(732-ITP-10 (V-6902) 42000-SNG-69-42000P-MS-5733-501-0000-07

download (732-ITP-10 (V-6902) 42000-SNG-69-42000P-MS-5733-501-0000-07

of 10

Transcript of (732-ITP-10 (V-6902) 42000-SNG-69-42000P-MS-5733-501-0000-07

  • PETROLEUM DEVELOPMENT

    OMAN L.L.C. (PDO) Contractor Job No. : 20036 Unit No

    Vendor Doc. No. : 732/QAP/10 Rev. 07

    Project Title: SAIH NIHAYDA CONDENSATE STABILIZATION PLANT (SNCP) Doc. Category : Q3

    Sheet No 1 of 8

    PDO Contract No. C311194

    Document Title: INSPECTION & TEST PLAN (QAP) FOR V 6902

    (HP Inlet Condensate Flash Vessel)

    PDO Doc. No.: Rev. 07

    SNG-69-42000P-MS-5733-501-0000

    Project No. 20036 Unit Description:

    INSPECTION & TEST PLAN (QAP) FOR V 6902 (HP Inlet Condensate Flash Vessel)

    MR No.:- 20036-0100-M31-MR-42000 REV. 02 PURCHASE ORDER No. :- 4580041305 TAG No. : V-6902 POS. : 00030 PR ITEM No. :- 00031 VESSEL CATEGORY:- ENGINEERED PRESSURE VESSEL NACE MR-01-75 & SOUR SERVICE

    07 26/05/2014 REVISED TO INCORPORATE PDO COMMENTS S. Naik P.V.Ghanekar 06 08/04/2014 REVISED TO INCORPORATE PDO COMMENTS S. Naik P.V.Ghanekar 05 08/10/2013 REVISED TO INCORPORATE PDO COMMENTS S. Naik P.V.Ghanekar 04 17/07/2013 ISSUE FOR APPROVAL S. Naik P.V.Ghanekar 03 10/06/2013 ISSUE FOR APPROVAL S. Naik P.V.Ghanekar 02 08/04/2013 REVISED TO INCORPORATE ABB COMMENTS S. Naik P.V.Ghanekar 01 14/01/2013 ISSUE FOR APPROVAL S. Naik P.V.Ghanekar

    Rev Date Description Prepared Checked Approved

    Contractor Details (Headquarters and Offices): ABB SpA - Process Automation Division via Luciano Lama 33 20099 Sesto S.Giovanni (MI) - Italy

    Document property of ABB SpA: its reproduction, circulation and use without prior consent is forbidden

    17/06/2014

    The Company comments on Rev.06 response sheet need to be considered.

  • 732/QAP/10 Page 2 of 8....

    CLIENT : ABB S.p.A - Italy. QAP No. : 732/QAP/10 Rev. 07P.O. No. : 4580041305 DTD 02-12-2012. DATE : 14/05/2014EQUPT. No. : V 6902. CODE OF CONSTRUCTION : ASME SEC. VIII DIV 2 ED 2010 ADDENDA 2011PROJECT NAME : SAIH NIHAYDA CONDENSATE STABILIZATION PLANT (SNCP) DRG. No. : 732-E-10CONTRACTOR JOB No. : 20036 INSPECTION : AI (LR Insurance, Inc.)

    SPECIFICATIONS FOR PRESSURE VESSELS

    :SP 2069 Rev. 0, SP 2051 Rev. 2, DEP 31.10.00.10 Sep. 2011,

    SP 2041 Rev. 2, DEP 30.10.60.18 May 2004,& NACE MR 0175.

