Proposed expansion of Multi-Purpose Plant/Fluorospeciality Plant (3000 TPA to 6000 TPA); Installation of new generation Refrigerants & Refrigerant
Blends Plant (90,000 TPA) and Change in Product Mix of Chloromethanes and HFC134a At Village & P.O.-Jhiwana, Tehsil-Tijara, District-Alwar (Rajasthan)
Final EIA / EMP Report
7.2 RISK ASSESSMENT AND DISASTER MANAGEMENT PLAN
7.2.1 Risk Assessment & Damage Control
The risks associated with the chemical industry are commensurate with their rapid growth and
development. Apart from their utility, chemicals have their own inherent properties and hazards.
Some of them can be flammable, explosive, toxic or corrosive etc. The whole lifecycle of a chemical
should be considered when assessing its dangers and benefits. The chemical industries have
potential to cause disasters whose consequences are not only limited to the workers and
management, but also to the society and environment at large. The various chemical disasters that
have taken place world - wide both in developed and developing countries stand a proof to the
consequences. The disasters in chemical industries are generally due to fire, explosion and toxic
release.
Activities requiring assessment of risk due to occurrence of most probable instances of hazard and
accident are both onsite and off-site.
On site
� Emission/spillage etc. from storage & handling
� Exposure to fugitive dust, noise, and other emissions
� Housekeeping practices requiring contact with solid and liquid wastes
Off-site
� Exposure to pollutants released from on site/ storage/related activities
� Contamination due to accidental releases or normal release in combination with natural
hazard
� Deposition of toxic pollutants in vegetation / other sinks and possible sudden releases due to
accidental occurrences
Some of the important points considered to avoid/reduce any kind of hazard in the industry are:
� Design and Pre-modification review: Proper layout like location of plant in upwind side of
tank farm , fire station away from process area, process area far from public road and right
material selection can reduce severe damages to the work and outside environment
� Chemical Risk Assessment: Compatibility, storage, fire protection, toxicity, hazard index
rating, fire and explosion hazards
� Process Safety Management: HAZOP, FTA, F&E Index calculation, reliability assessment of
process equipment, incorporating safety trips and interlocks, scrubbing system, etc. before
effecting major process changes, proper Management of Change procedure (MoC), etc.
� Electrical Safety: Hazardous area classification , protection against static electricity , proper
maintenance of specialized equipment like switchgears, MCC Rooms
� Safety Audits: Periodical assessment of safety procedures and practices, performance of
safety systems and gadgets along with follow up measures.
� Emergency Planning: Comprehensive risk analysis indicating the impact of consequences and
specific written down and practiced emergency procedures along with suitable facilities.
� Training: Safety induction and periodical refresher training for the regular employees and
contract workmen shall be carried out.
Proposed expansion of Multi-Purpose Plant/Fluorospeciality Plant (3000 TPA to 6000 TPA); Installation of new generation Refrigerants & Refrigerant
Blends Plant (90,000 TPA) and Change in Product Mix of Chloromethanes and HFC134a At Village & P.O.-Jhiwana, Tehsil-Tijara, District-Alwar (Rajasthan)
Final EIA / EMP Report
7.2.2 Risk Analysis Methodologies
Risk assessment often requires the synthesis of risk profiles, which represent the probability
distribution of total annual loss due to a certain set of events or activities. These assessments
usually involve estimation of losses for several sub-classifications of the overall process and
synthesis of the results into an aggregate risk profile.
Some of the Main risk assessment methods adopted in Chemical Industries are:
� Standard Conformance And Performance Evaluation (SCOPE)
� Hazard and operability study (HAZOP), and
� Fault Tree Analysis (FTA)
7.2.2.1 Standard Conformance and Performance Evaluation (SCOPE)
SCOPE would evaluate the existing measures / system based on applicable national / international
standards. A few SCOPE reviews for chemical manufacturing plants are:
� SCOPE-FP (Fire Protection)
Indian Standards
� IS 2189 - Standard for automatic fire detection and alarm system
� IS 2190 - Code of practice for selection, installation and maintenance of first aid fire
extinguishers
� IS 3844 - Code of practice for installation and maintenance of internal fire hydrants and
hose reels
� IS 6382 - Carbon dioxide fire extinguishing system - fixed, design and installation
TAC Standard
Tariff Advisory Committee recommendations on hydrant and sprinkler system for fire
protection.
Oil Industry Safety Directorate
� OISD 117 - Fire Protection Facilities for Petroleum Depots and Terminals
� OISD 142 - Inspection of fire fighting equipment and systems
� OISD 158 - Recommended Practices on Storage and Handling of Bulk Liquefied
Petroleum Gas
� SCOPE - OHS (Occupational Health and Safety)
� IS 14489 Code of Practice for Occupational Safety & Health Audit
� NFPA 101 Life Safety Code
� SCOPE-ER (Electrical Risk)
� Hazardous Area Classification (base standard: IS 5572)
� Selection of Electrical Equipment for Hazardous Areas (base standard: IS 5571)
� Lightning Protection (base document: IS: 2309 /NFPA 780 /BS 6651)
� NFPA 70 B Recommended Practice for Electrical Equipment Maintenance
� NFPA 70 E Standard for Electrical Safety in Employee Work places
Proposed expansion of Multi-Purpose Plant/Fluorospeciality Plant (3000 TPA to 6000 TPA); Installation of new generation Refrigerants & Refrigerant
Blends Plant (90,000 TPA) and Change in Product Mix of Chloromethanes and HFC134a At Village & P.O.-Jhiwana, Tehsil-Tijara, District-Alwar (Rajasthan)
Final EIA / EMP Report
7.2.2.2 Hazard and operability study (HAZOP Study)
The HAZOP study is a systematic technique of identifying hazards of operability problems of a
process and lists all possible deviations from normal operating condition and how they might occur.
The consequences of the process are assessed and the means available to detect and correct the
deviations are examined. Thus, within the entire process all “credible” deviations that could lead to
hazardous events or operability problems are identified.
7.2.2.3 Fault Tree Analysis (FTA)
FTA is primarily a means of analyzing non-identifiable hazards. Hazards of top events (the ultimate
happening that is to be avoided) are first identified by other techniques such as HAZOP. Then all
combinations of individual failures that can lead to that hazardous event show the logical format of
the fault tree. Estimating the individual probabilities and then using the appropriate arithmetical
expressions can calculate the top event frequency.
The following Hazards are identified at the Plant.
a) Fire in Electric Panels, Oil room, Diesel storage building.
b) Spillage of chemical and wastes.
There are several other risk assessment technologies, the same are classified as follows:
1. PROCESS SAFETY MANAGEMENT
� Event Tree Analysis (ETA)
� Primary Hazard Analysis (PHA) using Dow Index
� Risk Assessment (with risk ranking technique)
2. ELECTRICAL RISK ASSESSMENT
� Review of Hazardous Area Classification
� Lightning Protection Risk Assessment
� Identification & Control of Electro-Static Hazards
� Review of electrical Preventive Maintenance System
3. FIRE RISK ASSESSMENT
� Identification & assessment of fire risks during operations in receipt, storage, transfer and
handling of chemicals (raw materials and finished products)
� Identification & control of ignition sources in areas where flammable chemicals are stored /
handled / transferred
� Review of chemical compatibility in storage areas and to suggest appropriate fire loss
control measures
� Review of fire detection measures adopted in the plant & to suggest suitable improvement
measures
� Review of the various active (fire hydrant, sprinkler, portable fire extinguishers) and passive
fire protection requirements for chemical storage and handling areas and to suggest
improvements as necessary
� Review of contractor safety awareness (chemical spill, fire fighting, emergency
communication, knowledge of plant hazards & safety regulations) and to recommend
suitable improvement measures to enhance contractor safety
Proposed expansion of Multi-Purpose Plant/Fluorospeciality Plant (3000 TPA to 6000 TPA); Installation of new generation Refrigerants & Refrigerant
Blends Plant (90,000 TPA) and Change in Product Mix of Chloromethanes and HFC134a At Village & P.O.-Jhiwana, Tehsil-Tijara, District-Alwar (Rajasthan)
Final EIA / EMP Report
� Review of safety awareness and safety training requirements
� (Training identification and efficacy) of plant employees with respect to hazards present in
the plant.
“The consequence, likelihood and exposure of each hazard are arrived using a systematic approach
and will help to determine the relative importance of hazard and focus on significant risks”.
7.2.3 Risk Analysis & Emergency Plan
Figure 7.1 PHOTOGRAPHS SHOWING RISK ANALYSIS & EMERGENCY PLAN
Proposed expansion of Multi-Purpose Plant/Fluorospeciality Plant (3000 TPA to 6000 TPA); Installation of new generation Refrigerants & Refrigerant
Blends Plant (90,000 TPA) and Change in Product Mix of Chloromethanes and HFC134a At Village & P.O.-Jhiwana, Tehsil-Tijara, District-Alwar (Rajasthan)
Final EIA / EMP Report
Figure 7.2 PHOTOGRAPHS SHOWING FIRE HYDRANT SYSTEM & FIRE EXTINGUISHERS
Proposed expansion of Multi-Purpose Plant/Fluorospeciality Plant (3000 TPA to 6000 TPA); Installation of new generation Refrigerants & Refrigerant
Blends Plant (90,000 TPA) and Change in Product Mix of Chloromethanes and HFC134a At Village & P.O.-Jhiwana, Tehsil-Tijara, District-Alwar (Rajasthan)
Final EIA / EMP Report
7.2.4 EHS Management at CB Unit of M/S SRF Limited
� With TQM as its guiding philosophy, Bhiwadi site is improving its organizational effectiveness
and changing the fundamental way in which it looks at things. Bhiwadi site is also working
towards developing and improving managerial, technical & marketing skills of its people.
� Bhiwadi site has regional marketing offices at Mumbai, Chennai, Kolkata and New Delhi with
its Central Marketing Office (CMO) at Guragon.
� An Environmental, Occupational Health and Safety Management system cell exists headed
by AVP (EHS) which monitors the legal compliance and the environmental parameters in the
plant premises.
� There exists a sophisticated laboratory equipped with state of the art equipment such as Gas
Chromatographs, Spectrophotometers, Stack monitor, High Volume samplers, BOD and COD
Analyzers, Ionometers, pH meter etc. for monitoring various environmental par
� There is a well equipped occupational health center with round the clock trained first aider.
There is an ambulance available with oxygen facility.
� The effluents from various plants are analyzed for the constituents. At ETP, the effluents are
treated and part of the treated water is recycled to the plant for scrubbing of acid emissions,
if any. Rest of the treated water is used for horticulture activity.
� The gaseous emissions from the plant are scrubbed using water as a scrubbing media and
some of the resultant dilute acid effluent is sent back to the plant. Balance is treated at the
effluent treatment plant, where it is converted into useful product & reuse.
� The Cell checks and prevents the unsafe practice and condition in the plant areas through
daily, weekly, monthly & Quarterly audit of the plant. It ensures the procurement of
appropriate quality of PPEs and its use. It identifies the EHS related training.
� This Cell monitors the implementation and compliance to applicable EHS legislations. It
conducts investigation of accidents, Near Miss & Non-Conformance and suggests corrective
and preventive measures.
� It coordinates with timely conduct of EHS Committee meetings.
� At Bhiwadi site there are three tier EHS committees to discuss and resolve safety &
environment related problems / issues.
� There are 7 nos. Area EHS Committees practically covering all plant areas / activities.
� There is Statutory EHS Committee to discuss/ monitor statutory related issues.
� There is Apex EHS Committee Management Review Committee) to review the Safety
Performance of all committees as well as overall safety performance of plant.
� SRF Bhiwadi site organizes Mock drills once in a quarter to check the preparedness, based on
On-site Emergency Plan.
� At the time of joining every factory based regular employee and Contract worker is required
to undergo compulsory safety training. Refresher Safety training is organized at regular
basis. In addition to this need based training are also organized.
Proposed expansion of Multi-Purpose Plant/Fluorospeciality Plant (3000 TPA to 6000 TPA); Installation of new generation Refrigerants & Refrigerant
Blends Plant (90,000 TPA) and Change in Product Mix of Chloromethanes and HFC134a At Village & P.O.-Jhiwana, Tehsil-Tijara, District-Alwar (Rajasthan)
Final EIA / EMP Report
� SRF Bhiwadi site also organizes EHS Promotional activities on the eve of National Safety Day,
Fire safety day & World Environment day etc. SRF is committed for a cleaner, greener & safer
environment and continual improvements are carried out in various areas.
� CB Unit is proving its organizational effectiveness and changing the fundamental way in
which it looks at things. CB is also working towards developing and improving managerial,
technical & marketing skills of its people to compete successfully.
7.2.5 On Site Emergency
An emergency which may cause serious injuries, loss of life, extensive damage to property or
environment or serious disruption inside the plant, or the events that are commonly having serious
implications like major fire hazards, causing serious burns to personnel resulting in collapse or
structures or release or toxic substances in the environment.
BASIC OBJECTIVES OF EMERGENCY PREPAREDNESS PLAN
1. To spell out overall action plan for effective mitigation of any emergency.
2. Reduce risk to human health & life both within the works boundary and outside.
3. Minimize damage to property both within and outside the boundary
4. Liaison effectively with the Government Authorities/ Public/ Press to avoid panic situation
and public disorder.
5. To protect the environment
The overall objective of the plan is:
To localize the emergency and if possible eliminate it
Emergency plan covers following:
1. Assignment of specific responsibilities to all categories of personnel.
2. Effective communication of the nature of emergency to authorities within the organization.
3. Contain & control the emergency
4. Rescue and treatment of the affected person (s)
5. Safeguard people in and outside the works.
6. Institutionalization of works emergency action.
7. Maintenance of orderly public relation. Provide information to media & government
agencies.
8. Identify causalities notify their relatives and render necessary help to them.
9. Termination of Emergency.
10. Rehabilitate area affected
11. Appraisal of Local Hospitals/Nursing Homes/Doctors on specific emergency treatment
required for persons affected, relevant to SRF.
12. Preserve record/ equipment for subsequent enquiry.
Proposed expansion of Multi-Purpose Plant/Fluorospeciality Plant (3000 TPA to 6000 TPA); Installation of new generation Refrigerants & Refrigerant
Blends Plant (90,000 TPA) and Change in Product Mix of Chloromethanes and HFC134a At Village & P.O.-Jhiwana, Tehsil-Tijara, District-Alwar (Rajasthan)
Final EIA / EMP Report
EFFECTIVENESS OF EMERGENCY RESPONSE PLAN:
The following essential things should be taken care-off for the effective implementation of the
Emergency Preparedness Plan.
1. Periodic review and Updating of the plan.
2. Periodic rehearsal of the plan by way of Mock Drills.
3. Review and the strengthening of the Resources needed.
4. Training of the site personnel in handling emergency equipment like the use of various Fire-
Fighting Equipments, Use of Chemical suits with BA sets.
5. Rescue and treatment of the affected person (s)
6. Safeguard people in and outside the works.
7. Maintenance of orderly public relation. Provide information to media & government
agencies.
8. Identify causalities notify their relatives and render necessary help to them.
9. Termination of Emergency.
10. Rehabilitate area affected
11. Appraisal of Local Hospitals/Nursing Homes/Doctors on specific emergency treatment
required for persons affected, relevant to SRF.
12. Preserve record/ equipment for subsequent enquiry.
The Onsite Emergency Plan is divided in 3 Parts:
� Pre Emergency Activities
� Activities During Emergency
� Post Emergency Activities
The onsite emergency / Disaster control plan out lays the detailed sequence of steps to be followed
by plant personnel in case such an eventuality occurs in chemical Business of SRF Limited either in
day or night time due to collapse of buildings/structures, leakage or fire of any hazardous chemical,
viz. leakage of CI2, AHF, HCl, H2S04, fire in Methanol tank etc. It details out of the management
system that would work at the time and defines the location, responsibilities and step by step
studies of Emergency Officers. It also forms the basis of Mock-Drills to be carried out at least once a
quarter to prepare and improve upon the state of preparedness to tackle any emergency as well as
update the onsite Emergency Plan as when necessary.
The onsite emergency / Disaster Control Plan will be reviewed at least once in a year.
7.2.5.1 EMERGENCY CONTROL CENTRE
The fundamental need of a Emergency Plan is to establish two control centers, one at the affected
site (Incident Control Centre) and the other one reasonably away from the affected site
(Emergency Control Centre).
There are two Emergency Control Centres decided on the basis of prevailing wind direction.
1. At Main Gate ( New office of Security Head )
2. At HFC Control Room
Proposed expansion of Multi-Purpose Plant/Fluorospeciality Plant (3000 TPA to 6000 TPA); Installation of new generation Refrigerants & Refrigerant
Blends Plant (90,000 TPA) and Change in Product Mix of Chloromethanes and HFC134a At Village & P.O.-Jhiwana, Tehsil-Tijara, District-Alwar (Rajasthan)
Final EIA / EMP Report
7.2.5.1.1 UTILIZATION OF EMERGENCY CONTROL CENTER (ECC)
This centre is utilized for receiving and assessing information and approval.
This is headed by Chief Co-ordinator along with Admin, Co-ordinator & Safety co-ordinator. This
centre is equipped with:-
� Plan of the factory Layout
� Internal/ External Telephone Nos.
� Walkie – Talkie
� Emergency Phone with list of phone nos.( hot line)
� Site-Master Plan
� List of important persons at site, head office, and Govt. authorities outside along with their
names and telephone numbers.
� List of equipment / PPEs/ other facilities available at ECC
� A copy of On Site Emergency plan
� Jeep with PA system (at ECC-1)
� MSDS
� Fire Extinguishers
� Fire Fighting Accessories
� List of First Aiders
� List of Emergency Response Team
� Fire Proximity Suit (1 No.) at each ECC
� Self contained breathing apparatus (2 Nos.)
