Communications and datahandling
Session 7
ECRA Workshop on Smart Meters and Smart Grid Strategy
DAY 2: Sunday14th October 2012
-
8/9/2019 7. Communications and Data Handling.pdf
2/23
-
Communications and Data Handling
Data
communicationcenter GPRS
CommunicationNetworkIntranet
PLC
MV/LVSubstation
Concentrator
with modem
G P R S
VPN network
Remote Control Centre
G P R S
G P R S
AMMMDM/R
Legacy billing system
Telecommunication architecture for smart metering system
119/11/2012
-
8/9/2019 7. Communications and Data Handling.pdf
3/23
-
8/9/2019 7. Communications and Data Handling.pdf
4/23
-
Communications and Data Handling
S-FSK- 2 carriers, narrow band- Baudrate: up to
2.4kBaud- Strong against in-band
noise
B-PSK- Multiple modulation- Baudrate: up to
28.8kBaud- Strong immunity against
noise
OFDM- Narrowband multicarrier- Baudrate: up to
128kBaud- Strong immunity against
noise, reducing baudrate
Which type of PLC?
• Communication on Power Lines. Avoids need of dedicated infrastructure forcommunication.
• different frequency bands and modulations.
The modulation techniques have been improved in the last years, towards to mainaspects:1. better rejection to noise on LV network2. Higher baud-rate
Modulation techniques are coded according to international normative.
319/11/2012
-
8/9/2019 7. Communications and Data Handling.pdf
5/23
-
Communications and Data Handling
Interoperability “recipe”:• adopt of a suite of protocols which covers the levels of stack from physical
communication to application level.• choose of a well defined and stable suite of protocols will allow the
interchangeability of meters produced by different Manufacturers.
The choice of a standard for Meter. Interoperability
Different suite of protocols have been created by Associations to create Openstandards.
• … helps the Utility to foster competition among the Manufacturers and tohave always a second choice in case of lack of availability (temporary ordefinitive) of the chosen Supplier.
419/11/2012
-
8/9/2019 7. Communications and Data Handling.pdf
6/23
-
Communications and Data Handling
•An open standard for communication among different equipments is basedon a “suite of protocols”
• Interoperability at meter level cannot be achieved among devices withdifferent suites of protocols, even though the protocols adopted for somelayers are common
Upper layer
(i.e.
DLMS/COSEM)
Lower layer
(i.e. ODFM)
Meter Type A
Power-line
Upper layer
(i.e.
DLMS/COSEM)
Lower layer
(i.e. ODFM)
Meter Type A
Upper layer
(i.e.DLMS/COSEM)
Lower layer
(i.e. S-FSK)
Meter Type B
Upper layer
(i.e.
DLMS/COSEM)
Lower layer
(i.e. S-FSK)
Meter Type B
XAn example:Type B can talk only with type BType A can talk only with type AType A could potentially prevent proper communication for Type B and vice-versa
Interoperability and protocols
519/11/2012
-
8/9/2019 7. Communications and Data Handling.pdf
7/23- 719/11/2012
OPENmeter (European Project. www.openmeter.com):“The result of the project will be a set of draft standards, based on alreadyexisting and accepted standards wherever possible. These standards include theIEC 61334 series PLC standards, the IEC 62056 DLMS/COSEM standards forelectricity metering, the EN 13757 series of standards for utility metering otherthan electricity using M-Bus and other media.”
NOTE: Includes different standards
• ENEL• NETBEHEER NEDERLANDS• KEMA• LANDIS+GYR• RWE
• ST MICROELECTRONICS• UNIVERSITY OF KARLSRUHE• USYSCOM• ZIV MEDIDA• CENELEC
• IBERDROLA DISTRIBUCIÓN• ACTARIS (ITRON),• ADVANCED DIGITAL
DESIGN• CESI RICERCA
• CURRENT TECHNOLOGIESINTERNATIONAL• DLMS USER ASSOCIATION• EDF• ELSTER• ENDESA
–Members:
Communications and Data Handling
Associations and standards on the market
http://www.openmeter.com/http://www.openmeter.com/
-
8/9/2019 7. Communications and Data Handling.pdf
8/23- 819/11/2012
Prime Alliance www.prime-alliance.org (Powerline Related IntelligentMetering Evolution).
“The end objective of PRIME is to establish a complete set of standardson an international level that will permit interoperability amongequipment and systems from different manufacturers.”