    SP 1176 Rev. 2, DEP 30.10.02.17 Feb. 2011,

    GR A.I. ABB PDO

    1.0

    1.1 Drawing, Design Calculations Review of DocumentsASME Sec. VIII Div. 2

    / 20036-0100-M31-MR-42000ASME Sec. VIII Div. 2

    / 20036-0100-M31-MR-42000

    Approved Drawing, Design

    CalculationsH R RA RA

    1.2 Quality Assurance Plan, IRR Approval Review of documentsASME Sec. VIII Div. 2/ Approved Drawing

    / 20036-0100-M31-MR-42000

    ASME Sec. VIII Div. 2/ Approved Drawing

    / 20036-0100-M31-MR-42000QAP H H RA RA

    1.3

    Procedures - NDE, Heat Treatment, Hydrotest, Hardness, PMI, Painting, Packing transport

    & preservation procedures

    Documented ProcedureASME Sec. VIII Div. 2/ Approved Drawing

    / 20036-0100-M31-MR-42000

    ASME Sec. VIII Div. 2/ Approved Drawing

    / 20036-0100-M31-MR-42000

    Procedure Documents H R RA RA

    1.4 Pre inspection meetingReviewing & understanding of

    technical requirements and Approval of MTC.

    Purchase order / 20036-0100-M31-MR-42000

    Purchase order / 20036-0100-M31-MR-42000

    Minutes ofmeeting H ---- H H

    2.0

    Material after receipt (For Pressure Parts)

    Plates, Pipes

    H H RA RA

    Forging, fittings, Fastners, gaskets etc. H R RA RA

    MATERIAL INSPECTION

    2.1

    Review of manufacturer's test certificates, Identification co-realting heat number, Visual

    damages & Dimesional inspection, Transfer of identity &

    physical verification.

    ASME Sec.-II A/B / Data sheet / Approved

    Drawing / TDC / SP 2069, SP 2041, DEP 31.22.20.31 & NACE-MR-01-75.

    ASME Sec.-II A/B / Data sheet / Approved

    Drawing

    Material Test Certificates, Identification

    reports

    1) ALL CS materials shall be killed or semi killed & Carbon content shall be 0.23% max.2) Mateial for shell & head shall be supplied in normalised condition. Chemical composition : Carbon (c) = 0.20 % (Max) Sulfur (s) = 0.003 % (Max) for plate, 0.01% for seamless product, 0.025% for forging, Vanadium (V) + Niobium (NB) = 0.03 (Max) Carbon Equivalent (CE) = 0.43% (t 50mm) & 0.45 % (50mm < t 200mm) 3) Clad plate material shall be ultrasonically tested at the mill in accordance with ASME SA-578.4) Forged products above 50 mm thick shall be 100 % ultrasonically examined

    ACCEPTANCE NORMS

    SP 1246 Part 1,2,3,4 Rev. 2 & Part 5 Rev. 3, DEP 31.22.20.31- Gen. Feb. 2011,

    FORMAT OF RECORD

    Scope of Inspection REMARKS

    DOCUMENTS

    G.R.ENGINEERING PRIVATE LTD. -TARAPURINSPECTION & TEST PLAN (QAP) FOR V 6902

    SL.NO STAGE / ACTIVITY TYPE OF CHECK REFERENCE DOCUMENT

    Form No. GR 11 Rev. 02 FOR DETAILED NON DESTRUCTIVE EXAMINATION REQUIREMENTS REFER ANNEXURE "A"

  • 732/QAP/10 Page 3 of 8....

    CLIENT : ABB S.p.A - Italy. QAP No. : 732/QAP/10 Rev. 07P.O. No. : 4580041305 DTD 02-12-2012. DATE : 14/05/2014EQUPT. No. : V 6902. CODE OF CONSTRUCTION : ASME SEC. VIII DIV 2 ED 2010 ADDENDA 2011PROJECT NAME : SAIH NIHAYDA CONDENSATE STABILIZATION PLANT (SNCP) DRG. No. : 732-E-10CONTRACTOR JOB No. : 20036 INSPECTION : AI (LR Insurance, Inc.)

    SPECIFICATIONS FOR PRESSURE VESSELS

    :SP 2069 Rev. 0, SP 2051 Rev. 2, DEP 31.10.00.10 Sep. 2011,

    SP 2041 Rev. 2, DEP 30.10.60.18 May 2004,& NACE MR 0175.