� Chemical Suit (1 No.) at each ECC
7.2.5.1.2 Incident Control Centre
Location of Incident control centre/ rooms:
Five Nos. control rooms provided with sizes:
� CMS Control Room - First Floor, Size -12 Meter x 11.5 Meter
� RG/HF Control Room - First Floor, Size - 12 Meter x 6.5 Meter
� CPP Control Room -First Floor, Size- 9.0 Meter X 7.5 Meter
� HFC-134a Control Room-First Floor, Size 6.0 Meter 15 Meter
� SCB -P2 Control Room, Ground Floor, Size- 7.0 Meter X 6.0 Meter
Locations of the Control rooms are absolutely safe and properly located to have a better
operational control of the plant, even in emergency situation.
Incident Control rooms have been provided with:
� Internal/ External Telephone Nos.,
� Plan of the Area
� STD phones
� Emergency Phone with list of phone nos.( hot line)
� Walkie -Talkies
Proposed expansion of Multi-Purpose Plant/Fluorospeciality Plant (3000 TPA to 6000 TPA); Installation of new generation Refrigerants & Refrigerant
Blends Plant (90,000 TPA) and Change in Product Mix of Chloromethanes and HFC134a At Village & P.O.-Jhiwana, Tehsil-Tijara, District-Alwar (Rajasthan)
Final EIA / EMP Report
� PA system and Emergency Siren switches
� Copy of On-Site Emergency Plan
� MSDS
� List of equipment / PPEs/ other facilities available at ECC.
� Fire extinguishers, Fire Hose, Nozzles, Fire Box Key Self Contained breathing apparatus (2
Nos.)
� Chemical Suits (2 Nos.)
� Air line breathing apparatus in RG/HF Plant / CMS/HFC-134a/P2/P6/P10 Control Room is
available. The Air is supplied through a compressor installed near Engineering stores and at
HFC compressor house . The line is kept pressurised. However in case of emergency the
breathing air will only be used after considering & ensuring the wind direction & possible
contamination. Depending on the wind direction utility JE will ensure operation of
compressor for contamination free supply of air.
There is no hot line provided directly with District Magistrate / Police Control room / Fire
brigade / Emergency ward of hospital, etc. However, they can be communicated immediately
through STD lines. Non-stop power supply (UPS) has been provided in all the Control rooms.
Emergency lights are also available in control room and critical plant floors. Meteorological
information is available in Laboratory.
Four nos. Assembly points are located at four different directions.
1. Lawn in front of Management Block
2. Lawn near HFC-134a Plant
3. Lawn in front of R & D
4. Lawn near new empty drum godown ( SCB area)
Boards have been displayed at proper site to indicate the Assembly points.
Roll call/ Head count is done at Assembly point (during emergency).
7.2.5.1.3 Communication System
1. Internal & External Telephones
2. Speakers for announcement
3. Mobile Phones
4. Walkie-Talkie
5. Hot Lines/ Emergency Telephones
Internal & External Telephones
Internal & external phones are available in all plant Control Rooms, offices and department. List of
telephone Nos. is as per Telephone List.
Speakers for Announcement
By dialing "100" from the phone, announcement can be made from phone. This announcement will
be audible through various loudspeakers installed at stretegic locations inside the premises. For
announcement in limited area (Restricted to a particular plant only) Five different Telephone Nos.
are provided i.e. for RG-HF, CMS, HFC-134a, CPP & SCB area.
Proposed expansion of Multi-Purpose Plant/Fluorospeciality Plant (3000 TPA to 6000 TPA); Installation of new generation Refrigerants & Refrigerant
Blends Plant (90,000 TPA) and Change in Product Mix of Chloromethanes and HFC134a At Village & P.O.-Jhiwana, Tehsil-Tijara, District-Alwar (Rajasthan)
Final EIA / EMP Report
Mobile phones
Mobile phones are provided to various key employees in the organisation. List of Mobile no. is
available in ECC and Security office. These employees are available 24 hours on Mobile phone & can
be contacted anytime. "
Walkie-Talkie
Walkie Talkie sets are available in all Control Rooms. Person on field duty carries Walkie Talkie. He
can contact Control room immediately for any communication related to incident/ emergency.
"Hot lines/ Emergency phones
Hot lines/ Emergency phones are provided in internal telephones for un-interrupted / direct contact
from one Control Room to another Control Room, Chlorine area, Elect Dept & Security office."
TABLE 7.1
List Internal / External Communication Equipment
ITEM Total Nos.
Location Remarks
Internal Telephones 196 All Departments, offices, Control Room
Complete list is available with Electrical Deptt.
Hot Lines/ Emergency Phone
9 Plant Control Rooms, Cl2, electrical & Security
Complete list is available with Electrical Deptt. & C/R
Speakers for Announcement
70 Control Rooms, offices & Plant Complete list is available with Electrical Deptt.
Mobile Phones >60 Individual Complete list is available with Electrical
Deptt.
Proposed expansion of Multi-Purpose Plant/Fluorospeciality Plant (3000 TPA to 6000 TPA); Installation of new generation Refrigerants & Refrigerant
Blends Plant (90,000 TPA) and Change in Product Mix of Chloromethanes and HFC134a At Village & P.O.-Jhiwana, Tehsil-Tijara, District-Alwar (Rajasthan)
Final EIA / EMP Report
SIREN for Emergency
To declare ON-Site Emergency, Siren is provided in different Plant/ departments. Siren can be
blown from the Control Rooms and Security offices. Green Colour switches are provided and shall
be used by pressing according to Siren Codes.
SIREN Code
Declaration of the Emergency: 10 Second On -> 5 Second off -> repeat the same Three times.
Declaration of all Clear: A long Hooter for 60 Seconds
7.2.5.2 ALERTS LEVEL
On the basis of potential consequence and area affected the Three Alerts levels are envisaged
1. Level-1
2. Alert Level-2
3. Alert Level-3
ALERT Level-1
If the emergency is confined to the Same Plant/ Section and it is not affecting the other Plants and
departments in the vicinity the Alert Level would be ALERT level-1
ALERT Level-2
If the Emergency is such that it is going to affect the neighboring Plant in the vicinity the Level of
the emergency would be ALERT Level-2
ALERT Level-3
If the emergency is having potential to affect the periphery and can go beyond the boundaries of
Factory then it is ALERT Level-3 emergency.
7.2.5.2.1 Criteria for Proclaiming Major Emergency/Deciding the ALERT Levels
A major emergency situation can occur in the event of:
a) Fire:
Fire can take place inside the plant/ various departments / Stores/ Paints, solvents and Oil
Storage yards offices and other areas inside the site.
b) Explosion:
Explosion followed by fire or fire followed by explosion. These could take place inside the
plant/ Storage yards & Stores.
c & d) Release of Toxic/ corrosive Gas or Bulk spillage of Chemicals:
The released of toxic/corrosive gas/ chemicals can create a major emergency situation in
view of the quantities stored, the procedure outlined to handle the emergency situation is to
be followed with respect to:
• Evacuation and assembly of personnel to a safe place.
• Taking appropriate steps for bringing the situation under control.
Proposed expansion of Multi-Purpose Plant/Fluorospeciality Plant (3000 TPA to 6000 TPA); Installation of new generation Refrigerants & Refrigerant
Blends Plant (90,000 TPA) and Change in Product Mix of Chloromethanes and HFC134a At Village & P.O.-Jhiwana, Tehsil-Tijara, District-Alwar (Rajasthan)
Final EIA / EMP Report
7.2.5.2.2 Alert Level Decision
Table – 7.2
Alert Level
Shifts LEVEl-1 LEVEL-2 LEVEL-3
A-Shift Shift Incharge of the
respective Plant
Plant Manager Technical Coordinator
B & C Shift Shift Incharge of the respective Plant
Shift Incharge of the respective Plant
Shift Incharge of the respective Plant
Sunday & holiday Shift Incharge of the respective Plant
Shift Incharge of the respective Plant
Shift Incharge of the respective Plant
TABLE 7.3
Actions in Alerts Level
ALERT Levels Level-1 Level-2 Level-3
Actions Shift incharge should visit the site & start action to isolate &
mitigate.
Shift incharge should start assessment, isolation & mitigation & then inform Plant
manager.
Plant Manager has to inform Technical coordinator & take advice for declaration of ON-SITE
Emergency.
Communication After controlling the
emergency Shift incharge has to inform Plant
Manager
-Shift Incharge has to inform
Plant Manager. -Plant manager has to inform Technical Coordinator.
-After controlling the emergency Tech. Coordinator
has to inform Chief Coordinator.
Shift incharge has to inform Plant
Manager & Emergency organissation chart has to be followed.
Assistance Required
-Maintenanace -Security for Fire fighting/ Running of
Fire water Pump.
-Maintenance -Security for Fire Fighting/ Running of Fire pump
-ERT members -First Aid (Ambulance).
-EHS Representative
As per Emergency Organisation chart
ALARM/Siren Code
No Siren No Siren Siren Code :
"10 Second ON", "5 Second OFF"
(Three Times)
Proposed expansion of Multi-Purpose Plant/Fluorospeciality Plant (3000 TPA to 6000 TPA); Installation of new generation Refrigerants & Refrigerant
Blends Plant (90,000 TPA) and Change in Product Mix of Chloromethanes and HFC134a At Village & P.O.-Jhiwana, Tehsil-Tijara, District-Alwar (Rajasthan)
Final EIA / EMP Report
7.2.5.2.3 Steps to Be Followed in Case of Alert Level-3 Emergency (On-Site Emergency)
� After getting the information of major gas leak / fire, the control room operator will contact
the Plant Manager (Incident Controller) and will inform him about the situation. Incident
Controller then inform the Technical Coordinator (TCO).
� The TCO will quickly assess the situation and immediately inform CCO to declare Emergency.
� In case CCO & TCO both are not available, the next line Manager / Supervisor will decide and
declare the emergency, especially in the night.
� TCO will ask Shift person in Control Room /main Gate to press the Emergency Siren (10
second Press – 5 Second Release – 10 Second Press – 5 Second Release – 10 Second Press-
Release) to declare LEVEL-3 (On Site Emergency).
� After hooter, he would announce on P.A. system about the nature of Emergency and
location of Emergency. If required, he would take steps to shut down the plant.
� TCO will inform the CCO about further developments and act as per CCO’s advice.
� TCO will ask one Process J.E. & one Mech. J.E. to wear cover-all emergency safety suits (if
required) along with SCBA and go to field immediately to control the leakage as well as
rescue the victim (if any) from the place of accident.
� On hearing siren / announcement, the Fire & Rescue team and Ambulance shall reach the
concerned site immediately and contact incident Controller/ TCO for instructions.
� TCO will ask the Fire & Rescue team to send the victim (if any) to Medical Center in
ambulance.
� On hearing siren / announcement, a Security guard shall immediately rush and start the fire
water pump.
� On hearing siren / announcement, the Officers with various responsibilities as per
Organization Chart for Emergency Control, shall reach their designated places and report to
the concerned coordinators for instructions. They shall discharge their duties
� On hearing siren / announcement, all other persons present in the plant ( those who are not
playing any role in mitigation of emergency) would rush either opposite of wind direction or
right angle to the wind direction (whichever is suitable depending upon the emergency
situation i.e. spread of toxic release or fire ) and assemble at the safe “Assembly Point”.
� Further activities would proceed accordingly to the instructions of CCO, in case of
evacuation or otherwise.
� When the Emergency will be over, TCO will inform the same to CCO and after getting
consent from CCO will ask shift person / main gate to press the hooter for all clear signal
(Press the hooter for 1 minute continuous without releasing it).
� After that Incident Controller will arrange to announce on P.A. System that the Emergency is
over now & It is “ALL CLEAR.”
� If any visitor is inside the factory, it will be the responsibility of the concerned officer with
whom he will be attached, to send him at the “Assembly Point” along with a responsible
person.
� Specific emergency action is to be taken as per scenario based action plan.
Proposed expansion of Multi-Purpose Plant/Fluorospeciality Plant (3000 TPA to 6000 TPA); Installation of new generation Refrigerants & Refrigerant
Blends Plant (90,000 TPA) and Change in Product Mix of Chloromethanes and HFC134a At Village & P.O.-Jhiwana, Tehsil-Tijara, District-Alwar (Rajasthan)
Final EIA / EMP Report
Note:-
� In absence of Chief Co-ordinator, Mr. Himanshu Shukla will function as CCO.
� In absence of Admn. Co-ordinator, Mr. Lalit Pratap will function as ACO, C & LO as well as
Fire & rescue officer.
� In absence of Tech. Co-ordinator, next lower level (SS Pundir / SC Joshi / S L Bains / Hirdayesh
Kumar / Dinesh Gangawane / Rahul Gupta/ Dharam Pal Bajaj) will function as TCO
Proposed expansion of Multi-Purpose Plant/Fluorospeciality Plant (3000 TPA to 6000 TPA); Installation of new generation Refrigerants & Refrigerant
Blends Plant (90,000 TPA) and Change in Product Mix of Chloromethanes and HFC134a At Village & P.O.-Jhiwana, Tehsil-Tijara, District-Alwar (Rajasthan)
Final EIA / EMP Report
� In absence of Safety Co-ordinator, Sanjay Katiyar will function as SCO as well as SO.
� In absence of responsible persons in any shift as earmarked for Emergency Officers, the
next lower level person available/ present in shift will assume the respective functional
duties.
NOTE:
� Plant Shift Manager / Shift Incharge will remain CCO till the arrival of Mr A K Goel. Similarly
the responsibilities on all other officers get transferred as and when the respective
Deptt./Section heads arrive at site.
� In absence of responsible persons in any shift as earmarked for Emergency Officers, the
next lower level person available/ present in shift will assume the respective functional
duties.
Proposed expansion of Multi-Purpose Plant/Fluorospeciality Plant (3000 TPA to 6000 TPA); Installation of new generation Refrigerants & Refrigerant
Blends Plant (90,000 TPA) and Change in Product Mix of Chloromethanes and HFC134a At Village & P.O.-Jhiwana, Tehsil-Tijara, District-Alwar (Rajasthan)
Final EIA / EMP Report
7.2.5.2.4 Responsibilities for on Site (Level-3) Emergency Control
Chief Coordinator:-
1. Shall immediately go to Emergency Control Center and contact Technical and Administrative
Coordinators.
2. Will direct the plant from the Emergency Control Center.
3. Assess the situation and decide and initiate actions if not done already.
4. Ensure proper communication to inside & outside emergency services.
5. Take direct operational control of the plant not affected by incident.
6. Determine probable course of action and review the situation to initiate further actions
accordingly.
7. Direct shutting down of the plant & evacuating the people, if required.
8. Shall be the only authority to speak and submit report to the outside media like press,
government officials, etc. on behalf of the company.
9. Shall take assistance from Technical and Administrative Coordinators and shall consult Safety
Coordinator, if required.
10. Control rehabilitations efforts after the emergency are over.
Administrative Co-ordinator :
1. Shall immediately go to Emergency Control Center and report to Chief Coordinator for
instructions.
2. Shall coordinate the smooth functioning of Communication / Liaison Officer, First-Aid
Officer, Fire/ Accident Rescue Officer, Guard Officer and shall guide them in case of any
need.
3. Shall keep chief coordinator fully informed about the progress of activities of the Emergency
Officers under his control. Shall seek further instructions and implement them.
4. Must see that there is "NO PANIC" in and outside the factory, so that Emergency Control
can proceed without any hindrance and all the agencies concerned work in unison.
5. Ask administrative assistant to take Roll Call of all assembled at Assembly Point.
6. In consultation with chief coordinator
� Inform Police
� Inform neighboring factories
7. Communicate the incident to statutory authorities like factory Inspector, district magistrate
etc. and insurance company.
8. Communicate with Local administration to provide assistance in communication and safe
evacuation of nearby villagers.
Technical Co-ordinator:-
1. Shall immediately go to the control room of the concerned plant, take stock of the situation
from Operations Officer and incident controller, contact Chief Co-ordinator at Emergency
Control Center at the earliest and apprise him about the nature and extent of Emergency and
any need for support.
Proposed expansion of Multi-Purpose Plant/Fluorospeciality Plant (3000 TPA to 6000 TPA); Installation of new generation Refrigerants & Refrigerant
Blends Plant (90,000 TPA) and Change in Product Mix of Chloromethanes and HFC134a At Village & P.O.-Jhiwana, Tehsil-Tijara, District-Alwar (Rajasthan)
Final EIA / EMP Report
2. To assess the scale and severity of the incident
3. Shall coordinate the smooth functioning of Operations Officer, Mech. Maintenance Officer,
Utility Officer, Electrical Officer, Stores Officer, Inst. Officer. Safety/ Environment Officer and
shall give them guidance.
4. Shall keep Chief Coordinator fully informed about the progress of Emergency Control
activities under his control. Shall seek further instructions and implement them.
5. Must see that the affected plant is shut-down safely, damage is restricted from spreading,
injured persons are safely evacuated and subsequently necessary repairs are carried out at
the earliest, once the situation comes within control.
6. Shall arrange for declaring all clear after getting information from incident controller.
7. To preserve evidence that would facilitate any subsequent inquiry into the cause and
circumstances of the emergency.
Incident Controllers
1. After getting information about any untoward incident, incident controller should
immediately rush to incident site.
2. After assessing the situation contact Technical Coordinator & decide to declare On Site
(Level-3) Emergency.
3. Shall go to incident site with required PPE's and direct the mitigation team for isolation.
4. Shall provide guidance to fire fighting crew & rescue crew for effective mitigation.
5. Arrange for the search of causalities.
6. Ascertain the source, amount and extent of leakage; Assess possible hazards to human
health and the environment, both inside and outside the factory, and inform Technical
Coordinator.
7. Shall keep updating the Technical coordinator about situation at Incident site. Seek further
help required from technical coordinator.
8. After controlling the emergency he should inform Technical coordinator about all clear.
9. Arrange for decontamination of the site.
Safety Co-ordinator:
1. Shall immediately report to Chief Co-ordinator at Emergency Control Center for assistance.
2. Shall assist Chief Co-ordinator for systematic implementation of "Emergency Plan", both
strategic and logistics.
3. Shall provide safety related information to Chief Co-ordinator.
4. Shall advise Chief Coordinator as to change in location of ECC or Assembly point depending
on wind direction and extent of emergency.
5. Shall advise Chief Coordinator as an independent observer, where are the shortfalls, or
the activities which need immediate attention and support.
