Construction Procedure Sheet I "Prevention of water leak from roof floor" 1/14 建築事業本部:品質推進部
Division Project name India Office
Date:2011/02/26 : Muraoka
Plan/ Construction
Control Items Quality Target (Acceptable Criteria) Time Object
LG
S
① Vibration & Difrection EX)
Check the wall thickness and stud size Saint-Gobain spec thickness CH Planning stage Specification
Wall clearance hight and stud size shall be corrected Delivery
Check th dry partition supplier spac
*Thickness include the board
② Stud pitch
Measurement of the distance stud to studPhoto Installation Stud to stud
distance
③ Anchor to the slab LGS runner shall be anchored to the concrete slab @900mm
Check the anchor distance Fixing anchor distance
④ Vertical alignment of stud LGS stud shall be fixed vertical straightly.
Check the Akignment Fixing Stud verticality
⑤ Door, window openning reinforcement support. Additional reinforcement shall be installed around the door, window opennings
Photo Planning
Vertical; Slab to slab, Holizontal; support to support Installation
Materials; Steel hollow section 50*50 or wooden box 50*50
Quality Control SheetLGS Dry partition
Important
Items
Checking Method
Stud, runner size and thickness
12.5mm+LGS75+12.5mm=100 → CH=3600
Measurment of the space stud to stud as per design spac. India usual →@600
Top and bottom diflection toralance ⊿=10mm
Method of statement
Supportframe
Construction Procedure Sheet I "Prevention of water leak from roof floor" 2/14 建築事業本部:品質推進部
Control Items Quality Target (Acceptable Criteria) Time Object
Important
Items
Checking Method
LG
S
Construction Procedure Sheet I "Prevention of water leak from roof floor" 3/14 建築事業本部:品質推進部
Control Items Quality Target (Acceptable Criteria) Time Object
Important
Items
Checking Method LG
S⑥ Switch box/ Piping/ Wiring inside LGS partation wall
Photo Planning
Installation
Also there shall be supported within 30cm from the box connecting portion.
Gyp
sum
boa
rd
⑦ Fixing board joint
Photo Planning Shop drawing
Installation Joint position
Supporting interval for condit pipe and cable. Outlet box; Metal→ less than @2.0mOutlet box; Plastic→less than @1.5m Method of
statement
Considering sound proof, the swith boxes shall not be provided back to back. And the interval between boxes is secured not less than 150mm.
Double board joint shall not be provided same position
Stud
Stud150mm
Box outletInside LGS Partation wall
Construction Procedure Sheet I "Prevention of water leak from roof floor" 4/14 建築事業本部:品質推進部
Control Items Quality Target (Acceptable Criteria) Time Object
Important
Items
Checking Method
Gyp
sum
boa
rd
⑧ The Details of Gyp. board to board joint treatment Board joint shall be smooth finishing with putty work.
Joint putty+ super taping+ putty Installation
⑨ Joint treatment among plaster wall and dry wall Groove line shall be provided among plaster wall and dry wall.
To prevent the wall crack Groove line t=10mm Planning Shop drawing
Installation
⑩ Prevention water leaking to the electrcal room To prevent water leaking to the electrial room Photo Planning Shop drawing
Prevention sound leaking to the VIP room To prevent sound leaking to the VIP room Installation Cauling
Cauking shall be provided to the slab joint
t=12mm, w=15mm
⑪ Photo Planning Shop drawing
Installation
Cauking shall be provided to the slab joint
t=12mm, w=15mm
Joint putty with taping
Plastic or AL channel
Prevention buckling the dry wall coused by structural roof wind vibration.
To prevent buckling the dry wall partation, these are provided the slot hole joint between aditional frame and roof structure(PEB rafter or Jack beam)
(Elect. rm)(Wash basin)
Cauking
Joint Joint
joint putty
Tapingputty
putty
putty
Groove t=10mm
Plaster wall Dry wall
Crack
Construction Procedure Sheet I "Prevention of water leak from roof floor" 5/14 建築事業本部:品質推進部
Control Items Quality Target (Acceptable Criteria) Time Object
Important
Items
Checking Method
Slot hole joint between additional reinforcement frame and PEB rafter to isolate eachother.
Additional reinforcement frame□50*50
PEB Rafter or Jack beam
Construction Procedure Sheet I "Prevention of water leak from roof floor" 6/14 建築事業本部:品質推進部
India Office P. M Site Manager
Date:2011/02/26 : Muraoka
Plan/ Construction
JudgmentMethod
Check ○
Measurement
Measurement Shall be adjust require distance ○
Measurement
Measurement To adjust with in toralance
Split bar
Check Provide support frame
Visual
Checking Method Action for deviation from criteria when planning
Consultant/designe
reconfirm
Change the wall thickness or consider reinforcement
Reject to receive the wrong materials
Additional anchor shall be installed
Construction Procedure Sheet I "Prevention of water leak from roof floor" 7/14 建築事業本部:品質推進部
JudgmentMethod
Checking Method Action for deviation from criteria when planning
Consultant/designe
reconfirm
Construction Procedure Sheet I "Prevention of water leak from roof floor" 8/14 建築事業本部:品質推進部
JudgmentMethod
Checking Method Action for deviation from criteria when planning
Consultant/designe
reconfirm
Measurment Provide support as per standard.
Visual
Check Re located Gyp. board
Visual
Construction Procedure Sheet I "Prevention of water leak from roof floor" 9/14 建築事業本部:品質推進部
JudgmentMethod
Checking Method Action for deviation from criteria when planning
Consultant/designe
reconfirm
Visual
Check
Visual
Check
Visual Provide the cauking
Check
Slot hole joint Provide loose hole
Welding
Construction Procedure Sheet I "Prevention of water leak from roof floor" 10/14 建築事業本部:品質推進部
JudgmentMethod
Checking Method Action for deviation from criteria when planning
Consultant/designe
reconfirm