    SP 1176 Rev. 2, DEP 30.10.02.17 Feb. 2011,

    GR A.I. ABB PDOACCEPTANCE NORMS

    SP 1246 Part 1,2,3,4 Rev. 2 & Part 5 Rev. 3, DEP 31.22.20.31- Gen. Feb. 2011,

    FORMAT OF RECORD

    Scope of Inspection REMARKS

    G.R.ENGINEERING PRIVATE LTD. -TARAPURINSPECTION & TEST PLAN (QAP) FOR V 6902

    SL.NO STAGE / ACTIVITY TYPE OF CHECK REFERENCE DOCUMENT

    2.2Non Pressure Parts (including internals,

    supports etc.)

    Review of Material Test Certificates

    ASME Sec.-II A, Approved Drawing,

    SP 2069, DEP 31.22.20.31

    ASME Sec.-II A, Approved Drawing

    Material Test Certificates H --- R R

    3.0

    3.1 Shop Weld & Test PlanWPS,PQR,WPQ & Consumable,

    NDT Plan

    ASME Sec. IX / Approved Drawing

    / DEP 30.10.60.18 & 31.22.20.31 ASME Sec. IX Weld Plan H R RA RA

    3.2 PQR Welding parameters ASME Sec. IX

    / Approved Drawing / DEP 30.10.60.18

    ASME Sec. IX / Approved Drawing WPS/ PQR H R RA RA

    3.3 WPQ Qualification requirementsASME Sec. IX

    / Approved Drawing / DEP 30.10.60.18

    ASME Sec. IX / Approved Drawing WPQ H R RA RA

    3.4 Welding Consumable Chemical & mechanical properties ASME Sec. II Part C

    / DEP 30.10.60.18 ASME Sec. II Part CBatch Test Certificate R R R R

    4.0

    Visual & Dimensional inspection including profile check &

    minimum thickness mesurementH W W

    Dye Penetrant Test (to detect cracks inside &

    outside knuckle surface area) H R W

    Normalising of dished ends. Heat Treatment Chart H R R

    Simulation Test Coupon of normalised dished end. Inspection Report H W H W Test Coupon for physical test

    UT to check lack of bond after forming 100 % surface area UT report H ---- W

    UT shall be carried out in accordance with specification ASME SA-578 level 1

    RT - Full for weld seams in dished ends. RT Report H R R

    RT films review.

    WELDING INSPECTION WPS & PQR

    INSPECTION OF FORMED COMPONENTS

    4.1Inspection of Formed

    Components (Dished ends)

    ASME Sec. VIII Div. 2/ Approved Drawing / SP 2069

    Appendix 8, SP 1176, DEP 31.22.20.31,

    SNG-69-42000P-MS-6038-517-0000,

    SNG-69-42000P-MS-6038-539-0000,

    SNG-69-42000P-MS-6026-525-0000,

    SNG-69-42000P-MS-6038-537-0000,

    SNG-69-42000P-MS-6038-536-0000

    ASME Sec. VIII Div. 2/ Approved Drawing

    Inspection report

    Form No. GR 11 Rev. 02 FOR DETAILED NON DESTRUCTIVE EXAMINATION REQUIREMENTS REFER ANNEXURE "A"

  • 732/QAP/10 Page 4 of 8....

    CLIENT : ABB S.p.A - Italy. QAP No. : 732/QAP/10 Rev. 07P.O. No. : 4580041305 DTD 02-12-2012. DATE : 14/05/2014EQUPT. No. : V 6902. CODE OF CONSTRUCTION : ASME SEC. VIII DIV 2 ED 2010 ADDENDA 2011PROJECT NAME : SAIH NIHAYDA CONDENSATE STABILIZATION PLANT (SNCP) DRG. No. : 732-E-10CONTRACTOR JOB No. : 20036 INSPECTION : AI (LR Insurance, Inc.)