6. Take note of the sequence of events/ reporting/ action taken against time.
7. Assess the initiative taken by different persons, their understanding of the situation/ actions
and find out shortfalls / deviations.
Proposed expansion of Multi-Purpose Plant/Fluorospeciality Plant (3000 TPA to 6000 TPA); Installation of new generation Refrigerants & Refrigerant
Blends Plant (90,000 TPA) and Change in Product Mix of Chloromethanes and HFC134a At Village & P.O.-Jhiwana, Tehsil-Tijara, District-Alwar (Rajasthan)
Final EIA / EMP Report
Operations Officer (Shift Incharge-Process):
1. After getting information regarding any untoward incident, wear appropriate PPE's & visit
the site to assess the scale of emergency
2. Contact Incident Controller to brief about incident & take instruction/ decision for declaring
On-Site Emergency
3. Ask Panel JE/ Main Gate Security In charge to press the button for Emergency Siren (10
second Press – 5 Second Release – 10 Second Press – 5 Second Release – 10 Second Press and
then Release ) to declare Emergency. Announce Emergency (Exact location & type ) through
PA system. Also announce the wind direction & safe assembly point to be used.
4. On hearing siren all process person should leave the affected plant field area and
assemble at Control Room.
5. Ask one J.E. to wear all cover suit with SCBA.
6. Switch off A.C. of Control Room.
7. Be in touch with the Incident controller & send the J.E. ( wearing all cover suit & SCBA set) to
find out causalities ( if any) in location of accident and evacuate them immediately. Also
send one JE for isolation/ mitigation of the emergecy with all PPE's.
8. Ensure all operating personnel have come to Control room from the affected plant (through
Roll Call).
9. Take safe shut down of the plant with the help of J.E.s, and Engg. People (if required). Note
in log book the timing and sequence of events.
10. Arrange to call ERT members by announcing on PA system.
11. Ask Environment. Officer about wind direction and toxicity level in the atmosphere.
12. Ask safety officer for additional requirement of PPE, if any.
13. When the Emergency is over take clearance from Technical Coordinator to sound the hooter
"All Clear" (Press the hooter for 1 minute then release). Also announce on P.A. system that
Emergency is over now & “ALL Clear”.
Communication/Liaison Officer:
1. Rush to ECC and contact Admn. Coordinator for instructions.
2. Establish contact with all Emergency Officers on Phone for Chief Coordinator.
3. Telephone to external agencies like, Police, District Magistrate, etc. depending on nature of
Emergency and as instructed by Chief Co-ordinator.
4. Call Doctor to come to factory immediately by his own vehicle.
5. Receive reports on movement of transport and situation at Gate and inform Admn.Co-
ord./Chief Co-ordinator.
6. Arrange emergency vehicle as required by Dispensary and instruct the driver for sending the
causalities to outside Hospital.
7. Inform Chief Coord./Admn. Coord. on progress of activities being supervised by you
frequently.
8. Direct the Guard Officer on controlling traffic flow at Gate as instructed by Admn. Coord.
Proposed expansion of Multi-Purpose Plant/Fluorospeciality Plant (3000 TPA to 6000 TPA); Installation of new generation Refrigerants & Refrigerant
Blends Plant (90,000 TPA) and Change in Product Mix of Chloromethanes and HFC134a At Village & P.O.-Jhiwana, Tehsil-Tijara, District-Alwar (Rajasthan)
Final EIA / EMP Report
Fire/Accident Rescue Officer:
1. Send a Security Guard to ensure that Main Fire Water Pump is running.
2. Send a Security Guard to bring all security personnel from barrack to report at Main Gate.
Take a Roll Call.
3. Form a fire-fighting/accident rescue team.
4. Send Ambulance at incident site, if required.
5. Take additional stretcher from First-Aid Center to evacuate the affected persons.
6. Rush to the concerned Incident site along with fire and rescue team with required Safety
appliances and report to Incident controller for further instructions.
7. In case of fire involving Methanol / HSD storage tank, operate foam flooding / pouring
system.
8. Contact Admin. Coordinator, inform the status. Ask for further Instructions.
9. If situation is normal, withdraw the team.
First-Aid Officer:
1. Shall immediately contact ECC/ Admn. Coordinator for instructions. Know the nature of
accident.
2. Be available at First-Aid Center. Keep mediacl appliances/ medicines ready.
3. Give First-Aid to Casualties brought. Take help from avaialble first-aiders at site.
4. Shall take instruction from medical officer on phone till arriving factory.
5. Inform communication officer about requirement of vehicle to send the casualties to
outside hospitals for further treatment, if required.
6. Maintain record - Names of persons injured, nature and location of injury, nature of first-aid
given, etc.
7. Help Communication officer in transportation of casualties. Send casualties with an
information slip having informing regarding nature of accident special antidotes (if any)/
already given/ to be used, any other precautions to be taken to treat the persons in hospital.
Guard Officer/ Main gate management:
1. Rush to ECC and report to Admn. Co-ordinator for instructions.
2. Be available at Main Gate and take the control of all vehicles available at Gate in your hand.
Instruct the drivers to :
a) Remain at the vehicle,
b) Carry out instruction given by respective guard officer.
3. Stop entry of vehicle inside factory.
4. Direct flow of traffic from inside the plant to outside the Gate, as per instructions from
Communication Officer.
5. Restrict unauthorized persons so that they should not go near the emergency area with the
help of additional Security Guards who have arrived at Main Gate from barracks.
6. Ensure all contractors’ labors and casual labors, visitors are out of the plant and gone to safe
Assembly point.
Proposed expansion of Multi-Purpose Plant/Fluorospeciality Plant (3000 TPA to 6000 TPA); Installation of new generation Refrigerants & Refrigerant
Blends Plant (90,000 TPA) and Change in Product Mix of Chloromethanes and HFC134a At Village & P.O.-Jhiwana, Tehsil-Tijara, District-Alwar (Rajasthan)
Final EIA / EMP Report
Mech. Maint., Utility & Inst. JE/Officers:
1. Send one Utility Technician to Fire Water pump house to start and maintain main Fire
Hydrant Pump in running condition. He will also be monitored level of the fire hydrant
reservoir tank.
2. Rush to control room and report to Tech. Co-ordinator for instructions.
3. Ascertain that all Maintenance personnel have evacuated the affected site. Take a Roll Call.
4. Help Tech. Co-ordinator to perform emergency maintenance. if any, in co-ordination with
Operations Officer.
5. Arrange for auxiliary equipment, if required.
6. Assist Fire-Rescue Crew, along with technicians, as directed by TCO, if required.
7. Shift J.E. will decide the person who will stay at Control room and others to assemble at
Assembly Point.
Stores Officer/PPE management
1. On hearing Siren, report to Administration Coordinator for instructions.
2. Be ready to supply any additional requirement of PPE / Safety gears, as informed by
Communication Officer, from stores.
Electrical Officers:
1. Shall rush to control room and report to Technical Co-ordinator for instructions.
2. Take instruction from Technical coordinator for isolation of Electrical supply for certain area
if required.
3. Ascertain that all Elec. personnel of the affected plant have evacuated from the accident site.
4. Assist Fire & Rescue Crew, along with technicians, as directed by TCO, if required.
5. Ask one JE to ensure uninterrupted electrical supply to Fire fighting pumps.
6. Shift J.E. will decide the person who will stay at Control room and others to assemble at
Assembly Point.
Environment Officer:
1. Rush to Control Room and report to Tech. Co-ordinator for instructions.
2. Instruct one chemist to monitor wind direction and speed. Report same to technical co-
ordinator & safety co-ordinator as well.
3. Instruct one chemist to monitor gas concentration in atmosphere (preferably at assembly
points) and other places as suggested by Tech. co-ordinator / Safety Co-ordinator and report
the same to Safety as well as Tech. Coordinator.
4. On hearing Siren, all other chemists should assemble at Assembly point.
5. Shall arrange to take a Roll Call of the QA people.
CPP Officer
1. Remain at Control Room
2. See the wind direction
3. Coordinate with Chief coordinator
Proposed expansion of Multi-Purpose Plant/Fluorospeciality Plant (3000 TPA to 6000 TPA); Installation of new generation Refrigerants & Refrigerant
Blends Plant (90,000 TPA) and Change in Product Mix of Chloromethanes and HFC134a At Village & P.O.-Jhiwana, Tehsil-Tijara, District-Alwar (Rajasthan)
Final EIA / EMP Report
4. If wind direction is towards CPP, ask only essential person to stay at control Room & rest to
go to suitable assembly point.
5. Get ready for Emergency Shut Down
6. If chances of toxic gas coming towards Control Room Ask operating person to wear SCBA
7. Wait for instruction from CCO & brief him about the situation
8. After All clear, restore the plant
Safety Officer
1. Rush immediately to Control Room and report to Technical Co-ordinator.
2. Help Operation J.E. to wear Safety suit with SCBA.
3. Keep open all safety cup boards.
4. One Safety Officer should go to incident site with required PPE's & assist incident controller.
5. Help the staff in replacement of safety equipment, if required, or get more PPE from Stores
Officer.
6. Watch wind / gas leak profile and advice Tech. Co-ordinator accordingly.
7. Shall note the sequence of events and time in a pad for analysis.
8. Assist TCO in safety related matters.
Contractor/Casual Laborers:
1. Contractor of the affected plant would immediately ask all his laborers to leave the plant
and go to the Assembly Point. Similarly, Guard Officer would ensure all casual workers
are out of the affected plant and have gone to Assembly Point.
2. Take a Roll Call and ensure all contract worker have come out of the plant.
3. Act as per instructions from Admin Co-ordinator.
Visitors
1. All related officers are required to direct/ help concerned visitor to reach safe assembly
point.
2. Visitors are required to remain at Assembly point till further instruction/ all clear Siren.
7.2.5.2.5 Relay Communication for Alert Level-3 (in case of On-Site Emergency)
In case of On Site emergency it is not possible for the incident controller to tackle the emergency &
simultaneously communicate the emergency to higher-ups. To facilitate Incident Controller
following relay communication shall be followed.
Proposed expansion of Multi-Purpose Plant/Fluorospeciality Plant (3000 TPA to 6000 TPA); Installation of new generation Refrigerants & Refrigerant
Blends Plant (90,000 TPA) and Change in Product Mix of Chloromethanes and HFC134a At Village & P.O.-Jhiwana, Tehsil-Tijara, District-Alwar (Rajasthan)
Final EIA / EMP Report
Proposed expansion of Multi-Purpose Plant/Fluorospeciality Plant (3000 TPA to 6000 TPA); Installation of new generation Refrigerants & Refrigerant Blends Plant (90,000 TPA) and Change in Product Mix of Chloromethanes and
HFC134a At Village & P.O.-Jhiwana, Tehsil-Tijara, District-Alwar (Rajasthan)
Final EIA / EMP Report
TABLE 7.4
List of Communication Numbers Bhiwadi Site
NAME TEL
NO.
MOBILE NAME TEL
NO.
MOBILE NAME TEL
NO.
MOBILE NAME TEL
NO.
MOBILE
EMERGENCY HOT LINE AND PA NOS R22/HF INSTRUMENTATION R&D
PA-Common 100/4
00
Spare 190 Mr.S.S.Sharma 260 9910043656 Spare 340
PA-R22/HF 101 Mr.S.S.Pundir 191 8003290532 Mr.Asai Thambi 261 9799492498 Mr. Bhupinder
Singh Rana
341
PA-CMS 102 Spare 192 Mr.Bacchu Singh 262 9799492698 Spare 342
PA-CPP 700 Spare 193 JE- Instrument-
R134a
263 Mr.Rajsekaran 343 981820091
1
PA-R134a 600 Mr.A.K.Singh 194 9929712328 JE- Instrument-
SCB
264 8003090265 Mr.Kapil Kumar 344 981012790
8
PA-SCB 105 Mr.K.Singhal 195 9929712318 Instrumentation
Lab
265 8003090261 Synthetic Lab-3 345
HOT LINE-M.Gate
112 R22 Control Room
196 512552 8003090419/20/80
03593830
Instrument Lab- SCB
266 Mr.RP Balaji 346 8003090856
HOT LINE-R22/HF
113 HF Control Room
197 Walki talki 267 Mr.Surender Dhingra
347 9810662293
HOT LINE-CMS 114 Spar Control Room
198 Instrument W/S 268 Dr.Niharika Singh
348 9928497138
HOT LINE-R134a 115 ATF Control
Room
199 SALES & FILLING Synthetic Lab-2 349
HOT LINE-CPP 116 DHF Control
Room
200 Mr.Pratap Singh 270 9818006663 Mr.Jose George 350 99100746
64
HOT LINE-SCB 117 ETP Plant 202 Mr.R.K.Thapliyal 271 9680302277 Mr.H.P Gupta 351 80030908
57
HOT LINE-ELECT-FCB
118 Old MTF 203 Mr.K. Srivastava 272 R&D Plant 352
HOT LINE-P-6 119 R22 Filling 204 8003394711 Filling Station
Mr.S.K.Dixit 273 R&D Center (Pantry)
353
HOT LINE- CL2 120 Jug Filling 205 Mr.Bhagwan Das 274 Synthetic Lab-1 354
Proposed expansion of Multi-Purpose Plant/Fluorospeciality Plant (3000 TPA to 6000 TPA); Installation of new generation Refrigerants & Refrigerant Blends Plant (90,000 TPA) and Change in Product Mix of Chloromethanes and
HFC134a At Village & P.O.-Jhiwana, Tehsil-Tijara, District-Alwar (Rajasthan)
Final EIA / EMP Report
NAME TEL NO.
MOBILE NAME TEL NO.
MOBILE NAME TEL NO.
MOBILE NAME TEL NO.
MOBILE
EPBAX-OPERATOR
9 Drum Filling 206 Spare 275 Conference Room
355
ADM BLOCK Tonner Filling 207 Mr.S.K.Gupta 276 9829669894 Mr.Manoj Kumar
356
Mr.Prashant
Yadav
130 T.O.Plant 208 Mr.Suresh
Kumar
277 9929597584 High-pressure
Lab
357
Mr.Rajeev
Marwah
131 9810747
954
CMS TECHNICAL SERVICES Mr.Man Singh 358 992925557
7
Mr.Neeraj Chandna
132 9818200914
Mr.S.C.Joshi 210 9958080275 Mr.Himanshu Shukla
280 9829349994 Mr.Kapil Sharma
359 9910027793
Mr.Manoj Mishra
133 9810742832
Mr.R.Bhatnagar 211 Mr.Anil Ojha 281 Analytical Lab 360
Mr.Rajesh Trpathi
134 9818200917
CMS Control Room
212/213
519108 8003090417/18
Mr.M.Gundal 282 Spare 361
HOW Conf. Room
136 CMS Pantry 214 Mr.Siddharth Bhawal
283 8003092132 R134a R&D Maint.
362 9829629910
Pantry 138 CL2 Unloding 215 Mr. Mukesh Dixit 284 9680495222 R134a R&D LAB 363
CEO Conf. Room
139 CL2 C. ROOM 216 IT System 285 9928073912 Dr.Chandresh Soni
364 8003090858
Mr.Rohit Srivastava
141 9950206502
MTF 217 P.Conf. Room 286 R134a
PERSONAL& HR MECHANICAL & UTILITY Mr.Krishan
Bahadur
288 Mr. L S Bains 480
Mr.Rajbir Singh 150 8826288
933
Mr.Amit Pandey 220 9971091404 Pantry 289 Mr.T.K.Barik 481 88900905
22
Mr.S.Khandelwa
l
151 9829349
993
Mr.Hari Om
Singh
221 8003091650 QA LAB Mr.Abhishek/Mr
. SKManna
482
Mr.Rahul Parasar
152 8003090195
Mr.Pankaj Garg 222 8003093945 Mr.P.Varshney 300 9950259643 Mr.Susheel 483
Mr.A.K.Gomes 153 Mr.S.Karmakar 223 8003093028 Mr.S.C.Tomer 301 9799396150 Sub-Station 484
Mr.S.K.Singh 154 9799296 Mr.Sandeep 224 8003091649 Spare 302 Control Room 485/4 512145
Proposed expansion of Multi-Purpose Plant/Fluorospeciality Plant (3000 TPA to 6000 TPA); Installation of new generation Refrigerants & Refrigerant Blends Plant (90,000 TPA) and Change in Product Mix of Chloromethanes and
HFC134a At Village & P.O.-Jhiwana, Tehsil-Tijara, District-Alwar (Rajasthan)
Final EIA / EMP Report
NAME TEL NO.
MOBILE NAME TEL NO.
MOBILE NAME TEL NO.
MOBILE NAME TEL NO.
MOBILE
530 Dalal 86 8003390136/37
Mr. Mumtaz Masood
155 8003094036
Mr.Gaurav Jaiswal
225 8003593670 Wet Lab 303 UTILITY 487 8003090365
Ms.Shipra
Rathore
156 8003094
483
Mr. Ravindra
Yadav
226 Chemical Lab 304 Mr.M.K.Sharma 488
Canteen 158 JE- Mech R22/HF 227 9799879729 QA Lab 305 QA Lab Cabin 489
ADMINISTRATION JE- Mech R134a 228 8003090867 Mr. Amitosh Singh
306 8890090526 HOG 490
Mr.Lalit Pratap 160 8003091
667
JE- Mech SCB 229 9829849910 SCB Conference
Room
491
Mr.Sanjay Sain 161 8003090
634
Mech W/S
R22/HF
230 Mr.A.K.Goyal 310 9829409576 Mr. Ratnesh
Kesari
492 957191299
9
Mr.Joy Thomas 162 Mech W/S CMS 231 Mr.S.S.Sharma 311 9928345082
Main gate 163 Tool Room 232 Mr.Rai singh 312 9001098645 CPP
Main gate 164 8003090635
Mr.D.N.Gupta 233 9001792691 Mr.P.N.Goyal 313 8003092133 Spare 401
Material Gate 165 9829349990
Utility R22/HF 235 9799879731 Control Room 314/315
519166 8003390135
Mr.Rahul Gupta 402 8003090356
Casual Gate 166 Utility R22/HF 235 9799879731 JE-Process 316 Mr.Ganesh Padole
403 8003091248
Weigh Bridge 168 Utility CMS 236 Dinesh
Gangawane
328 8003951118 Spare 404
SARD 169 Boiler House 237 Utility-HOG 318 8003390131 CPP Mech
W/Shop
405
Dr.Anil Agarwal 170 9414366
495
Mr. R.C.Sharma 238 RM Store 319 Control Room 406/4
07
98293384
85
Time Office 171 Mr.Sudhir Baranwal
239 9001297163 ETP 320 Boiler Fire 408
Medical Center-OPD
172 Mr.Ayush Bhardwaj
326 8003090233 Conference Room
321 Boiler House 409
Proposed expansion of Multi-Purpose Plant/Fluorospeciality Plant (3000 TPA to 6000 TPA); Installation of new generation Refrigerants & Refrigerant Blends Plant (90,000 TPA) and Change in Product Mix of Chloromethanes and
HFC134a At Village & P.O.-Jhiwana, Tehsil-Tijara, District-Alwar (Rajasthan)
Final EIA / EMP Report
NAME TEL NO.
