Ryan Johnson - Structural OptionAE Senior Thesis – 2010
![Page 2: 800 North Glebe Arlington, VA](https://reader036.fdocuments.in/reader036/viewer/2022062323/56816806550346895ddd8709/html5/thumbnails/2.jpg)
OUTLINE
•Project Info
•Existing Structure
•Project Goals
•Structural Depth
•Architectural Breadth
•Construction Breadth
•Comparison and Conclusion
•Questions and Comments
![Page 3: 800 North Glebe Arlington, VA](https://reader036.fdocuments.in/reader036/viewer/2022062323/56816806550346895ddd8709/html5/thumbnails/3.jpg)
General Building Data
• Location: Arlington, VA
• Occupancy Type: Mixed-Use Office
• Distinctive Architectural Features
• Building Setbacks At Levels 4,6 And 8
•Project Info•Existing Structure
•Project Goals
•Structural Depth
•Architectural Breadth
•Construction Breadth
•Comparison and Conclusion
![Page 4: 800 North Glebe Arlington, VA](https://reader036.fdocuments.in/reader036/viewer/2022062323/56816806550346895ddd8709/html5/thumbnails/4.jpg)
3 Below Grade Parking Levels 1 Level Retail On Ground Level 9 Levels Of Offices
•Project Info•Existing Structure
•Project Goals
•Structural Depth
•Architectural Breadth
•Construction Breadth
•Comparison and Conclusion
EXISTING STRUCTURE
General Building Data•Size: 316,000 SF
•Completion Date: 2011
•Estimated Project Cost: $62 Million
![Page 5: 800 North Glebe Arlington, VA](https://reader036.fdocuments.in/reader036/viewer/2022062323/56816806550346895ddd8709/html5/thumbnails/5.jpg)
EXISTING STRUCTURE
•Project Info
•Existing Structure•Project Goals
•Structural Depth
•Architectural Breadth
•Construction Breadth
•Comparison and Conclusion
![Page 6: 800 North Glebe Arlington, VA](https://reader036.fdocuments.in/reader036/viewer/2022062323/56816806550346895ddd8709/html5/thumbnails/6.jpg)
Existing Structure•Column Foundations Range In Size From 4’-0” Up
To 14’-0”
• Caissons Supporting On-grade Columns
• 6’-0” Thick Mat Foundation Supporting Shearwalls
• 12” Foundation Wall Around Parking Substructure
•Project Info
•Existing Structure•Project Goals
•Structural Depth
•Architectural Breadth
•Construction Breadth
•Comparison and Conclusion CAISONS
N
![Page 7: 800 North Glebe Arlington, VA](https://reader036.fdocuments.in/reader036/viewer/2022062323/56816806550346895ddd8709/html5/thumbnails/7.jpg)
Existing Structure•Post-tensioned Girders With 9” Thick One-Way Slab
• 10.5” Two-way Slabs Used For Building Stepouts
• Two 12” Think “C” Shaped Shear Walls At The Building’s Core
•Project Info
•Existing Structure•Project Goals
•Structural Depth
•Architectural Breadth
•Construction Breadth
•Comparison and Conclusion
Y
X
![Page 8: 800 North Glebe Arlington, VA](https://reader036.fdocuments.in/reader036/viewer/2022062323/56816806550346895ddd8709/html5/thumbnails/8.jpg)
PROJECT GOALS
•Project Info
•Existing Structure•Project Goals
•Structural Depth
•Architectural Breadth
•Construction Breadth
•Comparison and Conclusion
![Page 9: 800 North Glebe Arlington, VA](https://reader036.fdocuments.in/reader036/viewer/2022062323/56816806550346895ddd8709/html5/thumbnails/9.jpg)
•Project Info
•Existing Structure
•Project Goals•Structural Depth
•Architectural Breadth
•Construction Breadth
•Comparison and Conclusion
Project Goals• Uniform Slab Type And Thickness
• Uniform Column Sizes
• Reduce Lateral loads Carried By The Shearwalls
• Determine Affects On Floor Plans
• Compare Sequencing And Cost
![Page 10: 800 North Glebe Arlington, VA](https://reader036.fdocuments.in/reader036/viewer/2022062323/56816806550346895ddd8709/html5/thumbnails/10.jpg)
STRUCTURAL DEPTH
•Project Info
•Existing Structure
•Project Goals
•Structural Depth•Architectural Breadth
•Construction Breadth
•Comparison and Conclusion
![Page 11: 800 North Glebe Arlington, VA](https://reader036.fdocuments.in/reader036/viewer/2022062323/56816806550346895ddd8709/html5/thumbnails/11.jpg)
