National Highways Authority of India(Ministry of Shipping, Road Transport &
Highways) Government of India
Design, Engineering, Construction, Finance, Operation & Maintenance of Amritsar – Wagha Border BOT (Annuity) Project
of NH-1(Km 456.100 to Km 492.030) in the State of Punjab
(Package No. NHDP-IIIA/BOT/PB/07/04) `
Monthly Operation & Maintenance Report September-2014
Submitted by Rohan Rajdeep Toll Roads Ltd
Independent Consultant:
Concessionaire: Unihorn India Pvt. Ltd ROHN RAJDEEP
TOLL ROADS LTD.
INDEX
Project Details Page 1 to 1
1.0 Introduction Page 2 to 14
2.0 Description of Project Highway2.1 Start and End of Project2.2 Latitudes and Longitudes2.3 Terrain2.4 Climate2.5 ROW Details2.6 Road Geometry2.7 Junctions2.8 Widening Scheme2.9 Service Road2.10 Underpasses2.11 Key Map Project Section
3.0 Details of Bridges/Culverts3.1 Existing bridges on the Project Highway3.2 Details of Existing Culverts
4.0 Details of Median Opening Chainges (Km 456.100 to Km 492.030)
5.0 Bus Shelter, Bus Lay Byes & Truck Lay Byes5.1 Location of Bus Shelter Km 456.100 to Km 492.0305.2 Location of Truck Lay Byes
6.0 Details of Drains6.1 Side Drain Chainge6.2 Median Drain Chainge6.3 Chainge of Anti Crash Barrier
7.0 Emergency Services7.1 Emergency Service Location and Equipments7.2 Patrolling Emergency Team
8.0 List of Maintenance working equipments8.1 Machinery Deployed at Site8.2 Organization Chart (Maintenance)
9.0 Route Operations Page 15 to 23
9.1 Accident Report9.2 Incident Report9.3 Encroachment Removal Report 9.4 Encroachment Removal Images9.5 Incident of Lane Closure9.6 Incident of Lane Image9.7 Damage Report
10.0 Preventive/Periodic Maintenance Report Page 24 to 31
10.1 Accident /Incident Report10.2 Inspection Report10.3 Inspection Compliance Report10.4 Maintenance Report10.5 Preventive / Periodic Maintenance Report10.6 Test Performance Report10.7 Users Complaint Report10.8 Lane Closure Report
11.0 Maintenance of Electrical Page 32
12.0 Maintenance Images Page 33
13.0 Log Books 13.1 The Movement of Recovery Van13.2 The Movement of Ambulance13.3 The Movement of Highway Petrol
Project Details
Name of Project : Improvement & WideningofAmritsarWagha
Border Section of NH-1 (From Km 456.100 to
Km 492.030) in the state of Punjab UnderNHDPPhase IIIA on BOT (Annuity Basis)
Project Limit : Km 456.100 to Km 492.030 on
NH-1
Project Length : 35.930 Km.
Client : National Highways Authority of India
Concessionaire : Rohan Rajdeep Toll Roads Limited.
Independent Consultant : M/S Unihorn (India) Pvt. Ltd.
EPC Contractor : Rohan Rajdeep Toll Ways Ltd.
Total Project Cost : 205.88 Crore (Fin. Documents)
Appointed Date(LOA) : 31-Aug-2007
Date of Concession Agreement : 18-Dec-2007
Date of Commencement : 15 June-2008
Period of Completion : 24 Months
Scheduled date of Completion : 18-June-2010
1 INTRODUCTION
The National Highway No. 1 originates from Delhi and traverses through the States of Haryana and Punjab and terminates at Wagha Border. The Project is 4-lane from km 456.100 to km 492.030 Amritsar- Wagha Section of NH-1 in the State of Punjab on BOT Annuity Basis under operation & maintenance.
In route it passes through urban/semi urban areas of Amritsar bypass location at Majitha road, Fathegarh Churian road, Ajnala Airport road, Ram Tirath road, Khasa, Attari and Military Cantonment etc. with provision for service roads and one Underpass on Ajnala road crossing and providing Bridge and Culverts and improving junctions etc. on BOT Annuity Basis.