MOBILE NAME TEL NO.
MOBILE NAME TEL NO.
MOBILE NAME TEL NO.
MOBILE
STORE ELECTRICAL Pantry 322 D.M.W House 410 8003094035
Mr.J.K.Biswas 180 9818007044
Mr.A.Nagori 240 9829223494 Filling station 323 Sub-Station 411
Mr.Satish Arora 181 97840115
71
Mr.Saurabh
Chauhan
241 8003593669 FG Godown 324 Shift Incharge 412 80030940
31
Mr.Rajesh Singh 182 97840115
79
Mr.A.K.Singh 242 8003390133 Mech.W/S 325 CPP Mech 413 80030940
34
Mr.N.K.Mathur 183 Mr.Rajesh Yadav
243 9799879727 P5 Plant JE 8003993336 Conference Room
414
Mr.C.P.Adlakha 184 9818200912
JE-Electrical -FCB
244 9799879734 Mr .Hirdesh Kumar
370 9784003630 C.H.P.Operator 416
Mr.C.Nair/Mr.Dinesh
185 8003494699
SCB DG House 430 P6 & P9 Pilot Plant
Mr.Tushar 186 SCB MCC ROOM 245 Mr.Satrughan Gupta
421 8003092336 Mr.Nilesh Shah 330 8003090629
Mr.A.Sharma 187 8003494
688
JE-Electrical -
SCB
246 9829829910 P6-JE
Mechanical
422 8003092134 Mr.Ajay
Bhardwaj
331 97993967
99
CIVIL JE-Electrical -
CPP
247 8003094033 Control room 423 9001298949 Spare 331
Mr.Pankaj Sharma
252 9784596384
Mr.R.K.Bisaria 248 9812183826 Control room 424 Spare 332
ACCOUNT Motor Room 249 Spare 425 Sub-Station/Mech
333
Mr.Chander Sain 255 800309095
DG House-FCB 250 9829534466 Spare 426 Spare 334
Mr.Tarun Kumar 256 DG UPS House (R134a)
251 Spare 427 Mr. Dharam Pal Bajaj
335 9001895891
Motor Room (
SCB)
253 P6-JE
Mechanical
428 8003092134 Control Room 336 800309141
7
Mr.Subham-P2 8003092337
Proposed expansion of Multi-Purpose Plant/Fluorospeciality Plant (3000 TPA to 6000 TPA); Installation of new generation Refrigerants & Refrigerant Blends Plant (90,000 TPA) and Change in Product Mix of Chloromethanes and
HFC134a At Village & P.O.-Jhiwana, Tehsil-Tijara, District-Alwar (Rajasthan)
Final EIA / EMP Report
NAME TEL NO.
MOBILE NAME TEL NO.
MOBILE NAME TEL NO.
MOBILE NAME TEL NO.
MOBILE
SAFETY Mr.sarad -P3 8003294468
Spare 290 Mr. Jitendra
Silawat
429 9829145588 Mr.Pankaj
Jangra
337 99502073
57
Mr.S.Katiyar 291 9829893935
P-10 0.0Mtr/3Mtr Floor
431 Mr.Shailendra Namdeo
338 9799297056
Mr.Kunwar Pal 292 8003095828
Spare 440 8003092336 6.0Mtr/10.9Mtr Floor
432 Instrument lab 339 8003091416
Spare 293 P-10 Process 441 8003090632 12/15/18Mtr Floor 433
Mr.Neeraj Bhatnagar
294 9799497760
1st floor 442 Mech.W/S 434
QA Lab 443 Emergency Numbers
Ground Floor 444 R134a Control
Room
01493-517145 Facilities Available with
Intercom
Head Office
(Gurgoan)
0124-4354400 P10 Control
Room
445 8003090632 R22 Control
Room
01493-512552 To Lock Phone : Dial *66 PASSWORD
Factory LandLine
01493-517838,517839
2nd floor 446 CMS Control Room
01493-519108 To Un Lock Phone : Dial #66 PASSWORD
01493-512714,512715
Conference Room
447 CPP Control Room
09829338485 Auto Call Back: Flash + star(*)58
Store Fax 01493-511707 Change Room 448 SCB Control Room
01493-519166 Call Transfer: Flash + Extension No.
SCB Fax 01493-511837 MCC Room P10 449
Sales
Coordination
01493-512717 Call Pick UP:Star(*) 59 + Extension
No.
Proposed expansion of Multi-Purpose Plant/Fluorospeciality Plant (3000 TPA to 6000 TPA); Installation of new generation Refrigerants & Refrigerant
Blends Plant (90,000 TPA) and Change in Product Mix of Chloromethanes and HFC134a At Village & P.O.-Jhiwana, Tehsil-Tijara, District-Alwar (Rajasthan)
Final EIA / EMP Report
M/s. SRF Limited 29 J. M. EnviroNet Pvt. Ltd.
1 LIST OF OUTSIDE EMERGENCY SERVICES PHONE NO. :
A. FIRE STATION 01493-222700 /512101
B. POLICE STATION Bhiwadi/Tapukara) 01493-220600 /243015
C. HOSPITALS AND AMBULANCE SERVICES
C1 Rahat Hospital 01493-222242, 220395
C2 Civil Hospital 01493-221700
C3 ESIC Hospital 01493-221209
D. ELECTRICITY BOARD 01493-220806
E. RAJASTHAN POLLUTION CONTROL BOARD 01493-221435 /230437
F. FACTORY INSPECTORATE 01493-220782
G. FIRE STATION- Khushkhera 01493-298122
Mobile: 9929141136
2 LIST OF NEIGHBOURING INDUSTRIES :
ARAHAM SPINNING MILL 01493-220485, 220586
HONDA SIEL 01493- 511227
SIEGWERK 01493-243081, 84
3 RESIDENTIAL PNONE NO. OF EMERGENCY OFFICERS :
Location Name Phone/Mobile Nos. To be informed in
case of
Bhiwadi Dr. A.Aggarwal 01493 - 220395, 09829951595 Injury & / or L3
Mr.Sanjay Katiyar 09829893935 L1/L2/L3
Mr. Lalit Pratap 08003091667 L1/L2/L3
Mr. Neeraj Bhatnagar 09799497760 L1/L2/L3
Mr. Kunwar Pal 08003095828 L1/L2/L3
Mr. Anil Goyal 09829409576 L1/L2/L3 in SCB area.
Mr. S L Bains 09001598666 L1/L2/L3 in HFC area.
Mr. Sandeep Dalal 08003091649 L1/L2/L3 in SCB area.
Mr. Hari Om Singh 08003091650 L1/L2/L3 in FC area.
Mr. Rahul Gupta 8003090356 L1/L2/L3 in CPP.
Mr. DN Gupta 09001792691 L1/L2/L3 in FC area.
Mr. S S Pundir 08003290532 L1/L2/L3 in RG/HF/TO
Mr. Rajesh Bhatnagar 09829548256 L1/L2/L3 in CMS
Mr. Ankush Nagori 09829223494 L1/L2/L3
Mr. Pankaj Varshney 09950259643 L1/L2/L3
Mr. Asai Thambi 09799492498 L1/L2/L3
Mr. Hirdayesh Kumar 08003090629 L1/L2/L3 in SCB area
Mr. Dinesh Gangawane 8003951118 L1/L2/L3 in SCB area
Mr. Dharam Pal Bajaj 09001895891 L1/L2/L3 in Pilot Plant
Mr. Ajay Sharma (Store) 08003494688 L3
Mr. Prashant Yadav 09810108669 L3 ( FCB)
Mr. Anurag Jain 09818200920 L3 ( SCB)
Gurgaon Mr. Himanshu Shukla 09829349994 L1/L2/L3
Proposed expansion of Multi-Purpose Plant/Fluorospeciality Plant (3000 TPA to 6000 TPA); Installation of new generation Refrigerants & Refrigerant
Blends Plant (90,000 TPA) and Change in Product Mix of Chloromethanes and HFC134a At Village & P.O.-Jhiwana, Tehsil-Tijara, District-Alwar (Rajasthan)
Final EIA / EMP Report
M/s. SRF Limited 30 J. M. EnviroNet Pvt. Ltd.
Mr. Rajesh Tripathi 09818200917 L1/L2/L3
Mr. Manoj Mishra 09810742832 L1/L2/L3 in FC area.
Mr. Kapil Kumar 9810127908 L1/L2/L3 in R&D
Mr. Amit Pandey 9971091404 L1/L2/L3
Mr. S.S.Sharma ( Instt) 09910043656 L1/L2/L3
Mr. S.C Joshi 09958080275 L1/L2/L4 ( CMS area)
Mr. Neeraj Chandna 09818200914 L3
Mr. J.K.Biswas 09818007044 L3 & / or Stores
Mr. Rajbir Singh 08826288933 L3
Delhi Mr. Rajdeep Anand 011 - 25740564, 09810096665
L3 ( CTG)
Mr. Rajeev Marwah 09810747954 L2/L3
Other Mr. S Khandelwal 09829349993 L2/L3
Mr. Tapan Barik 08890090522 L2/L3
Head Office 0124-4354400 To inform Emerg. officers
7.2.5.2.6 Equipment having Potential for On-site Emergency
Following aspect could be the criteria for declaring emergency:
� Size of the leak/fire
� Spread of the leak ( Pr./Size/Temp./Nature)
� Man power in the plant
� Duration of the leak
� Support available in the plant
Following vessels could be considered as potential source for emergency:
RG Plant
S.
No.
Tag No. MOC Capacity (MT) Temp. (OC) Pressure
(Kg/Cm2)
1 R-22 Reactor Inconnel 3.6 62 10.5
2 Catalyst hold tank CS 6.9 60-80 5.0 - 7.0
3 Catalyst stripper reboiler CS 1 82 5
4 HF Vaporizer Inconel 0.5 110 13
5 Catalyst stripper Inconel 0.5 65 10.5
6 HF feed tank CS 8 Ambient 2
HF Plant
S. No
Tag No. MOC Capacity (MT) Temp. (OC) Pressure (Kg/Cm2)
1 Crude HF tanks CS 3.5 0-10 -100 to -150 mm WC
2 Reboiler of Ist dist. Column CS 1 70 3.0
3 Reboiler of IInd dist. Column CS 1 65 2.0
4 PSA tank A-20 3 95 -15 to -20 mm WC
Proposed expansion of Multi-Purpose Plant/Fluorospeciality Plant (3000 TPA to 6000 TPA); Installation of new generation Refrigerants & Refrigerant
Blends Plant (90,000 TPA) and Change in Product Mix of Chloromethanes and HFC134a At Village & P.O.-Jhiwana, Tehsil-Tijara, District-Alwar (Rajasthan)
Final EIA / EMP Report
M/s. SRF Limited 31 J. M. EnviroNet Pvt. Ltd.
5 HF day tanks CS 8+8+8 Ambient 2.0
6 HF main storage tanks CS 60+60+40+60 Ambient 2.0
CMS Plant
S.
No.
Tag No. MOC Capacity (MT) Temp. (OC) Pressure
(Kg/Cm2)
1 RQ 500 Monnel 15 55 14.5
2 C1 day tanks CS 9+9 Ambient 9.0
3 Chlorine bullets CS 70+70+70 15 to 20 9.0
4 RQ-603 CS(Glass
lined)
10 160 3.2
5 Chlorine tonner CS 0.9*190 Ambient 9.0
6 Methanol tank CS 170+170 Ambient +500 mm
WC
HFC_134a Plant
S. No.
Tag No. MOC Capacity (M3) Temp. (OC) Pressure (Kg/Cm2)
1 T-241 column reflux drum(V-242) CS 1.17 50 2.5
2 HF Distillation column (T-241) CS 1.0 60 2.5
3 Moisture removal column(HF)(T-
251)
PTFE lined 0.1 55 2.0
4 Reactor R101 Inconnel/ CS 18.91 275 5.0
5 Reactor R102 Inconnel/ CS 9.46 335 5.0
6 Reactor R103 Inconnel/ CS 6.46 350 5.0
7 Reactor R104 SS316L 2.8 200 1.0
8 Therminol Expansion tanks(V101) CS 4.0 275 10.0
9 Therminol Expansion tanks(V102) CS 11.55 340 12.0
10 Therminol Expansion tanks(V103) CS 4.0 350 12.0
Thermal Oxidation Plant
S. No.
Tag No. MOC Capacity (Cu Meter)
Temp. (OC) Pressure (Kg/Cm2)
1 Hydrogen Trolla MS 1700 Ambient 150 Kg/Cm2
Specialty Chemical Business
P2 to P4 Plants
1 Chlorine Tonner CS 900 Kg Amb 9.0 Kg/Cm2
2 HF tank- V2131/ V2136 SS 2.1 MT Amb 1.0 Kg/Cm2
3 Fluorination Reactor V-3132-A/B SS 2.5 M3 350 0C 17.0 Kg/Cm2
4 Flammable tanks on G. floor SS 1-2 MT Amb Atm.
5 Flammable Storage shed (Barrels) HDPE/SS/GI 200 Kg Amb Atm.
6 Br2 Vessel Glass 100 Ltrs. Amb Atm.
7 Spent H2SO4 Storage Tank V9006, V9007
MS 16 MT, 14 MT Amb Atm.
8 Crude TFA tank ( V-2151) A/B PP/FRP 2M3, 1.4 M3 Amb Atm.
P6 to P9 Plant
S. Tag No. MOC Capacity (Cu Temp. (OC) Pressure
Proposed expansion of Multi-Purpose Plant/Fluorospeciality Plant (3000 TPA to 6000 TPA); Installation of new generation Refrigerants & Refrigerant
Blends Plant (90,000 TPA) and Change in Product Mix of Chloromethanes and HFC134a At Village & P.O.-Jhiwana, Tehsil-Tijara, District-Alwar (Rajasthan)
Final EIA / EMP Report
M/s. SRF Limited 32 J. M. EnviroNet Pvt. Ltd.
No. Meter) (Kg/Cm2)
1 R-9021A ( P8 reactor) SS316L /
SS304
3.2 Max 61°C Max 0.1
2 R-9021B ( P8 reactor) SS316L /
SS304
3.2 Max 61°C Max 0.1
3 Ethanol storage Tank ( V-6096) CS 20 Ambient Max 0.1
4 ETFA storage tank (V-9112) SS316L 20 Ambient Max 0.2
5 TFEMe storage tank (V-6051) SS316L 22 Ambient Max 0.8
CREDIBLE SCENARIO FOR EMERGENCY:
PLANT : RG/HF/TO
S.N. Chemical Scenario Alert Level
1 HF Storage Tank failure 3
2 HF Pipeline Failure 2 or 3
3 HCl Storage Tank failure 3
4 HCl Pipeline Failure 2 or 3
5 H2SO4 Storage Tank failure 3
6 H2SO4 Pipeline Failure 1 or 2
7 Hydrogen Fire in Hydrogen 2 or 3
8 DHF Spillage of DHF 1
PLANT : CMS
1 Chlorine Tonner valve/ body leak 2 or 3
2 Chlorine Tonner unloading tube leak 1 or 2
3 Chlorine Bullet leak/ Failure 3
4 HCl Gas & C1 Leakage / failure of Photochlorination Reactor
2 or 3
5 HCl Gas & C1 Leakage/ failure of Hydrochlorination
Reactor
2 or 3
6 Methyl Chloride (C1) Fire in C1 storage Tank 3
7 Methanol Fire in Methanol tank 3
8 Methanol Fire in tanker during unloading 2 or 3
9 LSHS/HSD Fire in LSHS/HSD Tank 3
10 Chloromethanes Leakage/ failure of storage tanks 2 or 3
PLANT: Captive Power Plant
1 Coal /Husk File in Coal / Husk Storage 1 or 2
PLANT: SCB
1 Methanol, Fluorobenzene, Toluene Fire in Methanol, Toluene or Fluorobenzene storage tank
2 or 3
2 Bromine Br2 vessel failure 2 or 3
3 Bromine Br2 Bottle 1 or 2
4 TFA TFA storage tank failure 2 or 3
5 BN, PFBN BN/PFBN leakage from fluorination reactor
2 or 3
6 TCAC Leak in TCAC tank from pipeline 1 or 2
Proposed expansion of Multi-Purpose Plant/Fluorospeciality Plant (3000 TPA to 6000 TPA); Installation of new generation Refrigerants & Refrigerant
Blends Plant (90,000 TPA) and Change in Product Mix of Chloromethanes and HFC134a At Village & P.O.-Jhiwana, Tehsil-Tijara, District-Alwar (Rajasthan)
Final EIA / EMP Report
M/s. SRF Limited 33 J. M. EnviroNet Pvt. Ltd.