    SPECIFICATIONS FOR PRESSURE VESSELS

    :SP 2069 Rev. 0, SP 2051 Rev. 2, DEP 31.10.00.10 Sep. 2011,

    SP 2041 Rev. 2, DEP 30.10.60.18 May 2004,& NACE MR 0175.

    SP 1176 Rev. 2, DEP 30.10.02.17 Feb. 2011,

    GR A.I. ABB PDOACCEPTANCE NORMS

    SP 1246 Part 1,2,3,4 Rev. 2 & Part 5 Rev. 3, DEP 31.22.20.31- Gen. Feb. 2011,

    FORMAT OF RECORD

    Scope of Inspection REMARKS

    G.R.ENGINEERING PRIVATE LTD. -TARAPURINSPECTION & TEST PLAN (QAP) FOR V 6902

    SL.NO STAGE / ACTIVITY TYPE OF CHECK REFERENCE DOCUMENT

    5.0

    Visual & dimensional inspection, weld edge,cut back, root - gap, offset, alignment & cleanliness

    etc. for long seams of shell, dished end & nozzles

    H H 10%W5 %W

    Visual & dimensional inspection, weld edge, cut back, root - gap, offset, alignment & cleanliness etc. for circular seam, neck to flange, nozzles on shell / head

    H W 10%W5 %W

    PT of weld edges to detect linear discontinuties.

    ASME Sec. VIII Div. 2 /Approved Drawing /

    SNG-69-42000P-MS-6038-539-0000

    ASME Sec. VIII Div. 2 Inspection Report H R 10%W5 %W

    5.2 Intermediate Inspection of welds Visual / Interpass temperature / PT inspection after backchip

    ASME Sec. VIII Div. 2 & Sec. IX / Approved Drawing

    /SNG-69-42000P-MS-6038-517-0000,

    SNG-69-42000P-MS-6038-539-0000

    ASME Sec. VIII Div. 2 & Sec. IX Inspection Report H R S S

    Visual inspection for reinforcement, undercuts, surface

    defects etc.

    ASME Sec. VIII Div. 2 & Sec. V/ Approved Drawing

    / SNG-69-42000P-MS-6038-517-0000

    ASME Sec. VIII Div. 2 & Sec. V/ Approved Drawing Inspection Report H W W W

    Welder Identification stamp on completed weld (Die stamp)

    MT of welds

    ASME Sec. VIII Div. 2/Approved Drawing

    /SNG-69-42000P-MS-6038-540-0000

    ASME Sec. VIII Div. 2 Inspection Report H R S SPT shall also be carried out for the tack

    welds(after removal & ground flush) utilized to aid construction.

    Radiography Test

    ASME Sec. VIII Div. 2/Data sheet / Approved Drawing

    /SNG-69-42000P-MS-6038-536-0000

    ASME Sec. VIII Div. 2 RT Report H R RA RA Review of Radiography films

    5.3Base Metal Welding

    (Inspection of completed CS weld)

    INSPECTION DURING FABRICATION

    5.1

    Weld edge perparation & setup of pressure parts

    ( Long seam, circular seam, nozzle neck

    to flange, nozzle on shell/head)

    ASME Sec. VIII Div. 2 / Approved Drawing

    /SNG-69-42000P-MS-6038-517-0000

    ASME Sec. VIII Div. 2 / Approved Drawing

    Inspection Report

    Form No. GR 11 Rev. 02 FOR DETAILED NON DESTRUCTIVE EXAMINATION REQUIREMENTS REFER ANNEXURE "A"

  • 732/QAP/10 Page 5 of 8....

    CLIENT : ABB S.p.A - Italy. QAP No. : 732/QAP/10 Rev. 07P.O. No. : 4580041305 DTD 02-12-2012. DATE : 14/05/2014EQUPT. No. : V 6902. CODE OF CONSTRUCTION : ASME SEC. VIII DIV 2 ED 2010 ADDENDA 2011PROJECT NAME : SAIH NIHAYDA CONDENSATE STABILIZATION PLANT (SNCP) DRG. No. : 732-E-10CONTRACTOR JOB No. : 20036 INSPECTION : AI (LR Insurance, Inc.)

