Construction Safety for the Transportation of Nuclear Reactor
Chan-Wei Hsu1 Huang Hsing Pan2
1 Department of Civil Engineering, Kaohsiung University of Applied Sciences, Kaohsiung, Taiwan (Graduate)
2
Gantry nuclear power plant, the fourth nuclear power plant in Taiwan, is still constructing. Nuclear reactors are the heart of a nuclear power plant that plays an important role to protect the internal fuel rods if the nuclear reaction hazards occur, so the size of reaction furnace is always far greater than the pressure vessel. To reduce occupational hazards in crane unloading and handling operations of nuclear power reactors, this study explores the process of construction handling operations and the related risk factors, and provides the construction safety checklist according to engineering experiences and Delphi method. Handling operations of nuclear power reactor are divided into the transport frame and support construction, pilot transport and road improvement process, and reactor proper shipping
Department of Civil Engineering, Kaohsiung University of Applied Sciences, Kaohsiung, Taiwan (Professor)
ABSTRACT
2012
1205
process. Dismantling operating procedures include for construction projects, the disasters preliminary hazard analysis, risk factors, and then, set the initial construction work safety checklist, assessment and construction of basic things. Following Delphi method validation, the main hazards are falling, drowning, tumble, fall, collision, flying objects, objects collapsed, knocked, cut, cuts, and high temperature contact, a sense of power, fire. Keywords: Nuclear reactor, Risk factors, Handling safety checklist, Delphi method.
2012
1206
2011 3 11 9
[1]
[2]
(GE) [3]
24161(mm) 8974(mm)10087 (mm) 1007
[4][5]
[6]
[7]
[8]
2.1
( 1.) (2.)
[9]
( 3.)
1.
2012
1207
2.
3.
2.2 (2012 )
1. [10]
(R.P.V.)
( 4 ) ( 5
)
4
5
2.
( 6 7
8
9
10 25%
11 50% 12
100% 13
)
2012
1208
6
7
8
9
10 25%
11 50%
12 100%
2012
1209
13
3.
2
14
15 16
14
15
16
3.1
4-6-225% 2
21 5
2(25% )
3.2
3 51 3
34 25% 4
25%
2012
1210
25% ( 4)
30
32
4 25%
21-2
21-2
21-2 11
3233
3.
2012
1211
4. 25% ( )
4.1 2 3
4.2
17
1. 2. 3. 4. 5. 6. 7.
8. 9. 10. 11. 12. 13. 14. 15. 16. 17.
4.3
17
44
55 5 5
20 5
5
4.4
2012
1212
17 6
5
6
: 1. 13
13 6051
2.
14
3.
17 4. 17
5.
1. (ABWR)
2. “
” 100
1
3. “ ”
94 6
4. “RPV ”
92 5
5. “RPV ”
92 5
2012
1213
6. 2000 “
” 128 15-21
7. 1999 “
” 117
11-30
8. 2000 12
“ ”
8 423-440
9. 2011 “
”
10. “1# (R.P.V.) ”
92 6
11. “#2 RPV ” 92 9