7 Toluene Fire in Toluene storage shed 1 or 2
8 Hot Oil Fire in Hot Oil 1 or 2 or 3
9 Ethyl Acetate, Fluorobenzene, Benzonitrile, Monoglyme
Fire in EA, BN, Fluorobenzene & Monoglyme storage shed
1 or 2
10 FS Product -Flammable Fire in Product storage shed 1 or 2
11 Chemical Storage Fire in Chemical storage yard 1 or 2
12 Ammonia Ammonia cylinder leakage 1 or 2
13 Ethyl Alcohal Fire in Ethyl alcohal Tank in MTF 1 or 2 or 3
14 P-61, Ethanol Fire in Tanker of Ethanol / P-61 1 or 2
PLANT: HFC -134a Plant
1 HOG tank Fire in HOG drain tanks 2 or 3
2 Ammonia Ammonia leak in compressor area 2 or 3
PLANT: R &D
1 R & D Chemicals Fire in R & D Chemicals 1 or 2
Nucleonic Sources
1 Nucleonic Gauges at CMS & RG
Plant
Radiation from the Nucleonic gauges 1
Plant : Pilot
1 Fluorine Cylinder Valve Leak 1 or 2
2 Fluorine process pipe lines leak 1 or 2
3 Fluorine system Fire 1 or 2
4 SF4 Cylinder Valve Leak 1 or 2
5 SF4 process pipe lines leak 1 or 2
7.2.5.2.7 Maximum Inventory of Substances
Plant: RG/HF/TO
Name of Chemical Scenario
HF Storage Tank Failure
HF Pipeline Failure
HCl Storage Tank Failure
HCl Pipeline Failure
H2SO4 Storage Tank Failure
H2SO4 Pipeline Failure
Hydrogen Fire in Hydrogen
Plant : CMS
Chlorine Tonner value/ body leak
Chlorine Tonner value/ body leak
Chlorine Bullet leak/ Failure
HCL Gas & C1 Leakage/Failure of photo chlorination Reactor
Methyl Chloride (C1) Fire in C1 Storage Tank
Methanol Fire in Methanol Tank
Methanol Fire in tanker during unloading
Proposed expansion of Multi-Purpose Plant/Fluorospeciality Plant (3000 TPA to 6000 TPA); Installation of new generation Refrigerants & Refrigerant
Blends Plant (90,000 TPA) and Change in Product Mix of Chloromethanes and HFC134a At Village & P.O.-Jhiwana, Tehsil-Tijara, District-Alwar (Rajasthan)
Final EIA / EMP Report
M/s. SRF Limited 34 J. M. EnviroNet Pvt. Ltd.
LSHS/HSD Fire in LSHS/HSD Tank
Chloromethanes Leakage/failure of storage tanks
Captive Power Plant
Coal File in coal storage
Fluoro Specialty Plant
Methanol, Fluorobenzene, Toluene
Fire in methanol, Toluene of Fluorobenzene Storage Tank
Bromine Br2 vessel Failure
TFA TFA Storage Tank Failure
BN, PFBN BN/PFBN leakage from fluorination reactor
HFC-134a Plant
HOG Tank Fire in HOG drain Tanks
Ammonia Ammonia leak in compressor area
7.2.5.3 Toxic Release / Spillage of Chemicals
Control Measures inside factory premises:
� All Plants are open and well ventilated.
� Personnel Protective equipment such as SCBA, Air line, Safety goggles, Full suit, Gum boot,
gloves are provided & available in each plant/ section.
� Safety Showers and eye wash fountains are provided at strategic locations.
� Four assembly points are provided where person can be assembled & evacuated if required.
� Red cordoning strips are available for isolating the affected area.
� Remove all non-required persons from the area.
� PA system is available to communicate the emergency.
� Windsocks to assess the air direction have been provided at strategic locations
� Air monitoring to measure the concentration of toxic chemical.
� MSDS of all chemical available in each Plant/ Deptt.
� Leak detectors in place.
� Level & weight monitoring in control room through DCS system.
� Header for CAS system to suck any accidental release.
� Containment dykes
� Emergency trick & transfer pump.
� Empty stand by storage tank available.
� CCTV in critical areas.
Proposed expansion of Multi-Purpose Plant/Fluorospeciality Plant (3000 TPA to 6000 TPA); Installation of new generation Refrigerants & Refrigerant
Blends Plant (90,000 TPA) and Change in Product Mix of Chloromethanes and HFC134a At Village & P.O.-Jhiwana, Tehsil-Tijara, District-Alwar (Rajasthan)
Final EIA / EMP Report
M/s. SRF Limited 35 J. M. EnviroNet Pvt. Ltd.
7.2.5.4 Fire Hazard
Control Measures inside factory premises:-
� To prevent Fire, the entire factory premises have been declared as "NO SMOKING" zone.
� No spark-producing job is being allowed inside the plant, Tank Farm area & other areas
without Hot Work Permit.
� Emergency Siren is available to warn about Fire emergency. Sound the Siren as soon as
possible after observing the fire. Notify where fire took place. The faster the reaction is, the
easier will be to stop the spread of the fire.
� No vehicle is allowed to move in front of Methanol Tank farm area without having spark
arrestor.
� All plants are covered & protected with 7-kg/ cm2 fire hydrant system.
� Fire-fighting systems installed in the factory are - Portable Fire Extinguishers, Fire hydrant
system and fixed Foam Flooding System to fight Methanol / HSD fire.
� Detailed Layout of the above systems are available in drawings office.
� Detailed Layout of the above systems are available in drawings office.
� Entire fire-fighting system (Extinguishers as well as hydrant system) is inspected/audited in a
phased manner once in a 6 week cycle and record is maintained in 4.4.7_CL-01 (for
extinguishers) and 4.4.7_CL-02 (for hydrant system).
� Once in a year Fire systems Audit is done by External Agency as per 4.4.7_CL-03 and record is
maintained in 4.4.7_F-01.
� The checking of the fixed foam flooding system is done as per 4.4.7_CL-04 under the
supervision of PM MAP (Safety) and PM MWE (Security & Admin.).
� On the Job drill is done once a week and record maintained.
� The Fire sub-process (Security & Admin.) has been given the operational responsibility for
Foam Flooding system, but process person as well as MAP (MP&U) can also operate the
system.
� Any change in the type and/or location of the Fire extinguisher/ Hydrant /Foam system will be
through MAP (Safety) and the change would be sent to drawing office through EWR for
updation.
� Head of P&A carries out monthly review of the Fire Management.
� Trained Fire fighting Security men are available in each shift.
� Four assembly points are provided where person can be assembled & evacuated if required.
� Fire escape staircase is provided in all plants.
� Trained First-Aides & mail nurse are available in each shift.
� Fire proximity suit is available and can be used if valve isolation & other jobs are required in
fire vicinity.
� In case of emergency shift In charge / JE are trained & required to evacuate / shut off the
plants in short notice. They have to follow the responsibility of Technical Coordinator.
� It is in practice to provide earthing before starting loading/ unloading of flammable
Proposed expansion of Multi-Purpose Plant/Fluorospeciality Plant (3000 TPA to 6000 TPA); Installation of new generation Refrigerants & Refrigerant
Blends Plant (90,000 TPA) and Change in Product Mix of Chloromethanes and HFC134a At Village & P.O.-Jhiwana, Tehsil-Tijara, District-Alwar (Rajasthan)
Final EIA / EMP Report
M/s. SRF Limited 36 J. M. EnviroNet Pvt. Ltd.
chemicals. This is to dissipate static charge.
� Medium velocity water sprinkler system has been provided on Methanol tank.
� After fire fighting operation the water/ foam inside the dyke wall is to be collected in
containers / drum with the help of portable pump & same should be transferred to ETP.
In case of water comes out of dyke wall or if fire takes place in tanker the water used for
firefighting will go to storm water drain. Storm water drain to be isolated and all the water
used in fire fighting shall be collected and transferred to ETP.
7.2.5.5 Safety Appliances
Type of Appliance Nos. available Location
Coverall Emergency Suit 2 RG/ HF Control Room
2 CMS Control Room
1 Cl2 Handling Area
2 FSP
1 HFC-134a
Self Contained Breathing Apparatus 2 RG/ HF Control Room
2 CMS Control Room
2 Cl2 Handling Area
2 FSP
2 HFC-134a
2 CPP
2 Main Gate/ ECC
On Line Breathing Network 4 Chlorine area
1 CMS Control Room
3 CMS Plant
1 RG/HF Control room
5 HF Plant
1 RG Plant
9 SCB Plant area
1 SCB- P2 control Room
1 SCB- P6 control Room
1 HFC Control Room
3 HFC Plant
Compressor for filling the BA Set 1 EHS Department
Chlorine Kit 2 Chlorine area
1 RG Plant
1 FSP
1 Cooling Tower
1 CPP
Safety Showers 98 All plant & floors
Detectors/Sensors
Proposed expansion of Multi-Purpose Plant/Fluorospeciality Plant (3000 TPA to 6000 TPA); Installation of new generation Refrigerants & Refrigerant
Blends Plant (90,000 TPA) and Change in Product Mix of Chloromethanes and HFC134a At Village & P.O.-Jhiwana, Tehsil-Tijara, District-Alwar (Rajasthan)
Final EIA / EMP Report
M/s. SRF Limited 37 J. M. EnviroNet Pvt. Ltd.
Chlorine 14
Methyl Chloride 12
HF 7
Smoke detectors 75
Manual Call Points 24
CCTV 6 RG-HF Plant
4 CMS
4 FSP
5 HFC-134a
2 Security Gate
2 Marerial Gate
1 Weigh Bridge
1 Casual Entry Gate
7.2.5.6 Fire Fighting & Fire Detection System
There are 60 smoke detectors and 15 manual call points are installed at various locations. These
smoke detectors sense the smoke and give signal to the emitters which are installed in the nearby
location of the sensors. These emitters transmit the signal to the panel installed at ECC-1/ Main Gate
which further gives the location no. of the detector / manual call point with an alarm. The exact
location of the detector or the manual call point from which the alarm was actuated can be
referred from the list depicted near the Main panel of ECC-1/ Main gate.
TABLE 7.5
Smoke Detector Numbers & Location
Smoke Detector No
Location Smoke Detector No
Location
1 HFC CONTROL ROOM 51 HFC ROTRAY UPS PCC
2 HFC CONTROL ROOM 52 P-10 PLANT CONTROL ROOM
3 HFC UPS ROOM 53 P-10 PLANT DCS ROOM
4 HFC BATTERY ROOM 54 P-10 MCC ROOM
5 HFC MCC ROOM 55 P-10 CABLE TRANCH
6 HFC MCC ROOM 56 P-6 PLANT CONTROL ROOM
7 HFC MCC ROOM 57 P-6 PLANT DCS ROOM
8 HFC DCS ROOM 58 P-6 PLANT MCC ROOM
9 HFC CABLE CELLER 59 P-6 PLANT UPS ROOM
10 CMS CONTROL ROOM 60 P-6 PLANT CABLE CELLER
11 CMS MCC ROOM 61 CAN FILLING STATION
12 CMS MCC ROOM 62 CAN FILLING STATION
13 CMS UPS ROOM 63 CAN FILLING STATION
14 CMS DCS ROOM 64 CAN STORAGE BOTTOM
15 CMS HT ROOM 65 CAN STORAGE BOTTOM
16 CPP MCC ROOM 66 CAN STORAGE BOTTOM
17 CPP MCC ROOM 67 CAN BOX STORAGE
Proposed expansion of Multi-Purpose Plant/Fluorospeciality Plant (3000 TPA to 6000 TPA); Installation of new generation Refrigerants & Refrigerant
Blends Plant (90,000 TPA) and Change in Product Mix of Chloromethanes and HFC134a At Village & P.O.-Jhiwana, Tehsil-Tijara, District-Alwar (Rajasthan)
Final EIA / EMP Report
M/s. SRF Limited 38 J. M. EnviroNet Pvt. Ltd.
18 CPP MCC ROOM 68 CAN BOX STORAGE
19 CPP CONTROL ROOM 69 CAN BOX STORAGE
20 CPP CONTROL ROOM 70 MEZZANINE FLOOR
21 CPP UPS ROOM 71 MEZZANINE FLOOR
22 CPP UPS ROOM 72 MEZZANINE FLOOR
23 CPP BATTERY ROOM 73 FILLING OFFICE
24 CPP CABLE CELLER 74 FILLING OFFICE
25 CPP CABLE CELLER 75 CYLINDER FILLING STATION
26 FSP MCC ROOM 76 CYLINDER FILLING STATION
27 FSP MCC ROOM 77 CYLINDER FILLING STATION
28 FSP MCC ROOM 78 CYLINDER FILLING STATION
29 FSP BATTERY ROOM 79 CYLINDER FILLING STATION
30 FSP CONTROL ROOM 80 CYLINDER FILLING STATION
31 FSP DCS ROOM 81 CYLINDER FILLING STATION
32 FSP UPS ROOM 82 CYLINDER FILLING STATION
33 FSP CABLE CELLER 83 CYLINDER FILLING STATION
34 IT ROOM 84 OLD WEIGHING BRIDGE
35 DRAWING ROOM 85 MAIN GATE
36 SUB STATION 76 CYLINDER FILLING STATION
37 SUB STATION 77 CYLINDER FILLING STATION
38 DG PCC ROOM 78 CYLINDER FILLING STATION
39 DG CABLE TRAY 79 CYLINDER FILLING STATION
40 DG CABLE TRANCH 80 CYLINDER FILLING STATION
41 SUB STATION CABLE TRANCH 81 CYLINDER FILLING STATION
42 SUB STATION CABLE TRANCH 82 CYLINDER FILLING STATION
43 RG/HF CONTROL ROOM 83 CYLINDER FILLING STATION
44 RG/HF BATTERY ROOM 84 OLD WEIGHING BRIDGE
45 RG/HF UPS ROOM 85 MAIN GATE
46 RG/HF RC FAN
47 RG/HF CABLE TRANCH
48 HFC ROTRAY DG
49 HFC ROTRAY UPS
50 HFC ROTRAY UPS
Proposed expansion of Multi-Purpose Plant/Fluorospeciality Plant (3000 TPA to 6000 TPA); Installation of new generation Refrigerants & Refrigerant
Blends Plant (90,000 TPA) and Change in Product Mix of Chloromethanes and HFC134a At Village & P.O.-Jhiwana, Tehsil-Tijara, District-Alwar (Rajasthan)
Final EIA / EMP Report
M/s. SRF Limited 39 J. M. EnviroNet Pvt. Ltd.
Location of Manual Call Points:
TABLE 7.6
Location of Manual Call Points
Zone /element name Location
0010/001 FSP MCC ROOM
0010/002 P-06BLOCK
0010/003 P-10BLOCK
0010/004 RG/HF BLOCK
0010/005 CMS BLOCK
0010/006 HFC BLOCK MCC ROOM
0010/007 HFC ROTARY UPS ROOM
0010/008 SUB STATION MCC ROOM
0010/009 SEQURITY OFFICE
0010/010 CPP MCC -ROOM
MCP-1 CAN FILLING GATE
MCP-2 CAN FILLING DISPATCH GATE
MCP-3 GFS MCC AREA
MCP-4 BACK ENTRY GATE-1
MCP-5 BACK ENTRY GATE-2
7.2.5.6.1 Fire Fighting System (Fire hydrant System)
Fire hydrant system is TAC approved with a working pressure of 7 Kg/Cm2. Jockey Pump maintains
pressure of the fire hydrant network. The fire hydrant is forming main ring in which water is
available from two sides.
7.2.5.6.2 Working of Fire hydrant System
The system operates at 7 Kg/cm2 pressure. In case of pressure drops, first jockey pumps starts at 5
Kg/cm2 pressure and maintains 7 kg/cm2 pressure. In case of any emergency when any fire hydrant
pressure drops below 5 Kg/cm2 and one Jockey pump is not able to maintain pressure, second
jockey starts at 4.5kg/cm2. First main pump starts at 4 kg/ cm2 automatically and it provides
required water for fire fighting. Water reservoir capacity is 1200 m3 which is sufficient for more
than 2 hours fire fighting. Main pump is stopped manually after ensuring the all clear.
Second main pump starts at 3 kg/cm2.
7.2.5.6.3 Power Backup
Three types of Power are available to run the Fire hydrant Pump. Turbine Generator, Diesel
Generator & State Electricity Board. In addition to this a separate Diesel pump is available as
standby & can be operated from the remote operated switch at Security Gate.
Proposed expansion of Multi-Purpose Plant/Fluorospeciality Plant (3000 TPA to 6000 TPA); Installation of new generation Refrigerants & Refrigerant
Blends Plant (90,000 TPA) and Change in Product Mix of Chloromethanes and HFC134a At Village & P.O.-Jhiwana, Tehsil-Tijara, District-Alwar (Rajasthan)
Final EIA / EMP Report
M/s. SRF Limited 40 J. M. EnviroNet Pvt. Ltd.
TABLE 7.7
Details of Fire Hydrant System
Item Availability
No. of Electrical driven main pumps 2
No. of Diesel driven Main Pumps 1
Capacity of Main Pump 1 273 M3/Hr
Capacity of Main Pump-2 273 M3/Hr
Capacity of Diesel pump 273M3/Hr
Hydrant Pressure 7-8 Kg/Cm2
No. of Jockey Pump 2
Capacity Jockey Pump-1 20 M3/Hr
Capacity Jockey Pump-2 20 M3/Hr
Water reservoir 1200 M3 (two parts, 600 each)
Source of water Ground water
Hydrant Points (Single headed) 193 NOS.
Monitors (Manual) 24 NOS.
Monitor (Remote Control) 08 NOS.
Ozzie Oscillator 1 NO.
Hose Pipe –15 meter length 309
Hose Box 169
Nozzles 85 Nos.
7.2.5.6.4 Foam Flooding System
Foam flooding system has been provided in Methanol Tank & HSD tank. The Foam pourers are
connected with the Fire hydrant system. In case of tank fire individual valve of the foam flooding
system is to be opened manually & thru ventury action foam will be poured in the tanks.
No. of Foam Pourer system: 04 nos. : 2 each in Methanol & HSD tanks.
Details of Water Sprinkler systems : Medium velocity spray systems ( MVSS) have been provided in
following areas:
• Methanol tank Farm ( Both Methanol Tanks)- FCB
• Hydrogen Unloading area- TO Plant- FCB
• Flammable Chemical storage shed - SCB
• HFC main tank farm area- FCB
• P2 Plant Mezzanine Floor- SCB
Water curtain systems have been provided in following areas:
• Chlorine Bullet area- CMS Plant- FCB
• HF Main Storage tanks area- HF Plant- FCB
• NH3 Cylinders storage area- SCB
Proposed expansion of Multi-Purpose Plant/Fluorospeciality Plant (3000 TPA to 6000 TPA); Installation of new generation Refrigerants & Refrigerant
Blends Plant (90,000 TPA) and Change in Product Mix of Chloromethanes and HFC134a At Village & P.O.-Jhiwana, Tehsil-Tijara, District-Alwar (Rajasthan)
Final EIA / EMP Report
M/s. SRF Limited 41 J. M. EnviroNet Pvt. Ltd.