    SPECIFICATIONS FOR PRESSURE VESSELS

    :SP 2069 Rev. 0, SP 2051 Rev. 2, DEP 31.10.00.10 Sep. 2011,

    SP 2041 Rev. 2, DEP 30.10.60.18 May 2004,& NACE MR 0175.

    SP 1176 Rev. 2, DEP 30.10.02.17 Feb. 2011,

    GR A.I. ABB PDOACCEPTANCE NORMS

    SP 1246 Part 1,2,3,4 Rev. 2 & Part 5 Rev. 3, DEP 31.22.20.31- Gen. Feb. 2011,

    FORMAT OF RECORD

    Scope of Inspection REMARKS

    G.R.ENGINEERING PRIVATE LTD. -TARAPURINSPECTION & TEST PLAN (QAP) FOR V 6902

    SL.NO STAGE / ACTIVITY TYPE OF CHECK REFERENCE DOCUMENT

    Visual inspection for reinforcement, undercuts, surface

    defects etc.

    ASME Sec. VIII Div. 2/ Approved Drawing

    / SNG-69-42000P-MS- 6038-517-0000

    ASME Sec. VIII Div. 2/ Approved Drawing Inspection Report H W W W

    PT of final layer

    ASME Sec. VIII Div. 2/ Approved Drawing / DEP 31.22.20.31,

    SNG-69-42000P-MS-6038-539-0000

    ASME Sec. VIII Div. 2, Appendix 8 Inspection Report H R W W

    Chemical analysis of weld overlay

    ASME Sec. VIII Div. 2 /Approved Drawing

    / ASME Sec. II C / SP 2069ASME Sec. II C Inspection Report H R RA RA

    Chemical analysis of one seam from each shell course and one seam from each head.

    Alloy elements to be checked as per ASME II Sec. C

    Visual / Dimensional Inspection H R R R

    PT for fillet welds of lifting lugs and other

    pressure bearing weldsH R R R

    Final visual & dimensional Inspection

    ASME Sec. VIII Div. 2 / Approved Drawing / SNG-69-42000P-MS-

    6038-517-0000

    ASME Sec. VIII Div. 2 / Approved Drawing Inspection Report H W H H

    MT of finish welds

    ASME Sec. VIII Div. 2 & Sec. V , DEP 31.22.20.31 /

    Approved Drawing / SNG-69-42000P-MS-

    6038-540-0000

    ASME Sec. VIII Div. 2 Inspection Report H R S S

    RT of finish welds

    ASME Sec. VIII Div. 2 /Data sheet / Approved Drawing /

    SNG-69-42000P-MS-6038-536-0000

    ASME Sec. VIII Div. 2 Inspection Report H R RA

    ASME Sec. VIII Div. 2 & Sec. V / Approved Drawing

    Inspection of the equipment before PWHT 5.6

    ASME Sec. VIII Div. 2 & Sec. V / Approved Drawing

    / SNG-69-42000P-MS-6038-517-0000,

    SNG-69-42000P-MS-6038-539-0000

    Inspection Report

    5.4Overlay welding

    (Clad restoration)

    5.5 Fitment & Welding of Internal & External attachments etc.

    Form No. GR 11 Rev. 02 FOR DETAILED NON DESTRUCTIVE EXAMINATION REQUIREMENTS REFER ANNEXURE "A"

  • 732/QAP/10 Page 6 of 8....

    CLIENT : ABB S.p.A - Italy. QAP No. : 732/QAP/10 Rev. 07P.O. No. : 4580041305 DTD 02-12-2012. DATE : 14/05/2014EQUPT. No. : V 6902. CODE OF CONSTRUCTION : ASME SEC. VIII DIV 2 ED 2010 ADDENDA 2011PROJECT NAME : SAIH NIHAYDA CONDENSATE STABILIZATION PLANT (SNCP) DRG. No. : 732-E-10CONTRACTOR JOB No. : 20036 INSPECTION : AI (LR Insurance, Inc.)