•Project Info
•Existing Structure
•Project Goals
•Structural Depth•Architectural Breadth
•Construction Breadth
•Comparison and Conclusion
Structural Depth
Design Process
1. Initial Plan Layout
2. Slab Design
3. Lateral System Design
![Page 12: 800 North Glebe Arlington, VA](https://reader036.fdocuments.in/reader036/viewer/2022062323/56816806550346895ddd8709/html5/thumbnails/12.jpg)
•Project Info
•Existing Structure
•Project Goals
•Structural Depth•Architectural Breadth
•Construction Breadth
•Comparison and Conclusion
Slab Design
• Slab Type And Thickness
• Direction Of Banded Tendons
• Tendon Stresses Altered To Account For Opening And Nonuniform Slab Edges
d =
30’ x 12” 45 = 8” two-way post-
tensioned
![Page 13: 800 North Glebe Arlington, VA](https://reader036.fdocuments.in/reader036/viewer/2022062323/56816806550346895ddd8709/html5/thumbnails/13.jpg)
•Project Info
•Existing Structure
•Project Goals
•Structural Depth•Architectural Breadth
•Construction Breadth
•Comparison and Conclusion
Y - Direction
• Distributed Tendons • 4 7-wire Strands Per Tendon• Uniformly Spaced To Allow For 250 psi Minimum
Precompression Stress
X - Direction
• Tendons Banded Along Column Strip• 25 7-wire Strands Per Tendon Grouping• 650 Kips Average Tendon Forces
![Page 14: 800 North Glebe Arlington, VA](https://reader036.fdocuments.in/reader036/viewer/2022062323/56816806550346895ddd8709/html5/thumbnails/14.jpg)
•Project Info
•Existing Structure
•Project Goals
•Structural Depth•Architectural Breadth
•Construction Breadth
•Comparison and Conclusion
Immediate Load Deflection = Service LC – (Dead +Balanced)
Time Dependent Deflection = Long Term LC–(Dead + Balanced)
![Page 15: 800 North Glebe Arlington, VA](https://reader036.fdocuments.in/reader036/viewer/2022062323/56816806550346895ddd8709/html5/thumbnails/15.jpg)
•Project Info
•Existing Structure
•Project Goals
•Structural Depth•Architectural Breadth
•Construction Breadth
•Comparison and Conclusion
Lateral System DesignInitial Design
•Uniform R-value For Both Directions (R=6)
Initial Design• Shear wall core
![Page 16: 800 North Glebe Arlington, VA](https://reader036.fdocuments.in/reader036/viewer/2022062323/56816806550346895ddd8709/html5/thumbnails/16.jpg)
•Project Info
•Existing Structure
•Project Goals
•Structural Depth•Architectural Breadth
•Construction Breadth
•Comparison and Conclusion
Lateral System DesignRedesign
•Different R-value Per Direction (Rx = 5,Ry = 5.5)•Ordinary Reinforced Shearwall & Duel System
• PT Flat Plate Slabs Used In LFRS Not In Code
Redesign•Shear Wall Core•Concrete Moment Frame Included In Y - Direction
![Page 17: 800 North Glebe Arlington, VA](https://reader036.fdocuments.in/reader036/viewer/2022062323/56816806550346895ddd8709/html5/thumbnails/17.jpg)
•Project Info
•Existing Structure
•Project Goals
•Structural Depth•Architectural Breadth
•Construction Breadth
•Comparison and Conclusion
Lateral System Design
System Comparison
Loading Condition:• Wind Load Case 1 Controlled Both Designs
Displacement• Max X: 53% Reduction• Max Y: 27% Reduction
Story Drift• Max X: 45% Reduction• Max Y: 20% Reduction
![Page 18: 800 North Glebe Arlington, VA](https://reader036.fdocuments.in/reader036/viewer/2022062323/56816806550346895ddd8709/html5/thumbnails/18.jpg)
•Project Info
•Existing Structure
•Project Goals
•Structural Depth•Architectural Breadth
•Construction Breadth
•Comparison and Conclusion
Column Design
EXISTING STRUCTURE
![Page 19: 800 North Glebe Arlington, VA](https://reader036.fdocuments.in/reader036/viewer/2022062323/56816806550346895ddd8709/html5/thumbnails/19.jpg)
•Project Info
•Existing Structure
•Project Goals
•Structural Depth•Architectural Breadth
•Construction Breadth