• P6/P9 MTF area- SCB
• NH3 Cylinders unloading area at P6 Plant- SCB
• Compressors area at HFC Utility- FCB
7.2.5.6.5 First Aid Fire Fighting System
First Aid Fire Extinguishers have been provided all across the Plants & departments. Fire
extinguishers selection has been made according to class of fire in the area. Capacity and Quantity
of Fire extinguishers have been decided according to floor area.
Following is summary of Fire extinguishers available at the site.
TABLE 7.8
Type & Nos of Extinguishers
S. No. Type of Extinguisher Nos. available
1 CO2,4.5 KG 150
2 DCP trolley 25 KG 7
3 DCP,5 KG 290
4 DCP,10 KG 7
5 MECH.FOAM,9 LTRS 21
6 MECH.FOAM,50 LTRS 15
7 ABC,5 KG 130
8 ABC,2 Kg 2
9 CO2,9.0 Kg 11
Total 633
Mobile type Mech. Foam Trolley (200 Lts capacity): 4 Nos. (Two at P6/p9 plant, one each at P3 Plant
and HFC HOG area)
Foam Making Branch: 5 Nos (one each at ECC1, ECC2, Ehs Dept, Pilot Plant & P2 Control Room)
Sand Bucket
Total 104 nos. sand Buckets are available in different plants and storage areas.
7.2.5.7 Control & Mitigation Measures
SCENARIO 1: AHF/ HCl/ H2SO4 Storage Tank failure
Control Measures:-
� Dyke wall provided
� Full Chemicals suit & SCBA provided in the Control Room
� Both RG and HF plants have suction pipe/hose networks connected to CAS to tackle any
eventuality.
Proposed expansion of Multi-Purpose Plant/Fluorospeciality Plant (3000 TPA to 6000 TPA); Installation of new generation Refrigerants & Refrigerant
Blends Plant (90,000 TPA) and Change in Product Mix of Chloromethanes and HFC134a At Village & P.O.-Jhiwana, Tehsil-Tijara, District-Alwar (Rajasthan)
Final EIA / EMP Report
M/s. SRF Limited 42 J. M. EnviroNet Pvt. Ltd.
Mitigation Measures
S. No. Activity Responsibility
1 Inspect the area, assess the leak & inform to Technical controller & Control room.
JE Operations
2 Technical controller visit the site & assess whether to declare On Site Emergency or not.
Technical Controller/ JE Operations
3 Start Fire pump. Security Utility staff
4 For HF storage tanks start the water sprinkler system JE Operations
5 Ensure that Dyke valve is in close position. JE Operations
6 Wear the Full suit & SCBA. JE Operations
7 Remove all non essential persons. Tech. Coordinator
8 Remove all vehicles in the area. Tech Coord./ JE Operations
9 Instruct emergency combating team to Stay in upwind direction. Tech Coord.
10 Spray firewater from hoses over the fumes to control and contain acid fumes from spreading. Water should not be sprayed directly over liquid
pool.
Security staff/ Operation JE
11 Transfer acid to the stand by empty tank by transfer pumps to the extent
possible. Also, fill acid tankers, if available, by loading pumps.
JE Operations
12 Transfer the spilled acid collected in the dyke pit back to the stand by tank, or to ETP for neutralization.
JE Operations
13 Neutralize the residual acid in dyke, if any, with lime powder. Wash the slurry with water to dyke pit and pump to ETP.
JE Operations
14 For situation beyond control, shut down the plant & evacuate the area. Technical Coordinator
SCENARIO 2: AHF/ HCl/ H2SO4 pipe line failure
Control Measures:-
� Dyke wall provided
� Full Chemicals suit & SCBA provided in the Control Room
� Both RG and HF plants have suction pipe/hose networks connected to CAS to tackle any
eventuality.
Mitigation Measures
S. No. Activity Responsibility
1 Inspect the area, assess the leak & inform to Technical controller & Control room.
JE Operations
2 Technical controller visits the site & assesses whether to declare On Site Emergency or not.
Technical Controller/ JE Operations
3 Wear the Full suit & SCBA. JE Operations
4 Isolate the upstream & down stream valves. JE Operations
5 If leak is within the dyke ensure that dyke valve is closed. JE Operations
6 If leak is outside the dyke wall, cordon off the area & make dyke of lime/ sand to stop spreading of the acid.
JE Operations
7 For small and controllable leakages, put suction hose at the point of leakage so as to send acid fumes to Central Absorption System in RG/HF plant.
JE Operations
8 Repair or plug the leakage with wooden/ metallic wedge wearing full chemical JE / Tech. Mechanical
Proposed expansion of Multi-Purpose Plant/Fluorospeciality Plant (3000 TPA to 6000 TPA); Installation of new generation Refrigerants & Refrigerant
Blends Plant (90,000 TPA) and Change in Product Mix of Chloromethanes and HFC134a At Village & P.O.-Jhiwana, Tehsil-Tijara, District-Alwar (Rajasthan)
Final EIA / EMP Report
M/s. SRF Limited 43 J. M. EnviroNet Pvt. Ltd.
suit with SCBA.
9 Transfer the spilled acid collected in the dyke pit back to the standby tank, or
to ETP for neutralization
JE Operations
10 Neutralize the residual acid in dyke, if any, with lime powder. Wash the slurry
with water to dyke pit and pump to ETP.
JE Operations
SCENARIO 3: Chlorine Tonner valve/ body leak
Control Measures:-
� 12 nos. Chlorine leak detector installed at Tonner unloading, Bullets & CMS plant ISBL area.
� Dyke available in Tonner handling & bullet area
� Chlorine emergency tonner handling kit provided
� Suction cover for Tonner hood provided.
� 2 nos. SCBA set kept at tonner unloading area.
� Suction pipe provided & connected with Hypo system
Mitigation Measures
S. No. Activity Responsibility
1. Inspect the area, assess the leak & inform to Technical controller & Control room.
Cl2 area operator
2. Technical controller visit the site & assess whether to declare On Site Emergency or not.
Technical Controller/ JE Operations
3. Wear SCBA set. Cl2 area operator
4. Identify the leaky tonner. Cl2 area operator
5. Roll the tonner to keep the leaky point at higher position. Cl2 area operator
6. Take the help of other person came from control room. Process JE
7. If leak is minute try to put chlorine kit. JE/ Cl2 area operator
8. Is leak stops after putting the Chlorine kit check the area with ammonia bottle.
Cl2 area operator
9. Evacuate the non essential persons from the area. Technical Coordinator/ Process JE
10. If leak is heavy, put the hood over Tonner. JE/ Cl2 area operator
11. Connect the hood with suction system. JE/ Cl2 area operator
12. Scrub all chlorine venting in hypo system. JE/ Cl2 area operator
13. Check the Chlorine concentration in the surrounding area. JE/Environment officer
14. If liquid Chlorine spilled on the floor, neutralize the same with Caustic solution/ lime.
JE/ Cl2 area operator
SCENARIO 4: Chlorine Tonner unloading tube leak
Control Measures
� 12 nos. Chlorine leak detector installed at Tonner unloading, Bullets & CMS plant ISBL area.
� Dyke available in Tonner handling & bullet area.
� Chlorine emergency tonner handling kit provided.
� Suction cover for Tonner hood provided.
� 2 nos. SCBA set kept at tonner unloading area.
� Suction pipe provided & connected with Hypo system.
Proposed expansion of Multi-Purpose Plant/Fluorospeciality Plant (3000 TPA to 6000 TPA); Installation of new generation Refrigerants & Refrigerant
Blends Plant (90,000 TPA) and Change in Product Mix of Chloromethanes and HFC134a At Village & P.O.-Jhiwana, Tehsil-Tijara, District-Alwar (Rajasthan)
Final EIA / EMP Report
M/s. SRF Limited 44 J. M. EnviroNet Pvt. Ltd.
Mitigation Measures
S. No. Activity Responsibility
1. Inspect the area, assess the leak & inform to Technical controller & Control room.
CL2 area operator
2. Technical controller visits the site & assess whether to declare On Site Emergency or not.
Technical Controller/ JE Operations
3. Identify the leaky tonner. CL2 area operator
4. Roll the tonner to keep the leaky point at higher position. CL2 area operator
5. Take the help of other person came from control room. Process JE
6. Isolate the unloading valve. JE/ CL2 area operator
7. Evacuate the non essential persons from the area. Technical Coordinator/ JE
8. Close the tonner valve. JE/ CL2 area operator
9. Connect the system with hypo system. JE/ CL2 area operator
10. Check the area with ammonia bottle. JE/ CL2 area operator
11. If leak is heavy, put the hood over Tonner. JE/ CL2 area operator
12. Connect the hood with suction system. JE/ CL2 area operator
13. Scrub all chlorine in hypo system. JE/ CL2 area operator
14. Check the Chlorine concentration in the surrounding area JE/ Environment officer
15. If liquid Chlorine spilled on the floor, neutralize the same with Caustic solution/ lime
JE/ CL2 area operator
SCENARIO 5: Chlorine Bullet leak
CONTROL MEASURES:
� 12 nos. Chlorine leak detector installed at Tonner unloading, Bullets & CMS plant ISBL area.
� Dyke available in Tonner handling & bullet area.
� Suction cover for Tonner hood provided.
� 2 nos. SCBA set kept at tonner unloading area.
� Suction pipe provided & connected with Hypo system
� Water curtain around Chlorine storage area
� One spare Tank always kept empty for emergency transferring.
� Rupture disc & safety valve
� Temperature indicator & alarm in chlorine unloading line
� Pressure indication & alarm in Tank downstream system
� Air breathing line provided.
Proposed expansion of Multi-Purpose Plant/Fluorospeciality Plant (3000 TPA to 6000 TPA); Installation of new generation Refrigerants & Refrigerant
Blends Plant (90,000 TPA) and Change in Product Mix of Chloromethanes and HFC134a At Village & P.O.-Jhiwana, Tehsil-Tijara, District-Alwar (Rajasthan)
Final EIA / EMP Report
M/s. SRF Limited 45 J. M. EnviroNet Pvt. Ltd.
Mitigation Measures
S. No. Activity Responsibility
1. Inspect the area, assess the leak & inform to Technical controller & Control room.
Cl2 area operator
2. Technical controller visits the site & assess whether to declare On Site Emergency or not.
Technical Controller/ JE Operations
3. Start Fire pump. Security staff
4. Wear SCBA set. Cl2 area operator
5. Start water sprinkler system Cl2 area operator
6. Evacuate the area. Technical Coordinator/ JE
7. Take the help of other person came from control room. Process JE
8. Put he suction hood & connect the same with hypo system and start transferring the chlorine into empty tank.
Cl2 area operator
9. Restrict the area for non essential persons Tech. Coordinator
10. Use Air line / Trolley mounted breathing system JE Operations
11. Check the Chlorine concentration in the surrounding area JE/ Environment officer
12. Recover chlorine accumulated inside the dyke wall JE Operations/ Cl2 area operator
SCENARIO 6: Photo chlorination Reactor leak
Control Measures
� Methyl chloride & Chlorine leak detector installed all around the reactor to detect ppm of
leak.
� 2 nos. SCBA set kept in CMS control room.
� Reaction stoppage on high pressure of the Reactor.
� Reaction stoppage on high level of the reactor.
� Reaction stoppage on high temperature of the reactor.
� Reaction stoppage on high pressure of the Methyl chloride & Chlorine feed line.
� Reactor dump tank is available to dump the reactor. (Emergency dumping sequence in place)
� Two sets of Rupture disc & Safety valve, to take care of over pressurization, is available on
the Reactor.
� Individual three level of leak alarm is available on all 14 UV lamps. Auto tripping of individual
UV lamp & whole plant on 2nd & 3rd leak alarm respectively.
Proposed expansion of Multi-Purpose Plant/Fluorospeciality Plant (3000 TPA to 6000 TPA); Installation of new generation Refrigerants & Refrigerant
Blends Plant (90,000 TPA) and Change in Product Mix of Chloromethanes and HFC134a At Village & P.O.-Jhiwana, Tehsil-Tijara, District-Alwar (Rajasthan)
Final EIA / EMP Report
M/s. SRF Limited 46 J. M. EnviroNet Pvt. Ltd.
Mitigation Measures
S. No. Activity Responsibility
1. Inspect the area, assess the leak & inform to Technical controller & Control room.
Operation JE
2. Technical controllers visit the site & assess whether to declare On Site Emergency or not.
Technical Controller/ JE Operations
3. Start Fire pump. Security staff
4. Shut off UV lamps & dump the Reactor into dump tank. Control room JE
5. Complete the dumping sequence till reactor pressure is Zero. Control room & Field JE
6. Start water spray from water monitors & fire water hose to absorb the vapors in the environment. Don't spray water directly on the
Reactor.
Security staff/ Operation JE
7. Evacuate the area. Technical coordinator
SCENARIO 7: Hydro Chlorination Reactor leak
Control Measures
� Methyl chloride leak detector installed all around the reactor to detect ppm of leak.
� 2 nos. SCBA set kept in CMS control room.
� Reaction stoppage on high pressure of the Reactor.
� Reaction stoppage on high pressure of the Methanol line.
� Reactor dump tank is available to dump the reactor. (Emergency dumping sequence in place)
� Rupture disc & Safety valve, to take care of over pressurization, is available on the Reactor.
Mitigation Measures
S.
No.
Activity Responsibility
1. Inspect the area, assess the leak & inform to Technical controller & Control room.
Operation JE
2. Technical controller visit the site & assess whether to declare On Site Emergency or not.
Technical Controller/ JE Operations
3. Start Fire pump. Security staff
4. Stop the plant & de-gass the reactor into dump tank & to HCl
scrubber to Zero pressure.
Operation JE
5. Start reactor cooling & when temperature is < 90oC, dump the reactor into dump tank using transferring pump.
Operation JE
4. Ensure spillage, if any, in ISBL only. Operation JE
5. Start water spray from water monitors & fire water hose to absorb the vapors in the environment. Don't spray water directly
on the Reactor.
Security staff/ Operation JE
6. Evacuate the area. Technical coordinator
Proposed expansion of Multi-Purpose Plant/Fluorospeciality Plant (3000 TPA to 6000 TPA); Installation of new generation Refrigerants & Refrigerant
Blends Plant (90,000 TPA) and Change in Product Mix of Chloromethanes and HFC134a At Village & P.O.-Jhiwana, Tehsil-Tijara, District-Alwar (Rajasthan)
Final EIA / EMP Report
M/s. SRF Limited 47 J. M. EnviroNet Pvt. Ltd.
SCENARIO 8: Fire in Methyl Chloride storage Tank
Control Measures
� 12 nos. Methyl chloride leak detector installed in CMS plant area.
� Reaction stoppage on high pressure of the storage tanks.
� Reaction stoppage on high level of the storage tanks.
� Two sets of Rupture disc & Safety valve, to take care of over pressurization, is available on
each tank.
� Rupture disc vent connected with Faraday Cage for safe discharge.
� Dyke wall available.
Mitigation Measures
S. No. Activity Responsibility
1 Inspect the area, assess the magnitude of fire & inform to Technical controller & Control room.
Operation JE
2 Use portable fire extinguisher to put off the fire immediately. Technical
Coordinator to be informed & declare On Site emergency.
Technical Controller/ JE
Operations
3 Isolate the storage tank from all other processes. Technical Controller/ JE
Operations
4 Start Fire pump. Security staff
5 Start the water spray to extinguish the fire. Security Guard/ Fire staff
6 Evacuate the area. Tech Coordinator
7 Cool the adjacent area by spraying water. Security staff
SCENARIO 9: Fire in Methanol storage tank
Control Measures
� Dyke wall available.
� Medium Velocity water spray system installed around Methanol tanks.
� Breather vent with flame arrestor provided in Methanol tanks.
� Overflow line provided. In Methanol tanks overflow line with water seal provided.
� Foam pouring system provided.
Mitigation Measures
S. No. Activity Responsibility
1 Inform Control Room. Field Operator/ Field JE
2 Technical Coordinator to be informed & declare On Site emergency. Control room JE
3 Start Fire pump. Security staff
4 Ensure that Medium Velocity spray system has been operated
automatically, if not then start manually.
Field JE
5 Open valve of foam pourer & start foam pouring. Field JE
6 Start water spray from water monitors & fire water hose. Security staff
7 Also keep the adjacent tank cool by water spray over these. Security staff
8 If fire is still uncontrolled call the external help & ask them to bring
foam tender/ extra amount of foam.
Technical Coordinator
9 Evacuate the area. Technical coordinator
Proposed expansion of Multi-Purpose Plant/Fluorospeciality Plant (3000 TPA to 6000 TPA); Installation of new generation Refrigerants & Refrigerant
Blends Plant (90,000 TPA) and Change in Product Mix of Chloromethanes and HFC134a At Village & P.O.-Jhiwana, Tehsil-Tijara, District-Alwar (Rajasthan)
Final EIA / EMP Report
M/s. SRF Limited 48 J. M. EnviroNet Pvt. Ltd.
SCENARIO 10: Fire in HSD/ LSHS storage tank
Control Measures
� Dyke wall available.
� Overflow line provided. In Methanol tanks overflow line with water seal provided
� Foam pouring system provided in one HSD tank
Mitigation Measures
S. No. Activity Responsibility
1 Inform HOD Utility & Technical Coordinator & Security Field Operator/ Utility JE
2 Technical Coordinator assess the emergency & declare On Site
emergency.
CMS Control room JE
Inform CMS control room to sound the emergency hooter Technical Coordinator
3 Start Fire pump. Security staff
4 Ensure that Medium Velocity spray system has been operated
automatically, if not then start manually.
