  • 7/29/2019 79601588 RTN Commissioning With Weblct V2R5 V1 0

    1/18

    RTN commissioning with weblct V2R5 V1.0

    Optical network product service department HW

    Xing Zibin 59397

    1/Login the NE for new device

    The IP address of your laptop must be network section 129.9.x.x, the mask

    must be 255.255.0.0

    Open weblct, and click the NE search.

    Please be sure the domain must be 129.9.255.255 that is by default. Then

    click search. Click add NE after searching the NE. Cancel the NE search-

    dialog box.

    2012-1-27 1 , 18

  • 7/29/2019 79601588 RTN Commissioning With Weblct V2R5 V1 0

    2/18

    Select the NE that you want to login, and click the NE login, the use name is

    root or lct by default, password is password.

    Click the NE Explore to open the NE Explore.

    2012-1-27 2 , 18

  • 7/29/2019 79601588 RTN Commissioning With Weblct V2R5 V1 0

    3/18

    2/Commissioning

    Quick configuration:

    For PDH MW (there is no line board (Optical board/Electronic board/Ethernet

    service board), and must be single direction MW), the Quick configuration is

    the best method for commissioning. But please remember the Quickconfiguration is only for new device.

    Strongly recommend Quick configuration is only for 10 system.

    Step1: Modify the NE name and NE ID

    Please modify the NE name and NE ID as planed. For example: there are

    several sets of IDU, if the NE ID of a IDU is 12 and the site name is upper23,

    the NE name is 12-upper23-1 and others maybe 13-upper23-2 or 14-upper23-

    3

    IF there is no plan, please contact with HW engineer. You must not modify the

    extended NE ID, NE IP address and gateway IP address if there is no plan.

    If you modify the NE ID, the SCC board will be reset. You can close the NE

    Explore and delete the NE in NE list. Then you can search the NE and login

    again.

    2012-1-27 3 , 18

  • 7/29/2019 79601588 RTN Commissioning With Weblct V2R5 V1 0

    4/18

    Step2: Quick configuration

    Please click next and select the capacity and modulation configure the TX

    Frequency and TX power for the link as planed. If there is no plan for link ID

    and T/R spacing, please leave them (no need to change) and they are 1 and

    0 respectively by default.

    Please select how many E1 service we want to use as planed.

    2012-1-27 4 , 18

  • 7/29/2019 79601588 RTN Commissioning With Weblct V2R5 V1 0

    5/18

    Please select the clock source as planed. If there is no plan, please select the

    internal clock source for clock level 1 or contact with HW engineer.

    Please configure the order wire and click next. Maybe there is no plan for

    order wire. But strongly recommend, the high site is 101 and low site is 102.

    2012-1-27 5 , 18

  • 7/29/2019 79601588 RTN Commissioning With Weblct V2R5 V1 0

    6/18

    If you make sure the configuration is ok, please click Apply and finish the

    Quick configuration.

    Step3: NE time synchronization

    Before you configure the NE time synchronization, you must make sure you

    the time of your laptop is the local time. Then please double click the

    synchronous mode and select the NM, click apply.

    2012-1-27 6 , 18

  • 7/29/2019 79601588 RTN Commissioning With Weblct V2R5 V1 0

    7/18

    Right click and select the synchronize with NM time

    Step4: 15min/24hour performance monitor

    Select the NE you want to configure the performance. Select the enable for

    15-minute and 24-hour. If the operation is failed, please select the next day

    for form time and must not select the to time.

    2012-1-27 7 , 18

  • 7/29/2019 79601588 RTN Commissioning With Weblct V2R5 V1 0

    8/18

    Congratulations for you, if you finish the 4 steps!

    General configuration:

    General configuration is for any configuration of RTN 610 and RTN 620.

    Step1: Add boardsPlease first add the PXC board, then you can add others

    Step2: Modify the NE name and NE IDPlease modify the NE name and NE ID as planed. For example: there are

    2012-1-27 8 , 18

  • 7/29/2019 79601588 RTN Commissioning With Weblct V2R5 V1 0

    9/18

    several sets of IDU, if the NE ID of a IDU is 12 and the site name is upper23,

    the NE name is 12-upper23-1 and others maybe 13-upper23-2 or 14-upper23-

    3

    IF there is no plan, please contact with HW engineer. You must not modify theextended NE ID, NE IP address and gateway IP address if there is no plan.