2 DESCRIPTION OF PROJECT HIGHWAY
The Project Highway is 4-lane vide having one meter vide paved shoulders on either side from Km 456.100 to Km 492.030. The condition of payment is generally fair to good.
An index map of the Project Highway is given at the serial No 2.11.
2.1 ‘START’ and ‘END’ of the Project Highway
The Project Highway starts from Chainage at Km 456/100 at Verka Chowk Junction , Amritsar and End Chainage at Km 492.030 at Wagha Border . As per design Chainage, the actual length of Project Highway is 35.930 Km (492.030-456.100=35.930 Km.)
2.2 Latitudes and Longitudes
The Project Highway generally lies between latitudes 31.39 N and 31.36 N and longitudes 74.55 E and 74.34 E.
2.3 Terrain
The road traverses through plain terrain
2.4 Climate
The climate features of the areas covered by the Project Highway are:-
Max temperature: 46.30 C
Min. temperature: -0.20 C
Rainfall (normal): 813.2 mm
2.5 ROW Details
The details of Right –of-Way (ROW) are given in Table: A-1
Table: - A-1 Details of ROW
ChainageROW (m)
From (Km.) To (Km.)
456.100 456.240 63.00
456.240 470.700 60.00
470.700 492.030 55.00
Generally, no land Acquisition is done for widening the Project Highway to 4-lane except in the following 1 location
1. Verka Chowk Junction (Km 456.100 ) to make ROW to 63 m
2. At the location of Toll Plaza (KM 480.500 ) At Chidden Village in Amritsar Dist.
2.6 Road Geometry
This project road predominantly has a straight alignment and traverses through plain terrain.
2.7 Junctions:
There are 10 Major and 3 Minor junctions. The details of Major junctions are given in Table A-8 and that of Minor junctions in Table A-9
Table A-8: Major Junctions
S. No. Location Name of Road meeting the project Road
1 459.195 Amritsar Town and Majhita Road
2 460.915 Amritsar Town and Fatehgarh Churian Road
3 462.167 Ranjit Avenue
4 462.820 Ranjit avenue
5 463.990 Amritsar Town and Ajnala Road Via airport
6 466.945 Amritsar Town and Ram Tirath Road
7 472.560 Amritsar town and Wagha Attari Road
8 482.645 Bhakna-Garinda-Padri REO Road
9 486.705 Chugama-Rane Ke Mod MDR
10 489.810 Attari Rly Station Raja Tal Chibbal Road
Table A-9: Minor Junctions:
S. No. Location Name of Road meeting the project Road
1 462.348 Lokhara-Jagdev Kala Road
2 477.022 Bhakna-Khasa-Boparai MDR Road
3 488.560 Attari Raja Tal-Chibal Road
2.8 Widening Scheme
The details of widening scheme done given below:-
Starting (Km) Ending (Km) Widening done as per DPR
456.100 458.950 L.H.S.
458.950 459.100 Transition for shifting To concentric
459.100 459.400 Concentric
459.400 459.550 Transition for shifting To left
459.550 472.250 L.H.S.
472.250 472.550 Transition for shifting to Right
472.550 472.925 R.H.S.
472.925 473.225 Transition for shifting to left
473.225 474.400 L.H.S.
474.400 474.700 Transition for shifting to right
474.700 474.700 R.H.S.
476.550 476.700 Transition for shifting to concentric
476.700 476.250 Concentric
477.250 477.400 Transition for shifting to Right
477.400 479.925 R.H.S.
479.925 480.075 Transition for shifting to concentric
480.075 480.150 Concentric
480.150 480.300 Transition for shifting to right
480.300 486.400 R.H.S.
486.400 486.550 Transition for shifting to concentric
486.550 486.700 Concentric
486.700 486.850 Transition for shifting to right
486.850 488.100 R.H.S.
488.100 488.250 Transition for shifting to concentric
488.250 488.900 Concentric
488.900 489.050 Transition for shifting to right
489.050 490.550 R.H.S.