Utility JE/ Technician
5 Open valve of foam pourer & start foam pouring in HSD tanks Utility JE
6 Start water spray from water monitors & fire water hose. Security staff
7 Also keep the adjacent tank cool by water spray over these. Security staff
8 If fire is still uncontrolled call the external help & ask them to bring
foam tender/ extra amount of foam.
Technical Coordinator
9 Evacuate the area. Technical coordinator
SCENARIO 11: Fire in Methanol tanker during Unloading
Control Measures
� Earthing of tankers as soon as tanker reach the destination to dissipate static charge.
Mitigation Measures
S. No. Activity Responsibility
1 If fire is small immediately put off the fire with the help of Foam/
ABC/DCP/CO2 fire extinguisher. Inform Control Room.
Field Operator
2 Technical Coordinator to be informed & declare On Site emergency. Control room JE
4 Start Fire pump. Security staff
5 Ensure that Medium Velocity spray system has been operated automatically, if not then start manually.
JE
6 If possible isolate the downstream system. JE/ Field operator
7 Spray water from Monitors & fire hoses to keep tanker cool. Security staff
8 Pour foam over the fire. Security staff
9 Evacuate the area. Technical coordinator
10 Spray water on other tank in the vicinity to keep these cool. Security staff/ fire fighting
staff
SCENARIO 12: CMS Storage Tank failure
Control Measures
� Dyke wall provided
� Full Chemicals suit & SCBA provided in the Control Room
� Wind Sock provided to know the wind direction.
Proposed expansion of Multi-Purpose Plant/Fluorospeciality Plant (3000 TPA to 6000 TPA); Installation of new generation Refrigerants & Refrigerant
Blends Plant (90,000 TPA) and Change in Product Mix of Chloromethanes and HFC134a At Village & P.O.-Jhiwana, Tehsil-Tijara, District-Alwar (Rajasthan)
Final EIA / EMP Report
M/s. SRF Limited 49 J. M. EnviroNet Pvt. Ltd.
Mitigation Measures
S. No. Activity Responsibility
1 Inspect the area, assess the leak & inform to Technical controller & Control room.
Filling operator
2 Technical controller visit the site & assess whether to declare On Site Emergency or not.
Technical Controller/ JE Operations
3 Start Fire pump. Security staff
4 Ensure that Dyke valve is in close position. JE Operations
5 Wear the Full suit & SCBA. JE Operations
6 Remove all non essential persons. Tech. Coordinator
7 Remove all vehicles in the area. Tech Coord./ JE Operations
8 Instruct emergency combating team to Stay in upwind direction. Tech Coord.
9 Spray firewater from hoses over the vapors to knock down the
same.
Security staff/ Operation JE
10 Transfer CMS to the empty tank by transfer pumps to the extent possible. Also, fill CMS tankers, if available, by loading pumps.
JE Operations
11 Absorb the remaining CMS in sand or saw dust & wash the area with water.
JE Operations
SCENARIO 13: Fire in Coal/Husk storage
Control Measures
� Fire hydrant system with monitors provided around Coal storage.
� Area remained manned round the clock
� Trained fire fighting team is available.
Mitigation Measures
S. No. Activity Responsibility
1 Inform Operationofficer/ Technical Coordinator & Security Field Operator/ JE
2 Technical Coordinator assess the emergency & declare On Site
emergency.Simultaneoulsy following mitigation activities shall be started immediately.
Tech Coordinator
3 Inform Main Gate Security Incharge to sound the emergency hooter Technical
Coordinator
4 Start Fire pump. Security staff
5 Ask operation officer to get ready for plant stoppage Technical coordinator
6 Start water spray from water monitors & fire water hose. Emergency Team
7 Flood the water over fire zone Emergency team
8 If fire is still uncontrolled call the external help & ask them to bring fire tender/
extra amount water
Emergency Team
9 If required Evacuate the area. Technical
Coordinator
Proposed expansion of Multi-Purpose Plant/Fluorospeciality Plant (3000 TPA to 6000 TPA); Installation of new generation Refrigerants & Refrigerant
Blends Plant (90,000 TPA) and Change in Product Mix of Chloromethanes and HFC134a At Village & P.O.-Jhiwana, Tehsil-Tijara, District-Alwar (Rajasthan)
Final EIA / EMP Report
M/s. SRF Limited 50 J. M. EnviroNet Pvt. Ltd.
SCENARIO 14: Fire in Hydrogen Trolla
Control Measures
� Fire Hydrant System provided.
� CCTV for monitoring.
� Physical monitoring
Mitigation Measures
S. No. Activity Responsibility
1 Inform Operationofficer/ Technical Coordinator & Security Field Operator/ JE
2 Technical Coordinator assess the emergency & declare On Site
emergency.Simultaneoulsy following mitigation activities shall be started immediately.
Tech Coordinator
3 Inform RG-HF Control to sound the emergency hooter Technical Coordinator
4 Start Fire pump. Security staff
5 Arrange for removal of 2nd Trolla (if any), away from the hydrogen shed Technical coordinator
6 Ask operation officer to stop the plant Technical coordinator
7 Start water spray from water monitors & fire water hose. Emergency Team
8 Cordonn off the area to stop the entry Emergency team
9 If fire is still uncontrolled call the external help & ask them to bring fire tender/
extra amount water
Emergency Team
10 If required Evacuate the area. Technical
Coordinator
11 If situation gets under controll askControl Room to blow the All clear Siren. Technical
Coordinator
SCENARIO 15: Fire in Methanol, Toluene or Fluorobenzene storage tank
Control Measures
� Breather vent with flame arrestor provided in al flammable material tanks.
� Fire Extinguishers installed.
� Fire hydrant system installed around the plant.
� Flame sensor provided.
Mitigation Measures
S. No. Activity Responsibility
1 Inform Control Room. Field Operator/ Field JE
2 Technical Coordinator to be informed & declare On Site emergency. Control room JE
3 If fire is small use portable fire extinguishersb to extinguish the fire. Field Operator/ Field JE
4 Start Fire pump. Security staff
5 Start water spray from water monitors & fire water hose. Security staff
6 Also keep the adjacent tank cool by water spray over these. Security staff/JEs
7 If fire is still uncontrolled call the external help & ask them to bring foam
tender/ extra amount of foam.
Technical Coordinator
8 Evacuate the area. Technical coordinator
Proposed expansion of Multi-Purpose Plant/Fluorospeciality Plant (3000 TPA to 6000 TPA); Installation of new generation Refrigerants & Refrigerant
Blends Plant (90,000 TPA) and Change in Product Mix of Chloromethanes and HFC134a At Village & P.O.-Jhiwana, Tehsil-Tijara, District-Alwar (Rajasthan)
Final EIA / EMP Report
M/s. SRF Limited 51 J. M. EnviroNet Pvt. Ltd.
SCENARIO 16: Br2 vessel failure
Control Measures
� Operation is under vacuum.
� Br2 sensor installed.
� Cover all chemicals suit & SCBA provided in the Control Room
Mitigation Measures
S. No. Activity Responsibility
1 Inspect the area, assess the leak & inform to Technical controller & Control room.
JE Operations
2 Technical controller visit the site & assess whether to declare On Site Emergency or not.
Technical Controller/ JE Operations
3 Start Fire pump. Security staff
4 Wear all cover suit & SCBA. JE Operations
5 Remove all non essential persons. Tech. Coordinator
6 Instruct emergency combating team to Stay in upwind direction. Tech Coord.
7 Spray firewater from hoses over the fumes to control and contain acid
fumes from spreading. Water should not be sprayed directly over liquid pool.
Security staff/ Operation JE
8 Dump the material into the reactor. JE Operations
9 Neutralize the residual, if any, with Sodium Thio Sulphate solution or lime . Wash the slurry with water to dyke pit and pump to ETP.
JE Operations
10 For situation beyond control, shut down the plant & evacuate the area. Technical Coordinator
SCENARIO 17: TFA Storage Tank failure
Control Measures
� CAS provided
� Fire hydrant around the plant provided.
� Cover all chemicals suit & SCBA provided in the Control Room
Mitigation Measures
S. No. Activity Responsibility
1 Inspect the area, assess the leak & inform to Technical controller &
Control room.
JE Operations
2 Technical controller visit the site & assess whether to declare On
Site Emergency or not.
Technical Controller/ JE
Operations
3 Start Fire pump. Security staff
4 Wear the all cover suit & SCBA. JE Operations
5 Remove all non essential persons. Tech. Coordinator
6 Instruct emergency combating team to Stay in upwind direction. Tech Coord.
7 Spray firewater from hoses over the fumes to control and contain acid fumes from spreading. Water should not be sprayed directly
over liquid pool.
Security staff/ Operation JE
8 Neutralize the residual acid, if any, with lime powder. Wash the slurry with water and pump to ETP.
JE Operations
9 For situation beyond control, shut down the plant & evacuate the area.
Technical Coordinator
Proposed expansion of Multi-Purpose Plant/Fluorospeciality Plant (3000 TPA to 6000 TPA); Installation of new generation Refrigerants & Refrigerant
Blends Plant (90,000 TPA) and Change in Product Mix of Chloromethanes and HFC134a At Village & P.O.-Jhiwana, Tehsil-Tijara, District-Alwar (Rajasthan)
Final EIA / EMP Report
M/s. SRF Limited 52 J. M. EnviroNet Pvt. Ltd.
SCENARIO 18: BN/PFBN leakage from fluorination reactor
Control Measures
� Safety valve provided.
� Emergency release valve provided
� Cover all chemicals suit & SCBA provided in the Control Room
� Fire extinguishers provided on the floors.
� Flame sensor provided.
Mitigation Measures
S. No. Activity Responsibility
1 Inspect the area, assess the leak & inform to Technical controller &
Control room.
JE Operations
2 Technical controller visits the site & assess whether to declare On Site
Emergency or not.
Technical Controller/ JE
Operations
3 Ensure that there is no ignition source is available in the plant area. Technical Controller/ JE Operations
4 Start Fire pump. Security staff
5 Wear the Full suit & SCBA. JE Operations
6 Remove all non essential persons. Tech. Coordinator
7 Instruct emergency combating team to Stay in upwind direction. Tech Coord.
8 Spray firewater from hoses over the fumes to control and contain BN/
PFBN fumes from spreading. Water should not be sprayed directly over leaky point.
Security staff/ Operation
JE
9 For situation beyond control, shut down the plant & evacuate the area. Technical Coordinator
SCENARIO 19: Fire in HOG drain/Dump tanks
Control
� Flame arrester available on the drain tanks.
� AFFF Extinguisher and DCP type extinguishers available.
� Hydrant system With Water monitor available
� Dyke wall available.
Mitigation Measures
S. No. Activity Responsibility
1 Inspect the area, assess the magnitude of fire & inform to Technical co-ordinator & Control room.Simultaneoulsy following mitigation activities shall
be started immediately.
Operation JE
2 Use portable fire extinguisher to put off the fire immediately. Technical
Coordinator to be informed & declare On Site emergency.
Technical Controller/
JE Operations
3 Isolate the storage tank from all other processes. Technical Controller/ JE Operations
4 Start Fire hydrant pump. Security staff / RG Utility
5 Start the water spray to extinguish the fire.Use the Water Monitor nearby to cool adjacent tanks.
Security Guard/ Fire staff
Proposed expansion of Multi-Purpose Plant/Fluorospeciality Plant (3000 TPA to 6000 TPA); Installation of new generation Refrigerants & Refrigerant
Blends Plant (90,000 TPA) and Change in Product Mix of Chloromethanes and HFC134a At Village & P.O.-Jhiwana, Tehsil-Tijara, District-Alwar (Rajasthan)
Final EIA / EMP Report
M/s. SRF Limited 53 J. M. EnviroNet Pvt. Ltd.
6 Use foam monitor to pour the foam on the fire Operation People/ Fire staff
7 Mechanical foam trolley may also be used to pour the foam on fire Operation People/ Fire staff
8 Evacuate the area. Tech Coordinator
9 Cool the adjacent area by spraying water. Security staff
SCENARIO 20: Ammonia leak in compressor area
Control Measures
� 1nos. SCBA set kept at compressor area.
� Water monitor around compressor area.
� Rupture disc & safety valve provided.
� Temperature indicator & alarm in DCS System.
� Pressure indication & alarm in DCS system.
Mitigation Measures
S. No. Activity Responsibility
1 Inspect the area, assess the leak & inform to Technical controller & Control room.
Utility area operator
2 Technical controller visit the site & assess whether to declare On Site Emergency or not. Simultaneoulsy following mitigation activities shall be
started immediately.
Technical Controller/ JE Utility
3 Start Fire hydrant pump. Security staff / RG Utility
4 Wear SCBA set. Utility area operator
5 Start sprinkler system, water Monitor & Hydrant system Utility area operator
6 Isolate the electrical supply & start the Water spray system JE (Utility)
7 Evacuate the area. Technical Controller/ JE Utility
8 Take the help of other person came from control room. Process JE
9 Arrest the leak with the help of Process personel Utility area operator
10 Restrict the area for non essential persons Tech. Coordinator
11 Ensure Use of Air line / SCBA breathing system for the personnel attending the leak.
Technical Controller/ JE Utility
12 Check the Ammonia concentration in the surrounding area JE/ Environment officer
SCENARIO 21: Fire in P61, Ethanol tanker during Unloading
Control Measures
� Earthing of tankers before unloading
� Earthing and bonding of tanks
� Fixed Foam System are provided at MTF
� Mobile foam trolley is available
Proposed expansion of Multi-Purpose Plant/Fluorospeciality Plant (3000 TPA to 6000 TPA); Installation of new generation Refrigerants & Refrigerant
Blends Plant (90,000 TPA) and Change in Product Mix of Chloromethanes and HFC134a At Village & P.O.-Jhiwana, Tehsil-Tijara, District-Alwar (Rajasthan)
Final EIA / EMP Report
M/s. SRF Limited 54 J. M. EnviroNet Pvt. Ltd.
S. No. Activity Responsibility
1 If fire is small immediately put off the fire with the help of Foam/ ABC/DCP/CO2
fire extinguisher. Inform Control Room.
Field Operator
2 Technical Coordinator to be informed & declare On Site emergency. Control room JE
3 Start Fire pump. Security staff
4 If possible isolate the downstream system. JE/ Field operator
5 Spray water from Monitors & fire hoses to keep tanker cool. Security staff
6 Pour foam over the fire. Security staff
7 Evacuate the area. Technical
coordinator
8 Spray water on other tank in the vicinity to keep these cool. Security staff/ fire fighting staff
SCENARIO 22: Fire in Ethanol storage tank
Control Measures
� Earthing of tankers before unloading
� Earthing and bonding of tanks
� Fixed Foam System are provided at MTF
� Mobile foam trolley is available
Mitigation Measures
S. No. Activity Responsibility
1 Inform Control Room. Field Operator/ Field JE
2 Technical Coordinator to be informed & declare On Site emergency. Control room JE
3 If fire is small use portable fire extinguishersb to extinguish the fire. Field Operator/ Field JE
4 Start Fire pump. Security staff
5 Start water spray from water monitors & fire water hose. Security staff
6 Also keep the adjacent tank cool by water spray over these. Security staff/JEs
7 If fire is still uncontrolled call the external help & ask them to bring foam tender/ extra amount of foam.
Technical Coordinator
8 Evacuate the area. Technical coordinator
SCENARIO 23: P8/P9 Storage Tank failure
Control Measures
� Fire Extinguishers installed.
� Fire hydrant system installed around the plant.
� Dyke wall is available
Proposed expansion of Multi-Purpose Plant/Fluorospeciality Plant (3000 TPA to 6000 TPA); Installation of new generation Refrigerants & Refrigerant
Blends Plant (90,000 TPA) and Change in Product Mix of Chloromethanes and HFC134a At Village & P.O.-Jhiwana, Tehsil-Tijara, District-Alwar (Rajasthan)
Final EIA / EMP Report
M/s. SRF Limited 55 J. M. EnviroNet Pvt. Ltd.
Mitigation Measures
S. No. Activity Responsibility
1 Inspect the area, assess the leak & inform to Technical controller & Control room.
JE Operations
2 Technical controller visits the site & assesses whether to declare On Site Emergency or not.
Technical Controller/ JE Operations
3 Start Fire pump. Security staff
4 Wear the all cover suit & SCBA. JE Operations
5 Remove all non essential persons. Tech. Coordinator
6 Instruct emergency combating team to Stay in upwind direction. Tech Coord.
7 Spray firewater from hoses over the fumes to control and contain acid fumes
from spreading. Water should not be sprayed directly over liquid pool.
Security staff/
Operation JE
8 Neutralize the residual acid , if any, with lime powder. Wash the slurry with
water and pump to ETP.
JE Operations
9 For situation beyond control, shut down the plant & evacuate the area. Technical Coordinator
SCENARIO 24 : Ammonia leakage From cylinder
Control Measures
� SCBA set kept at Control Room.
� Water curtain is available
� Water monitor and hydrant point are available
� Emergency Kit is Available
Mitigation Measures
S. No. Activity Responsibility
1 Inspect the area, assess the leak & inform to Technical controller & Control room.
JE Operations
2 Technical controller visits the site & assesses whether to declare On
Site Emergency or not.
Technical Controller/ JE
Operations
3 Start Fire pump. Security staff
4 Wear SCBA set. JE Operations
5 Start water Curtain
6 Arrest the leak with the help of emergency kit JE Operation
7 Isolate the electrical supply & start the Water spray system Tech Coord.
8 Evacuate the area. Technical coordinator
9 Restrict the area for non essential persons Tech. Coordinator
10 Ensure Use of SCBA breathing system for the personnel attending the leak.
Technical Controller
11 Check the Ammonia concentration in the surrounding area JE/ Environment officer
SCENARIO 25: Fire in R&D
Control Measures
� Fire Extinguishers installed.
� Fire hydrant system installed near to R&D centre
� Mobile foam trolley in P6 plant
Proposed expansion of Multi-Purpose Plant/Fluorospeciality Plant (3000 TPA to 6000 TPA); Installation of new generation Refrigerants & Refrigerant
Blends Plant (90,000 TPA) and Change in Product Mix of Chloromethanes and HFC134a At Village & P.O.-Jhiwana, Tehsil-Tijara, District-Alwar (Rajasthan)
Final EIA / EMP Report
M/s. SRF Limited 56 J. M. EnviroNet Pvt. Ltd.