    If you modify the NE ID, the SCC board will be reset. You can close the NE

    Explore and delete the NE in NE list. Then you can search the NE and login

    again.

    Step3: IF 1+1 protection

    Click the new and open the IF 1+1 protection dialog box. Select the working

    mode as planed, and select the working board and protection board. Please

    make sure the working board must be connect to main ODU that installed on

    main interface of coupler.

    The protection group ID, revertive mode, WTR time and reverse switching are

    by default, no need to change if there is no design.

    Click ok.

    2012-1-27 9 , 18

  • 7/29/2019 79601588 RTN Commissioning With Weblct V2R5 V1 0

    10/18

    Step4: IF configuration (radio work mode/link id/ATPC)

    Please select the capacity and modulation for the link as planed. No need to

    change the link ID if there is no design. Dont enable the ATPC if no

    requirements or design.

    If its a 1+1 system, only configure the main IF board.

    Step5: ODU configuration (TX Frequency/TR spacing/TX power/transmission

    status of ODU including main and standby)

    Configure the TX Frequency as planed; The T/R Spacing is 0 by default, no

    need to change!

    2012-1-27 10 , 18

  • 7/29/2019 79601588 RTN Commissioning With Weblct V2R5 V1 0

    11/18

    Configure the TX power as planed.

    Configure the transmission status of ODU.

    If its a 1+1, make sure the configure transmission status of ODU

    including main and standby ODU must be unmute

    2012-1-27 11 , 18

  • 7/29/2019 79601588 RTN Commissioning With Weblct V2R5 V1 0

    12/18

    Step6: Cross-connection

    Step7: Clock source priority

    2012-1-27 12 , 18

  • 7/29/2019 79601588 RTN Commissioning With Weblct V2R5 V1 0

    13/18

    Step8: Order wire

    If there is no design for order wire, strongly recommend it is 101 for high site

    and 102 for low site.

    Step9: NE time synchronization

    Before you configure the NE time synchronization, you must make sure you

    the time of your laptop is the local time. Then please double click the

    synchronous mode and select the NM, click apply.

    2012-1-27 13 , 18

  • 7/29/2019 79601588 RTN Commissioning With Weblct V2R5 V1 0

    14/18

    Right click and select the synchronize with NM time

    Step10: 15min/24hour performance monitor

    Select the NE you want to configure the performance. Select the enable for

    15-minute and 24-hour. If the operation is failed, please select the next day

    for form time and no need to select the to time.

    2012-1-27 14 , 18

  • 7/29/2019 79601588 RTN Commissioning With Weblct V2R5 V1 0

    15/18

    Extended ECC Mode

    If there are less than 4(including 4 ) IDUs in one shelter, you can connect the

    IDUs( EHT and EHT-HUB port on SCC board, EHT cable) like the picture as

    follows, and then set the Extended ECC Mode to Auto mode.

    After finishing, you can manage all IDUs in one MW network.

    2012-1-27 15 , 18

  • 7/29/2019 79601588 RTN Commissioning With Weblct V2R5 V1 0

    16/18

    IF 1+1 protection

    Please pay more attention to switching status of device and active board of

    device", please make sure they are normal and the active board is the main

    board.

    You can use the clear to change the switching status of device to

    normal.

    loopback.

    Set the E1 loop back for example. (Other loopback is like this.)Inloop is internal, and outloop is external.

    2012-1-27 16 , 18

  • 7/29/2019 79601588 RTN Commissioning With Weblct V2R5 V1 0

    17/18

    PRBS TEST

    Please pay more attention to the testing direction!

    Before doing PRBS test, first confirm the cross-connecting of the near end and

    far end is ready!

    2012-1-27 17 , 18

  • 7/29/2019 79601588 RTN Commissioning With Weblct V2R5 V1 0

    18/18

    Remark:

    When aligning the antennas, turn off the standby ODU and make sure the

    ATPC is disabled, if it is a 1+1 system.

    If the both of IF boards and ODUs are normal, but the receive power of Main

    ODU is less about 6dBm than standby ODU, maybe the main ODU connects to

    the standby IF board. You can turn off the main and standby ODUs power,

    and then exchange the IF jumpers of main and standby IF boards.

    2012-1-27 18 , 18