490.550 490.700 Transition for shifting to concentric
490.700 492.030 Concentric
2.9 Service Road
The service road is provided at the following locations
S. No.
Village/City/Town Location RHS/LHS Length(Km)
From(km)
To (Km)
(a) service Road (7.0 m carriageway)
1 End of Amritsar bypass built-up zone
471.520 473.140 L.H.S. 1.62
2 Sub Way Underpass
463.540 464.370 Both Side 1.66
Sub –total length (a)
3.28
(b) service road (5.5 m carriageway)
1 Amritsar Bye-pass Build-up zone
456.100 459.500 Both sides 6.80
2 Khasa Build-up Zone
476.340 477.945 Both side 3.20
3 Attari Build-up Zone
487.730 489.140 Both side 2.82
Sub-total length (b)
12.82
Total length (a+b)
16.1
2.10 Underpasses
1 Underpass at Km 463.980, i.e. Amritsar Town-Ajnala Airport Road. Central span is 25m. Starting Km 463.652 to ending Km 464.265 total length 613 mtr.
2.11 MAP
Key Map of Project Section
3.0 Details of Minor Bridges/Culverts
3.1 Minor Bridges on the Project Highway
S. No.
Bridge No.
Location/
Chainage
Type of structur
e
Span Details No. x
length(M)
Total length (M)
Carriageway width Existing (M)
Carriageway width New (M)
Remarks
1 462/1 462.084 RCC Slab 2x8.6 17.2 6.7 8.5
2 482/1 481.253 RCC Slab 3x 13.6 40.8 7.4 8.5
3 483/1 482.211 RCC Slab 2x 3.8 7.6 8.2 8.5
4 483/2 482.412 RCC Slab
1x4.8+1x5.0+
43.68 7.6 8.5
1x4.9+1x4.8+
1x4.75+2x4.8
5+1x4.8+1x4.7
5 486/1 485.783 RCC Slab 3x 8.75 26.25 7.3 8.5
6 487/1 486.196 RCC Slab 3x2.333 7.00 8.15 8.5
7 490/1 489.908 RCC Slab 2x13.56 27.12 7.4 8.5
3.2 Culverts of Project Highway
SI.No. Chainage Span Remarks
1 456+295 1.200
2 456+623 3.4/4.0
3 458+002 3.030
4 458+940 1.200
5 459+743 1.200
6 460+105 1.100
7 460+388 1.200
8 460+582 2.000
9 461+442 1.200
10 462+327 1.200
11 462+364 1.200
12 462+730 1.200
13 463+192 1.200
14 463+245 1.200
15 463+625 2.00
16 464+294 1.200
17 465+265 1.200
18 465+835 1.200
19 466+536 1.200
20 466+790 3.000
21 466+884 3.000
22 466+973 2.000
23 468+787 1.200
24 470+071 1.200
25 470+276 1.200
26 471+240 1.200
27 472+620 1.200
28 478+436 2.000
29 479+772 2.000
30 481+624 3.000
31 483+287 1.200
32 483+753 (2x2.1)
33 486+925 1.200
34 487+552 2.100
35 488+857 2.500
36 490+075 2.0/2.09
4.0 Details of Median Opening Chainges (Km 456.100 to Km 492.030)
S.No. Chainage
Distance between
successive GAP
Median Opening
(Rmt)Remarks
1 458.015 1.975 20 Colony Road LHS (median opening changed from 457.545)
2 459.195 1.180 40 Major Junction - Majhitha Road
3 460.150 0.955 30 RHS- Khanna paper Mill & LHS- Tata Motors
4 460.915 0.765 30 Fatheghar Churrrian Junction
5 462.170 1.255 30 LHS - Ranjit Avenue
6 462.348 0.178 20 Loharka Jagdev Kala
7 462.758 0.588 30 LHS - Ranjit Avenue
8 463.350 0.592 20 LHS-Ranjit Avenue
9 463.960 0.610 25 Under Pass
10 465.760 1.800 20 RHS - Holicity
11 466.945 1.180 35 Ramtirath Junction
12 468.646 1.706 35 RHS-Baba Darshan singh Gurudwara
13 469.630 0.984 30 RHS-BSF CAMP
14 470.410 0.780 30 RHS-BSF CAMP
15 471.195 0.785 30 RHS-BSF CAMP
16 472.560 1.365 55 India Gate
17 473.050 0.490 20 BSF CAMP LHS
18 473.300 0.740 20 BSF CAMP LHS (SBI ATM)
19 473.520 0.220 20 ARMY GATE (CP-5) RHS
20 474.065 0.545 20 ARMY GATE - LHS
21 474.600 0.535 20 ARMY GATE (CP-6) RHS
22 475.140 0.540 20 ARMY GATE (DOGRAI HOUSE) RHS
23 475.830 0.690 20 ARMY GATE (CP-7) RHS
24 476.686 0.856 20 Khurmaia Vill RHS
25 477.020 1.190 30 Minor Junction Khasa
26 477.775 0.755 20 ARMY GATE RHS
27 478.720 0.945 20 LHS Minor Vill. Link Road To Khasa Vill.
