GLAST LAT Project Peer Review, March 24-25, 2003 7E2 1 Gamma-ray Large Gamma-ray Large Area Space Area Space Telescope Telescope 7E2: EM test plans GLAST Large Area GLAST Large Area Telescope: Telescope: Tracker Subsystem Nicola Mazziotta University and INFN Bari - Italy [email protected] t

description

Gamma-ray Large Area Space Telescope. 7E2: EM test plans. GLAST Large Area Telescope: Tracker Subsystem. Nicola Mazziotta University and INFN Bari - Italy [email protected]. Outline. Test strategies First results Panel vib plan Tray thermal plan Tower vib plan Tower thermal plan - PowerPoint PPT Presentation

Transcript of 7E2: EM test plans

Page 1: 7E2: EM test plans

GLAST LAT Project Peer Review, March 24-25, 2003

7E2 1

Gamma-ray Large Gamma-ray Large Area Space Area Space TelescopeTelescope

7E2: EM test plans

GLAST Large Area GLAST Large Area Telescope:Telescope:Tracker Subsystem

Nicola MazziottaUniversity and INFNBari - [email protected]

Page 2: 7E2: EM test plans

GLAST LAT Project Peer Review, March 24-25, 2003

7E2 2

OutlineOutlineTest strategiesFirst resultsPanel vib planTray thermal

planTower vib planTower thermal

planEM Matrix planReference LAT Documents:

1. LAT-MD-00408, LAT Instrument Performance Verification Plan2. LAT-SS-00788, LAT Environmental Specification3. LAT-TD-01005, Thermal Test Results on Thick Converter Mock-up

Trays4. LAT-TD-01249, Thermal Test Results for Pre-Engineering Model

Trays5. LAT-PS-01584, LAT Tracker Tray SSD Ladder Panel Assembly

Procedure6. LAT-TD-01004, EM Tray Vibration Test Plan 7. LAT-TD-01037, EM Tray Thermal Test Plan

Page 3: 7E2: EM test plans

GLAST LAT Project Peer Review, March 24-25, 2003

7E2 3

Tray assembly&test sequenceTray assembly&test sequence

Tray factory (panels)

Vibration test

Ladder factory

Tray assembly: ladders and MCMs on trays

Thermal cycles

Stacked cosmic rays*

Electrical test

Fast electrical test*

Tower assembly* Live trays

Page 4: 7E2: EM test plans

GLAST LAT Project Peer Review, March 24-25, 2003

7E2 4

Tray vib levelsTray vib levels

Frequency (Hz)

ASD QualLevel

(g2/Hz)

ASD AcceptLevel

(g2/Hz)

ASD LaunchLevel(g2/Hz)

20 0.026 0.013 0.006520-50 +6 dB/oct +6 dB/oct +6 dB/oct

50-800 0.16 0.08 0.04800-2000 -6 dB/oct -6 dB/oct -6 dB/oct

2000 0.026 0.013 0.0065Overall 14.0 grms 10.0 grms 7 grms

Duration 2 min 1 min 1 min

Random vibration

Frequency

(Hz)

ASD WN Level(g2/

Hz)

Overall

grms

Duration

(min)

20 ÷ 2000 10-4 0.45 1

White NoiseFrequency

range20 2000 Hz

Sweep rate 2 oct/min

Target Amplitude

0.5 g0-pk

Sine sweep

Page 5: 7E2: EM test plans

GLAST LAT Project Peer Review, March 24-25, 2003

7E2 5

Tray vib set upTray vib set upAccelerometers position:•Control: two mono-axial accelerometers positioned on two of the four L-shaped block TP1&TP2

•Fixture: three mono axial accelerometers placed on a corner on one of the four L-shaped block TP6

•Tray: one three-axial accelerometer in the middle TP5

Centrotecnica set up:- 1 LDS V864LT shake table- 2 fixtures - 9 read out channels- 4 trays/day test rate capability

W side on the top

Page 6: 7E2: EM test plans

GLAST LAT Project Peer Review, March 24-25, 2003

7E2 6

Tray vib sequence thrust Tray vib sequence thrust axisaxis

Step Description Test Level1 Fixture, tray and

accelerometers mounting

2 Fixture calibration and tray resonance

searchSine sweep 0.5 g 0-pk

3 Pre-random vibration White noise 0.45 grms

4 Random vibration Random vibration Launch

5 Post/Pre-random vibration White noise 0.45 grms

6 Random vibration Random vibration Acceptance

7 Post/Pre-random vibration White noise 0.45 grms

8 Random vibration Random vibration Qualification

9 Post-random vibration White noise 0.45 grms

10 Normal mode check Sine sweep 0.5 g 0-pk

11 Dismounting12 Test completion

Page 7: 7E2: EM test plans

GLAST LAT Project Peer Review, March 24-25, 2003

7E2 7

First results – TG07 (1)First results – TG07 (1)Sine sweep before/after random Random vibration + White noise