    SPECIFICATIONS FOR PRESSURE VESSELS

    :SP 2069 Rev. 0, SP 2051 Rev. 2, DEP 31.10.00.10 Sep. 2011,

    SP 2041 Rev. 2, DEP 30.10.60.18 May 2004,& NACE MR 0175.

    SP 1176 Rev. 2, DEP 30.10.02.17 Feb. 2011,

    GR A.I. ABB PDOACCEPTANCE NORMS

    SP 1246 Part 1,2,3,4 Rev. 2 & Part 5 Rev. 3, DEP 31.22.20.31- Gen. Feb. 2011,

    FORMAT OF RECORD

    Scope of Inspection REMARKS

    G.R.ENGINEERING PRIVATE LTD. -TARAPURINSPECTION & TEST PLAN (QAP) FOR V 6902

    SL.NO STAGE / ACTIVITY TYPE OF CHECK REFERENCE DOCUMENT

    Mechanized UT of Category A, B (above 50mm thk) & D welds

    ASME Sec. VIII Div. 2 /Data sheet /

    Approved Drawing / SNG-69-42000P-MS-

    6038-525-0000

    ASME Sec. VIII Div. 2 Inspection Report H R W W

    PMI examination of alloy materials & welds

    ASME Sec. II- B/C, / DEP 31.10.00.10, SP 2069,

    SNG-69-42000P-MS-6180-523-0000

    ASME Sec. II- B/C PMI Report H R W W

    5.7 Post Weld Heat Treatment of equipment Review of

    Heat Treatment Cycle

    ASME Sec. VIII Div. 2 /Approved Drawing

    /SNG-69-42000P-MS-6026-519-0000

    ASME Sec. VIII Div. 2 /Approved Drawing

    Heat Treatment Chart H R RA R

    PWHT of equipment Soaking Temperature :- 61010C.

    100 % PT of weld overlay machine surface

    ASME Sec. VIII Div. 2/ Approved Drawing / DEP 31.22.20.31,

    SNG-69-42000P-MS-6038-539-0000

    ASME Sec. VIII Div. 2, Appendix 8 Inspection Report H R W W

    RT of Pressure part butt welds for thk below 50mm

    ASME Sec. VIII Div. 2/Data sheet / Approved Drawing

    /SNG-69-42000P-MS-6038-536-0000

    ASME Sec. VIII Div. 2 Inspection Report H R RA

    MT of Pressure part welds

    ASME Sec. VIII Div. 2/Approved Drawing

    /SNG-69-42000P-MS-6038-540-0000

    ASME Sec. VIII Div. 2 Inspection Report H R RA

    Mechanized UT of Category A, B (above 50mm thk) & D welds

    ASME Sec. VIII Div. 2 /Data sheet /

    Approved Drawing / SNG-69-42000P-MS-

    6038-525-0000

    ASME Sec. VIII Div. 2 Inspection Report H R W W

    Hardness test of welds, HAZ

    ASME Sec. VIII Div. 2 / Approved Drawing /

    SP 2069 Appendix-8, DEP 31.22.20.31 CL 6.2, SNG-69-42000P-MS-6061-526-0000

    ASME Sec. VIII Div. 2 / Approved Drawing

    Hardness test report H R W W

    248 HV10 maximum for ferritic metals in process services, including H2 and sour

    service conditions.

    Inspection of the equipment before PWHT 5.6

    NDE after PWHT5.8

    Form No. GR 11 Rev. 02 FOR DETAILED NON DESTRUCTIVE EXAMINATION REQUIREMENTS REFER ANNEXURE "A"

  • 732/QAP/10 Page 7 of 8....