28 480.160 1.440 20 RHS Minor Vill. Road Junction-Chhiddan Vill.
29 481.790 1.630 20 RHS Minor Vill. Link Road To Lahori Mal Vill.
30 482.645 0.855 30 Major Junction - Garinda RHS/LHS
31 483.475 0.830 20 LHS Minor Vill. Link Road To Garinda Vill.
32 485.370 1.895 20 Minor Vill. Road Junction LHS-Dodi Vill., RHS- Padrana Vill.
33 486.705 1.335 30 Major Junction - Ranike Mod RHS
34 487.590 0.885 20 LHS- Entrance to Dana Mandi
35 488.560 0.970 30 Minor Junction - Attari LHS
36 489.810 1.250 30 Major Junction - Attari Rly Station Raja tal-Chibal Road LHS
37 490.790 0.980 20 Lay Bye Location
38 491.040 0.250 20 Parking Area Location
5.0 Bus Shelter, Bus Lay Byes & Truck Lay Byes
5.1 Location of Bus Shelter Km 456.100 to Km 492.030
S.No. Chainage Side Remark
1 459.485 LHS Majihta Chowk
2 460.800 LHS Fathegarh Churian Chowk
3 463.440 LHS Ajnala Chowk
4 466.830 LHS Ramtirath Chowk
5 472.790 RHS India Gate
6 474.840 RHS Ram Pura
7 476.370 LHS Khasa
8 478.790 LHS Khas Vill
9 480.140 LHS Chiddan Vill
10 480.190 RHS Chiddan Vill
11 482.750 RHS Garinda
12 482.790 LHS Garinda
13 486.670 LHS Rani Ki Mod
14 486.790 RHS Rani Ki Mod
15 487.800 LHS Attari
16 488.650 RHS Attari
17 490.857 RHS Border
18 490.960 LHS Border
5.2 Location of Truck Lay Byes
S.No. Chainage Side Remark
1 491.025 RHS Border
2 491.150 LHS Border
6.0 Chainage of Drains
6.1 Side Drains Details
Sr. No.