–Founders/Members:
• ST MICROELECTRONICS, Texas Instrument,• ZIV, FujutzuCurrent, CIRCUITOR,• ITRON,• LANDIS+GYR,• ADD group,• SAGEMCOM,
• ISKRAEMECO• IBERDROLA DISTRIBUCIÓN, CEZ GROUP, EDP• ORBIS, SAC• APATOR• JANZ
–Association: Prime is a no-profit association.
– Suite of Protocols: OFDM + DLMS/COSEM
Communications and Data Handling
Associations and standards on the market
-
8/9/2019 7. Communications and Data Handling.pdf
9/23- 919/11/2012
IDIS (www.idis-association.com)
“The IDIS association develops, maintains and promotes publicly availabletechnical interoperability specifications, known as ‘IDIS specifications’, based onopen standards and supports their implementation in interoperable products.”
–
Founders/Members:
• Iskraemeco,
• Itron,
• Landis+Gyr
–Association: no profit
–Suite of Protocols: S-FSK + DLMS/COSEM
Communications and Data Handling
Associations and standards on the market
http://www.idis-association.com/http://www.idis-association.com/http://www.idis-association.com/http://www.idis-association.com/
-
8/9/2019 7. Communications and Data Handling.pdf
10/23-
1019/11/2012
G3 (www.g3-plc.com)
“G3-PLC enables the high-speed, highly reliable communications on existing powerlines needed to make the "energy Internet" a reality”
•Founders:
– ERDF
•Members:
– Maxim
• Association: consortium
•Suite of Protocols: OFDM + DLMS/COSEM
•Notes: allow coexistence with S-FSK modulation
Communications and Data Handling
Associations and standards on the market
http://www.g3-plc.com/http://www.g3-plc.com/http://www.g3-plc.com/http://www.g3-plc.com/
-
8/9/2019 7. Communications and Data Handling.pdf
11/23-
1119/11/2012
Meters and more. (www.metersandmore.com)“The main goal of the Association is to provide the industry with a provenopen protocol for smart metering, thus being a tangible answer to theEuropean Commission’s Mandate 441 to achieve standard AMM solutionsacross the continent.”
– Founders:
• Enel Distribuzione SpA
• Endesa Distribución SA – Members:
• Siemens, ST MICROELECTRONICS,
• IBM, CESI,
• Sagemcom,
• AP Systems, Emeter corporation,
• Xi’an swip, coelce (electric company)• AMPLA energia
–Others:
• Bitron,Kaifa
– Association: no profit
–Suite of Protocols: meters and more
Communications and Data Handling
Associations and standards on the market
http://www.metersandmore.com/http://www.metersandmore.com/
-
8/9/2019 7. Communications and Data Handling.pdf
12/23-
Case a) ENEL TELEGESTORE project Italy
• Communication modulation: FSK
• Communication Standard: proprietary
• Number of meters installed in Italy: 32.000.000
• Key results: System completed and working since 2009
Communications and Data Handling
Main outcomes from ongoing projects
1219/11/2012
-
8/9/2019 7. Communications and Data Handling.pdf
13/23-
Case b) ENEL + ENDESA project
• Communication modulation: B-PSK
• Open protocol: “meters and more”
• Number of meters installed in Spain: 2.000.000
• Key information:
• Project completion: 13.000.000 meters
Communications and Data Handling
Main outcomes from ongoing projects
1319/11/2012
-
8/9/2019 7. Communications and Data Handling.pdf
14/23-
Case c) ERDF project
• Communication standard: S-FSK
• Application Standard: DLMS/COSEM
• Number of Manufacturers:
– at least three
• Number of meters installed:
– 300.000 (in pilots)
• Next steps:
– Introduction of Linky G3 after 2013, capable of coexistence with S-FSK.
Tests on interoperability are under development; the three main
Manufacturers are working together in order to assure full
interoperability based upon DLMS/COSEM IDIS).
Communications and Data Handling
Main outcomes from ongoing projects
1419/11/2012
-
8/9/2019 7. Communications and Data Handling.pdf
15/23-
Case d) IBERDROLA project
• Communication modulation: OFDM
• Application Standard: DLMS/COSEM
• Number of Manufacturers:
– Seven (ZIV, Landis&GYR, Sagemcom, Sogecam, Orbis, Elster andG.E.)