    CLIENT : ABB S.p.A - Italy. QAP No. : 732/QAP/10 Rev. 07P.O. No. : 4580041305 DTD 02-12-2012. DATE : 14/05/2014EQUPT. No. : V 6902. CODE OF CONSTRUCTION : ASME SEC. VIII DIV 2 ED 2010 ADDENDA 2011PROJECT NAME : SAIH NIHAYDA CONDENSATE STABILIZATION PLANT (SNCP) DRG. No. : 732-E-10CONTRACTOR JOB No. : 20036 INSPECTION : AI (LR Insurance, Inc.)

    SPECIFICATIONS FOR PRESSURE VESSELS

    :SP 2069 Rev. 0, SP 2051 Rev. 2, DEP 31.10.00.10 Sep. 2011,

    SP 2041 Rev. 2, DEP 30.10.60.18 May 2004,& NACE MR 0175.

    SP 1176 Rev. 2, DEP 30.10.02.17 Feb. 2011,

    GR A.I. ABB PDOACCEPTANCE NORMS

    SP 1246 Part 1,2,3,4 Rev. 2 & Part 5 Rev. 3, DEP 31.22.20.31- Gen. Feb. 2011,

    FORMAT OF RECORD

    Scope of Inspection REMARKS

    G.R.ENGINEERING PRIVATE LTD. -TARAPURINSPECTION & TEST PLAN (QAP) FOR V 6902

    SL.NO STAGE / ACTIVITY TYPE OF CHECK REFERENCE DOCUMENT

    6.0

    6.1Final Visual & Dimensional

    Inspection(Internal & External)

    Dimensions, completeness of the assembly, as built thickness measurement

    ASME Sec. VIII Div. 2 & Sec. V / Approved Drawing

    / DEP 30.22.20.31, SNG-69-42000P-MS-6038-554-0000

    ASME Sec. VIII Div. 2 / Approved Drawing Inspection Report H H H H

    6.2 Pneumatic test of Nozzle RF pads Leak check

    ASME Sec. VIII Div. 2 & Sec. V / Approved Drawing /

    DEP 31.22.20.31 CL 6.9, SP 2051, SNG-69-42000P

    -MS-6180-520-0000

    ASME Sec. VIII Div. 2 / Approved Drawing Test Report H R RW

    10%W

    6.3 Trial assembly of supplied Internals Trial fitting of internals P.O. /

    Internals supplier Drawings P.O. /

    Internals supplier Drawings Inspection Report H W W

    6.4 Interior & exterior cleaning

    All completed equipment shall be cleaned internally and externally to remove scale, weld spatter,dirt,and foreign material.

    Approved Drawing / DEP 30.22.20.31 Approved Drawing Inspection Report H R R

    6.5 Hydrostatic Testing (Horizontal) Leak check

    / Pressure drop

    ASME Sec. VIII Div. 2 /Approved Drawing

    / DEP 31.22.20.31 CL 6.9, SP 2069 CL 6.2, SP 2051 CL

    6.4.4,SNG-69-42000P-MS-6180-520-0000

    ASME Sec. VIII Div. 2 /Approved Drawing Inspection Report H H H H

    6.6 Drying of equipment CleanlinessApproved Drawing

    / DEP 31.22.20.31 CL 6.9, SP 2069 CL 6.2.

    Approved Drawing Inspection Report H ----

    6.7 External Surface preparation Visual Inspection for worksmanship, profile check H ----

    6.8 PaintingVisual inspection for

    workmanship, DFT checking, Adhesion

    H ---- W W

    Painting shall be checked for surface chloride contaimination , Holiday / pinhole, Adhesion

    test & DFT test.Criteria of Acceptability as per specification SP-

    1246 Part-1 Table B1

    Approved Drawing / Data Sheet /

    SP -1246 (PCS-1)Inspection Report

    Approved Drawing / Data Sheet /

    SP -1246 (PCS-1), SNG-69-42000P-MS-

    6180-521-0000

    FINAL INSPECTION

    Form No. GR 11 Rev. 02 FOR DETAILED NON DESTRUCTIVE EXAMINATION REQUIREMENTS REFER ANNEXURE "A"

  • 732/QAP/10 Page 8 of 8....