From To Side Length (km)
Remarks
1 456.140 459.170 B/S 6.06 Verka To Majhita Byepass
2 471.640 472.990 LHS 1.35 India Gate Byepass
3 476.490 477.795 B/S 2.61 Khasa
4 480.040 480.260 B/S .440 Chiddan Vill
5 485.440 486.820 B/S .760 Rani Ke Mod
6 487.870 488.975 B/S 2.210 Attari
6.2 Median Drains Chainage
Sr. No. From To Length (Mtr) Remarks
1 456.790 457.120 330
2 458.190 458.390 200
3 459.260 459.470 210
4 460.770 460.900 130
5 460.955 461.095 140
6 461.740 462.075 335
7 462.610 462.740 130
8 462.780 462.980 200
9 463.240 463.340 100
10 464.800 465.270 470
11 466.365 466.660 295
12 466.790 466.925 135
13 466.955 467.090 135
14 468.480 468.600 120
15 468.635 468.860 225
16 469.690 470.040 350
17 471.590 471.970 380
6.3 Chainage of Anti Crash Barrier Wall RHS from
SR.NO. From To Length (in rmt) Remarks
1 459.440 459.500 0.060
2 459.490 459.575 0.085
3 459.625 459.685 0.060
4 459.695 459.735 0.040
5 459.740 459.807 0.067
6 459.820 460.057 0.237
7 460.040 460.160 0.120
8 460.210 460.240 0.030
9 460.253 460.385 0.132
10 460.395 460.500 0.105
11 460.490 460.585 0.095
12 460.595 460.675 0.080
13 460.680 460.720 0.040
14 460.775 460.870 0.095
15 461.050 461.400 0.350
16 461.410 461.420 0.010
17 461.425 461.690 0.265
18 461.700 461.880 0.180
19 461.900 462.065 0.165
20 462.840 462.875 0.035
21 462.895 463.240 0.345
22 463.280 463.620 0.340
23 463.640 463.940 0.300
24 463.980 464.280 0.300
25 464.290 465.260 0.970
26 465.270 465.750 0.480
27 465.770 465.820 0.050
28 465.840 466.120 0.280
29 466.135 466.330 0.195
30 466.350 466.925 0.575
31 466.955 467.790 0.835
32 467.800 468.600 0.800
Total 7.721
7.0 Emergency Services
7.1 Emergency Service Location and Equipments
Emergency Services Location at Km 480.500 Chiddan Toll Plaza
Sr. No.
Equipments Contact Numbers
Name of Contact Person
1 Highway Pat rolling
96466-20274 Jagir Singh (Safety Officer)
2 Recovery Van 96466-20300 Mohan Lal (Supervisor)
3 Ambulance 96466-20300 Anantpal Singh (Medical First Aider)
7.2 Patrolling Emergency Team
Patrolling Team
Safety Officer
Supervisor (2 Nos)
Ambulance Recovery Van Patrolling Vehicle (15Mt.Ton)
First Aider(2Nos 2 shift) Driver (2 Nos 2 shift) Supervisor (2Nos 2 shift)
Driver (2 Nos 2 shift) Helper (2 Nos 2 shift) Driver (2 Nos 2 shift)
Helper (2 Nos 2 shift) Helper (4 Nos 2 shift)
8.0 List of Maintenance working Equipments
8.1 Machinery Deployed at SiteSI. No. Name of Machinery Available Nos. Remarks
1. Water Tankers 2
2 Tractor trolley 1
3 Motor cycle 3
4 Pick up 1
5 Dust Broomer 1
8.2 ORGANISATION CHART (MAINTENANCE)
ROHAN RAJDEEP TOLL ROADS LTD.
EXECUTIVE DIRECTOR
MAINTENANCE ENGINEER
SUPERVISOR ELECTRICAL ENGINEER
2 Nos 1 Nos
MAZDOORS ELECTRICAL SUPERVISOR
34 Nos 1Nos
9.0 Route Operations
Month: September
2014
9.1 ACCIDENT REPORT (Km 456.100 to Km 492.030 )
Date
Time of
Accident
A B C D E F G H
Vehicle responsible
No. of Affected Person
No. of Animals killed
if any
Help Provided
by Ambulance/trauma Vehicle/
Patrolling
Remarks
Accidnents Loactions
Naure of Accident
Classification
of Accide
nt
Causes
Road Failure
Road Condition
Transporation
type
Weather
Condition
Fatal
Grievous
Minor
Non
Injured
1/9/2014
07.30 A.M.
481+050
RHS6 3 5 4 1 1 1
one Autorickshaw
0 0 2 0 0 Ambulance
9/9/2014
4.30 P.M.
477+000
LHS4 1 5 4 1 3 1
one Motorc
ycle1 0 0 0 0 Ambulanc
e
Total 1 0 2 0 0
A Loaction/Urban/Rural and details of Surrounding land useB 1.Obertrumoing, 2.Heading Collision, 3.Rear End Collision, 4.Collision Brush/side Wipe, 5. Left Turn Collision 6.Skidding 7.Right Turn Collision 8.Others (Pl.Specific)C 1.Fatal, 2.Grievious injury, 3. Monor Injury, 4. Non InjuryD 1.Drucken ,2. Overspeeding, 3. Vehicle out of control ,4. Falult of Motor Vehicle/Driver of other vehicle/Cyclist/Pedstrain/Passengar 5. Defect in mechanical condition og moator vehicles/road conditionE 1.Single Lane, 2. Two Lane, 3. Three Lane or more without central divider (medain), 4.