• Number of meters installed:
– 100.000 in pilot in Castellón (2010)
– March 2012: contracts for total of $395 ML to seven Companies for7.000.000 meters to be installed in Spain
• Key step:
– Constitution of PRIME project as a non-profit association for diffusion.Tests on interoperability are under development.
Communications and Data Handling
Main outcomes from ongoing projects
1519/11/2012
-
8/9/2019 7. Communications and Data Handling.pdf
16/23
-
The following open standards (or candidate to become) havecurrently the greater diffusion in Europe:
Communications and Data Handling
Associations and standards on the market. Lessons Learnt
Most of the suites have adopted, or are going to apply, a commonstandard application protocol, DLMS.They differentiate for the implementation of the OBIS model used inthe meters, the PLC modulation and, obviously for the intermediatelayers.
1619/11/2012
-
8/9/2019 7. Communications and Data Handling.pdf
17/23
-
1719/11/2012
Source: DLMS UA
Communications and Data Handling
Associations and standards on the market.
Unification of different communication technologies within One consistent
framework
-
8/9/2019 7. Communications and Data Handling.pdf
18/23
-
PLC
GPRS
LAN
RadioFrequency
How tochoose?
Local Bus
Communication• It must be verified when The Communications and Information
Technology Commission (CITC) will assign in KSA the frequencies spectrumfor use of PLC as defined in Europe by CENELEC. In KSA pilot installationusing PLC is on-going.
• In KSA Pilot using Radio frequency, based on liberalized frequencies, is notperforming well, mainly due to interferences.
Communications and Data Handling
KSA Smart meter communication
1819/11/2012
-
8/9/2019 7. Communications and Data Handling.pdf
19/23
-
KSA LV distribution network has the following characteristics:
1. Typical MW-LW transformer range: from 400 to 1500kVA;
2. About 60 PoD (Point of Delivery) are connected to the transformer
3. The LV distribution is almost radial, with capability to connection of lines
from near substation in case of failure.
4. Maximum length of lines from Sub-station to Customer is less than 250m,to avoid voltage drop along the line.
Communications and Data Handling
Use of PLC in KSA
The above characteristics are fully compatible with the PLC communicationand relatively short lines will help the communication between the data
concentrator (installed in the sub-station) and the meters, which are usuallyinstalled on the border of Customer’s property.
Perform an assessment in different zones of the LV network before adoptingthe PLC technology in extended pilot, especially in rural areas
1919/11/2012
-
8/9/2019 7. Communications and Data Handling.pdf
20/23
-
2019/11/2012
• At the moment a real consolidated standard is not present on the market.
• There are four main “lines of development” associations, consortium, projects):
PRIME, IDIS, Meters & more, G3.
• The Manufacturers within each “line of development” are working in order to achieve
full interoperability, at meter level; many tests are still on going.
• The DLMS/COSEM protocol:
– Is widely spread among most of the International and local Manufacturers
– Most of the on-going international meter pilots are based upon DLMS/COSEM.
DLMS/COSEM can guarantee an adequate answer from the market
Communications and Data Handling
KSA. Next considerations for Choice of PLC standards
-
8/9/2019 7. Communications and Data Handling.pdf
21/23
-
2119/11/2012
Flow of information and data handling
Source: e-utile
-
8/9/2019 7. Communications and Data Handling.pdf
22/23
-
2219/11/2012
Flow of information and data handling
The smart meters, dealing with sensible data, raise a range of securitydata privacy and data privacy requirements.
Data security issues:Data security issues:
• Confidentiality of data;• Integrity of the grid in case of
corrupted commands orinformation;
• Attaches of third parties tocontrol the grid;
• Respond to security threats,including acts of terrorism andmanipulation of meter data
Data privacy issues:Data privacy issues:
• Consumers could be sensitive to thesharing of their personal data.
• Load profiles with sufficient samplingperiod could reveal when Customer is
at home, or if his habits of use ofelectricity are changing
Use Telecommunications and financial servicesUse Telecommunications and financial services…
… as good “case studies” for management of data privacy and cyber-security canbe embedded within current systems and processes.
Always have back-up and redundancy of machines with smart meter dataAlways have back-up and redundancy of machines with smart meter data…
…as loosing data provokes inconsistencies, hard to be fixed.
-
8/9/2019 7. Communications and Data Handling.pdf
23/23
19/11/2012
Typical set-up of communication network for Smart meters.
Source: e-utile