    CLIENT : ABB S.p.A - Italy. QAP No. : 732/QAP/10 Rev. 07P.O. No. : 4580041305 DTD 02-12-2012. DATE : 14/05/2014EQUPT. No. : V 6902. CODE OF CONSTRUCTION : ASME SEC. VIII DIV 2 ED 2010 ADDENDA 2011PROJECT NAME : SAIH NIHAYDA CONDENSATE STABILIZATION PLANT (SNCP) DRG. No. : 732-E-10CONTRACTOR JOB No. : 20036 INSPECTION : AI (LR Insurance, Inc.)

    SPECIFICATIONS FOR PRESSURE VESSELS

    :SP 2069 Rev. 0, SP 2051 Rev. 2, DEP 31.10.00.10 Sep. 2011,

    SP 2041 Rev. 2, DEP 30.10.60.18 May 2004,& NACE MR 0175.

    SP 1176 Rev. 2, DEP 30.10.02.17 Feb. 2011,

    GR A.I. ABB PDOACCEPTANCE NORMS

    SP 1246 Part 1,2,3,4 Rev. 2 & Part 5 Rev. 3, DEP 31.22.20.31- Gen. Feb. 2011,

    FORMAT OF RECORD

    Scope of Inspection REMARKS

    G.R.ENGINEERING PRIVATE LTD. -TARAPURINSPECTION & TEST PLAN (QAP) FOR V 6902

    SL.NO STAGE / ACTIVITY TYPE OF CHECK REFERENCE DOCUMENT

    7.0 Inspection of Mandatory & Commissioning spares Verification of spares20036-0100-M31-MR-42000 /

    Approved Drawing / P.O.20036-0100-M31-MR-42000 /

    Approved Drawing / P.O. Spares List H ---- H

    7.1Verification of Name plate and authorise for ASME certification

    markName plate review Approved Drawing Approved Drawing Inspection Report H H H

    7.2 Attachment of Stamped name plate on the equipmentName plate attachment

    confirmation Approved Drawing Approved DrawingRub off /

    Photo copy of name plate

    H W

    7.3 Inspection Release Note / Despatch ClearanceVerification of documents & issue

    of IRN 20036-0100-M31-MR-42000 /

    Approved Drawing / P.O.20036-0100-M31-MR-42000 /

    Approved Drawing / P.O. IRN R --- H R

    7.4 Signing of Manufacturer's Data Report (MDR) Review of MDRASME Sec. VIII Div. 2 / Approved Drawing

    ASME Sec. VIII Div. 2 / Approved Drawing MDR H H H R

    7.5 Check of packing & packing listVisual inspection /

    Varification P.O. /

    20036-0100-M31-MR-42000 P.O. /

    20036-0100-M31-MR-42000 Packing list H --- W

    7.6 Manufacturing Record Book(MRB) Review of MRB P.O. /

    20036-0100-M31-MR-42000 P.O. /

    20036-0100-M31-MR-42000 MRB H ---- H R

    Legends :

    S. NAIK P. V. GHANEKARQA Engineer QA Manager Authorised Inspector

    H- Hold ( Do not proceed without approval), W- Witness(Give due notice, work may proceed after schedule date), R- Document Review,RA- Approval of Documents RW-Random Witness, S- Survellance, NDE- Non Destructive Examination, PT - Dye Penetrant Test, RT - Radiographic Examination, UT - Ultrasonic Test, P.O.- Purchase Order, CS - Carbon steel, PMI - Positive Material Identification, TDC - Technical Delivery Condition, HAZ - Heat Affected Zone

    Form No. GR 11 Rev. 02 FOR DETAILED NON DESTRUCTIVE EXAMINATION REQUIREMENTS REFER ANNEXURE "A"