau Daya Listrik PT, Cilegon, Banten

Vehicle

Police Number

ouble tires truck

W 9491

Total 1

package

All cargos have been lashing by properly before leaving SWG facility

, with police number

W 9491 UA

CostumeContractor NameReport Number

BALTEC Exhaust Dan Inlet Systems IndonesiaKIG Blok A-16, Jl. Tridarma No. 3Website: www.baltecies.com.au

Forwarder by

Surveyor by

Assurance Company

PT. Swadaya Graha, Gresik

Insurance Type

from: RA kartini, gresik to: Krakatau Daya Listrik PT, Cilegon, Banten

ETA of Shipment

Inspector Name

Loaded Onto

Loose CargoPolice Number

491

UA

package

have been loaded on

All cargos have been lashing by properly before leaving SWG facility

Costumer

Contractor Name

Report Number

Systems Indonesia

16, Jl. Tridarma No. 3

www.baltecies.com.au

Forwarder by

Surveyor by

Assurance Company

Insurance Type

ETA of Shipment

Inspector Name

Loose Cargo

(Yes/ No)

Crate

have been loaded on Saturday, September 0

All cargos have been lashing by properly before leaving SWG facility

:

Arrange by

:

N/A

:

N/A

:

N/A

:

2

days

:

Wawan Setyo

Into Container

N/A

, September 08, 2012

All cargos have been lashing by properly before leaving SWG facility

:

PT. PP

:

PT. Swadaya Graha

:

8339-WLR

Certificate No. : JKT6011937

Arrange by PT. Swadaya Graha

days

Wawan Setyo

Remarks

Support structure faste

Turnbackle for EJ 21

Various fastener for Diverter 13

, 2012

All cargos have been lashing by properly before leaving SWG facility

Form No. 1000MI-

PT. Swadaya Graha

WLR-06

Page 1

of 1

Certificate No. : JKT6011937

wadaya Graha

Remarks

Support structure fastener U1 &U2

backle for EJ 21-U1 and U2

Various fastener for Diverter 13

U1 & U2

-950-413

Certificate No. : JKT6011937

U1 & U2

Page 4: 8339MA-Delivery Data of SHP-06
Page 5: 8339MA-Delivery Data of SHP-06