Resonance search:0= 815 Hz, Q 51

Resonance check:0= 809 Hz, Q 49

Z accelerometer response

X accelerometer response

Y accelerometer response

Page 8: 7E2: EM test plans

GLAST LAT Project Peer Review, March 24-25, 2003

7E2 8

Light≈ 1000Hz

≈ 800Hz Heavy tray

Mid tray

Last Vib Runs (Mar, 17-19) (1)Last Vib Runs (Mar, 17-19) (1)

≈ 660Hz

Page 9: 7E2: EM test plans

GLAST LAT Project Peer Review, March 24-25, 2003

7E2 9

Last Vib Runs (Mar, 17-19) (2)Last Vib Runs (Mar, 17-19) (2)

“Watch-dog”Input-notched: 13.6 grms

Output-notched: 59.6 grms

Applied notching on qual ASD: output ≤ 16 g2/Hz ( Q=10) “Watch-dog”

Heavy tray (TS05) Q=100 @ 660Hz Output-expected: 140.4 grms

Page 10: 7E2: EM test plans

GLAST LAT Project Peer Review, March 24-25, 2003

7E2 10

EM Vib Runs Summary (16 trays)EM Vib Runs Summary (16 trays)

All trays first mode › 500 Hz

No relevant changes in the resonance frequency after the

random

Page 11: 7E2: EM test plans

GLAST LAT Project Peer Review, March 24-25, 2003

7E2 11

Thermal tests on pre-EM trays: set-Thermal tests on pre-EM trays: set-upup

Wheatstone bridge

configuration(Labview)

Si Strain gauge

Reference Strain gauge on quartz

1 m3

Procedures: LAT-TD-1037; Pre-EM Results: LAT-TD-1249Service box

Page 12: 7E2: EM test plans

GLAST LAT Project Peer Review, March 24-25, 2003

7E2 12

Thermal tests on pre-EM trays: some Thermal tests on pre-EM trays: some resultsresults

Silicon temperature delay 45 min

Stability @ plateau: dT/dt < 3°C/hrTchamber

Tsilicon

plateau 5 hr

Page 13: 7E2: EM test plans

GLAST LAT Project Peer Review, March 24-25, 2003

7E2 13

Tray thermal levelsTray thermal levelsAcceptance Qualification/Survival

Temperature Range -20°C 35°C -30°C 50°C# of cycles 4 4

Temperature rate 20°C/hr 20°C/hrPressure 1 atm T-C

‹ 10-5 Torr T-V1 atm T-C

‹ 10-5 Torr T-VDuration @ T

extreme5 hr 5 hr

Total Duration 62 + 2 hr 72 + 2 hr

T-C: Thermal cycle (dummy trays)T-V: Thermal vacuum (live tray)

On orbit temperature range -15°C 30°C

Page 14: 7E2: EM test plans

GLAST LAT Project Peer Review, March 24-25, 2003

7E2 14

Tray thermal Tray thermal sequencesequence

Step Description Level0 Strain gauges and

thermocouple set up

1 Chamber set up2 Strain gauges

calibration3 Thermal cycles Qualification4 Dismounting5 Test completion

The EM dummy trays will be tested at ambient pressure into the service

boxes

Page 15: 7E2: EM test plans

GLAST LAT Project Peer Review, March 24-25, 2003

7E2 15

Tower vib levelsTower vib levels

Frequency(Hz)

ASD Acceptance

Level (g2/Hz)

ASD Qualification Level (g2/Hz)

20 0.01 0.0220-50 +5.9 dB/oct +5.9 dB/oct

50-800 0.06 0.12800-2000 -5.9 dB/oct -5.9 dB/oct

2000 0.01 0.02Overall 8.7 grms 12.3 grms

Duration 1 min/axis 2 min/axis

Low frequency sine sweep

Frequencyrange

20 2000 Hz

Sweep rate 2 oct/min

Target Amplitude

0.5 g0-pk

High frequency sine sweep

Frequency

(Hz)

ASD WN Level(g2/

Hz)