•Comparison and Conclusion
DEPTH CONCLUSION• Uniform Slab Type And Thickness
• Reduced Need for PT Girders
• Lateral System Successfully Altered• Building Rotation Reduced• Shear Wall Loads Reduced• Drift And Displacement Reduced
![Page 20: 800 North Glebe Arlington, VA](https://reader036.fdocuments.in/reader036/viewer/2022062323/56816806550346895ddd8709/html5/thumbnails/20.jpg)
•Project Info
•Existing Structure
•Project Goals
•Structural Depth
•Architectural Breadth•Construction Breadth
•Comparison and Conclusion
Architectural Breadth
![Page 21: 800 North Glebe Arlington, VA](https://reader036.fdocuments.in/reader036/viewer/2022062323/56816806550346895ddd8709/html5/thumbnails/21.jpg)
•Project Info
•Existing Structure
•Project Goals
•Structural Depth
•Architectural Breadth•Construction Breadth
•Comparison and Conclusion
BUILDING ENVELOPE STUDYExisting Curtain Wall• Stick Built • Anchors At Each Level• Aluminum Mullions• Insulating Glass Unit
• ¼” Clear Heat Strengthened Plys• ½” Air Space• Low-E Coating On Surface #2
![Page 22: 800 North Glebe Arlington, VA](https://reader036.fdocuments.in/reader036/viewer/2022062323/56816806550346895ddd8709/html5/thumbnails/22.jpg)
•Project Info
•Existing Structure
•Project Goals
•Structural Depth
•Architectural Breadth•Construction Breadth
•Comparison and Conclusion
ORIGINAL FLOOR PLAN REDESIGNED FLOOR PLAN
![Page 23: 800 North Glebe Arlington, VA](https://reader036.fdocuments.in/reader036/viewer/2022062323/56816806550346895ddd8709/html5/thumbnails/23.jpg)
•Project Info
•Existing Structure
•Project Goals
•Structural Depth
•Architectural Breadth•Construction Breadth
•Comparison and Conclusion
ORIGINAL FLOOR PLAN REDESIGNED FLOOR PLAN
![Page 24: 800 North Glebe Arlington, VA](https://reader036.fdocuments.in/reader036/viewer/2022062323/56816806550346895ddd8709/html5/thumbnails/24.jpg)
•Project Info
•Existing Structure
•Project Goals
•Structural Depth
•Architectural Breadth
•Construction Breadth•Comparison and Conclusion
Construction Breadth
![Page 25: 800 North Glebe Arlington, VA](https://reader036.fdocuments.in/reader036/viewer/2022062323/56816806550346895ddd8709/html5/thumbnails/25.jpg)
•Project Info
•Existing Structure
•Project Goals
•Structural Depth
•Architectural Breadth
•Construction Breadth•Comparison and Conclusion
• 94 Days Of Construction
Thesis Building RedesignCurrent Building
• 43 Days Of Construction
![Page 26: 800 North Glebe Arlington, VA](https://reader036.fdocuments.in/reader036/viewer/2022062323/56816806550346895ddd8709/html5/thumbnails/26.jpg)
•Project Info
•Existing Structure
•Project Goals
•Structural Depth
•Architectural Breadth
•Construction Breadth•Comparison and Conclusion
Original Design
Thesis Building Redesign
Comparison
![Page 27: 800 North Glebe Arlington, VA](https://reader036.fdocuments.in/reader036/viewer/2022062323/56816806550346895ddd8709/html5/thumbnails/27.jpg)
•Project Info
•Existing Structure
•Project Goals
•Structural Depth
•Architectural Breadth
•Construction Breadth
•Comparison and Conclusion
Conclusion:• Uniform Slab Type &Thickness and Column Sizes
• Reduced Floor Weight And Material Use
• Lateral System Modified To Include Moment Frame• Shearwall Loads Reduced
• Floor Plans Were Not Overly Modified
• Sequencing and Cost Increase
![Page 28: 800 North Glebe Arlington, VA](https://reader036.fdocuments.in/reader036/viewer/2022062323/56816806550346895ddd8709/html5/thumbnails/28.jpg)
•Project Info
•Existing Structure
•Project Goals
•Structural Depth
•Architectural Breadth
•Construction Breadth
•Comparison and Conclusion
QUESTIONSAcknowledgements:
Structura The JBG Companies Cooper Carry
The Pennsylvania State UniversityDr. Linda HanaganProfessor M. Kevin ParfittProfessor Robert HollandProfessor Paul BowersThe entire AE faculty and staff