Mitigation Measures
S. No.
Activity Responsibility
1 If fire is small use portable fire extinguishers to
extinguish the fire.
Chemist/operator
2 Inform Technical Coordinator & Security Chemist/Operator.
3 Start Fire pump. Security staff
4 Start water spray/Foam from fire water hose. Security staff /ERT member on instruction of technical cordinator
5 Close the supply of Hydrogen Chemist/Operator
6 Remove all Cylinder from R&D Technical coordinator
7 If required Evacuate the area. Technical coordinator
SCENARIO 26: Fire in Product shed-SCB
Control Measures
� Fire Extinguishers installed.
� Fire hydrant system installed
� Mobile foam trolley in P6 plant
Mitigation Measures
S. No. Activity Responsibility
1 If fire is small use portable fire extinguishers to extinguish the fire. Operator
2 Inform Technical Coordinator & Security JE Process
3 Start Fire pump. Security staff
4 Start water/foam spray from fire water hose. Security staff /ERT member on instruction of
technical coordinator
5 Also keep the adjacent tank cool by water spray over these. Technical coordinator
4 If fire is still uncontrolled call the external help & ask them to bring foam
tender/ extra amount of foam.
Technical coordinator
5 Evacuate the area. Technical coordinator
SCENARIO 27 : Spillage of Br2 due to brakage of bottle-SCB
Control Measures
� SCBA and cover all suit is available
� Lime and Sodium thio sulphate soultion is kept in plant
Proposed expansion of Multi-Purpose Plant/Fluorospeciality Plant (3000 TPA to 6000 TPA); Installation of new generation Refrigerants & Refrigerant
Blends Plant (90,000 TPA) and Change in Product Mix of Chloromethanes and HFC134a At Village & P.O.-Jhiwana, Tehsil-Tijara, District-Alwar (Rajasthan)
Final EIA / EMP Report
M/s. SRF Limited 57 J. M. EnviroNet Pvt. Ltd.
Mitigation Measures
S. No. Activity Responsibility
1 Inspect the area, assess the leak & inform to Technical controller & Control room.
Operator
2 Technical controller visit the site& assess the leak Technical coordinator
3 Wear SCBA and PVC suit JE Process
4 Put lime on the spillage bromine Security staff /ERT member on instruction of technical cordinator
5 Spary the Sodium thio sulphate solution on the Br2 liquid Technical coordinator
6 Evacuate the area. Technical coordinator
SCENARIO 28: Fire in chemical Yard-SCB
Control Measures
� Fire Extinguishers installed.
� Fire hydrant system installed.
� Mobile foam trolley in P6 plant
Mitigation Measures
S. No. Activity Responsibility
1 If fire is small use portable fire extinguishers to extinguish the fire. Operator
2 Inform Technical Coordinator & Security JE Process
3 Start Fire pump. Security staff
4 Start water/foam spray from fire water hose. Security staff /ERT member on instruction of technical cordinator
5 Also keep the adjacent drum cool by water spray over these. Technical coordinator
6 Remove other drums if possible. Technical coordinator
7 If fire is still uncontrolled call the external help & ask them to
bring foam tender/ extra amount of foam.
Technical coordinator
8 Evacuate the area. Technical coordinator
SCENARIO 29: Radiation from nucleonic gauge
Control Measures
� All sources kept in lead boxes.
� Fencing provide around the nucleonic sources
� Warning sign displayed near the all nucleonic sources.
� Periodic radiation checking around the nucleonic sources in ON & OFF condition with
Radiation Survey Meter.
� Trained manpower- BARC certified radiation officer (RSO)
Proposed expansion of Multi-Purpose Plant/Fluorospeciality Plant (3000 TPA to 6000 TPA); Installation of new generation Refrigerants & Refrigerant
Blends Plant (90,000 TPA) and Change in Product Mix of Chloromethanes and HFC134a At Village & P.O.-Jhiwana, Tehsil-Tijara, District-Alwar (Rajasthan)
Final EIA / EMP Report
M/s. SRF Limited 58 J. M. EnviroNet Pvt. Ltd.
Mitigation Measures
S. No. Activity Responsibility
1 If the radiation observed is higher than the specified limit of 2mR/Hr in periphery on 1 meter. The individual source shall be covered in another lead
box.
RSO
2 If the ambient radiation level observed is higher than the 0.25 mSv/h at 100
meter from the facility:
2.1 Declare on site emergency as per procedure defined in SRF genenrnal emergency response plan.
RSO/ Shift in-charge
2.2 SRF site have four assembly points to assemble at safe points during emergency. The same assemble points will be used in case of ambient radiation
from the nucleonic sources used in SRF site, Bhiwadi.
All employees & contract workers
2.2 Inform BARC official for further course of action and guidance. Admn Co-ordinator
(HOW) / RSO
3 In the event that a site emergency situation deteriorates into off site emergency:
3.1 Inform to local as well as district emergency authorities Admn Co-ordinator (HOW) / RSO
3.2 Evacuate the area. Chief / admn Co-ordinator
3.3 Inform BARC official for further course of action and guidance. Admn Co-ordinator
(HOW) / RSO
7.2.5.8 Mock Drill for Emergency
� Head (EHS) fixes-up the date and area of Mock Drill in consultation with Head (TS & EHS) and
Head of Works on the day of the Mock Drill. The time of drill may or may not be fixed before
hand in order to check the emergency preparedness of the plant.
� The Mock Drill for chemical leakage and fire is carried out at least quarterly as per the Onsite
Emergency / Disaster Control plan.
� Head (EHS) deputes observers chosen from Plants & EHS deptt. to observe the activities at
the site of Mock incident, ECC & Incident Control Room and note down the violations
occuring during the exercise.
� After finishing the Mock drill a meeting is being held with Head of Works to share the
findings & area of improvement. The meeting is attended by observers and all other
responsible person involved in the drill.
� Head (EHS) prepares Mock Drill report as per Format 4.4.7_F-02 stating the sequence of
events with timings, the deviations /violations, the reasons, necessary actions for compliance
with /improvement upon the Plan, Process Heads responsible.
� Head (EHS) circulates the Mock Drill Report copy to Head of Works & all Process Heads
responsible for Mock Drill Plan compliance within three working days.
� Head (EHS) monitors and presents the status of improvement actions, based on last Mock
Drill, in the next statutory safety committee meeting. The actions to be taken further are
recorded in statutory safety committee MOM.
Proposed expansion of Multi-Purpose Plant/Fluorospeciality Plant (3000 TPA to 6000 TPA); Installation of new generation Refrigerants & Refrigerant
Blends Plant (90,000 TPA) and Change in Product Mix of Chloromethanes and HFC134a At Village & P.O.-Jhiwana, Tehsil-Tijara, District-Alwar (Rajasthan)
Final EIA / EMP Report
M/s. SRF Limited 59 J. M. EnviroNet Pvt. Ltd.
� Onsite Emergency Plan is updated, if necessary, based on the findings of Mock Drill.
Updation of On-site Emergency Plan is authorised by CEO with adequate justifications.
� After updation, all the employees, especially the key persons as per On-site Emergency Plan,
are informed and/or trained suitably, if required, before the next Mock Drill.
7.2.5.8.1 Priority list of Scenario for conducting Mock Drill
S. No. Scenario Frequency
1 Chlorine Leak from Tonner valve/ body leak Tonner unloading tube leak Once in a Year
2 HF Leakage Tank Failure Pipeline Failure Once in a Year
3 HCL/Sulphuric/Oleum Leakage Tank Failure Pipeline Failure Once In a Year
4 Fire In Methanol Tank/ Ethanol Tank C1 Storage Tank HSD/LSHS Tank
Hydrogen Trolla Coal Yard /Husk Yard HOG
Once in a year
7.2.5.8.2 Procedure of Mock Drill
Responsibiliity of Conducting Mock Drill EHS
Information to be given Surprise drill, to be only pre-intimated to HOW & AVP ( EHS) &
Concerned Plant Head
Observers Observers are to selected from EHS team & other Plant officers.
Roll Call To be taken by Administration & communicated to EHS
Post critique meeting Post critique meeting to be conducted involving HOW, observers, & all concerned officers involved in Emergency mock drill)
Minutes of Meeting To be drafted & circulated by EHS
Follow up of corrective actions for deviations emerged during Mock Drill
Once in a 15 days by EHS
7.2.5.9 Chlorine Emergency Kit
Chlorine kits are available in Chlorine area, RG plant, Cooling Tower RG/HF, FSP ( P3) Chlorine Feed
Area & CPP cooling Tower area.
A Chlorine kit consists of following items:
TABLE 7.9
Details of Chlorine Kit
S. No. Item Quantity
1 Big Hood with VENT valve 1
2 Rubber Gasket(OD155mm-ID 90 mm ) 3
3 Tie Rod Assembly 1
Tie Rods 2
Tie Rods Washers 8
Tie Rod Pipe Pieces 4
Angle 2
Stud with Welded Handle 1
4 Small Hood 1
5 Yoke 1
Proposed expansion of Multi-Purpose Plant/Fluorospeciality Plant (3000 TPA to 6000 TPA); Installation of new generation Refrigerants & Refrigerant
Blends Plant (90,000 TPA) and Change in Product Mix of Chloromethanes and HFC134a At Village & P.O.-Jhiwana, Tehsil-Tijara, District-Alwar (Rajasthan)
Final EIA / EMP Report
M/s. SRF Limited 60 J. M. EnviroNet Pvt. Ltd.
6 Studs 1
7 Rubber Gasket(OD115mm-ID 60 mm) 3
8 Blind fiber Gasket (1" O ) 3
9 Fiber Gasket (!.25" OD - 0.75 ID ) 3
10 Cap Nut 1
11 Steel Patch Plate 1
12 Rubber Gasket (80 mm square) 2
13 Round Yoke Plate 1
14 Cap Screw 1
15 Chain (96"long) 2
16 Drift Pins (In Two Sizes) 2
17 Hammer 1
18 Valve Cap 1
19 Yoke Clamp 1
20 Flexible Copper Tubing 1
21 Teflon Tape 1
22 Ammonia Torch 1
23 Ammonia Solution Bottle 1
24 Valve Spindle (10 mm Square) 1
25 Spanner-30 # 32 mm 1
26 Spanner-3/4" # 5/8" 1
27 Blind fiber Gasket (20 mm O ) 3
7.2.5.10 Evacutation Procedure
"The Maximum credible loss scenario in Chemicals Business is rupture of Chlorine Tonner. As per
QRA result in case of catstrophic rupture of Chlorine Tonner 3273 square meter area will get
affected in IDLH range within 87.52 Seconds. The Chlorine will travel in specific direction depending
upon the wind direction. Looking into size of the site i.e. approx 84 acres, still lot of open area
remains unaffected. Follwing action would be required for the evacuation:
After declaring the emergency, Incident controller should arrange for announcement of wind
direction and safer Assembly points. In case of extreme emergency, decision would be taken for
evacuation of plant people, who have assembled at the assembly point, by Chief Co-ordinator. The
assembled person will be required to be evacuated in safer direction within the Plant premises."
"Depending on prevailing wind direction and place of emergency, there is a pedestrian road leading
to outside the factory premises from four gates provided in different directions of the factory,
through which the people would be evacuated to safer locations in nearby villages.
Following procedure will be followed by Security person posted on gate duty for safe evacuation.
As soon as Emergency Hooter is sounded Security person manning the gates should come to the
gate & unlock the same. The gate should be kept in closed condition. This instruction shall be
displayed near the gates.
Proposed expansion of Multi-Purpose Plant/Fluorospeciality Plant (3000 TPA to 6000 TPA); Installation of new generation Refrigerants & Refrigerant
Blends Plant (90,000 TPA) and Change in Product Mix of Chloromethanes and HFC134a At Village & P.O.-Jhiwana, Tehsil-Tijara, District-Alwar (Rajasthan)
Final EIA / EMP Report
M/s. SRF Limited 61 J. M. EnviroNet Pvt. Ltd.
All Security person manning these gates shall be equipped with Walkie-Talkie. In case of evacuation
is needed and any of these require to be opened, instruction shall be given from ECC/ Security main
gate to security person on gate duty to open the gate for evacuation.
The affected people will be evacuated with the help of Ambulance & Jeep available round the clock
within the premises.
"The outside community people shall be communicated using Public address system. For this
purpose a Company Jeep equipped with Public Announcement system will go to nearby villagers
and inform them about the emergency and safe route of evacuation. Security Incharge will be
responsible for this activity. In addition to this help would be taken from local administration for
information & evacuation of the nearby villagers if required.
Administration Coordinator will be responsible for arrangement of the vehicle to evacuate nearby
villagers falling in the wind direction. For this purpose he will take help of Local Administration.
External environment shall be protected by using copius amount of water spray around emergency
area to subside the spreading of the vapors. "
Above evacuation procedure shall be applicable for all three shifts.
7.2.5.11 Medical facility
A 24 hours manned Medical centre is available in the factory to provide First Aid treatment to the
Employees & Contract workers.
A full time Medical Doctor is available on 10 minutes call.
Trained and experienced Medical Male Nurse round the clock.
Other facility available in Medical Centre:-
S. No. ITEM Availability Remarks
1 Rooms 3 nos. Air Conditioned Room
2 Bed 3 Nos. Each bed equipped with oxygen Set
3 Oxygen Set 3 nos.
4 Spare Oxygen Cylinders 1 no.
5 Medicines/ Antidotes As per
requirement
Medicine / Antidote are available for all chemicals.
6 Nebuliser 2 Nos.
7 Stretcher 2 Nos.
8 Ambulance Van 1 No. Ambulance van is equipped with Stretcher,
Oxygen Set & PPE's kit.
Proposed expansion of Multi-Purpose Plant/Fluorospeciality Plant (3000 TPA to 6000 TPA); Installation of new generation Refrigerants & Refrigerant
Blends Plant (90,000 TPA) and Change in Product Mix of Chloromethanes and HFC134a At Village & P.O.-Jhiwana, Tehsil-Tijara, District-Alwar (Rajasthan)
Final EIA / EMP Report
M/s. SRF Limited 62 J. M. EnviroNet Pvt. Ltd.
LIST OF FIRST-AID BOXES INSIDE THE FACTORY:
S. No. Location Item
1 RG/HF Control room BANDAGE, COTTON, SAVALON, BETADINE OINTMENT, SEISER,OINTMENT for external use, BAND AID 2 CMS Control room
3 Chlorine area
4 RG Filling Station
5 Electrical Substation
6 JE (Utility) room
7 Store
8 CPP Control Room
9 HFC-134a Control Room
10 SCB P2 Control Room
11 SCB P6 Control Room
12 SCB P10 Control Room
12 SCB P2 Filling area
13 SCB P6 Filling area
7.2.6 Off Site Emergency
In case of Off-Site Emergency, prime responsibility lies with the local administration for
communication to nearby area, evacuation, providing emergency services like transportation,
rescue team, medical help etc. District Collector/ Additional District Collector becomes Chief
Controller for Off-site emergency
SRF's responsibility in case of Off-site Emergency
SRF will initiate all possible measures to control the emergency within the premises without
affecting the outside area. Despite this if situation arises & emergency becomes off site following
action shall be taken to minimize the damage to outside people & environment.
S.
No.
Item Responsibility Action Remarks
1 Communication to
officials about emergency
Administrative
Coordinator
Administrative coordinator will take
consent of Chief Coordinator to inform about emergency to following '-District Magistrate/ Additional DM/SDM
-SP/DYSP -Factory Inspectorate
-Fire Brigade
-Neighbour Industries
-Sarpanch of nearby villagers
Contact Nos. are
available in External telephone list
2 Communication to nearby community
Administrative Coordinator
Administrative coordinator will ask Fire/Rescue officer to send the jeep
equipped with Public address system for making announcement about emergency
& safe evacuation in nearby villages.
Round the clock Presence of One
jeep is to be ensured.
3 Communication to media/ villagers
about situation of
Administrative Coordinator
Administrative coordinator will interact with media/ villagers to update them
about situation.
Proposed expansion of Multi-Purpose Plant/Fluorospeciality Plant (3000 TPA to 6000 TPA); Installation of new generation Refrigerants & Refrigerant
Blends Plant (90,000 TPA) and Change in Product Mix of Chloromethanes and HFC134a At Village & P.O.-Jhiwana, Tehsil-Tijara, District-Alwar (Rajasthan)
Final EIA / EMP Report
M/s. SRF Limited 63 J. M. EnviroNet Pvt. Ltd.
S. No.
Item Responsibility Action Remarks
emergency
4 Traffic Control Security Officer Security officer will instruct the Security
staff and guard officer on duty to mobilise the vehicle to safer area & keep personal gate free from any obstacle for
evacuation/entry of fire tender etc.
Wind direction is
to be considered to decide the safer entry/ exit
gate.
5 Arrangement of
transportation for evacuation
Administrative
Coordinator
Administrative coordinator will arrange
the transportation for evacuation of person inside the premises & also people residing in the near vicinity. This will be in
addition to assistance provided by local authorities.
6 Medical Help Medical Officer/ Liaison Officer
Medical officer will assist liaison officer to contact the Hospitals & shifting of
injured.
7 Emergency Mitigation
Chief Controller Chief Coordinator will remain in touch with Technical coordinator & safety
Coordinator for early mitigation of the emergency, he will also get in touch with
emergency expert team from Local crisis group/District Crisis group.
List of Emergency crisis group will
be made available after its
formation.
8 Declaration of All
clear
DM/SDM/ Chief
Coordinator
After controlling the emergency Chief
coordinator will take consent from DM/SDM to declare All clear for Offsite
emergency.
9 Comm. About All
clear
Administrative
Coordinator
Administrative coordinator will ask
Security officer to announce all clear in the near vicinity.
7.2.7 Conclusion
It has concluded that there will be no major risk involved due to proposed expansion plant. Proper
precaution will be taken so risk can be minimized. Personal Protective Equipments (PPEs) will help
to minimize the health hazards and accidental casualties. So it is safe to say that there will be no
major risk involved due to the proposed expansion plant.