Overall

grms

Duration

(min)

20 ÷ 2000 10-4 0.45 1

White Noise

Random vibration

Page 16: 7E2: EM test plans

GLAST LAT Project Peer Review, March 24-25, 2003

7E2 16

Tower vib set upTower vib set upAccelerometers set up (TBR):1. 3 axial on the shaker table (control accelerometer) 2. 3 axial on the center of the bottom tray lower surface 3. 3 axial on the center of the top tray upper surface 4. 3 axial accelerometer +X sidewall center of the thermal

boss tray number 12;5. 3 axial accelerometer +Y sidewall near the center of the

tray number 10;6. 3 axial accelerometer +Y sidewall center of the thermal

boss of the tray number 1;7. 3 axial accelerometer +Y sidewall center of the thermal

boss of the tray number 19;8. 3 axial accelerometer -X sidewall center of the thermal

boss of the tray number 10;9. 3 axial accelerometer -Y sidewall near the center of the

tray number 10, on the center plane;

Page 17: 7E2: EM test plans

GLAST LAT Project Peer Review, March 24-25, 2003

7E2 17

Tower vib sequence X,Y,Z Tower vib sequence X,Y,Z axisaxis

For each axisStep Description Test Level

1 Fixture, tower and accelerometers mounting

2 Fixture calibration High frequency sine sweep 0.5 g 0-pk

3 Normal mode search High frequency sine sweep

0.5 g0-pk

4 Pre-random vibration White noise 0.45 grms

5 Random vibration Random vibration -6 dB Qual 6 Post/Pre-random vibration White noise 0.45 grms

7 Random vibration Random vibration -3 dB Qual8 Post/Pre-random vibration White noise 0.45 grms

9 Random vibration Random vibration 0 dB Qual10 Post-random vibration White noise 0.45 grms

11 Normal mode check High frequency sine sweep 0.5 g0-pk

12 Low frequency test Low frequency sine sweep Qual

13 Dismounting14 Test completion

Page 18: 7E2: EM test plans

GLAST LAT Project Peer Review, March 24-25, 2003

7E2 18

Tower thermal levelsTower thermal levels

Thermal-Vacuum cycling/Qual-Surv levelRanges -30°C 50°C

# of cycles 8 (12)

Temp. rate 20°C/hr

Pressure 10-5 Torr

Duration @ extreme 12 hr

Total Duration 256 (384) hr + stabilization

Page 19: 7E2: EM test plans

GLAST LAT Project Peer Review, March 24-25, 2003

7E2 19

Tower thermal set upTower thermal set up

Additional thermocouples (TBR):1.+Y sidewall center of the thermal boss of the tray number 1;2.+X sidewall center of the of the tray number 1, on the center plane;

3.+Y sidewall center of the thermal boss of the tray number 19;4.+X sidewall center of the of the tray number 19, on the center plane;

5.-X sidewall center of the thermal boss of the tray number 10;6.-Y sidewall near the center of the tray number 10, on the center plane

The tower has a large number of thermocouples in the read out cables that can be acquired by using the TKR DAQ system.

The temperature control point for the cold part of the cycle will be the coldest thermocouple, while

the control point for the hot part of the cycle will be the hottest one.

Tower covered with a thermal blanket during T-V cycles.

Page 20: 7E2: EM test plans

GLAST LAT Project Peer Review, March 24-25, 2003

7E2 20

Tower thermal Tower thermal sequencesequence

Step Description Level

0 (Strain gauges and) Thermocouple set up

1 Chamber set up

2 (Strain gauges calibration)

3 Thermal vacuum cycles Qualification/Survival

4 Dismounting

5 Test completion

Page 21: 7E2: EM test plans

GLAST LAT Project Peer Review, March 24-25, 2003

7E2 21

EM matrixEM matrix

Item

Quantity

Quantity to test

High freq sine

Sweep

20-2000 Hz

Random Vibe

White noise

Low freq sine

Sweep

5-50 Hz

Functional

Thermal Cycle

Thermal Vacuum

Test site

Panels

24 24 QualZ axis

QualZ

axis

Centrotecnica (vib)

Live Trays

5 1 QualZ axis

QualZ

axis

Qual Centrotecnica (vib)

Alenia (thermal-vac)

Dummy Trays

19 5 vib19 ther

QualZ axis

Qual Z

axis

Qual Centrotecnica (vib)

INFN Perugia (in Terni) (thermal)

Tower 1 1 QualX,Y,Z

QualX,Y,Z

Qual Alenia