2012 1204 1 2 1 ( ) 2 ( ) : Construction Safety for the Transportation of Nuclear Reactor Chan-Wei Hsu 1 Huang Hsing Pan 2 1 Department of Civil Engineering, Kaohsiung University of Applied Sciences, Kaohsiung, Taiwan (Graduate) 2 Gantry nuclear power plant, the fourth nuclear power plant in Taiwan, is still constructing. Nuclear reactors are the heart of a nuclear power plant that plays an important role to protect the internal fuel rods if the nuclear reaction hazards occur, so the size of reaction furnace is always far greater than the pressure vessel. To reduce occupational hazards in crane unloading and handling operations of nuclear power reactors, this study explores the process of construction handling operations and the related risk factors, and provides the construction safety checklist according to engineering experiences and Delphi method. Handling operations of nuclear power reactor are divided into the transport frame and support construction, pilot transport and road improvement process, and reactor proper shipping Department of Civil Engineering, Kaohsiung University of Applied Sciences, Kaohsiung, Taiwan (Professor) ABSTRACT

Transcript of 7àP¥#u1qA¸3Ô ó 9 +1! G¼J - kuas.edu.t · 2012 &Ç6ÐQ¯DÇ0ó- I³G¼Y¶6« 1205 process....

Page 1: 7àP¥#u1qA¸3Ô ó 9 +1! G¼J - kuas.edu.t · 2012 &Ç6ÐQ¯DÇ0ó- I³G¼Y¶6« 1205 process. Dismantling operating procedures include for construction projects, the disasters preliminary

2012

1204

1 2 1 ( )

2 ( )

:

Construction Safety for the Transportation of Nuclear Reactor

Chan-Wei Hsu1 Huang Hsing Pan2

1 Department of Civil Engineering, Kaohsiung University of Applied Sciences, Kaohsiung, Taiwan (Graduate)

2

Gantry nuclear power plant, the fourth nuclear power plant in Taiwan, is still constructing. Nuclear reactors are the heart of a nuclear power plant that plays an important role to protect the internal fuel rods if the nuclear reaction hazards occur, so the size of reaction furnace is always far greater than the pressure vessel. To reduce occupational hazards in crane unloading and handling operations of nuclear power reactors, this study explores the process of construction handling operations and the related risk factors, and provides the construction safety checklist according to engineering experiences and Delphi method. Handling operations of nuclear power reactor are divided into the transport frame and support construction, pilot transport and road improvement process, and reactor proper shipping

Department of Civil Engineering, Kaohsiung University of Applied Sciences, Kaohsiung, Taiwan (Professor)

ABSTRACT

Page 2: 7àP¥#u1qA¸3Ô ó 9 +1! G¼J - kuas.edu.t · 2012 &Ç6ÐQ¯DÇ0ó- I³G¼Y¶6« 1205 process. Dismantling operating procedures include for construction projects, the disasters preliminary

2012

1205

process. Dismantling operating procedures include for construction projects, the disasters preliminary hazard analysis, risk factors, and then, set the initial construction work safety checklist, assessment and construction of basic things. Following Delphi method validation, the main hazards are falling, drowning, tumble, fall, collision, flying objects, objects collapsed, knocked, cut, cuts, and high temperature contact, a sense of power, fire. Keywords: Nuclear reactor, Risk factors, Handling safety checklist, Delphi method.

Page 3: 7àP¥#u1qA¸3Ô ó 9 +1! G¼J - kuas.edu.t · 2012 &Ç6ÐQ¯DÇ0ó- I³G¼Y¶6« 1205 process. Dismantling operating procedures include for construction projects, the disasters preliminary

2012

1206

2011 3 11 9

[1]

[2]

(GE) [3]

24161(mm) 8974(mm)10087 (mm) 1007

[4][5]

[6]

[7]

[8]

2.1

( 1.) (2.)

[9]

( 3.)

1.

Page 4: 7àP¥#u1qA¸3Ô ó 9 +1! G¼J - kuas.edu.t · 2012 &Ç6ÐQ¯DÇ0ó- I³G¼Y¶6« 1205 process. Dismantling operating procedures include for construction projects, the disasters preliminary

2012

1207

2.

3.

2.2 (2012 )

1. [10]

(R.P.V.)

( 4 ) ( 5

)

4

5

2.

( 6 7

8

9

10 25%

11 50% 12

100% 13

)

Page 5: 7àP¥#u1qA¸3Ô ó 9 +1! G¼J - kuas.edu.t · 2012 &Ç6ÐQ¯DÇ0ó- I³G¼Y¶6« 1205 process. Dismantling operating procedures include for construction projects, the disasters preliminary

2012

1208

6

7

8

9

10 25%

11 50%

12 100%

Page 6: 7àP¥#u1qA¸3Ô ó 9 +1! G¼J - kuas.edu.t · 2012 &Ç6ÐQ¯DÇ0ó- I³G¼Y¶6« 1205 process. Dismantling operating procedures include for construction projects, the disasters preliminary

2012

1209

13

3.

2

14

15 16

14

15

16

3.1

4-6-225% 2

21 5

2(25% )

3.2

3 51 3

34 25% 4

25%

Page 7: 7àP¥#u1qA¸3Ô ó 9 +1! G¼J - kuas.edu.t · 2012 &Ç6ÐQ¯DÇ0ó- I³G¼Y¶6« 1205 process. Dismantling operating procedures include for construction projects, the disasters preliminary

2012

1210

25% ( 4)

30

32

4 25%

21-2

21-2

21-2 11

3233

3.

Page 8: 7àP¥#u1qA¸3Ô ó 9 +1! G¼J - kuas.edu.t · 2012 &Ç6ÐQ¯DÇ0ó- I³G¼Y¶6« 1205 process. Dismantling operating procedures include for construction projects, the disasters preliminary

2012

1211

4. 25% ( )

4.1 2 3

4.2

17

1. 2. 3. 4. 5. 6. 7.

8. 9. 10. 11. 12. 13. 14. 15. 16. 17.

4.3

17

44

55 5 5

20 5

5

4.4

Page 9: 7àP¥#u1qA¸3Ô ó 9 +1! G¼J - kuas.edu.t · 2012 &Ç6ÐQ¯DÇ0ó- I³G¼Y¶6« 1205 process. Dismantling operating procedures include for construction projects, the disasters preliminary

2012

1212

17 6

5

6

: 1. 13

13 6051

2.

14

3.

17 4. 17

5.

1. (ABWR)

2. “

” 100

1

3. “ ”

94 6

4. “RPV ”

92 5

5. “RPV ”

92 5

Page 10: 7àP¥#u1qA¸3Ô ó 9 +1! G¼J - kuas.edu.t · 2012 &Ç6ÐQ¯DÇ0ó- I³G¼Y¶6« 1205 process. Dismantling operating procedures include for construction projects, the disasters preliminary

2012

1213

6. 2000 “

” 128 15-21

7. 1999 “

” 117

11-30

8. 2000 12

“ ”

8 423-440

9. 2011 “

10. “1# (R.P.V.) ”

92 6