Organization didnt have any standard process of structuring the project
Each project is different in nature, therefore cost planning and Budgeting andcontrol over the project is very important for the business.
Projects are in various geographical locations and it is very difficult to monitorand control the consumption of material. Also reconciliation of material used inthe Project is a tedious process.
Currently we dont have the Cost Planning in place therefore analysis of Actual
Cost with Budgeted Cost is not possible.
Re-scheduling of Project Structure and activities, which is the commonpractice in any organization. Currently handled Excel which is very tedious andtime consuming exercise.
-
7/31/2019 77011444 SAP PS Way Forward
3/33
SAP PS is Completely integrated with other Modules. That means anytransaction executed in any other module if affecting PS module willautomatically be reflected at the respective place & Vice versa.
Can Maintain different versions of same project to compare current status vs
previous status.
SAP provides well defined standardized process.
Total work can be divided into smaller, manageable pieces and activities
SAP Provides activity based cost planning & Budgeting.
SAP gives proper way of allocating the fund at different stages of Projectthrough a scientific method.
SAP Provides focused solution for re-scheduling the project.
-
7/31/2019 77011444 SAP PS Way Forward
4/33
PS Provides Contracting & Material Consumption Cost WBS/Activity Wise.
SAP Provides the detailed reports of Planned vs Actual cost in line withprogress of the project.
We can Control the un authorized or wrong posting using user/system status.
SAP provides milestone billing at any point of time and number of billingsshould be generated with respect to the work accomplished .
SAP Provides solution to control the activities at sites in such a way that the
material consumption and reconciliation of material becomes transparent.
Provide a permanent record of project performance which can be analyzed forfuture performance improvements
-
7/31/2019 77011444 SAP PS Way Forward
5/33
-
7/31/2019 77011444 SAP PS Way Forward
6/33
Project System Overview.
Project Definition
WBS Elements
Networks
Network Activities
Project Definition
Identifier, Contains Start & Finish dates of Project
Work Breakdown Structure
Hierarchy model of the Project
Network
Sequential structure showing activities
Activity
Start and finish date of work or activity
Processed w/o interruption, incurring costs, resources arerequired for execution
MilestonesMilestones
-
7/31/2019 77011444 SAP PS Way Forward
7/33
Costs
Work
Time
1996
ProgressProject
SAP Project system
Projects are tasks with special characteristics:
They are generally complex, unique, involve a high
degree of risk and with precise goals.
They are limited in duration and are cost and capacity
intensive i.e. time, finance and resource dependent.
-
7/31/2019 77011444 SAP PS Way Forward
8/33
Dates
- Scheduled dates- Actual dates
Budget- Original Budget- Budget Release
Costs- Planned costs- Actual costs
Revenues- Plan revenues- Actual revenues
Commitments-Purchase requisitions-Purchase orders
WBS element functionality
-
7/31/2019 77011444 SAP PS Way Forward
9/33
Project structure in SAP
-
7/31/2019 77011444 SAP PS Way Forward
10/33
Project structure in SAP
-
7/31/2019 77011444 SAP PS Way Forward
11/33
System Status and User Status control
CRTD
CRTD CRTD
CRTD CRTD CRTD CRTD
PREL
PREL REL
CRTD REL REL REL
What is Status control used for?
To allow or forbid certain businesstransactions.
How?
Status are activated manually or
automatically by the system.
Which elements?
Project definition and WBS elementsare affected.
Why system and user status?
User status adds detail to the system
Status.
-
7/31/2019 77011444 SAP PS Way Forward
12/33
Logical Sequence Time Sequence
FS Relationship
SS Relationship
FF Relationship
SF Relationship
Relationships between Activities
-
7/31/2019 77011444 SAP PS Way Forward
13/33
2020 6 D6 D
333 88833 88
3030 2 D2 D
444 55533 44
4040 3 D3 D
666 88855 77
1010 2 D2 D
111 22211 22
5050 3 D3 D
999 11111199 1111
50
40
30
20
10
1 2 3 4 5 6 7 8 9 10 11 12 13 Days
222
Earliest
Start Date
Latest Start
Date
Earliest Finish
Date
Latest Finish
Date
1010 2 D2 D
111 22211 22
Example of Time Planning
-
7/31/2019 77011444 SAP PS Way Forward
14/33
Time planning board
-
7/31/2019 77011444 SAP PS Way Forward
15/33
Cost Planning
-
7/31/2019 77011444 SAP PS Way Forward
16/33
Planning Methods
-
7/31/2019 77011444 SAP PS Way Forward
17/33
-
7/31/2019 77011444 SAP PS Way Forward
18/33
-
7/31/2019 77011444 SAP PS Way Forward
19/33
Costing Primary (Cost Element wise)
-
7/31/2019 77011444 SAP PS Way Forward
20/33
Costing Report WBS Wise
-
7/31/2019 77011444 SAP PS Way Forward
21/33
-
7/31/2019 77011444 SAP PS Way Forward
22/33
Costing Report Cost Element wise
-
7/31/2019 77011444 SAP PS Way Forward
23/33
Project Structure
WBS Elements Activity
Release project
Confirm Activity
Reverse, if reqd
Generate DPR
Activity confirmation
-
7/31/2019 77011444 SAP PS Way Forward
24/33
DPR Report Date wise
-
7/31/2019 77011444 SAP PS Way Forward
25/33
-
7/31/2019 77011444 SAP PS Way Forward
26/33
Material Issue Process
-
7/31/2019 77011444 SAP PS Way Forward
27/33
Material Issue Process
-
7/31/2019 77011444 SAP PS Way Forward
28/33
-
7/31/2019 77011444 SAP PS Way Forward
29/33
Actualpercentage ofcompletion
Actual costs
Budgeted cost ofwork scheduled
VariancesBudgeted cost ofwork performed
Planned percentageof completion
Progress Analysis
-
7/31/2019 77011444 SAP PS Way Forward
30/33
Missing Links
There are 4 steps to take makethis module in full swing
-
7/31/2019 77011444 SAP PS Way Forward
31/33
1) Time Planning:
Before Starting the Project in SAP PS, We need Complete Project/TowerStructure Otherwise we will not able to do the time planning properly.
2) Cost Planning & Quantity Controlling:
We also need the Drawing before starting of the project to calculate the qty of
work need to executed. Other wise we will not able to create BOQ & CostPlanning.
3) Material Requirement & Material Controlling (through SAP MM):
On getting above items in place we can get the material requirement in
planned manner.
4) Milestone Billing through SAP SD:
We need to define the Project Wise/Tower wise Milestone to activate themilestone billing in SAP SD Module.
-