Four Lanes or more with dividerF 1. Straight Road, 2. Slight Curve, 3. Sharp Curve, 4. Flat Raod, 5. Gentle Incline, 6.Steep Incline, 7.Hump 8. DipG 1.T Junctions, 2. Y-Junction, 3.Four Arm Junction, 4.Stagged Junction, 5.Junction with more than 4 arms 6.Roundabout Junction 7.Manned Rail crossing 8.Unamned Rail crossingH 1.Fine, 2Mist/fog, 3.Cloudy, 4. Light Rain, 5. Heavy Rain, 6. Hail/sleet, 8. Snow Wind, 9.Dust storm, 10.Very hot, 11. Very Cold, 12.Other extraordinary weather condition
9.2 INCIDENT REPORT Date: September
2014RO
Refrence made to NHAI HQ letter No. NHAI/CM/lnc.Man/2011 dated 24.05.2011
General Information Route Park Vehicle Ambulance Two Way Crane Tot
alRemar
ks
1 2 3 4 1 2 3 4 1 2 3 4
1 PIU Nos Jalandhar
2 NH Nos NH-1 (Now NH-3)
3 Strecth 456.100 to 492.030
4 Loaction of Incident Managament 480.500 480.500 480.500
5 Registration No PB 11 AC 4302 PB 10 CS
6124 PB 32 B 4081
6 Total Nos of Accident Reported 2 2
7 Number of Accidents cases attended 2 2
8 Number of Accidents shifted to hospital 2 2 2
9Number of other help provided by route patroll (other than accidents)
3 3
10Number of other bhelp provided by Two way vehicle (other than accident)
26 26
11 No. of vehicle painted in stripes as per approved colour scheme 1 1 1 3
12 No. of vehicle requesite T&P accessories as per contact 1 1 1 3
13 No. of vehicle as per approved illuminated boards on top 1 0 0 1
14 No. of vehicle with requsite man power as per contact 1 1 1 3
15 No. of vehicle tited with GPS/VTS 1 1 0 2
16No. of reflective signages showing emergency contact numbers
14 14
17No. of plazas where emergency contact detials boards are installted
1 1
18 No. of plaza where information is being on back of toll tickets 1 1
19 Date of last inspection by PD/RO
9.3 Temporary Encroachment Removal Report Month: September 2014
Sr. No.
Chainage Location Notice Issued
Date Category QTY Action Taken
01/09/20141 460.940 LHS Not Reqiured khoka 1 Removed
2 472.800 LHS Not Reqiured Wooden item 4 Removed
02/09/2014
1 462.210. RHS Not Reqiured Wooden item 5 Removed
2 466.880 LHS Not Reqiured Board 1 Removed
3 457.600 RHS Not Reqiured Flexi 1 Removed 03/09/2014
1 488.700 LHS Not Reqiured Flexi 1 Removed
2 490.500 RHS Not Reqiured Rehri 2 Removed 04/09/2014
1 459.000 LHS Not Reqiured Bricks 3 Removed 05/09/2014
1 486.400 LHS Not Reqiured Flexi 1 Removed
2 490.800 RHS Not Reqiured Rehri 4 Removed 06/09/2014
1 459.180 RHS Not Reqiured Board 1 Removed
2 459.180 LHS Not Reqiured Board 1 Removed
3 470.100 LHS Not Reqiured Flexi 1 Removed 07/09/2014
1 469.300 RHS Not Reqiured Bricks 3 Removed 08/09/2014
1 467.400 LHS Not Reqiured Flexi 1 Removed 09/09/2014
1 473.650 RHS Not Reqiured Rehri 1 Removed
2 465.500 RHS Not Reqiured Board 2 Removed10/9/2014
1 476.990 RHS Not Reqiured Board 2 Removed 11/09/2014
1 468.600 LHS Not Reqiured Bricks 2 Removed
