80,000 SF Building in Plainfield Logistics Park
Transcript of 80,000 SF Building in Plainfield Logistics Park
Plainfield Logistics ParkOverview & Highlights
80-acre park located in Plainfield, Indiana
Premier southwest submarket of Indianapolis
Located off SR 267 (signalized intersection) with immediate access to I-70
10-minute drive-time to I-465
8-minute drive time to Indianapolis International Airport & FedEx Hub
Close proximity to large, skilled labor pool
10-year real estate tax abatement
Infrastructure complete
DanvilleDanville
ClaytonClayton
MonroviaMonrovia
MooresvilleMooresville
PlainfieldPlainfield
AvonAvon
BrownsburgBrownsburg
WhitestownWhitestown
IndianapolisIndianapolis
GreenwoodGreenwood
FranklinFranklin
www.plainfieldlogisticspark.com
Data Center Building80,000 SF Building in Plainfield Logistics Park
Luke Wessel, [email protected]
Grant Lindley, SIOR, [email protected]
Stephen [email protected]
PROPOSEDBUILDING III474,000 SF(918' x 520')
PROPOSEDBUILDING II203,000 SF(780' x 260')
I GNIDLIUBFS 082,981)'062 x '827(
DRIV
E-IN
DRIV
E-IN
DRIV
E-IN
NOITNETED
52'.PYT
50'
TYP.
60'
GNIKRAP OTUA 111
DRIV
E-IN
DRIV
E-IN
GNIKRAP RELIART 02
CR 8
25
SKCOD 11 SKCOD 01
.CA 30.3LECRAP CG
25 F
UTUR
E AU
TO P
ARKI
NG
SR 2
67.CA 25.1
LECRAP CG
50'
TYP.
60'
52'TYP.
10 DOCKS
140'
10 DOCKS
138 AUTO PARKING
DRIV
E-IN
24 F
UTUR
E AU
TOS
10 TRAILERS
DRIV
E-IN
55'
10 FUTURE TRAILERS
50'
TYP.
60'
54'TYP.
140'
140'
24 DOCKS
55'
129
AUTO
PAR
KING
31 AUTO PARKING
36 TRAILERS
36 FUTURE TRAILER PARKING
25 F
UTUR
E AU
TOS
60'
94 FUTUREAUTO PARKING
24 DOCKS
DETENTION
CAMBY ROAD
140'
PROPOSED DATA CENTER
80,000 SF
350'x250'
±8.74 ACRES
I-70
BERM
50' T
REE
PRES
ERVA
TION
ARE
A
60 AUTO PARKING
DRIVE-IN
2 DOCKS
Scale:Date:
North
Master Plan1" = 200'-0"12/10/20
(to scale on 11"x17" paper)
Plainfield Logistics ParkSR 267 & Camby Road
Plainfield, Indiana
Plainfield Logistics ParkProposed Data CenterPlainfield, Indiana
SITE DUE DILIGENCE COMPLETED + INFRASTRUCTURE COMPLETE
Phase I Environmental
Low natural disaster risk
Infrastructure ready by Q1 2021
Electricity feed – two dedicated 12.47 kV distribution circuits
20 MW capacity 18 – 24 months
Long-haul fiber with bandwidth to satisfy data center requirements
Close proximity to major fiber connection point/multiple networks
Zoning I-2 – data center permitted within classification
Outside storage permitted
Maximum building height 75 ft.
Parking 1/3000 SF of floor space
Monument signage
UTILITY PROVIDERS
Water: Town of Plainfield
Power: Duke Energy
Data: AT&T
Sewer: Town of Plainfield
Gas: Vectren
Cushman & WakefieldAmbrose Property Group
Economic Incentives (state and local level)
Data Center Sales Tax Exemption
Property tax offset
Investment and Job Creation
Duke Energy flexible rate options
Rider 58 / 5-year reduction up to 30%
Plainfield Data Center ReportClick here to view
certifiedbyverisite.com
Camby RdCamby Rd
PROPOSEDBUILDING III474,000 SF(918' x 520')
PROPOSEDBUILDING II203,000 SF(780' x 260')
I GNIDLIUBFS 082,981)'062 x '827(
DRIV
E-IN
DRIV
E-IN
DRIV
E-IN
NOITNETED
52'.PYT
50'
TYP.
60'
GNIKRAP OTUA 111
DRIV
E-IN
DRIV
E-IN
GNIKRAP RELIART 02
CR 8
25
SKCOD 11 SKCOD 01
.CA 30.3LECRAP CG
25 F
UTUR
E AU
TO P
ARKI
NG
SR 2
67
.CA 25.1LECRAP CG
50'
TYP.
60'
52'TYP.
10 DOCKS
140'
10 DOCKS
138 AUTO PARKING
DRIV
E-IN
24 F
UTUR
E AU
TOS
10 TRAILERS
DRIV
E-IN
55'
10 FUTURE TRAILERS
50'
TYP.
60'
54'TYP.
140'
140'
24 DOCKS
55'
129
AUTO
PAR
KING
31 AUTO PARKING
36 TRAILERS
36 FUTURE TRAILER PARKING
25 F
UTUR
E AU
TOS
60'
94 FUTUREAUTO PARKING
24 DOCKS
DETENTION
CAMBY ROAD
140'
PROPOSED DATA CENTER
80,000 SF
350'x250'
±8.74 ACRES
I-70
BERM
50' T
REE
PRES
ERVA
TION
ARE
A
60 AUTO PARKING
DRIVE-IN
2 DOCKS
Scale:Date:
North
Master Plan1" = 200'-0"12/10/20
(to scale on 11"x17" paper)
Plainfield Logistics ParkSR 267 & Camby Road
Plainfield, Indiana
Plainfield Advantage
+ Hendricks County Population: 167,009
+ Hendricks County has grown 60.4% since 2000
+ Dedicated programs to support a large, highly skilled workforce
+ Indianapolis Airport ranked Best Airport in North America for 7th consecutive year and features 2nd largest FedEx facility in the world
+ Indiana ranks #1 in Midwest and #5 in the nation as Best State for Business
+ Indiana ranks #1 in Midwest and #10 in the nation as Best Tax Climate
80,000 SF Data Center Building in Plainfield Logistics Park
1-day drive time
DanvilleDanville
ClaytonClayton
MonroviaMonrovia
MooresvilleMooresville
PlainfieldPlainfield
AvonAvon
BrownsburgBrownsburg
WhitestownWhitestown
IndianapolisIndianapolis
GreenwoodGreenwood
FranklinFranklinPark HighlightsPlainfield Logistics Park features flexible sites for build-to-suit opportunities, with up to 3 Class-A distribution buildings planned, totaling nearly 900,000 square feet, and a Verisite certified data center site. These modern, cross-dock and rear-load logistics facilities will range in size from 67,000 square feet to 474,000 square feet.
Plainfield offers easy access to the I-70, I-65 and I-74 distribution corridors, as well as the Indianapolis International Airport, which features the second largest FedEx facility in the world.
Site to Airport8-minute drive time6.4 miles
Site to I-46510-minute drive time8 miles
Site to Indianapolis20-minute drive time16.4 miles
Allison Transmission
Amazon
Balkamp
Becton Dickinson
CEVA
DHL
FedEx
Hartz Pet Products
Home Depot
Kohls
Medline
Niagra Water
PepesiCo
Pill Pack
Rolls-Royce
Sealy Posturpedic
Stitch Fix
Trane
UPS
Walmart
Whirlpool
Corporate Neighbors