2 460.940 RHS Not Reqiured Flexi 1 Removed12/9/2014
1 458.150 LHS Not Reqiured Board 1 Removed13/09/2014
1 461.800 RHS Not Reqiured Rehri 2 Removed
2 478.000 LHS Not Reqiured Board 1 Removed14/09/2014
1 466.600 RHS Not Reqiured Bricks 1 Removed15/09/2014
1 462.150 LHS Not Reqiured Flexi 1 Removed
2 467.400 LHS Not Reqiured Board 2 Removed
3 480.000 LHS Not Reqiured Bricks 5 Removed16/09/2014
1 475.100 LHS Not Reqiured Wooden item 3 Removed
2 468.250 RHS Not Reqiured Rehri 1 Removed17/09/2014
1 475.630 RHS Not Reqiured Flexi 1 Removed 18/09/2014
1 465.880 RHS Not Reqiured Bricks 3 Removed
2 462.200 RHS Not Reqiured Wooden item 5 Removed
19/09/2014
1 469.700 RHS Not Reqiured Bricks 3 Removed20/09/2014
1 472.550 RHS Not Reqiured Flexi 2 Removed
2 470.400 RHS Not Reqiured Board 1 Removed
3 459.180 LHS Not Reqiured Flexi 1 Removed21/09/2014
1 466.700 RHS Not Reqiured Bricks 1 Removed
2 459.180 LHS Not Reqiured Rehri 1 Removed 22/09/2014
1 487.900 LHS Not Reqiured tyres 3 Removed
2 490.800 RHS Not Reqiured Rehri 5 Removed23/09/2014
1 489.200 LHS Not Reqiured Rehri 2 Removed 24/09/2014
1 460.940 LHS Not Reqiured khoka 1 Removed25/09/2014
1 458.500 RHS Not Reqiured Bricks 2 Removed
2 463.660 LHS Not Reqiured Flexi 1 Removed 26/09/2014
1 460.400 RHS Not Reqiured Flexi 2 Removed27/09/2014
1 473.650 LHS Not Reqiured Rehri 1 Removed
2 476.900 LHS Not Reqiured Bricks 4 Removed28/09/2014
1 463.300 RHS Not Reqiured Flexi 1 Removed
2 466.400 LHS Not Reqiured Board 2 Removed29/09/2014
1 471.750 RHS Not Reqiured Flexi 1 Removed30/09/2014
1 480.000 RHS Not Reqiured Bricks 2 Removed
2 478.380 LHS Not Reqiured Flexi 1 Removed
3 462.800 LHS Not Reqiured Bricks 2 Removed
9.4 ENROACHMENT REMOVAL IMAGES
NO IMAGES FOR THIS MONTH
9.6 INCIDENTS LANE CLOUSRE IMAGES
NIL
9.7 DAMAGE REPORT
Sr. No Date Chainage No Side Damage
item Remarks
NIL
11.0 MAINTENANCE OF ELECTRICAL WORK
Sr No Date Location Equipments Nature of
worksDescription of work
done
1 04/09/2014 462+758 High Mast Lighting Preventive Check operation of panel MCB down
2 04/09/2014 489+810 High Mast Lighting Preventive Check operation of panel MCB down
3 12/09/2014 472+560 High Mast Lighting PreventiveCheck operation of panel MCB down
4 13/09/2014 482+645 High Mast Lighting PreventiveCheck operation of panel MCB down
5 23/09/2014 459+150 High Mast Lighting Preventive
Check operation of panel MCB down
6 25/09/2014 456+100 to
459+150
Street Lighting L/S PreventiveCheck operation of panel
MCB down and 60 mtr cable changed
7 28/09/2014 460+915 High Mast Lighting Preventive
Check operation of panel MCB down
12.0 MAINTENANCE IMAGES
Main Road Carriageway cleaning Work Underpass cleaning work
Median unwanted grass removing work Light repiaring work
9.5 INCIDENT OF LANE CLOUSRE
Sr. No.
Date Chainage No
Lane Clousre Direction From To
Total Time (In Min)
Reason
Nil